CN106877511A - Transmission line of electricity monitoring method and device - Google Patents
Transmission line of electricity monitoring method and device Download PDFInfo
- Publication number
- CN106877511A CN106877511A CN201710259683.6A CN201710259683A CN106877511A CN 106877511 A CN106877511 A CN 106877511A CN 201710259683 A CN201710259683 A CN 201710259683A CN 106877511 A CN106877511 A CN 106877511A
- Authority
- CN
- China
- Prior art keywords
- information
- maintenance
- abnormal
- current
- failure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000005540 biological transmission Effects 0.000 title claims abstract description 89
- 238000000034 method Methods 0.000 title claims abstract description 73
- 230000005611 electricity Effects 0.000 title claims abstract description 71
- 238000012544 monitoring process Methods 0.000 title claims abstract description 43
- 238000012423 maintenance Methods 0.000 claims abstract description 207
- 230000002159 abnormal effect Effects 0.000 claims abstract description 162
- 238000002360 preparation method Methods 0.000 claims abstract description 37
- 230000008439 repair process Effects 0.000 claims abstract description 28
- 230000005856 abnormality Effects 0.000 claims abstract description 10
- 230000001143 conditioned effect Effects 0.000 claims description 28
- 238000013024 troubleshooting Methods 0.000 claims description 25
- 239000004576 sand Substances 0.000 claims description 23
- 238000001514 detection method Methods 0.000 claims description 18
- 230000001960 triggered effect Effects 0.000 claims description 15
- 238000003860 storage Methods 0.000 claims description 11
- 230000007547 defect Effects 0.000 claims description 8
- 230000000694 effects Effects 0.000 claims description 6
- 238000007689 inspection Methods 0.000 claims description 2
- 230000004044 response Effects 0.000 abstract description 8
- 230000006870 function Effects 0.000 description 8
- 230000008569 process Effects 0.000 description 6
- 230000008901 benefit Effects 0.000 description 4
- 230000008859 change Effects 0.000 description 4
- 238000004458 analytical method Methods 0.000 description 3
- 230000004888 barrier function Effects 0.000 description 3
- 230000001133 acceleration Effects 0.000 description 2
- 230000010365 information processing Effects 0.000 description 2
- 230000007257 malfunction Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000007405 data analysis Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000013507 mapping Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012806 monitoring device Methods 0.000 description 1
Classifications
-
- H02J13/0003—
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/08—Locating faults in cables, transmission lines, or networks
- G01R31/081—Locating faults in cables, transmission lines, or networks according to type of conductors
- G01R31/085—Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution lines, e.g. overhead
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00001—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
-
- H02J13/0006—
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Human Computer Interaction (AREA)
- Power Engineering (AREA)
- Alarm Systems (AREA)
Abstract
The invention provides a kind of transmission line of electricity monitoring method and device, the transmission line of electricity method includes being contrasted the collection information that each collecting device sends with each information threshold set in advance, obtains each comparing result;According to the comparing result, if judging, collection information, for abnormal information, sends abnormality alarm to monitor supervision platform;The personal information in historical failure information, abnormal information, personal information storehouse in fault message storehouse, generation mission planning information and maintenance preparation list;It is determined that the presence of corresponding each maintenance terminal of maintenance terminal identification number in maintenance preparation list;Determine target maintenance terminal;Mission planning information is sent to target maintenance terminal;Receive the repair message that target maintenance terminal is returned;According to repair message, fault message storehouse is updated.The present invention is alleviated does not have relatively good monitoring scheme for transmission line of electricity in the prior art, the problem that can not be made a response to electric network fault in time when transmission line of electricity is abnormal.
Description
Technical field
The present invention relates to electric apparatus monitoring technical field, more particularly, to a kind of transmission line of electricity monitoring method and device.
Background technology
With the fast development of power grid construction, power network scale progressively expands, and transmission line of electricity coverage rate is more and more wider, and mostly
Suburb wilderness is operated in, the influences such as bad weather, geographical conditions, operating condition change are frequently subjected to, occurs jeopardizing power network unavoidably
The failure of safe and reliable operation.The abnormal conditions that can in time find to threaten line security are monitored to transmission line of electricity, so as to
Remove the dangerous condition and carry out targetedly repair based on condition of component.
Generally, when being monitored to transmission line of electricity, operating personnel are monitored in control and monitor console to the data for collecting, and pass through
Judge the analysis of data whether transmission line of electricity exception occurs, when data is abnormal, it may be possible to line short occur, break
Road, or line switching changes.Due to can not directly know the concrete condition for going wrong in control and monitor console, being defeated is judged
Electric line specifically which partly goes wrong, it is necessary to which operating personnel in time, accurately inquire about the essential information of transmission line of electricity, prison
Measurement information, and analyze data.However, transmission line of electricity data is various and complexity, by artificial enquiry, it is many to be that service work brings
Inconvenience.
At present, there is no relatively good monitoring scheme for transmission line of electricity, can not be in time to power network when transmission line of electricity is abnormal
Failure is made a response.
The content of the invention
In view of this, it is an object of the invention to provide a kind of transmission line of electricity monitoring method and device, to alleviate existing skill
There is no relatively good monitoring scheme for transmission line of electricity in art, electric network fault can not be made instead in time when transmission line of electricity is abnormal
The problem answered.
In a first aspect, a kind of transmission line of electricity monitoring method is the embodiment of the invention provides, including
The collection information of real-time reception each collecting device transmission, and carry out classification storage;
Each described collection information and each information threshold set in advance are contrasted, each comparing result is obtained;
According to the comparing result, judge whether each collection information is abnormal information;
If so, then sending abnormality alarm to monitor supervision platform, and the abnormal information is carried out into classification store to fault message
Storehouse;
Historical failure information, the abnormal information in the fault message storehouse, generate mission planning information;
According to the personal information in the mission planning information, personal information storehouse, generation maintenance preparation list, the maintenance
Preparation list at least includes maintenance terminal identification number;
According to the maintenance terminal identification number in the maintenance preparation list, determine that the maintenance terminal identification number is corresponding each
The presence of individual maintenance terminal;
According to the presence of each maintenance terminal, target maintenance terminal is determined;
The mission planning information is sent to the target maintenance terminal;
Receive the repair message that the target maintenance terminal is returned;
According to the repair message, the fault message storehouse is updated.
With reference in a first aspect, the embodiment of the invention provides the first possible implementation method of first aspect, wherein, institute
Stating collecting device at least includes location equipment, and methods described also includes:
Obtain the positional information of the location equipment collection;
According to the positional information, by the collection information MAP to digital sand table, and the real-time update in predetermined period
The digital sand table, wherein digital sand table geography information in real time in geographic profile information storehouse is presented monitor area
Geographic pattern, and the collection information in the monitor area is presented by way of illustration;
If the collection information is the abnormal information, the current out-of-the way position in the abnormal information, display
What comes into a driver's picture at each described abnormal information and the current out-of-the way position is to the relevant position of the digital sand table;
According to preset time period, the historical failure information, Frequent Troubles are set in the correspondence position of the digital sand table
Mark, to warn monitoring personnel.
With reference in a first aspect, the embodiment of the invention provides second possible implementation method of first aspect, wherein, institute
Stating abnormal information at least includes current abnormal data, current out-of-the way position, and the historical failure information at least includes historical failure
Position, history abnormal data, historical failure reason, historical failure solution;
Historical failure information, the abnormal information in the fault message storehouse, generation mission planning information include:
According to the current out-of-the way position, judge to whether there is at the current out-of-the way position in the fault message storehouse
Historical failure information;If so, then obtaining the historical failure information at the current out-of-the way position;
According to current abnormal data, judge to whether there is and current abnormal data identical history in the fault message storehouse
Abnormal data;If, it is determined that history abnormal information corresponding with current abnormal data identical history abnormal data is similar
Abnormal information;According to the similar abnormal information, current failure reason and current failure solution are determined;
According to the historical failure information at the current out-of-the way position, the current failure reason, the current failure solution
Certainly scheme, generates the mission planning information.
With reference to second possible implementation method of first aspect, the third of first aspect is the embodiment of the invention provides
Possible implementation method, wherein, the historical failure information also includes troubleshooting people name, troubleshooting people numbering, failure
Treatment people's contact method;The personal information at least includes person number, personnel's name, personnel's sex, on-job state, Ren Yuanlian
It is mode, maintenance range, maintenance terminal identification number;
According to the personal information in the mission planning information, personal information storehouse, generation maintenance preparation list includes:
According to the personal information, the similar abnormal information, the troubleshooting people in the similar abnormal information is judged
Whether on-job number corresponding maintenance personal;
If so, the then maintenance range in the current out-of-the way position, the personal information, judges the current exception
Position whether be the maintenance personal maintenance range;
If so, determining the corresponding maintenance terminal identification number of the maintenance personal;
According to each maintenance terminal identification number, generation maintenance preparation list.
With reference in a first aspect, the embodiment of the invention provides the 4th kind of possible implementation method of first aspect, wherein, institute
Stating collecting device includes picture pick-up device, visibility sensor, infrared sensor, and methods described also includes:
According to pre-conditioned, the open and close of the picture pick-up device are controlled, it is described pre-conditioned tactile including monitor command
Hair, visibility triggering, failure triggering, Preset Time triggering, any one in the infrared triggering of failure multiple phase;
If described pre-conditioned for monitor command is triggered, open command and the shutdown command of Surveillance center's transmission are received
Afterwards, the picture pick-up device is controlled to open and close;
If it is described it is pre-conditioned be visibility triggering, judge whether visibility value that the visibility sensor collects is
More than threshold of visibility;If so, then controlling the picture pick-up device to open;If it is not, then controlling the picture pick-up device to close;
If described pre-conditioned for failure is triggered, when the collection information is the abnormal information, taken the photograph described in control
As opening of device;When receive the abnormal information be disposed information after, control the picture pick-up device to close;
If described pre-conditioned for Preset Time is triggered, judge current time whether within the default time limit;If so, then
The picture pick-up device is controlled to open;If it is not, then controlling the picture pick-up device to close;
If it is described it is pre-conditioned be the infrared triggering of failure multiple phase, judge current time whether in failure it is multiple
Phase, if so, then when personnel activity's signal that the infrared sensor sends is received, controlling the picture pick-up device to open;If
It is no, then control the picture pick-up device to close;The wherein failure multiple phase is set according to the historical failure information.
With reference in a first aspect, the embodiment of the invention provides the 5th kind of possible implementation method of first aspect, wherein, institute
Stating collecting device at least includes picture pick-up device, thermal infrared imager, and the picture pick-up device is arranged on head;Pacify at monitor area
Equipped with voice announcer;
Methods described also includes:
The detection image that the picture pick-up device sends is received, wherein the picture pick-up device opens camera function, and in fixation
Detection image is sent in cycle;
Judge that the detection image whether there is defect;
If so, then opening the thermal infrared imager to obtain thermal-induced imagery, and the thermal-induced imagery is sent to institute
State monitor supervision platform;Meanwhile, the recording function of picture pick-up device is opened to obtain the video information in the monitor area, and will be described
Video information is sent to the monitor supervision platform;
According to the thermal-induced imagery, the detection image, the video information, failure judgement reason;Meanwhile, judgement is
No someone is in the monitor area, if so, then control voice broadcast device carries out voice message.
With reference in a first aspect, the embodiment of the invention provides the 6th kind of possible implementation method of first aspect, wherein, also
Including:
Receive the respective current operating state information that each described collecting device is reported;
Judge whether each described collecting device meets normal running conditions according to the current operating state information;
When the collecting device is unsatisfactory for normal running conditions, it is determined that the collecting device needs to be overhauled, and
Positional information where the collecting device is sent to corresponding collection maintenance terminal, so that the collection maintenance terminal-pair should
Maintainer the collecting device is overhauled.
Second aspect, the embodiment of the present invention also provides a kind of transmission line of electricity supervising device, including:
Information receiving module, for the collection information of real-time reception each collecting device transmission, and carries out classification storage;
Information contrast module, for each described collection information and each information threshold set in advance to be contrasted,
Obtain each comparing result;
Abnormal judge module, for according to the comparing result, judging whether each collection information is abnormal information;
Alarm sending module, for when there is collection information for abnormal information, then sending abnormality alarm to monitor supervision platform,
And the abnormal information is carried out into classification store to fault message storehouse;
Plane-generating module, for the historical failure information in the fault message storehouse, the abnormal information, generation
Mission planning information;
List generation module, for the personal information in the mission planning information, personal information storehouse, generation maintenance
Preparation list, the maintenance preparation list at least includes maintenance terminal identification number;
Online determining module, for the maintenance terminal identification number in the maintenance preparation list, determines the maintenance
The presence of corresponding each maintenance terminal of terminal iidentification number;
Target determination module, for the presence according to each maintenance terminal, determines target maintenance terminal;
Planning sending module, for the mission planning information to be sent to the target maintenance terminal;
Information return module, for receiving the repair message that the target maintenance terminal is returned;
Information updating module, for according to the repair message, updating the fault message storehouse.
With reference to second aspect, the first possible implementation method of second aspect is the embodiment of the invention provides, wherein, institute
Stating abnormal information at least includes current abnormal data, current out-of-the way position, and the historical failure information at least includes historical failure
Position, history abnormal data, historical failure reason, historical failure solution;
The plane-generating module includes:
First judging unit, for according to the current out-of-the way position, judging to whether there is institute in the fault message storehouse
State the historical failure information at current out-of-the way position;
Information acquisition unit, for when there is the historical failure information at the out-of-the way position in the fault message storehouse
When, obtain the historical failure information at the current out-of-the way position;
Second judging unit, for according to current abnormal data, judge to whether there is in the fault message storehouse with it is current
Abnormal data identical history abnormal data;
First determining unit, for when in the fault message storehouse exist and current abnormal data identical history exception number
According to when, it is determined that history abnormal information corresponding with current abnormal data identical history abnormal data is similar abnormal information;
Second determining unit, for according to the similar abnormal information, determining current failure reason and current failure solution
Certainly scheme;
Plane-generating unit, for former according to the historical failure information at the current out-of-the way position, the current failure
Cause, the current failure solution, generate the mission planning information.
With reference to the first possible implementation method of second aspect, second of second aspect is the embodiment of the invention provides
Possible implementation method, wherein, the historical failure information also includes troubleshooting people name, troubleshooting people numbering, failure
Treatment people's contact method;The personal information at least includes person number, personnel's name, personnel's sex, on-job state, Ren Yuanlian
It is mode, maintenance range, maintenance terminal identification number;
The list generation module includes:
On-job judging unit, for according to the personal information, the similar abnormal information, judging the similar abnormal letter
Whether the troubleshooting people in breath numbers corresponding maintenance personal on-job;
Range judging unit, for existing when the troubleshooting people in the similar abnormal information numbers corresponding maintenance personal
During duty, according to the maintenance range in the current out-of-the way position, the personal information, judge whether current out-of-the way position is described
The maintenance range of maintenance personal;
Mark determining unit, for when the current out-of-the way position is the maintenance range of the maintenance personal, determining institute
State the corresponding maintenance terminal identification number of maintenance personal;
List generation unit, for according to each maintenance terminal identification number, generation maintenance preparation list.
The embodiment of the present invention brings following beneficial effect:
In the embodiment that the present invention is provided, the collection information for first sending each collecting device is each with set in advance
Individual information threshold is contrasted, and obtains each comparing result;According to the comparing result, if judging, collection information is believed for abnormal
Breath, then send abnormality alarm to monitor supervision platform, and abnormal information is carried out into classification store to fault message storehouse;Then according to failure
Historical failure information in information bank, abnormal information, generate mission planning information;According to mission planning information, personal information storehouse
In personal information, generation maintenance preparation list;According to the maintenance terminal identification number in maintenance preparation list, maintenance terminal is determined
The presence of corresponding each maintenance terminal of identification number;According to the presence of each maintenance terminal, target maintenance is determined eventually
End;Mission planning information is sent to target maintenance terminal;Receive the repair message that target maintenance terminal is returned;Finally according to dimension
Information is repaiied, fault message storehouse is updated.The present invention for transmission line of electricity abnormal conditions, history that can be in fault message storehouse
Fault message finds suitable maintenance personal, so that the electric network fault of transmission line of electricity obtains timely, appropriate treatment, improves
Maintenance of Electric Transmission Line efficiency;Meanwhile, according to the repair message real-time update fault message storehouse that maintenance personal returns, to improve history
The accuracy of fault message, ensures the correctness to line upkeep and repairing work commander.Therefore, the embodiment that the present invention is provided
Alleviate does not have relatively good monitoring scheme for transmission line of electricity in the prior art, can not be in time to electricity when transmission line of electricity is abnormal
The problem that net failure is made a response.
Other features and advantages of the present invention will be illustrated in the following description, also, the partly change from specification
Obtain it is clear that or being understood by implementing the present invention.The purpose of the present invention and other advantages are in specification, claims
And specifically noted structure is realized and obtained in accompanying drawing.
To enable the above objects, features and advantages of the present invention to become apparent, preferred embodiment cited below particularly, and coordinate
Appended accompanying drawing, is described in detail below.
Brief description of the drawings
In order to illustrate more clearly of the specific embodiment of the invention or technical scheme of the prior art, below will be to specific
The accompanying drawing to be used needed for implementation method or description of the prior art is briefly described, it should be apparent that, in describing below
Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before creative work is not paid
Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the schematic flow sheet of transmission line of electricity monitoring method provided in an embodiment of the present invention;
Fig. 2 is that the method flow of generation mission planning information in transmission line of electricity monitoring method provided in an embodiment of the present invention shows
It is intended to;
Fig. 3 is that the method flow of generation maintenance preparation list in transmission line of electricity monitoring method provided in an embodiment of the present invention shows
It is intended to;
Fig. 4 is the structural representation of transmission line of electricity supervising device provided in an embodiment of the present invention;
Fig. 5 is the structural representation of plane-generating module in transmission line of electricity supervising device provided in an embodiment of the present invention;
Fig. 6 is the structural representation of list generation module in transmission line of electricity supervising device provided in an embodiment of the present invention.
Specific embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with accompanying drawing to the present invention
Technical scheme be clearly and completely described, it is clear that described embodiment is a part of embodiment of the invention, rather than
Whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art are not making creative work premise
Lower obtained every other embodiment, belongs to the scope of protection of the invention.
There is no relatively good monitoring scheme currently for transmission line of electricity, can not in time to power network event when transmission line of electricity is abnormal
Barrier is made a response.Based on this, a kind of transmission line of electricity monitoring method provided in an embodiment of the present invention and device can be directed to power transmission line
The abnormal conditions on road, the historical failure information in fault message storehouse finds suitable maintenance personal, so that transmission line of electricity
Electric network fault obtain timely, appropriate treatment, improve Maintenance of Electric Transmission Line efficiency;Meanwhile, returned according to maintenance personal
Repair message real-time update fault message storehouse, to improve the accuracy of historical failure information, ensures to line upkeep and repairing work
The correctness that work is commanded.Therefore, the embodiment that the present invention is provided alleviates not relatively good for transmission line of electricity in the prior art
Monitoring scheme, the problem that can not be made a response to electric network fault in time when transmission line of electricity is abnormal.
For ease of understanding the present embodiment, first to a kind of transmission line of electricity monitoring side disclosed in the embodiment of the present invention
Method describes in detail.
Embodiment one:
Fig. 1 shows the schematic flow sheet of transmission line of electricity monitoring method provided in an embodiment of the present invention.As shown in figure 1, should
Transmission line of electricity monitoring method includes:
Step S101, the collection information of real-time reception each collecting device transmission, and carry out classification storage.
Wherein, each collecting device includes location equipment, picture pick-up device, thermal infrared imager, visibility sensor, humiture
It is sensor, air velocity transducer, yaw range sensor, obliquity sensor, inclination angle acceleration transducer, ultrasonic range finder, micro-
One or more in weather monitoring device and infrared sensor, above-mentioned picture pick-up device is arranged on head, other collections
Equipment can be directly installed in shaft tower, wire or transformer station.Specifically, the collection information of each collecting device is received
Afterwards, classification store to collection information bank in, situation of specifically classifying, can be according to actual conditions depending on, will such as measure power transmission line
Road skew information Store be a class, including air velocity transducer, yaw range sensor, obliquity sensor, inclination angle acceleration pass
Sensor, the information of ultrasonic range finder collection.After above-mentioned collection information is preserved, be easy to subsequently to check and data analysis with it is pre-
Survey.
Step S102, each collection information is contrasted with each information threshold set in advance, obtains each contrast
As a result.
Specifically, each collection information is all previously provided with corresponding information threshold, and each collection information is corresponding
Information threshold contrasted, obtain final comparing result.
Step S103, according to comparing result, judges whether each collection information is abnormal information.
Wherein, above-mentioned abnormal information at least includes current abnormal data, current out-of-the way position.Specifically, contrast as described above
Result is more than information threshold or less than information threshold, then to judge that the collection information is abnormal information, performs step S104;If
Above-mentioned comparing result judges that the collection information is normal information in the range of acceptable information threshold, then, no longer performs follow-up
Step.
Step S104, sends abnormality alarm to monitor supervision platform, and abnormal information is carried out into classification store to fault message storehouse.
Above-mentioned fault message storehouse includes historical failure information, and each historical failure information carries out classification and deposits according to regional location
Storage, wherein, historical failure information at least includes that historical failure position, historical failure time, history abnormal data, historical failure are former
Cause, historical failure solution, troubleshooting people name, troubleshooting people numbering, troubleshooting people's contact method.Will be abnormal alert
After report to monitor supervision platform, the corresponding monitoring personnel of monitor supervision platform can take respective handling measure.
Step S105, the historical failure information in fault message storehouse, abnormal information generate mission planning information.
Specifically, Fig. 2 generates mission planning information in showing transmission line of electricity monitoring method provided in an embodiment of the present invention
Method flow schematic diagram.As shown in Fig. 2 above-mentioned steps S105 is specially:
Step S1051, according to above-mentioned current out-of-the way position, whether there is the current out-of-the way position in failure judgement information bank
The historical failure information at place.
If so, then performing step S1052;If it is not, then no longer performing subsequent step, can directly notify to be responsible for the position
Responsible person carries out maintenance process.
Step S1052, obtains the historical failure information at current out-of-the way position.
Step S1053, according to current abnormal data, with the presence or absence of identical with current abnormal data in failure judgement information bank
History abnormal data.
If so, then performing step S1054;If it is not, then no longer performing subsequent step, can directly notify to be responsible for the position
Responsible person carries out maintenance process.
Step S1054, it is determined that history abnormal information corresponding with current abnormal data identical history abnormal data is class
Like abnormal information.
Step S1055, according to above-mentioned similar abnormal information, determines current failure reason and current failure solution.
Specifically, if occurring being similar to abnormal information in the past, can by the corresponding history of the similar abnormal information therefore
Barrier reason, historical failure solution are used as current failure reason and current failure solution.
Step S1056, solves according to the historical failure information at current out-of-the way position, current failure reason, current failure
Scheme, generates mission planning information.
Specifically, above-mentioned mission planning information at least includes current failure reason, current failure solution, current exception
Historical failure information at position.So, dimension can be timely made after corresponding maintenance personal receives mission planning information
Preparation is repaiied, it is quick to determine actual maintenance program, transmission line malfunction is solved the problems, such as early as possible.
Step S106, according to the personal information in mission planning information, personal information storehouse, generation maintenance preparation list.
Wherein, above-mentioned maintenance preparation list at least includes maintenance terminal identification number, and above-noted persons' information at least includes personnel
Numbering, personnel's name, personnel's sex, on-job state, personnel's contact method, maintenance range, maintenance terminal identification number.Specifically,
Fig. 3 generates the method flow signal for repairing preparation list in showing transmission line of electricity monitoring method provided in an embodiment of the present invention
Figure.As shown in figure 3, above-mentioned steps S106 is specially:
Step S1061, according to personal information, similar abnormal information, judges that the troubleshooting people in similar abnormal information compiles
Whether number corresponding maintenance personal is on-job.
If so, then performing step S1062;If it is not, above-mentioned mission planning information to the responsible exception bits can be directly transmitted
The responsible person for putting carries out maintenance process.
Whether step S1062, according to the maintenance range in current out-of-the way position, personal information, judge current out-of-the way position
It is the maintenance range of maintenance personal.
If so, then performing step S1063;If it is not, can then directly transmit above-mentioned mission planning information to the responsible exception
The responsible person of position carries out maintenance process, and the responsible person, can be according to task in uncertain current failure solution
Planning information is numbered corresponding maintenance personal and is seeked advice to troubleshooting people.
Step S1063, determines the corresponding maintenance terminal identification number of maintenance personal.
Step S1064, according to each maintenance terminal identification number, generation maintenance preparation list.
Specifically, according to each maintenance terminal identification number, mission planning information to maintenance terminal can be directly transmitted, with logical
Knowing the maintenance personal of maintenance terminal carries out accident treatment.
Step S107, according to the maintenance terminal identification number in maintenance preparation list, determines that maintenance terminal identification number is corresponding
The presence of each maintenance terminal.
Step S108, according to the presence of each maintenance terminal, determines target maintenance terminal.
Specifically, using the maintenance terminal of presence as target maintenance terminal, target so can timely be notified
The corresponding maintenance personal of maintenance terminal, and obtain most fast response.
Step S109, mission planning information is sent to target maintenance terminal.
Step S110, receives the repair message that target maintenance terminal is returned.
Specifically, the maintenance personal of target maintenance terminal solves after the completion of maintenance according to actual failure cause, failure
Scheme, solution date, send repair message.
Step S111, according to above-mentioned repair message, updates fault message storehouse.
Specifically, in repair message physical fault reason, fault solution, solution date, out-of-the way position, it is raw
The historical failure information of Cheng Xin, by historical failure information updating to the fault message storehouse, to ensure the standard of historical failure information
True property, is easy to the treatment of consequent malfunction problem.
In the embodiment that the present invention is provided, the collection information for first sending each collecting device is each with set in advance
Individual information threshold is contrasted, and obtains each comparing result;According to the comparing result, if judging, collection information is believed for abnormal
Breath, then send abnormality alarm to monitor supervision platform, and abnormal information is carried out into classification store to fault message storehouse;Then according to failure
Historical failure information in information bank, abnormal information, generate mission planning information;According to mission planning information, personal information storehouse
In personal information, generation maintenance preparation list;According to the maintenance terminal identification number in maintenance preparation list, maintenance terminal is determined
The presence of corresponding each maintenance terminal of identification number;According to the presence of each maintenance terminal, target maintenance is determined eventually
End;Mission planning information is sent to target maintenance terminal;Receive the repair message that target maintenance terminal is returned;Finally according to dimension
Information is repaiied, fault message storehouse is updated.The present invention for transmission line of electricity abnormal conditions, history that can be in fault message storehouse
Fault message finds suitable maintenance personal, so that the electric network fault of transmission line of electricity obtains timely, appropriate treatment, improves
Maintenance of Electric Transmission Line efficiency;Meanwhile, according to the repair message real-time update fault message storehouse that maintenance personal returns, to improve history
The accuracy of fault message, ensures the correctness to line upkeep and repairing work commander.Therefore, the embodiment that the present invention is provided
Alleviate does not have relatively good monitoring scheme for transmission line of electricity in the prior art, can not be in time to electricity when transmission line of electricity is abnormal
The problem that net failure is made a response.
Further, in order to more intuitively show each collection information, it is easy to monitoring personnel to understand regional in real time
Transmission line status, above-mentioned transmission line of electricity monitoring method also includes:Obtain the positional information of location equipment collection;According to the position
Information, by collection information MAP to digital sand table, and real-time update digital sand table in predetermined period, wherein digital sand table reality
When geography information in geographic profile information storehouse the geographic pattern of monitor area is presented, and monitoring is presented by way of illustration
Collection information in region;If collection information is abnormal information, the current out-of-the way position in abnormal information shows each
What comes into a driver's picture at abnormal information and current out-of-the way position is to the relevant position of digital sand table;According to preset time period, history
Fault message, sets the mark of Frequent Troubles, to warn monitoring personnel in the correspondence position of digital sand table.
For example, in real time by temperature information, pole deviation information, the transmission line of electricity swing information of the transmission line of electricity of regional
It is displayed in the corresponding position of digital sand table.When the information of collection is abnormal information, picture pick-up device is opened, picture pick-up device is clapped
Transmission line of electricity outdoor scene at the out-of-the way position taken the photograph is displayed in the corresponding position of digital sand table, monitoring personnel is intuitively seen this
The external sights of transmission line of electricity, so that the cause of accident to abnormal data makes analysis, and make appropriate warning treatment.Separately
Outward, the position more than comparing of being broken down in preset time period can be counted, in the right of digital sand table according to historical failure information
Answer at position, the mark of Frequent Troubles is set, to warn monitoring personnel often to notice that the collection of the transmission line of electricity at the position is believed
Breath and real scene image.
Further, it is contemplated that picture pick-up device is always on, cause information processing capacity larger, in the inessential time, can be with
It is appropriate to close picture pick-up device.Based on this, above-mentioned transmission line of electricity monitoring method also includes:According to pre-conditioned, picture pick-up device is controlled
Open and close, this it is pre-conditioned including monitor command triggering, visibility triggering, failure triggering, Preset Time triggering, failure
Any one in the infrared triggering of multiple phase.
If this is pre-conditioned for monitor command is triggered, open command and the shutdown command of Surveillance center's transmission are received
Afterwards, control picture pick-up device is opened and closed.
If this is pre-conditioned for visibility is triggered, judge whether the visibility value that visibility sensor is collected is more than energy
Degree of opinion threshold value;If so, then control picture pick-up device is opened;If it is not, then control picture pick-up device is closed.
If this is pre-conditioned for failure is triggered, when the information of collection is abnormal information, control picture pick-up device is opened;When connecing
Receive abnormal information to be disposed after information, control picture pick-up device is closed.
If this is pre-conditioned for Preset Time is triggered, judge current time whether within the default time limit;If so, then controlling
Picture pick-up device processed is opened;If it is not, then control picture pick-up device is closed.Wherein, the default time limit can be set by monitoring personnel, it is such as every
It 8 a.m. is at 9 points in the morning, or 8 a.m. on every Saturdays is to 6 pm.
If it is the infrared triggering of failure multiple phase that this is pre-conditioned, whether current time is judged in the failure multiple phase,
If so, then when personnel activity's signal of infrared sensor transmission is received, control picture pick-up device is opened;If it is not, then control is taken the photograph
As equipment is closed;The wherein failure multiple phase can automatically be set according to failure frequency in historical failure information, and the latter is by supervising
Control personnel are voluntarily set according to the judgement of oneself.Further, to further speed up information processing rate, to be quickly found out failure former
Cause, and strengthen fault cues effect, voice announcer is installed at monitor area, above-mentioned transmission line of electricity monitoring method is also wrapped
Include:The detection image that picture pick-up device sends is received, wherein picture pick-up device opens camera function, and detection is sent within the fixed cycle
Image.Judge that detection image whether there is defect using image processing techniques;If so, it is infrared to obtain then to open thermal infrared imager
Thermal image, and thermal-induced imagery is sent to monitor supervision platform;Meanwhile, the recording function of picture pick-up device is opened to obtain monitor area
Interior video information, and video information is sent to monitor supervision platform.According to thermal-induced imagery, detection image, video information, judge
Failure cause;Meanwhile, judge whether someone in monitor area, if so, then control voice broadcast device carries out voice message.
Specifically, the shooting picture and recording function of picture pick-up device are switched according to the above method, information is helped speed up
Processing speed, meanwhile, open thermal infrared imager for defect image and be conducive to analyzing failure cause.It is other to monitor that failure is existing
During the someone of field, the people for notifying fault in-situ by voice broadcast leaves, to prevent the generation of personnel's electric shock or other danger.
Further, information can be accurately gathered in order to ensure each collecting device, for follow-up work provides data point
Analysis basis, above-mentioned transmission line of electricity monitoring method also includes:Receive the respective current operating state information that each collecting device is reported;
Judge whether each collecting device meets normal running conditions according to current operating state information;When collecting device is unsatisfactory for normally
During condition of work, it is determined that collecting device is needed to be overhauled, and the positional information where collecting device is sent to corresponding
Collection maintenance terminal, so that the corresponding maintainer of collection maintenance terminal overhauls to collecting device.Preferably, each collection
Equipment can be provided with corresponding protection circuit, and when a failure occurs it, can be labeled as current operating state by the protection circuit
It is abnormal.So, the embodiment that the present invention is provided can timely notify corresponding inspection when the working condition of collecting device is abnormal
The personnel of repairing are overhauled, it is ensured that the accuracy of the collection information of the collecting device of front end.
Embodiment two:
Fig. 4 shows the structural representation of transmission line of electricity supervising device provided in an embodiment of the present invention.As shown in figure 4, should
Transmission line of electricity supervising device includes:
Information receiving module 510, for the collection information that real-time reception each collecting device sends, and carries out classification and deposits
Storage;
Information contrast module 511, for each collection information to be contrasted with each information threshold set in advance, obtains
To each comparing result;
Abnormal judge module 512, for according to comparing result, judging whether each collection information is abnormal information;
Alarm sending module 513, for when there is collection information for abnormal information, then sending abnormality alarm flat to monitoring
Platform, and abnormal information is carried out into classification store to fault message storehouse;
Plane-generating module 514, for historical failure information, abnormal information in fault message storehouse, generates task
Planning information;
List generation module 515, for the personal information in mission planning information, personal information storehouse, generation maintenance
Preparation list, the maintenance preparation list at least includes maintenance terminal identification number;
Online determining module 516, for the maintenance terminal identification number in maintenance preparation list, determines maintenance terminal mark
Know the presence of number corresponding each maintenance terminal;
Target determination module 517, for the presence according to each maintenance terminal, determines target maintenance terminal;
Planning sending module 518, for mission planning information to be sent to target maintenance terminal;
Information return module 519, the repair message for receiving the return of target maintenance terminal;
Information updating module 520, for according to repair message, updating fault message storehouse.
Further, above-mentioned collecting device at least includes location equipment, and said apparatus also include:
Position acquisition module, the positional information for obtaining location equipment collection;
Information-mapping module, for according to positional information, by collection information MAP to digital sand table, and in predetermined period
Real-time update digital sand table, the wherein digital sand table geography information in real time in geographic profile information storehouse are presented monitor area
Geographic pattern, and by way of illustration present monitor area in collection information;
Information display module, if for gathering information for abnormal information, the current out-of-the way position in abnormal information,
Show what comes into a driver's picture at each abnormal information and current out-of-the way position to the relevant position of digital sand table;
Fault flag module, for according to preset time period, historical failure information, being set in the correspondence position of digital sand table
The mark of Frequent Troubles, to warn monitoring personnel.
Further, above-mentioned abnormal information at least includes current abnormal data, current out-of-the way position, above-mentioned historical failure letter
Breath at least includes historical failure position, history abnormal data, historical failure reason, historical failure solution;Fig. 5 shows this
The structural representation of plane-generating module in the transmission line of electricity supervising device that inventive embodiments are provided.As shown in figure 5, above-mentioned planning
Generation module 514 includes:
First judging unit 5141, for according to current out-of-the way position, with the presence or absence of current different in failure judgement information bank
Historical failure information at normal position;
Information acquisition unit 5142, for when there is the historical failure information at current out-of-the way position in fault message storehouse
When, obtain the historical failure information at current out-of-the way position;
Second judging unit 5143, whether there is for according to current abnormal data, in failure judgement information bank with it is current
Abnormal data identical history abnormal data;
First determining unit 5144, for when in fault message storehouse exist and current abnormal data identical history exception number
According to when, it is determined that history abnormal information corresponding with current abnormal data identical history abnormal data is similar abnormal information;
Second determining unit 5145, for according to similar abnormal information, determining current failure reason and current failure solution
Certainly scheme;
Plane-generating unit 5146, for according to the historical failure information at current out-of-the way position, current failure reason, when
Prior fault solution, generates mission planning information.
Further, above-mentioned historical failure information also includes troubleshooting people name, troubleshooting people numbering, troubleshooting
People's contact method;Above-noted persons' information at least includes person number, personnel's name, personnel's sex, on-job state, personnel's correspondent party
Formula, maintenance range, maintenance terminal identification number.Fig. 6 shows list in transmission line of electricity supervising device provided in an embodiment of the present invention
The structural representation of generation module.As shown in fig. 6, above-mentioned list generation module 515 includes:
On-job judging unit 5151, for according to personal information, similar abnormal information, judging the event in similar abnormal information
Whether barrier treatment people numbers corresponding maintenance personal on-job;
Range judging unit 5152, for existing when the troubleshooting people in similar abnormal information numbers corresponding maintenance personal
During duty, according to the maintenance range in current out-of-the way position, personal information, judge current out-of-the way position whether be maintenance personal dimension
Repair scope;
Mark determining unit 5153, for when current out-of-the way position for maintenance personal maintenance range when, it is determined that maintenance people
The corresponding maintenance terminal identification number of member;
List generation unit 5154, for according to each maintenance terminal identification number, generation maintenance preparation list.
Further, above-mentioned collecting device includes picture pick-up device, visibility sensor, infrared sensor, and said apparatus are also
Including:
Shooting control module, for according to pre-conditioned, controlling the open and close of picture pick-up device, this it is pre-conditioned including
Any one of monitor command triggering, visibility triggering, failure triggering, Preset Time triggering, failure multiple phase;
Specifically, the shooting control module is specifically included:
Command control unit, if receiving the unlatching of Surveillance center's transmission for monitor command is triggered for pre-conditioned
After order and shutdown command, control picture pick-up device is opened and closed;
Visibility control unit, if judging what visibility sensor was collected for visibility is triggered for pre-conditioned
Whether visibility value is more than threshold of visibility;If so, then control picture pick-up device is opened;If it is not, then control picture pick-up device is closed;
Failure trigger element, if for pre-conditioned for failure is triggered, when the information of collection is abnormal information, control is taken the photograph
As opening of device;When receive abnormal information be disposed information after, control picture pick-up device close;
Default control unit, if for pre-conditioned for Preset Time is triggered, judging current time whether in default
In time limit;If so, then control picture pick-up device is opened;If it is not, then control picture pick-up device is closed;
Multiple phase trigger element, if for it is pre-conditioned be the infrared triggering of failure multiple phase, judge that current time is
It is no in the failure multiple phase, if so, then when receive infrared sensor transmission personnel activity's signal when, control picture pick-up device open
Open;If it is not, then control picture pick-up device is closed;The wherein failure multiple phase is set according to historical failure information.
Further, above-mentioned collecting device at least includes picture pick-up device, thermal infrared imager, and the picture pick-up device is arranged on head
On;Voice announcer is installed at monitor area;Said apparatus also include:
Image receiver module, the wherein detection image for receiving picture pick-up device transmission, picture pick-up device open camera function,
And detection image is sent within the fixed cycle;
Defect dipoles module, for judging that detection image whether there is defect;
Infrared opening module, for when detection image existing defects, opening thermal infrared imager to obtain thermal-induced imagery,
And send to monitor supervision platform thermal-induced imagery;
Video recording opening module, for when detection image existing defects, opening the recording function of picture pick-up device to be supervised
Video information in control region, and video information is sent to monitor supervision platform;
Failure warning module, for according to thermal-induced imagery, detection image, video information, failure judgement reason;Meanwhile,
Judge whether someone in monitor area, if so, then control voice broadcast device carries out voice message.
Further, said apparatus also include:
State receiver module, for receiving the respective current operating state information that each collecting device is reported;
Condition judgment module, judges whether each collecting device meets normal work bar according to current operating state information
Part;
Maintenance determining module, for when collecting device is unsatisfactory for normal running conditions, it is determined that collecting device need into
Row maintenance, and the positional information where collecting device is sent to corresponding collection maintenance terminal, so that collection maintenance terminal-pair
The maintainer for answering overhauls to collecting device.
In the embodiment that the present invention is provided, the collection information for first sending each collecting device is each with set in advance
Individual information threshold is contrasted, and obtains each comparing result;According to the comparing result, if judging, collection information is believed for abnormal
Breath, then send abnormality alarm to monitor supervision platform, and abnormal information is carried out into classification store to fault message storehouse;Then according to failure
Historical failure information in information bank, abnormal information, generate mission planning information;According to mission planning information, personal information storehouse
In personal information, generation maintenance preparation list;According to the maintenance terminal identification number in maintenance preparation list, maintenance terminal is determined
The presence of corresponding each maintenance terminal of identification number;According to the presence of each maintenance terminal, target maintenance is determined eventually
End;Mission planning information is sent to target maintenance terminal;Receive the repair message that target maintenance terminal is returned;Finally according to dimension
Information is repaiied, fault message storehouse is updated.The present invention for transmission line of electricity abnormal conditions, history that can be in fault message storehouse
Fault message finds suitable maintenance personal, so that the electric network fault of transmission line of electricity obtains timely, appropriate treatment, improves
Maintenance of Electric Transmission Line efficiency;Meanwhile, according to the repair message real-time update fault message storehouse that maintenance personal returns, to improve history
The accuracy of fault message, ensures the correctness to line upkeep and repairing work commander.Therefore, the embodiment that the present invention is provided
Alleviate does not have relatively good monitoring scheme for transmission line of electricity in the prior art, can not be in time to electricity when transmission line of electricity is abnormal
The problem that net failure is made a response.
Transmission line of electricity supervising device provided in an embodiment of the present invention, the transmission line of electricity monitoring method provided with above-described embodiment
With identical technical characteristic, so can also solve identical technical problem, identical technique effect is reached.
Transmission line of electricity monitoring method and the computer program product of device that the embodiment of the present invention is provided, including store
The computer-readable recording medium of program code, the instruction that described program code includes can be used in execution previous methods embodiment
Described method, implements and can be found in embodiment of the method, will not be repeated here.
It is apparent to those skilled in the art that, for convenience and simplicity of description, the transmission of electricity of foregoing description
The specific work process of line monitoring equipment, may be referred to the corresponding process in preceding method embodiment, will not be repeated here.
If the function is to realize in the form of SFU software functional unit and as independent production marketing or when using, can be with
Storage is in a computer read/write memory medium.Based on such understanding, technical scheme is substantially in other words
The part contributed to prior art or the part of the technical scheme can be embodied in the form of software product, the meter
Calculation machine software product is stored in a storage medium, including some instructions are used to so that a computer equipment (can be individual
People's computer, server, or network equipment etc.) perform all or part of step of each embodiment methods described of the invention.
And foregoing storage medium includes:USB flash disk, mobile hard disk, read-only storage (ROM, Read-Only Memory), arbitrary access are deposited
Reservoir (RAM, Random Access Memory), magnetic disc or CD etc. are various can be with the medium of store program codes.Additionally,
Term " first ", " second ", " the 3rd " are only used for describing purpose, and it is not intended that indicating or implying relative importance.
Finally it should be noted that:Embodiment described above, specific embodiment only of the invention, is used to illustrate the present invention
Technical scheme, rather than its limitations, protection scope of the present invention is not limited thereto, although with reference to the foregoing embodiments to this hair
It is bright to be described in detail, it will be understood by those within the art that:Any one skilled in the art
The invention discloses technical scope in, it can still modify to the technical scheme described in previous embodiment or can be light
Change is readily conceivable that, or equivalent is carried out to which part technical characteristic;And these modifications, change or replacement, do not make
The essence of appropriate technical solution departs from the spirit and scope of embodiment of the present invention technical scheme, should all cover in protection of the invention
Within the scope of.Therefore, protection scope of the present invention described should be defined by scope of the claims.
Claims (10)
1. a kind of transmission line of electricity monitoring method, it is characterised in that including:
The collection information of real-time reception each collecting device transmission, and carry out classification storage;
Each described collection information and each information threshold set in advance are contrasted, each comparing result is obtained;
According to the comparing result, judge whether each collection information is abnormal information;
If so, then sending abnormality alarm to monitor supervision platform, and the abnormal information is carried out into classification store to fault message storehouse;
Historical failure information, the abnormal information in the fault message storehouse, generate mission planning information;
According to the personal information in the mission planning information, personal information storehouse, generation maintenance preparation list, the maintenance preparation
List at least includes maintenance terminal identification number;
According to the maintenance terminal identification number in the maintenance preparation list, corresponding each dimension of the maintenance terminal identification number is determined
Repair the presence of terminal;
According to the presence of each maintenance terminal, target maintenance terminal is determined;
The mission planning information is sent to the target maintenance terminal;
Receive the repair message that the target maintenance terminal is returned;
According to the repair message, the fault message storehouse is updated.
2. method according to claim 1, it is characterised in that the collecting device at least includes location equipment, the side
Method also includes:
Obtain the positional information of the location equipment collection;
According to the positional information, by the collection information MAP to digital sand table, and in the predetermined period described in real-time update
Digital sand table, wherein digital sand table geography information in real time in geographic profile information storehouse is presented the geography of monitor area
Image, and the collection information in the monitor area is presented by way of illustration;
If the collection information is the abnormal information, the current out-of-the way position in the abnormal information shows each
What comes into a driver's picture at the abnormal information and the current out-of-the way position is to the relevant position of the digital sand table;
According to preset time period, the historical failure information, the mark of Frequent Troubles is set in the correspondence position of the digital sand table
Note, to warn monitoring personnel.
3. method according to claim 1, it is characterised in that the abnormal information at least include current abnormal data, when
Preceding out-of-the way position, the historical failure information at least includes historical failure position, history abnormal data, historical failure reason, goes through
History fault solution;
Historical failure information, the abnormal information in the fault message storehouse, generation mission planning information include:
According to the current out-of-the way position, judge in the fault message storehouse with the presence or absence of the history at the current out-of-the way position
Fault message;If so, then obtaining the historical failure information at the current out-of-the way position;
According to current abnormal data, judge to whether there is and current abnormal data identical history exception in the fault message storehouse
Data;If, it is determined that history abnormal information corresponding with current abnormal data identical history abnormal data is similar abnormal
Information;According to the similar abnormal information, current failure reason and current failure solution are determined;
According to the historical failure information at the current out-of-the way position, the current failure reason, the current failure solution party
Case, generates the mission planning information.
4. method according to claim 3, it is characterised in that the historical failure information also includes troubleshooting people's surname
Name, troubleshooting people numbering, troubleshooting people's contact method;The personal information at least includes person number, personnel's name, people
Member's sex, on-job state, personnel's contact method, maintenance range, maintenance terminal identification number;
According to the personal information in the mission planning information, personal information storehouse, generation maintenance preparation list includes:
According to the personal information, the similar abnormal information, the troubleshooting people numbering in the similar abnormal information is judged
Whether corresponding maintenance personal is on-job;
If so, the then maintenance range in the current out-of-the way position, the personal information, judges the current out-of-the way position
Whether be the maintenance personal maintenance range;
If so, determining the corresponding maintenance terminal identification number of the maintenance personal;
According to each maintenance terminal identification number, generation maintenance preparation list.
5. method according to claim 1, it is characterised in that the collecting device includes that picture pick-up device, visibility are sensed
Device, infrared sensor, methods described also include:
According to pre-conditioned, the open and close of the picture pick-up device are controlled, it is described pre-conditioned including monitor command triggering, energy
The triggering of degree of opinion, failure triggering, Preset Time triggering, any one in the infrared triggering of failure multiple phase;
If described pre-conditioned for monitor command is triggered, after receiving open command and the shutdown command of Surveillance center's transmission,
The picture pick-up device is controlled to open and close;
If described pre-conditioned for visibility is triggered, judge whether the visibility value that the visibility sensor is collected is more than
Threshold of visibility;If so, then controlling the picture pick-up device to open;If it is not, then controlling the picture pick-up device to close;
If described pre-conditioned for failure is triggered, when the collection information is the abnormal information, the shooting is controlled to set
It is standby to open;When receive the abnormal information be disposed information after, control the picture pick-up device to close;
If described pre-conditioned for Preset Time is triggered, judge current time whether within the default time limit;If so, then controlling
The picture pick-up device is opened;If it is not, then controlling the picture pick-up device to close;
If it is described it is pre-conditioned be the infrared triggering of failure multiple phase, whether judge current time in the failure multiple phase, if
It is then when personnel activity's signal that the infrared sensor sends is received, to control the picture pick-up device to open;If it is not, then
The picture pick-up device is controlled to close;The wherein failure multiple phase is set according to the historical failure information.
6. method according to claim 1, it is characterised in that the collecting device at least includes picture pick-up device, infrared heat
As instrument, the picture pick-up device is arranged on head;Voice announcer is installed at monitor area;
Methods described also includes:
The detection image that the picture pick-up device sends is received, wherein the picture pick-up device opens camera function, and in the fixed cycle
Interior transmission detection image;
Judge that the detection image whether there is defect;
If so, then opening the thermal infrared imager to obtain thermal-induced imagery, and the thermal-induced imagery is sent to the prison
Control platform;Meanwhile, the recording function of picture pick-up device is opened to obtain the video information in the monitor area, and by the video recording
Information is sent to the monitor supervision platform;
According to the thermal-induced imagery, the detection image, the video information, failure judgement reason;Meanwhile, determine whether
People is in the monitor area, if so, then control voice broadcast device carries out voice message.
7. method according to claim 1, it is characterised in that also include:
Receive the respective current operating state information that each described collecting device is reported;
Judge whether each described collecting device meets normal running conditions according to the current operating state information;
When the collecting device is unsatisfactory for normal running conditions, it is determined that the collecting device needs to be overhauled, and by institute
Positional information where stating collecting device is sent to corresponding collection maintenance terminal, so that the corresponding inspection of the collection maintenance terminal
Personnel are repaiied to overhaul the collecting device.
8. a kind of transmission line of electricity supervising device, it is characterised in that including;
Information receiving module, for the collection information of real-time reception each collecting device transmission, and carries out classification storage;
Information contrast module, for each described collection information and each information threshold set in advance to be contrasted, obtains
Each comparing result;
Abnormal judge module, for according to the comparing result, judging whether each collection information is abnormal information;
Alarm sending module, for when there is collection information for abnormal information, then sending abnormality alarm to monitor supervision platform, and will
The abnormal information carries out classification and stores to fault message storehouse;
Plane-generating module, for the historical failure information in the fault message storehouse, the abnormal information, generates task
Planning information;
List generation module, for the personal information in the mission planning information, personal information storehouse, generation maintenance preparation
List, the maintenance preparation list at least includes maintenance terminal identification number;
Online determining module, for the maintenance terminal identification number in the maintenance preparation list, determines the maintenance terminal
The presence of corresponding each maintenance terminal of identification number;
Target determination module, for the presence according to each maintenance terminal, determines target maintenance terminal;
Planning sending module, for the mission planning information to be sent to the target maintenance terminal;
Information return module, for receiving the repair message that the target maintenance terminal is returned;
Information updating module, for according to the repair message, updating the fault message storehouse.
9. device according to claim 8, it is characterised in that the abnormal information at least include current abnormal data, when
Preceding out-of-the way position, the historical failure information at least includes historical failure position, history abnormal data, historical failure reason, goes through
History fault solution;
The plane-generating module includes:
First judging unit, for according to the current out-of-the way position, judging to work as with the presence or absence of described in the fault message storehouse
Historical failure information at preceding out-of-the way position;
Information acquisition unit, for when there is the historical failure information at the out-of-the way position in the fault message storehouse, obtaining
Take the historical failure information at the current out-of-the way position;
Second judging unit, for according to current abnormal data, judging to whether there is and current exception in the fault message storehouse
Data identical history abnormal data;
First determining unit, for when in the fault message storehouse exist and current abnormal data identical history abnormal data
When, it is determined that history abnormal information corresponding with current abnormal data identical history abnormal data is similar abnormal information;
Second determining unit, for according to the similar abnormal information, determining current failure reason and current failure solution party
Case;
Plane-generating unit, for according to the historical failure information at the current out-of-the way position, the current failure reason, institute
Current failure solution is stated, the mission planning information is generated.
10. device according to claim 9, it is characterised in that the historical failure information also includes troubleshooting people's surname
Name, troubleshooting people numbering, troubleshooting people's contact method;The personal information at least includes person number, personnel's name, people
Member's sex, on-job state, personnel's contact method, maintenance range, maintenance terminal identification number;
The list generation module includes:
On-job judging unit, for according to the personal information, the similar abnormal information, judging the similar abnormal information in
Troubleshooting people whether number corresponding maintenance personal on-job;
Range judging unit, for number corresponding maintenance personal on-job as the troubleshooting people in the similar abnormal information
When, according to the maintenance range in the current out-of-the way position, the personal information, judge whether current out-of-the way position is the dimension
Repair the maintenance range of personnel;
Mark determining unit, for when the current out-of-the way position is the maintenance range of the maintenance personal, determining the dimension
Repair the corresponding maintenance terminal identification number of personnel;
List generation unit, for according to each maintenance terminal identification number, generation maintenance preparation list.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710259683.6A CN106877511A (en) | 2017-04-19 | 2017-04-19 | Transmission line of electricity monitoring method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710259683.6A CN106877511A (en) | 2017-04-19 | 2017-04-19 | Transmission line of electricity monitoring method and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106877511A true CN106877511A (en) | 2017-06-20 |
Family
ID=59162696
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710259683.6A Pending CN106877511A (en) | 2017-04-19 | 2017-04-19 | Transmission line of electricity monitoring method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106877511A (en) |
Cited By (36)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107273983A (en) * | 2017-06-23 | 2017-10-20 | 深圳市盛路物联通讯技术有限公司 | A kind of equipment maintenance and management method and system based on Internet of Things |
CN107329448A (en) * | 2017-08-31 | 2017-11-07 | 北京蓝海华业科技股份有限公司 | A kind of system for monitoring transformer station |
CN108124132A (en) * | 2017-12-22 | 2018-06-05 | 国家电网公司 | A kind of method for safety monitoring and device |
CN108217364A (en) * | 2018-01-05 | 2018-06-29 | 日立楼宇技术(广州)有限公司 | Terminal distribution model foundation, target elevator debugging terminal determine method and device |
CN108566405A (en) * | 2018-01-05 | 2018-09-21 | 深圳市宝润科技有限公司 | Method for monitoring state, device and the storage medium of Medical Devices |
CN109325601A (en) * | 2018-08-21 | 2019-02-12 | 国网江苏省电力有限公司泰州供电分公司 | Logistics equipment malfunction monitoring operation management method |
CN109508387A (en) * | 2018-11-08 | 2019-03-22 | 深圳供电局有限公司 | Atlas renaming method and device, computer equipment and storage medium |
CN109698768A (en) * | 2018-12-26 | 2019-04-30 | 广东中安金狮科创有限公司 | Equipment monitoring apparatus and its monitoring method, readable storage medium storing program for executing |
CN110346691A (en) * | 2019-08-19 | 2019-10-18 | 江苏大烨智能电气股份有限公司 | A kind of power line failure diagnostic device and method based on HPLC high-speed power carrier communication |
CN110800315A (en) * | 2017-06-28 | 2020-02-14 | 三菱电机大楼技术服务株式会社 | Device maintenance support system, device maintenance support apparatus, and device maintenance support program |
CN110867963A (en) * | 2019-11-21 | 2020-03-06 | 广东电网有限责任公司 | Electric power dispatching remote control operation broadcast forecasting system and method |
CN110912273A (en) * | 2019-12-11 | 2020-03-24 | 云南电网有限责任公司临沧供电局 | Distribution network ground fault analysis management system |
CN110909894A (en) * | 2019-11-18 | 2020-03-24 | 广东卓维网络有限公司 | Safety management and control system for transformer substation |
CN111060149A (en) * | 2019-11-22 | 2020-04-24 | 广东电网有限责任公司云浮供电局 | Data monitoring method and device based on power equipment |
CN111459066A (en) * | 2020-04-13 | 2020-07-28 | 深圳市永恒光照明科技有限公司 | Underground pipe network monitoring system of urban lighting facility |
CN111551803A (en) * | 2020-05-06 | 2020-08-18 | 南京能瑞电力科技有限公司 | Diagnosis method and device for charging pile |
CN111738461A (en) * | 2020-06-03 | 2020-10-02 | 国网宁夏电力有限公司营销服务中心(国网宁夏电力有限公司计量中心) | Fault emergency processing system based on ubiquitous power Internet of things |
CN111784661A (en) * | 2019-12-31 | 2020-10-16 | 山东信通电子股份有限公司 | Adjusting method, device, equipment and medium of power transmission line detection equipment |
CN111915452A (en) * | 2020-08-28 | 2020-11-10 | 平安国际智慧城市科技股份有限公司 | Monitoring system, method and device, monitoring processing equipment and storage medium |
CN111983649A (en) * | 2020-07-21 | 2020-11-24 | 上海万位科技有限公司 | Vehicle GPS equipment off-line performance prediction method based on automatic analysis |
CN112104085A (en) * | 2020-09-24 | 2020-12-18 | 山东工业职业学院 | Multifunctional electric power and electric automation control system |
CN112182068A (en) * | 2020-09-30 | 2021-01-05 | 重庆市海普软件产业有限公司 | Remote fault judgment system and method based on Internet of things technology |
CN112713658A (en) * | 2020-12-30 | 2021-04-27 | 国网北京市电力公司 | Intelligent control method and system for monitoring defects of power grid equipment |
CN112860833A (en) * | 2021-02-05 | 2021-05-28 | 国网山东省电力公司日照供电公司 | Intelligent processing method, system, terminal and storage medium for power grid faults |
CN113393341A (en) * | 2021-06-17 | 2021-09-14 | 贵州电网有限责任公司 | Power grid operation monitoring method based on voice recognition |
CN113570082A (en) * | 2021-07-20 | 2021-10-29 | 陕西新泓水艺环境科技有限公司 | Information processing method, information processing apparatus, electronic device, and medium |
CN113726014A (en) * | 2021-09-01 | 2021-11-30 | 广东省珩祥安全科技有限公司 | Power utilization monitoring method and system based on circuit breaker |
CN114095536A (en) * | 2021-11-17 | 2022-02-25 | 国网山东省电力公司电力科学研究院 | Electric power transmission and transformation safety prompting system and method based on Internet of things |
CN114254798A (en) * | 2021-11-05 | 2022-03-29 | 南方电网数字电网研究院有限公司 | Monitoring method and device for power transmission line, computer equipment and storage medium |
CN114296000A (en) * | 2021-11-19 | 2022-04-08 | 上海信辰通信工程有限公司 | Power failure diagnosis system and method in wireless communication equipment |
CN114780273A (en) * | 2022-04-19 | 2022-07-22 | 苏州浪潮智能科技有限公司 | Processing method and system of fault server, electronic equipment and storage medium |
CN115223266A (en) * | 2022-07-19 | 2022-10-21 | 厦门星拉科技有限公司 | Mobile inspection terminal based on electric power hub |
CN115271129A (en) * | 2022-09-30 | 2022-11-01 | 北京国电通网络技术有限公司 | Fault maintenance method, device, equipment and medium applied to power transmission line |
CN115656683A (en) * | 2022-11-03 | 2023-01-31 | 深圳市铭泽智能电力科技有限公司 | Cable operation monitoring method, system, terminal equipment and storage medium |
CN116756692A (en) * | 2023-06-26 | 2023-09-15 | 中国长江三峡集团有限公司 | Wind turbine generator online monitoring method, device, system, computer equipment and medium |
CN117829811A (en) * | 2023-12-29 | 2024-04-05 | 江苏天合清特电气有限公司 | Equipment monitoring method, device and related system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103107601A (en) * | 2013-02-26 | 2013-05-15 | 合肥未来计算机技术开发有限公司 | Web of Things smart power grid operation and maintenance system |
CN104268805A (en) * | 2014-10-29 | 2015-01-07 | 杭州凯达电力建设有限公司 | Line management method and system |
CN104753178A (en) * | 2015-04-16 | 2015-07-01 | 河南行知专利服务有限公司 | Power grid fault handling system |
CN105322542A (en) * | 2015-11-26 | 2016-02-10 | 国网北京市电力公司 | Processing method and device for distribution network fault |
CN106096738A (en) * | 2016-05-31 | 2016-11-09 | 广东电网有限责任公司中山供电局 | One reports processing method and system for repairment |
-
2017
- 2017-04-19 CN CN201710259683.6A patent/CN106877511A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103107601A (en) * | 2013-02-26 | 2013-05-15 | 合肥未来计算机技术开发有限公司 | Web of Things smart power grid operation and maintenance system |
CN104268805A (en) * | 2014-10-29 | 2015-01-07 | 杭州凯达电力建设有限公司 | Line management method and system |
CN104753178A (en) * | 2015-04-16 | 2015-07-01 | 河南行知专利服务有限公司 | Power grid fault handling system |
CN105322542A (en) * | 2015-11-26 | 2016-02-10 | 国网北京市电力公司 | Processing method and device for distribution network fault |
CN106096738A (en) * | 2016-05-31 | 2016-11-09 | 广东电网有限责任公司中山供电局 | One reports processing method and system for repairment |
Cited By (47)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018232847A1 (en) * | 2017-06-23 | 2018-12-27 | 深圳市盛路物联通讯技术有限公司 | Internet of things-based device maintenance management method and system |
CN107273983A (en) * | 2017-06-23 | 2017-10-20 | 深圳市盛路物联通讯技术有限公司 | A kind of equipment maintenance and management method and system based on Internet of Things |
CN110800315B (en) * | 2017-06-28 | 2021-08-20 | 三菱电机大楼技术服务株式会社 | Device maintenance support system and device maintenance support apparatus |
CN110800315A (en) * | 2017-06-28 | 2020-02-14 | 三菱电机大楼技术服务株式会社 | Device maintenance support system, device maintenance support apparatus, and device maintenance support program |
CN107329448A (en) * | 2017-08-31 | 2017-11-07 | 北京蓝海华业科技股份有限公司 | A kind of system for monitoring transformer station |
CN108124132A (en) * | 2017-12-22 | 2018-06-05 | 国家电网公司 | A kind of method for safety monitoring and device |
CN108217364A (en) * | 2018-01-05 | 2018-06-29 | 日立楼宇技术(广州)有限公司 | Terminal distribution model foundation, target elevator debugging terminal determine method and device |
CN108566405A (en) * | 2018-01-05 | 2018-09-21 | 深圳市宝润科技有限公司 | Method for monitoring state, device and the storage medium of Medical Devices |
CN108566405B (en) * | 2018-01-05 | 2023-04-18 | 深圳市宝润科技有限公司 | Medical equipment state monitoring method and device and storage medium |
CN109325601A (en) * | 2018-08-21 | 2019-02-12 | 国网江苏省电力有限公司泰州供电分公司 | Logistics equipment malfunction monitoring operation management method |
CN109508387A (en) * | 2018-11-08 | 2019-03-22 | 深圳供电局有限公司 | Atlas renaming method and device, computer equipment and storage medium |
CN109698768A (en) * | 2018-12-26 | 2019-04-30 | 广东中安金狮科创有限公司 | Equipment monitoring apparatus and its monitoring method, readable storage medium storing program for executing |
CN110346691A (en) * | 2019-08-19 | 2019-10-18 | 江苏大烨智能电气股份有限公司 | A kind of power line failure diagnostic device and method based on HPLC high-speed power carrier communication |
CN110909894A (en) * | 2019-11-18 | 2020-03-24 | 广东卓维网络有限公司 | Safety management and control system for transformer substation |
CN110909894B (en) * | 2019-11-18 | 2020-11-10 | 广东卓维网络有限公司 | Safety management and control system for transformer substation |
CN110867963B (en) * | 2019-11-21 | 2021-08-24 | 广东电网有限责任公司 | Power dispatching remote control operation broadcast forecasting method based on power dispatching remote control operation broadcast forecasting system |
CN110867963A (en) * | 2019-11-21 | 2020-03-06 | 广东电网有限责任公司 | Electric power dispatching remote control operation broadcast forecasting system and method |
CN111060149A (en) * | 2019-11-22 | 2020-04-24 | 广东电网有限责任公司云浮供电局 | Data monitoring method and device based on power equipment |
CN110912273A (en) * | 2019-12-11 | 2020-03-24 | 云南电网有限责任公司临沧供电局 | Distribution network ground fault analysis management system |
CN110912273B (en) * | 2019-12-11 | 2023-04-25 | 云南电网有限责任公司临沧供电局 | Distribution network ground fault analysis management system |
CN111784661A (en) * | 2019-12-31 | 2020-10-16 | 山东信通电子股份有限公司 | Adjusting method, device, equipment and medium of power transmission line detection equipment |
CN111784661B (en) * | 2019-12-31 | 2023-09-05 | 山东信通电子股份有限公司 | Adjustment method, device, equipment and medium of transmission line detection equipment |
CN111459066A (en) * | 2020-04-13 | 2020-07-28 | 深圳市永恒光照明科技有限公司 | Underground pipe network monitoring system of urban lighting facility |
CN111551803A (en) * | 2020-05-06 | 2020-08-18 | 南京能瑞电力科技有限公司 | Diagnosis method and device for charging pile |
CN111738461A (en) * | 2020-06-03 | 2020-10-02 | 国网宁夏电力有限公司营销服务中心(国网宁夏电力有限公司计量中心) | Fault emergency processing system based on ubiquitous power Internet of things |
CN111983649A (en) * | 2020-07-21 | 2020-11-24 | 上海万位科技有限公司 | Vehicle GPS equipment off-line performance prediction method based on automatic analysis |
CN111915452A (en) * | 2020-08-28 | 2020-11-10 | 平安国际智慧城市科技股份有限公司 | Monitoring system, method and device, monitoring processing equipment and storage medium |
CN112104085A (en) * | 2020-09-24 | 2020-12-18 | 山东工业职业学院 | Multifunctional electric power and electric automation control system |
CN112182068B (en) * | 2020-09-30 | 2024-03-26 | 重庆市海普软件产业有限公司 | Remote fault judging system and method based on Internet of things technology |
CN112182068A (en) * | 2020-09-30 | 2021-01-05 | 重庆市海普软件产业有限公司 | Remote fault judgment system and method based on Internet of things technology |
CN112713658A (en) * | 2020-12-30 | 2021-04-27 | 国网北京市电力公司 | Intelligent control method and system for monitoring defects of power grid equipment |
CN112860833A (en) * | 2021-02-05 | 2021-05-28 | 国网山东省电力公司日照供电公司 | Intelligent processing method, system, terminal and storage medium for power grid faults |
CN113393341A (en) * | 2021-06-17 | 2021-09-14 | 贵州电网有限责任公司 | Power grid operation monitoring method based on voice recognition |
CN113570082A (en) * | 2021-07-20 | 2021-10-29 | 陕西新泓水艺环境科技有限公司 | Information processing method, information processing apparatus, electronic device, and medium |
CN113726014A (en) * | 2021-09-01 | 2021-11-30 | 广东省珩祥安全科技有限公司 | Power utilization monitoring method and system based on circuit breaker |
CN114254798A (en) * | 2021-11-05 | 2022-03-29 | 南方电网数字电网研究院有限公司 | Monitoring method and device for power transmission line, computer equipment and storage medium |
CN114095536A (en) * | 2021-11-17 | 2022-02-25 | 国网山东省电力公司电力科学研究院 | Electric power transmission and transformation safety prompting system and method based on Internet of things |
CN114296000A (en) * | 2021-11-19 | 2022-04-08 | 上海信辰通信工程有限公司 | Power failure diagnosis system and method in wireless communication equipment |
CN114780273A (en) * | 2022-04-19 | 2022-07-22 | 苏州浪潮智能科技有限公司 | Processing method and system of fault server, electronic equipment and storage medium |
CN114780273B (en) * | 2022-04-19 | 2024-09-06 | 苏州浪潮智能科技有限公司 | Fault server processing method, system, electronic equipment and storage medium |
CN115223266A (en) * | 2022-07-19 | 2022-10-21 | 厦门星拉科技有限公司 | Mobile inspection terminal based on electric power hub |
CN115271129A (en) * | 2022-09-30 | 2022-11-01 | 北京国电通网络技术有限公司 | Fault maintenance method, device, equipment and medium applied to power transmission line |
CN115271129B (en) * | 2022-09-30 | 2023-01-13 | 北京国电通网络技术有限公司 | Fault maintenance method, device, equipment and medium applied to power transmission line |
CN115656683A (en) * | 2022-11-03 | 2023-01-31 | 深圳市铭泽智能电力科技有限公司 | Cable operation monitoring method, system, terminal equipment and storage medium |
CN115656683B (en) * | 2022-11-03 | 2023-10-31 | 深圳市铭泽智能电力科技有限公司 | Cable operation monitoring method, system, terminal equipment and storage medium |
CN116756692A (en) * | 2023-06-26 | 2023-09-15 | 中国长江三峡集团有限公司 | Wind turbine generator online monitoring method, device, system, computer equipment and medium |
CN117829811A (en) * | 2023-12-29 | 2024-04-05 | 江苏天合清特电气有限公司 | Equipment monitoring method, device and related system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106877511A (en) | Transmission line of electricity monitoring method and device | |
CN205748466U (en) | A kind of dust from construction sites noise supervisory systems | |
CN105763853A (en) | Emergency early warning method for stampede accident in public area | |
CN104787084A (en) | Railway foreign matter clearance intrusion detection system and method | |
CN103259206A (en) | Transformer substation operation safety management and control system based on computer vision locating technology | |
CN203323790U (en) | Sensor collection control system | |
CN111144291A (en) | Method and device for distinguishing personnel invasion in video monitoring area based on target detection | |
CN111915853B (en) | Energy storage station safety situation assessment and early warning system and method with linkage characteristic | |
CN113066248B (en) | Intelligent community construction security monitoring intelligent management system based on video image processing | |
CN105785946B (en) | Computer room ring control integration monitors platform | |
CN107588799A (en) | A kind of architectural electricity equipment on-line monitoring system | |
CN112101495A (en) | Risk monitoring method, system and related equipment | |
CN116151802B (en) | Comprehensive management and control system for hydraulic and electric engineering construction and equipment operation and maintenance | |
CN117973705B (en) | Data processing and analyzing system and method for intelligent building site monitoring system | |
CN114446021A (en) | Building engineering monitoring system based on wireless communication | |
CN103207616A (en) | Environmental information monitoring method for transformer substation | |
CN106052745B (en) | A kind of power circuit monitoring method | |
CN115557384A (en) | Wisdom building site tower crane monitoring system | |
CN115841730A (en) | Video monitoring system and abnormal event detection method | |
CN113053063A (en) | Mobile terminal-based disaster online disposal flow implementation method | |
CN113018746A (en) | Wisdom fire extinguishing system based on internet of things | |
CN114061669B (en) | Intelligent monitoring system of environmental protection equipment | |
CN114882659A (en) | Battery replacing cabinet battery anti-theft method based on Internet of things | |
CN111308241A (en) | Lightning protection facility online safety monitoring method and device based on GIS platform | |
CN114386741A (en) | Building site construction safety monitoring system based on risk identification |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170620 |