CN106871316B - A kind of supply air system of tall and big clean room - Google Patents

A kind of supply air system of tall and big clean room Download PDF

Info

Publication number
CN106871316B
CN106871316B CN201710047434.0A CN201710047434A CN106871316B CN 106871316 B CN106871316 B CN 106871316B CN 201710047434 A CN201710047434 A CN 201710047434A CN 106871316 B CN106871316 B CN 106871316B
Authority
CN
China
Prior art keywords
air
return
supply
passageway
tall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710047434.0A
Other languages
Chinese (zh)
Other versions
CN106871316A (en
Inventor
倪欣
丁峰
邢超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Middle Northwest Co Ltd Of Study On Engineering Design Institute
Original Assignee
Middle Northwest Co Ltd Of Study On Engineering Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Middle Northwest Co Ltd Of Study On Engineering Design Institute filed Critical Middle Northwest Co Ltd Of Study On Engineering Design Institute
Priority to CN201710047434.0A priority Critical patent/CN106871316B/en
Publication of CN106871316A publication Critical patent/CN106871316A/en
Application granted granted Critical
Publication of CN106871316B publication Critical patent/CN106871316B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F7/00Ventilation
    • F24F7/007Ventilation with forced flow
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/72Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure
    • F24F11/74Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure for controlling air flow rate or air velocity
    • F24F11/77Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure for controlling air flow rate or air velocity by controlling the speed of ventilators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/10Temperature
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Abstract

The invention discloses a kind of supply air systems of tall and big clean room, including return airway and supply air duct at the top of toilet is arranged in;The supply air duct is connected to air supply tube, and is connected in the air blow and return passageway of toilet two sidewalls by blowpipe;The return airway is connect with backwind tube, and is connected in the air blow and return passageway of toilet two sidewalls by return air branch pipe;Air blow and return passageway includes air-supply passageway and return air passageway, is provided with jet air opening on the inner wall in passageway of blowing, and single layer grating return air inlet is provided on return air passageway, and blowpipe is connected to air-supply passageway, and return air branch pipe is connected to return air passageway.The supply air system reasonable Arrangement air conditioning air flow tissue, to meet under the premise of less energy intensive using the temperature and humidity environmental requirement in height.

Description

A kind of supply air system of tall and big clean room
[technical field]
The invention belongs to architectural design fields, and in particular to a kind of supply air system of tall and big clean room.
[background technique]
Toilet suffers from always higher requirement to temperature and humidity precision control, and the control difficulty of tall and big clean room is then More highlight.It is increasingly huge in the volume or height of experiment or manufacturing equipment with the progress of technology, therefore to experimental site It also proposed more stringent requirement with environment.The temperature and humidity of demand when in order to reach operation, will often put into more equipment Cost causes the unnecessary energy and fund to waste.
[summary of the invention]
The content of present invention aims to solve the problem that large space air supply mode problem, provides a kind of air-supply system of tall and big clean room System, the supply air system reasonable Arrangement air conditioning air flow tissue, to meet under the premise of less energy intensive using warm and humid in height Spend environmental requirement.
To achieve the above object, the invention adopts the following technical scheme:
A kind of supply air system of tall and big clean room, including return airway and supply air duct at the top of toilet is arranged in; The supply air duct is connected to air supply tube, and is connected in the air blow and return passageway of toilet two sidewalls by blowpipe;Institute The return airway stated is connect with backwind tube, and is connected in the air blow and return passageway of toilet two sidewalls by return air branch pipe;It sends back to Wind passageway includes air-supply passageway and return air passageway, is provided with jet air opening on the inner wall in passageway of blowing, return air is provided on passageway Single layer grating return air inlet, blowpipe are connected to air-supply passageway, and return air branch pipe is connected to return air passageway.
The jet air opening and single layer grating return air inlet is arranged at below the rail top of toilet;And two air blow and return folders Corresponding jet air opening, single layer grating return air inlet are oppositely arranged on road.
The jet air opening uses automatic wind direction angle-variable type jet air opening, and comes with filter;It blows on passageway The two rows of air outlets of lower arrangement, 5.2 meters far from ground of lower exhaust outlet bottom.
The single layer grating return air inlet bottom is far from ground 300mm.
Supply air duct, air supply tube, blowpipe, return airway, backwind tube and the return air branch pipe is arranged at cleaning Between ceiling portion and furred ceiling.
Being integrally formed air-supply end is arranged side by side with return air passageway interval in two air-supply passageways;Integration air-supply Air inlet, the setting of return air passageway upper end is arranged by being separated into independent seal cavity, air-supply passageway upper end inside color steel plate in end Air outlet.
Tall and big clean room includes at least two Precision Machining areas and two supply air systems, and two supply air systems are corresponding to be sent Wind branch pipe and return air branch pipe are arranged in parallel, and firewall is arranged between two adjacent Precision Machining areas.
Control valve is provided on the air supply tube, blowpipe, backwind tube and return air branch pipe;It is provided in toilet Temperature sensor, temperature sensor control connection control valve.
Compared with prior art, the present invention having the advantage that
The present invention is sent using both sides upper side to blowing by air blow and return passageway, mode of each side with side bottom return air;Air-supply Mouth uses automatic wind direction angle-variable type jet air opening, so that opposite air motion is formed inside toilet carries out heat exchange, and By return air inlet timely discharge temperature rise room air, the supply air system reasonable Arrangement air conditioning air flow tissue, thus Under the premise of less energy intensive, meet using the temperature and humidity environmental requirement in height.It is not only at low cost, but also temperature precise control, It is high-efficient.
Further, it is vertically disposed with jet air opening and single layer grating return air inlet, so that the entire clean indoor equal energy of air It is enough to form the phenomenon that circulating, avoiding local temperature differences.
Further, integration air-supply end be by color steel plate inner part every, there is no air hose access, make to send back to air piping and Send air port integration back to, integral manufacturing ensure that Cleanliness while reducing inleakage, reduce air hose production linking Possible secondary pollution in the future is brought in the process, also makes whole clean area more beautiful, stringing more succinctly facilitates.
Further, by the connection of temperature sensor and control valve, the automatic accurate control of temperature is realized, electromagnetism is passed through Valve regulation air output and return air amount, indirectly adjust room temperature.
[Detailed description of the invention]
Fig. 1 is tall and big clean room air supply mode schematic diagram;
Fig. 2 is tall and big clean room integration air-supply end schematic diagram;
Fig. 3 is tall and big clean room structural schematic diagram;
Wherein, 1, single layer grating return air inlet;2, return air passageway;3, (autogamy is efficient for automatic wind direction angle-variable type jet air opening Filter);4, air-supply passageway;5, return air branch pipe;6, return airway;7, backwind tube;8, air supply tube;9, supply air duct;10, it blows Branch pipe;11, furred ceiling;12, rail top.
[specific embodiment]
The present invention is described in detail with reference to the accompanying drawing:
As shown in Figure 1, a kind of supply air system of tall and big clean room of the present invention, including the return air at the top of toilet is arranged in Air duct 6 and supply air duct 9;The supply air duct 9 is connected to air supply tube 8, and is connected to toilet two by blowpipe 10 In the air blow and return passageway of side wall;The return airway 6 is connect with backwind tube 7, and is connected to toilet two by return air branch pipe 5 In the air blow and return passageway of side wall;Air blow and return passageway includes air-supply passageway 4 and return air passageway 2, is provided on the inner wall in passageway 4 of blowing Jet air opening 3 is provided with single layer grating return air inlet 1 on return air passageway 2, and blowpipe 10 is connected to air-supply passageway 4, return air branch pipe 5 are connected to return air passageway 2.
Jet air opening 3 and single layer grating return air inlet 1 are arranged at 12 lower section of rail top of toilet;And two air blow and return passageways Upper corresponding jet air opening 3 and single layer grating return air inlet 1 are oppositely arranged.Jet air opening 3 is sprayed using automatic wind direction angle-variable type Air port is flowed, and comes with filter;Two rows of air outlets, 5.2 meters far from ground of lower exhaust outlet bottom are arranged in air blow and return passageway up and down.Single layer 1 bottom of grating return air inlet is far from ground 300mm.
Supply air duct 9, air supply tube 8, blowpipe 10, return airway 6, backwind tube 7 and return air branch pipe 5 are arranged at cleaning Between ceiling portion and furred ceiling 11.Control valve is provided on air supply tube 8, blowpipe 10, backwind tube 7 and return air branch pipe 5.
As shown in Fig. 2, two air-supply passageways 4 are spaced with return air passageway 2 is arranged side by side being integrally formed air-supply end;One Change air-supply end and air inlet, return air passageway 2 are set by being separated into independent seal cavity, air-supply 4 upper end of passageway inside color steel plate Air outlet is arranged in upper end.
Embodiment
As shown in figure 3, tall and big clean room includes Liang Ge Precision Machining area and two supply air systems, two supply air systems pair The blowpipe and return air branch pipe answered are arranged in parallel.Precision Machining area temperature requirement: 20 ± 2 DEG C, humidity requirement: 45 ± 5%;It is clean Cleanliness grade: 100,000 grades (N8).About 3300 ㎡ of the space buildings area, 8.75 meters of clear height under furred ceiling.Two fire prevention are divided in the region Subregion, about 18 meters of each fire compartment clear span.
In order to guarantee the temperature and humidity and purity requirements of workspace within 3 meters, now sent using both sides upper side to blowing, each side With the mode of side bottom return air;Air outlet use automatic wind direction angle-variable type jet air opening, 5.2 meters away from ground of tuyere bottom, up and down Two rows arrangement air outlet;Downside return air inlet bottom is far from ground 300mm, using single layer air grille.
By the connection of temperature sensor and control valve, the automatic accurate control of temperature is realized, electromagnetism valve regulation is passed through Air output and return air amount, indirectly adjust room temperature.When temperature be more than Precision Machining area temperature requirement when, increase air output and Return air amount carries out quickly reducing temperature, when temperature is lower than Precision Machining area temperature requirement, reduces air output and return air amount carries out Increase temperature.
The principle of the present invention is as follows:
1. in order to realize the cleaning and constant temperature and humidity requirement (cleaniliness classs N8, temperature accuracy control ± 2 of large space DEG C, humidity precision controlling ± 5%), a possibility that needing dust and dust accumulation in control room, if air-conditioning send back to air piping directly into Enter clean area air blow and return, or be placed in clean furred ceiling, after through a long time operation, it is contaminated that indoor circulation air will certainly be aggravated A possibility that, internal cause greatly increases.
2. the area of tall and big clean room is generally large, ceiling advantage is made full use of, reduces air output, preferably control is real The cleanliness of area or operating space is tested, under type such as is now taken to arrange air supply duct and end:
(1) air blow and return supervisor is arranged in furred ceiling, and branch wind pipe is separated from main air hose is followed by integration end of blowing;
(2) 50mm is thick, the concrete-cored color steel plate air-supply end of integrated purifying is respectively independent by building span, inside be separated into Three parts.Two vertical ends of left and right are air-supply passageways 4, and using top Lateral supply, long-range air outlet is directly arranged in air-supply passageway surface, And until passageway passes to air outlet lower part;Integrated end intermediate vertical region is return air passageway 2, bottom is led directly to, away from ground Return air inlet is set at 300mm in return air passageway surface.Whole air-supply end is by color steel plate inner part every there is no air hoses to connect Enter, make to send air piping back to and send air port integration back to, integral manufacturing ensure that Cleanliness, subtract while reducing inleakage Lack in air hose production convergence process and brought possible secondary pollution in the future, has also made whole clean area more beautiful, stringing is simpler Clean convenience.
More than, only presently preferred embodiments of the present invention is not limited only to practical range of the invention, all according to the invention patent The equivalence changes and modification that the content of range is done all should be technology scope of the invention.

Claims (7)

1. a kind of supply air system of tall and big clean room, it is characterised in that: including the return airway (6) at the top of toilet is arranged in With supply air duct (9);The supply air duct (9) is connected to air supply tube (8), and is connected to toilet by blowpipe (10) In the air blow and return passageway of two sidewalls;The return airway (6) is connect with backwind tube (7), and is connected to by return air branch pipe (5) In the air blow and return passageway of toilet two sidewalls;Air blow and return passageway includes air-supply passageway (4) and return air passageway (2), is blown passageway (4) Inner wall on be provided with jet air opening (3), be provided on return air passageway (2) single layer grating return air inlet (1), blowpipe (10) with Air-supply passageway (4) connection, return air branch pipe (5) are connected to return air passageway (2);
The jet air opening (3) and single layer grating return air inlet (1) is arranged at below the rail top (12) of toilet;And two are sent Corresponding jet air opening (3), single layer grating return air inlet (1) are oppositely arranged on return air passageway.
2. a kind of supply air system of tall and big clean room according to claim 1, it is characterised in that: the jet air opening (3) automatic wind direction angle-variable type jet air opening is used, and comes with filter;Two rows of air outlets are arranged in air-supply passageway (4) up and down, 5.2 meters away from ground of lower dispatch tuyere bottom.
3. a kind of supply air system of tall and big clean room according to claim 1, it is characterised in that: the single layer grid Return air inlet (1) bottom is far from ground 300mm.
4. a kind of supply air system of tall and big clean room according to claim 1, it is characterised in that: the supply air duct (9), air supply tube (8), blowpipe (10), return airway (6), backwind tube (7) and return air branch pipe (5) are arranged at clean ceiling Between portion and furred ceiling (11).
5. a kind of supply air system of tall and big clean room according to claim 1, it is characterised in that: two air-supply passageways (4) it is spaced with return air passageway (2) and being integrally formed air-supply end is arranged side by side;Integration air-supply end by color steel plate inner part every At independent seal cavity, air inlet is arranged in passageway (4) upper end of blowing, and air outlet is arranged in return air passageway (2) upper end.
6. a kind of supply air system of tall and big clean room according to claim 1, it is characterised in that: tall and big clean room packet At least two Precision Machining areas and two supply air systems are included, the corresponding blowpipe of two supply air systems and return air branch pipe parallel connection are set It sets, firewall is set between two adjacent Precision Machining areas.
7. a kind of supply air system of tall and big clean room according to claim 1, it is characterised in that: the air supply tube (8), control valve is provided on blowpipe (10), backwind tube (7) and return air branch pipe (5);Temperature biography is provided in toilet Sensor, temperature sensor control connection control valve.
CN201710047434.0A 2017-01-22 2017-01-22 A kind of supply air system of tall and big clean room Active CN106871316B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710047434.0A CN106871316B (en) 2017-01-22 2017-01-22 A kind of supply air system of tall and big clean room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710047434.0A CN106871316B (en) 2017-01-22 2017-01-22 A kind of supply air system of tall and big clean room

Publications (2)

Publication Number Publication Date
CN106871316A CN106871316A (en) 2017-06-20
CN106871316B true CN106871316B (en) 2019-05-07

Family

ID=59158679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710047434.0A Active CN106871316B (en) 2017-01-22 2017-01-22 A kind of supply air system of tall and big clean room

Country Status (1)

Country Link
CN (1) CN106871316B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108800300A (en) * 2018-04-20 2018-11-13 中铁第勘察设计院集团有限公司 The automatic device and method for reducing large space indoor heating temperature gradient
CN111189134A (en) * 2020-01-13 2020-05-22 中国人民解放军63921部队 Efficient filtering air supply device for layered air-conditioning purification system of tall and big clean factory building
CN115218302B (en) * 2022-07-19 2023-12-08 山东省医药工业设计院有限公司 Self-balancing design method of air conditioning system applied to medicine production clean room

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5086692A (en) * 1990-04-12 1992-02-11 Welch Henry W Air handling system and method for an operating room
DE69228014T2 (en) * 1991-01-29 1999-05-27 Shinko Electric Co Ltd Unit for airtight storage of semiconductor wafers
KR100688606B1 (en) * 2006-06-12 2007-03-02 이재천 Integrated ventilation system for using heat exchanger
JP2008202929A (en) * 2007-02-22 2008-09-04 Sun Avenue:Kk Air intake and exhaust device for building
JP2009150058A (en) * 2007-12-19 2009-07-09 Naoki Fujiwara Heat insulating system of building using ventilation equipment
CN104819521A (en) * 2015-04-23 2015-08-05 中天道成(苏州)洁净技术有限公司 Intelligent energy-saving air handling system for operation room
CN205536269U (en) * 2016-02-04 2016-08-31 厦门中恒信净化科技股份有限公司 Return air filter equipment's improvement structure in operating room

Also Published As

Publication number Publication date
CN106871316A (en) 2017-06-20

Similar Documents

Publication Publication Date Title
CN106871316B (en) A kind of supply air system of tall and big clean room
CN101482303B (en) Energy-saving consumption-reducing air conditioning method and unit air conditioner of spinning factory
CN112050341B (en) Toilet ventilation system with upper row, lower row and ventilation method
CN102261708B (en) Indirect-evaporative-cooling-based small and large environment energy-saving air conditioning system for spinning mill
CN103512386B (en) Crossfolw open type cooling tower
CN104019507A (en) Tube type indirect and evaporative type cold air machine combined multi-fan evaporative cooling air conditioner system
CN205383908U (en) Prevent white cigarette ventilation formula cooling tower of impressing
CN209295284U (en) A kind of forms mounting structure
CN203893341U (en) Multi-fan evaporative cooling air conditioner
CN106253105B (en) A kind of transformer station's green exhaust system with noise reduction and function of smoking alarm
CN105042735B (en) Folded plate type indirect fluid power spray room composite evaporation cooling air conditioning unit
CN102141292A (en) Ceiling air outlet for air conditioning equipment
CN206449811U (en) A kind of integration air-supply end of tall and big clean room
CN209445549U (en) Campus fresh air system
CN204043150U (en) Industrial air conditioning cloth wind system
CN206160386U (en) Novel toilet
CN100363688C (en) Full automatic air conditioner sets
CN107747778B (en) Modular board tubular indirect evaporative cooling air conditioning group
CN103712296A (en) Combined fresh air thermostatic cooling system special for machine rooms and base stations
CN206430269U (en) A kind of cleaning shop
CN202119030U (en) Big or small environmental air-conditioning system applied to textile mill
CN104949227A (en) Air conditioning unit
CN211925917U (en) Temperature-adjustable humidifying and air-supplying combined device of gas film coal storage shed
CN110779140B (en) Fresh air system for high-rise building
CN2802323Y (en) Automatic control air conditioner set

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant