CN106871316A - A kind of supply air system of tall and big clean room - Google Patents

A kind of supply air system of tall and big clean room Download PDF

Info

Publication number
CN106871316A
CN106871316A CN201710047434.0A CN201710047434A CN106871316A CN 106871316 A CN106871316 A CN 106871316A CN 201710047434 A CN201710047434 A CN 201710047434A CN 106871316 A CN106871316 A CN 106871316A
Authority
CN
China
Prior art keywords
air
return
supply
passageway
tall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710047434.0A
Other languages
Chinese (zh)
Other versions
CN106871316B (en
Inventor
倪欣
丁峰
邢超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Middle Northwest Co Ltd Of Study On Engineering Design Institute
Original Assignee
Middle Northwest Co Ltd Of Study On Engineering Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Middle Northwest Co Ltd Of Study On Engineering Design Institute filed Critical Middle Northwest Co Ltd Of Study On Engineering Design Institute
Priority to CN201710047434.0A priority Critical patent/CN106871316B/en
Publication of CN106871316A publication Critical patent/CN106871316A/en
Application granted granted Critical
Publication of CN106871316B publication Critical patent/CN106871316B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F7/00Ventilation
    • F24F7/007Ventilation with forced flow
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/72Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure
    • F24F11/74Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure for controlling air flow rate or air velocity
    • F24F11/77Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure for controlling air flow rate or air velocity by controlling the speed of ventilators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/10Temperature
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Atmospheric Sciences (AREA)
  • Ventilation (AREA)

Abstract

The invention discloses a kind of supply air system of tall and big clean room, including it is arranged on return airway and supply air duct at the top of toilet;Described supply air duct is connected with ajutage, and is connected in the air blow and return passageway of toilet two side by blowpipe;Described return airway is connected with backwind tube, and is connected in the air blow and return passageway of toilet two side by return air branch pipe;Air blow and return passageway includes air-supply passageway and return air passageway, and jet air opening is provided with the inwall in passageway of blowing, and individual layer grating return air inlet is provided with return air passageway, and blowpipe is connected with air-supply passageway, and return air branch pipe is connected with return air passageway.The supply air system reasonable Arrangement air conditioning air flow tissue, so as on the premise of less energy intensive, meet and use the humiture environmental requirement in height.

Description

A kind of supply air system of tall and big clean room
【Technical field】
The invention belongs to architectural design field, and in particular to a kind of supply air system of tall and big clean room.
【Background technology】
Toilet suffers from requirement higher always to temperature and humidity precision control, and the control difficulty of tall and big clean room is then More highlight.It is increasingly huge in the volume or height of experiment or manufacturing equipment with the progress of technology, therefore to experimental site More stringent requirement is it is also proposed with environment.In order to reach the humiture of demand during operation, more equipment are often put into Cost, causes the unnecessary energy and fund waste.
【The content of the invention】
Present invention aims to solve the problem that large space air supply mode problem, there is provided a kind of air-supply system of tall and big clean room System, the supply air system reasonable Arrangement air conditioning air flow tissue, so as on the premise of less energy intensive, meet using warm and humid in height Degree environmental requirement.
To achieve the above object, the present invention uses following technical scheme:
A kind of supply air system of tall and big clean room, including it is arranged on return airway and supply air duct at the top of toilet; Described supply air duct is connected with ajutage, and is connected in the air blow and return passageway of toilet two side by blowpipe;Institute The return airway stated is connected with backwind tube, and is connected in the air blow and return passageway of toilet two side by return air branch pipe;Send back to Wind passageway includes air-supply passageway and return air passageway, and jet air opening is provided with the inwall in passageway of blowing, and return air is provided with passageway Individual layer grating return air inlet, blowpipe is connected with air-supply passageway, and return air branch pipe is connected with return air passageway.
Described jet air opening and individual layer grating return air inlet is arranged at the rail top lower section of toilet;And two air blow and return folders Corresponding jet air opening, individual layer grating return air inlet are oppositely arranged on road.
Described jet air opening uses automatic wind direction angle-variable type jet air opening, and comes with filter;On air-supply passageway Two dispatch air ports of lower arrangement, lower exhaust outlet bottom is far from 5.2 meters of ground.
Described individual layer grating return air inlet bottom is far from ground 300mm.
Described supply air duct, ajutage, blowpipe, return airway, backwind tube and return air branch pipe are arranged at cleaning Between ceiling portion and furred ceiling.
Two described air-supply passageways are arranged side by side being integrally formed air-supply end with return air passageway interval;Integration air-supply End sets air inlet by being separated into independent seal cavity, air-supply passageway upper end inside color steel, and return air passageway upper end is set Air outlet.
Tall and big clean room includes at least two Precision Machining areas and two supply air systems, and two supply air systems are corresponding to be sent Wind branch pipe and return air branch pipe are arranged in parallel, and fire wall is set between two adjacent Precision Machining areas.
Control valve is provided with described ajutage, blowpipe, backwind tube and return air branch pipe;It is provided with toilet Temperature sensor, temperature sensor control connection control valve.
The present invention compared with prior art, with advantages below:
The present invention sent to blowing using both sides upper side by air blow and return passageway, each side with side bottom return air mode;Air-supply Mouth uses automatic wind direction angle-variable type jet air opening so that toilet is internally formed relative air motion and carries out heat exchange, and By return air inlet timely discharge temperature rise room air, the supply air system reasonable Arrangement air conditioning air flow tissue, so as to On the premise of less energy intensive, meet and use the humiture environmental requirement in height.Not only low cost, and temperature control is accurate, Efficiency high.
Further, jet air opening and individual layer grating return air inlet are vertically disposed with so that the equal energy of air in whole toilet Enough formation circulate, it is to avoid the phenomenon of local temperature differences.
Further, integration air-supply end is separated by color steel inside, is accessed there is no airduct, make to send back to wind pipeline and Send air port integration back to, integral manufacturing while reducing inleakage, it is ensured that Cleanliness, reduces airduct and makes linking During bring possible secondary pollution in the future, also make that overall clean area is more attractive in appearance, stringing more succinctly facilitates.
Further, by temperature sensor and the connection of control valve, the automatic accurate control of temperature is realized, by electromagnetism Valve regulation air output and return air amount, indirectly adjust indoor temperature.
【Brief description of the drawings】
Fig. 1 is tall and big clean room air supply mode schematic diagram;
Fig. 2 is tall and big clean room integration air-supply end schematic diagram;
Fig. 3 is tall and big clean room structural representation;
Wherein, 1, individual layer grating return air inlet;2nd, return air passageway;3rd, (autogamy is efficient for automatic wind direction angle-variable type jet air opening Filter);4th, air-supply passageway;5th, return air branch pipe;6th, return airway;7th, backwind tube;8th, ajutage;9th, supply air duct;10th, blow Branch pipe;11st, furred ceiling;12nd, rail top.
【Specific embodiment】
The present invention is described in detail below in conjunction with the accompanying drawings:
As shown in figure 1, a kind of supply air system of tall and big clean room of the present invention, including it is arranged on the return air at the top of toilet Air channel 6 and supply air duct 9;Described supply air duct 9 is connected with ajutage 8, and is connected to toilet two by blowpipe 10 In the air blow and return passageway of side wall;Described return airway 6 is connected with backwind tube 7, and is connected to toilet two by return air branch pipe 5 In the air blow and return passageway of side wall;Air blow and return passageway includes air-supply passageway 4 and return air passageway 2, is provided with the inwall in passageway 4 of blowing Jet air opening 3, is provided with individual layer grating return air inlet 1 on return air passageway 2, blowpipe 10 is connected with air-supply passageway 4, return air branch pipe 5 connect with return air passageway 2.
Jet air opening 3 and individual layer grating return air inlet 1 are arranged at the lower section of rail top 12 of toilet;And two air blow and return passageways Upper corresponding jet air opening 3 and individual layer grating return air inlet 1 are oppositely arranged.Jet air opening 3 is sprayed using automatic wind direction angle-variable type Stream air port, and come with filter;Two dispatch air ports are arranged in air blow and return passageway up and down, and lower exhaust outlet bottom is far from 5.2 meters of ground.Individual layer The bottom of grating return air inlet 1 is far from ground 300mm.
Supply air duct 9, ajutage 8, blowpipe 10, return airway 6, backwind tube 7 and return air branch pipe 5 are arranged at cleaning Between ceiling portion and furred ceiling 11.Control valve is provided with ajutage 8, blowpipe 10, backwind tube 7 and return air branch pipe 5.
As shown in Fig. 2 two air-supply passageways 4 are arranged side by side being integrally formed air-supply end with the interval of return air passageway 2;Integrally Change air-supply end and air inlet, return air passageway 2 are set by being separated into independent seal cavity, the air-supply upper end of passageway 4 inside color steel Upper end sets air outlet.
Embodiment
As shown in figure 3, tall and big clean room includes Liang Ge Precision Machinings area and two supply air systems, two supply air systems pair The blowpipe and return air branch pipe answered are arranged in parallel.Precision Machining area temperature requirement:20 ± 2 DEG C, humidity requirement:45 ± 5%;It is clean Cleanliness grade:100000 grades (N8).The space buildings area about 3300 ㎡, 8.75 meters of clear height under furred ceiling.Two fire prevention are divided in the region Subregion, about 18 meters of each fire compartment clear span.
In order to ensure the humiture and purity requirements of workspace within 3 meters, now sent to blowing using both sides upper side, each side With the mode of side bottom return air;Air outlet uses automatic wind direction angle-variable type jet air opening, tuyere bottom away from 5.2 meters of ground, up and down Air outlet is put in two arrangements;Downside return air inlet bottom far from ground 300mm, using individual layer air grille.
By temperature sensor and the connection of control valve, the automatic accurate control of temperature is realized, by electromagnetism valve regulation Air output and return air amount, indirectly adjust indoor temperature.When temperature exceed Precision Machining area temperature requirement when, increase air output and Return air amount is quickly reduced temperature, and when temperature is less than Precision Machining area temperature requirement, reducing air output and return air amount is carried out Rise high-temperature.
Principle of the invention is as follows:
1. in order to realize that (cleaniliness classs N8, temperature accuracy controls ± 2 for the cleaning and constant temperature and humidity requirement of large space DEG C, humidity precision controlling ± 5%), it is necessary in control room dust and laying dust possibility, if air-conditioning sends wind pipeline back to directly entered Enter clean area air blow and return, or be positioned in clean furred ceiling, through long-play after, will certainly aggravate indoor circulation air be contaminated Possibility, internal cause greatly increases.
2. the area of tall and big clean room is generally large, makes full use of ceiling advantage, reduces air output, and preferably control is real The cleanliness factor of area or operating space is tested, now takes following manner to arrange air supply duct and end:
(1) air blow and return supervisor is arranged in furred ceiling, and branch wind pipe is separated from air main and is followed by integration air-supply end;
(2) the concrete-cored color steel air-supply end of 50mm thickness, integrated purifying is each independent by building span, is separated into inside it Three parts.Two vertical ends of left and right are air-supply passageways 4, and using top Lateral supply, long-range air outlet is directly arranged in air-supply passageway surface, And untill passageway passes to air outlet bottom;Integrated end intermediate vertical region is return air passageway 2, bottom is led directly to, away from ground Return air inlet is set at 300mm in return air passageway surface.Overall air-supply end is separated by color steel inside, is connect there is no airduct Enter, make to send wind pipeline back to and send air port integration back to, integral manufacturing while reducing inleakage, it is ensured that Cleanliness, subtracts Lack during airduct makes convergence process and brought possible secondary pollution in the future, also made that overall clean area is more attractive in appearance, stringing is simpler Clean convenience.
More than, only presently preferred embodiments of the present invention is not limited only to practical range of the invention, all according to patent of the present invention Equivalence changes and modification that the content of scope is done, all should be technology category of the invention.

Claims (8)

1. a kind of supply air system of tall and big clean room, it is characterised in that:Including the return airway (6) being arranged at the top of toilet With supply air duct (9);Described supply air duct (9) is connected with ajutage (8), and is connected to toilet by blowpipe (10) In the air blow and return passageway of two side;Described return airway (6) is connected with backwind tube (7), and is connected to by return air branch pipe (5) In the air blow and return passageway of toilet two side;Air blow and return passageway includes air-supply passageway (4) and return air passageway (2), blows passageway (4) Inwall on be provided with jet air opening (3), be provided with individual layer grating return air inlet (1) on return air passageway (2), blowpipe (10) with Air-supply passageway (4) connection, return air branch pipe (5) is connected with return air passageway (2).
2. the supply air system of a kind of tall and big clean room according to claim 1, it is characterised in that:Described jet air opening (3) it is arranged at below the rail top (12) of toilet with individual layer grating return air inlet (1);And corresponding spray on two air blow and return passageways Stream air port (3), individual layer grating return air inlet (1) are oppositely arranged.
3. the supply air system of a kind of tall and big clean room according to claim 1, it is characterised in that:Described jet air opening (3) automatic wind direction angle-variable type jet air opening is used, and comes with filter;Two dispatch air ports are arranged in air-supply passageway (4) up and down, Lower dispatch tuyere bottom is away from 5.2 meters of ground.
4. the supply air system of a kind of tall and big clean room according to claim 1, it is characterised in that:Described individual layer grid Return air inlet (1) bottom is far from ground 300mm.
5. the supply air system of a kind of tall and big clean room according to claim 1, it is characterised in that:Described supply air duct (9), ajutage (8), blowpipe (10), return airway (6), backwind tube (7) and return air branch pipe (5) are arranged at clean ceiling Between portion and furred ceiling (11).
6. the supply air system of a kind of tall and big clean room according to claim 1, it is characterised in that:Two air-supply passageways (4) being integrally formed air-supply end is arranged side by side with return air passageway (2) interval;Integration air-supply end is separated by color steel inside Into independent seal cavity, air-supply passageway (4) upper end sets air inlet, and return air passageway (2) upper end sets air outlet.
7. the supply air system of a kind of tall and big clean room according to claim 1, it is characterised in that:Tall and big clean room bag Include at least two Precision Machining areas and two supply air systems, the corresponding blowpipe of two supply air systems and return air branch pipe parallel connection set Put, fire wall is set between two adjacent Precision Machining areas.
8. the supply air system of a kind of tall and big clean room according to claim 1, it is characterised in that:Described ajutage (8), it is provided with control valve on blowpipe (10), backwind tube (7) and return air branch pipe (5);Temperature biography is provided with toilet Sensor, temperature sensor control connection control valve.
CN201710047434.0A 2017-01-22 2017-01-22 A kind of supply air system of tall and big clean room Active CN106871316B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710047434.0A CN106871316B (en) 2017-01-22 2017-01-22 A kind of supply air system of tall and big clean room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710047434.0A CN106871316B (en) 2017-01-22 2017-01-22 A kind of supply air system of tall and big clean room

Publications (2)

Publication Number Publication Date
CN106871316A true CN106871316A (en) 2017-06-20
CN106871316B CN106871316B (en) 2019-05-07

Family

ID=59158679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710047434.0A Active CN106871316B (en) 2017-01-22 2017-01-22 A kind of supply air system of tall and big clean room

Country Status (1)

Country Link
CN (1) CN106871316B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108800300A (en) * 2018-04-20 2018-11-13 中铁第勘察设计院集团有限公司 The automatic device and method for reducing large space indoor heating temperature gradient
CN111189134A (en) * 2020-01-13 2020-05-22 中国人民解放军63921部队 Efficient filtering air supply device for layered air-conditioning purification system of tall and big clean factory building
CN115218302A (en) * 2022-07-19 2022-10-21 山东省医药工业设计院有限公司 Self-balancing design method applied to air conditioning system of medical clean room

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5086692A (en) * 1990-04-12 1992-02-11 Welch Henry W Air handling system and method for an operating room
EP0497281A2 (en) * 1991-01-29 1992-08-05 Shinko Electric Co. Ltd. wafer airtight keeping unit and keeping facility thereof
CN101097081A (en) * 2006-06-12 2008-01-02 李在千 Integrated ventilation system for using heat exchanger
JP2008202929A (en) * 2007-02-22 2008-09-04 Sun Avenue:Kk Air intake and exhaust device for building
JP2009150058A (en) * 2007-12-19 2009-07-09 Naoki Fujiwara Heat insulating system of building using ventilation equipment
CN104819521A (en) * 2015-04-23 2015-08-05 中天道成(苏州)洁净技术有限公司 Intelligent energy-saving air handling system for operation room
CN205536269U (en) * 2016-02-04 2016-08-31 厦门中恒信净化科技股份有限公司 Return air filter equipment's improvement structure in operating room

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5086692A (en) * 1990-04-12 1992-02-11 Welch Henry W Air handling system and method for an operating room
EP0497281A2 (en) * 1991-01-29 1992-08-05 Shinko Electric Co. Ltd. wafer airtight keeping unit and keeping facility thereof
CN101097081A (en) * 2006-06-12 2008-01-02 李在千 Integrated ventilation system for using heat exchanger
JP2008202929A (en) * 2007-02-22 2008-09-04 Sun Avenue:Kk Air intake and exhaust device for building
JP2009150058A (en) * 2007-12-19 2009-07-09 Naoki Fujiwara Heat insulating system of building using ventilation equipment
CN104819521A (en) * 2015-04-23 2015-08-05 中天道成(苏州)洁净技术有限公司 Intelligent energy-saving air handling system for operation room
CN205536269U (en) * 2016-02-04 2016-08-31 厦门中恒信净化科技股份有限公司 Return air filter equipment's improvement structure in operating room

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108800300A (en) * 2018-04-20 2018-11-13 中铁第勘察设计院集团有限公司 The automatic device and method for reducing large space indoor heating temperature gradient
CN111189134A (en) * 2020-01-13 2020-05-22 中国人民解放军63921部队 Efficient filtering air supply device for layered air-conditioning purification system of tall and big clean factory building
CN115218302A (en) * 2022-07-19 2022-10-21 山东省医药工业设计院有限公司 Self-balancing design method applied to air conditioning system of medical clean room
CN115218302B (en) * 2022-07-19 2023-12-08 山东省医药工业设计院有限公司 Self-balancing design method of air conditioning system applied to medicine production clean room

Also Published As

Publication number Publication date
CN106871316B (en) 2019-05-07

Similar Documents

Publication Publication Date Title
CN101482303B (en) Energy-saving consumption-reducing air conditioning method and unit air conditioner of spinning factory
CN102261708B (en) Indirect-evaporative-cooling-based small and large environment energy-saving air conditioning system for spinning mill
CN104019507B (en) The multi fan Evaporative Cooling Air-conditioning System that tubular type is combined with vaporizing type air conditioner indirectly
CN106871316B (en) A kind of supply air system of tall and big clean room
CN112050341A (en) Toilet ventilation system with upper row, lower row and ventilation method
CN108413500A (en) A kind of air conditioner indoor unit
CN111520855A (en) Fold and move ventilation system
CN104566655B (en) A kind of cold wind circulating type hot blast decentralized heating device
CN203893341U (en) Multi-fan evaporative cooling air conditioner
CN106253105B (en) A kind of transformer station's green exhaust system with noise reduction and function of smoking alarm
CN206449811U (en) A kind of integration air-supply end of tall and big clean room
CN211925917U (en) Temperature-adjustable humidifying and air-supplying combined device of gas film coal storage shed
CN105042735B (en) Folded plate type indirect fluid power spray room composite evaporation cooling air conditioning unit
CN107747778B (en) Modular board tubular indirect evaporative cooling air conditioning group
CN202119030U (en) Big or small environmental air-conditioning system applied to textile mill
CN206572671U (en) The energy-saving mechanical cooling couple formula air-conditioner set of dew point indirect evaporative cooling
CN206160386U (en) Novel toilet
CN206739520U (en) Family formula VMC
CN212842035U (en) Fold and move ventilation system
CN107044708A (en) Indoor air-purification device and air conditioner and indoor air purification method
CN209165647U (en) A kind of dining room evaporation cooling channel air-conditioning system
CN201652686U (en) Ducted radial flow blowing device
CN109629689B (en) Green dome for building
CN206914337U (en) The new blower fan of high ferro with multi-point atomizing humidification system
CN113124490A (en) Temperature-adjustable humidifying and air-supplying combined device of gas film coal storage shed

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant