CN106869506A CN201710183861.1A CN201710183861A CN106869506A CN 106869506 A CN106869506 A CN 106869506A CN 201710183861 A CN201710183861 A CN 201710183861A CN 106869506 A CN106869506 A CN 106869506A
Authority
CN
China
Prior art keywords
muscle
skin bottom
bottom muscle
double
spacing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710183861.1A
Other languages
English (en)
Inventor
汪崇英
谢雪梅
潘吉应
郭登林
贾建祥
周炳秋
韩用
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Construction Engineering Group Seventh Construction Engineering Co Ltd
GUIZHOU CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
Guizhou Construction Engineering Group Seventh Construction Engineering Co Ltd
GUIZHOU CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Construction Engineering Group Seventh Construction Engineering Co Ltd, GUIZHOU CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical Guizhou Construction Engineering Group Seventh Construction Engineering Co Ltd
Priority to CN201710183861.1A priority Critical patent/CN106869506A/zh
Publication of CN106869506A publication Critical patent/CN106869506A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Floor Finish (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种解决大跨度组合楼板双层双向钢筋安装的施工方法,底层安装时,第1皮底筋平行于以金属波纹板作楼承板的肋方向,并在金属波纹板的波谷间,再将第2皮底筋布置在金属波纹板的波面上并垂直于第1皮底筋,然后把第1皮底筋与第2皮底筋绑扎在一起,完成底层钢筋的安装。安装面层钢筋时,第1皮面筋平行于第2皮底筋且平面投影重合布置,第2皮面筋安装在第1皮面筋上且投影与第1皮底筋重合,在交点处用扎丝固定,再按一定间距设钢筋马凳。本安装方法,填补了大跨度组合楼板双层双向钢筋安装无工艺技术指导的空白,加工制作简单、安装方便、不耗费材料、受力钢筋的间距、标高位置能满足设计要求,安装后能一次通过质量验收规范要求。

Description

一种解决大跨度组合楼板双层双向钢筋安装的施工方法
技术领域
本发明涉及钢结构与混凝土组合楼板的施工技术,特别是一种解决大跨度组合楼板双层双向钢筋安装的施工方法。
背景技术
高层建筑外观造型多样化,为满足业主使用功能要求,充分利用空间,建立空中连廊,一般对相距21~33米的塔楼,在顶部之间用连廊组合成一体,塔楼为框架结构,连廊采用钢桁架结构体系,连廊楼板及屋面板则采用金属楼承板组合楼板。楼承板在施工时起模板作用,在使用阶段代替板底部分钢筋,能够与混凝土形成有力的握裹,提升结构的承载能力。组合楼板钢筋安装施工难度虽不大,但在施工图中,设计单位一般只明确金属楼承板厚度和形状,但对其形状的细部尺寸不做具体规定。特别对大跨度组合楼板双层双向钢筋安装,施工单位若忽略覆盖在楼承板下的主次钢梁方向,不考虑设计间距与金属波纹板波谷间距的关系,布钢筋时会出现楼板荷载传递错误,或者底筋与金属波纹板不能有效共同作用,缩小组合板的有效截面高度,降低组合楼板承载力等等质量问题,为此施工时要考虑钢结构主次梁方向、金属波纹板肋方向、楼板钢筋纵横间距、金属波纹板波谷距离等因素,有利于控制楼板的有效厚度。
发明内容
本发明的目的主要解决大跨度组合楼板双层双向钢筋安装的施工流程、操作工艺、安装要点及做法。
施工流程:施工准备→第一皮底筋排列→第二皮底筋排列→绑扎底筋→安装马凳→第一皮面筋排列→第二皮面筋排列→绑扎面筋→检查验收。本安装方法能达到加工制作简单、安装方便、不耗费材料、受力钢筋的间距、标高位置能满足设计要求的目的。
本发明的构成:一种解决大跨度组合楼板双层双向钢筋安装的施工方法,其特征在于:所述钢筋安装步骤如下:
(1) 施工准备:H型钢梁上的各层金属波纹板由栓钉安装完毕并经验收检查合格后,进入钢筋安装工序前,熟读钢筋设计要求,注意底筋间距应与金属波纹板的波谷间距相等;
(2)第一皮底筋排列:按设计间距布置第一皮底筋,第一皮底筋平行于以金属波纹板作楼承板的肋方向并在金属波纹板的波谷处;
(3)第二皮底筋排列:按设计间距在金属波纹板上画线确定第二皮底筋位置,再将第二皮底筋摆放在金属波纹板波面上;
(4)底筋绑扎:第一、二皮底筋全数排列好后,用绑扎丝在第一、二皮底筋的交点处,提起第一皮底筋将其与第二皮底筋绑扎牢固,完成底筋安装;
(5)安装马凳:面筋绑扎前,按不大于600在第一皮面筋下设马凳筋,马凳筋的形状尺寸应专门设计,马凳高度为板厚减混凝土保护层厚度再减双层面筋厚度之和;
(6)第一皮面筋排列:按第二皮底筋的布置方法排列满足设计间距即可;
(7)第二皮面筋排列:按设计间距平行于第一皮底筋摆放,放置在第一皮面筋上;
(8)绑扎面筋:第一、二皮面筋全数排列好后,用绑扎丝在第一、二皮面筋的交点处,提起第一皮面筋将其与第二皮面筋绑扎牢固,遇马凳筋时,将面筋摆放在马凳面上并与面筋绑扎牢固,完成面筋安装;
(9)检查验收:组合楼板双层双向钢筋安装完毕后,对上下层钢筋的间距、位置、马凳筋间距、数量、预埋件、钢筋接头、支座长度全数检查,合格后进行下道工序施工。
与现有技术比较,本发明填补了大跨度组合楼板双层双向钢筋安装无工艺技术指导的空白,加工制作简单、安装方便、不耗费材料、受力钢筋的间距、标高位置能满足设计要求,安装后能一次通过质量验收规范要求。
附图说明
图1是本发明大跨度组合楼板双层双向钢筋安装图,
图2是图1的1-1剖视图。
图中1、第一皮底筋,2、第二皮底筋,3、第一皮面筋,4、第二皮面筋,5、栓钉,6、马凳,7、金属波纹板,8、H型钢梁。
具体实施方式
如图1-2所示,一种解决大跨度组合楼板双层双向钢筋安装的施工方法,其特征在于:所述钢筋安装步骤如下:
(1) 施工准备:H型钢梁8上的各层金属波纹板7由栓钉5安装完毕并经验收检查合格后,进入钢筋安装工序前,熟读钢筋设计要求,注意底筋间距应与金属波纹板的波谷间距相等;
(2)第一皮底筋排列:按设计间距布置第一皮底筋1,第一皮底筋1平行于以金属波纹板7作楼承板的肋方向并在金属波纹板7的波谷处;
(3)第二皮底筋排列:按设计间距在金属波纹板7上画线确定第二皮底筋2位置,再将第二皮底筋2摆放在金属波纹板波面7上;
(4)底筋绑扎:第一、二皮底筋全数排列好后,用绑扎丝在第一、二皮底筋的交点处,提起第一皮底筋1将其与第二皮底筋2绑扎牢固,完成底筋安装;
(5)安装马凳6:面筋绑扎前,按不大于600在第一皮面筋3下设马凳筋,马凳筋的形状尺寸应专门设计,马凳6高度为板厚减混凝土保护层厚度再减双层面筋厚度之和;
(6)第一皮面筋排列:按第二皮底筋2的布置方法排列满足设计间距即可;
(7)第二皮面筋排列:按设计间距平行于第一皮底筋1摆放,放置在第一皮面筋3上;
(8)绑扎面筋:第一、二皮面筋全数排列好后,用绑扎丝在第一、二皮面筋的交点处,提起第一皮面筋3将其与第二皮面筋4绑扎牢固,遇马凳筋时,将面筋摆放在马凳面上并与面筋绑扎牢固,完成面筋安装;
(9)检查验收:组合楼板双层双向钢筋安装完毕后,对上下层钢筋的间距、位置、马凳筋间距、数量、预埋件、钢筋接头、支座长度全数检查,合格后进行下道工序施工。

Claims (1)

1.一种解决大跨度组合楼板双层双向钢筋安装的施工方法,其特征在于:所述钢筋安装步骤如下:
施工准备:H型钢梁(8)上的各层金属波纹板(7)由栓钉(5)安装完毕并经验收检查合格后,进入钢筋安装工序前,熟读钢筋设计要求,注意底筋间距应与金属波纹板的波谷间距相等;
(2)第一皮底筋排列:按设计间距布置第一皮底筋(1),第一皮底筋(1)平行于以金属波纹板(7)作楼承板的肋方向并在金属波纹板(7)的波谷处;
(3)第二皮底筋排列:按设计间距在金属波纹板(7)上画线确定第二皮底筋(2)位置,再将第二皮底筋(2)摆放在金属波纹板波面(7)上;
(4)底筋绑扎:第一、二皮底筋全数排列好后,用绑扎丝在第一、二皮底筋的交点处,提起第一皮底筋(1)将其与第二皮底筋(2)绑扎牢固,完成底筋安装;
(5)安装马凳(6):面筋绑扎前,按不大于600在第一皮面筋(3)下设马凳筋,马凳筋的形状尺寸应专门设计,马凳(6)高度为板厚减混凝土保护层厚度再减双层面筋厚度之和;
(6)第一皮面筋排列:按第二皮底筋(2)的布置方法排列满足设计间距即可;
(7)第二皮面筋排列:按设计间距平行于第一皮底筋(1)摆放,放置在第一皮面筋(3)上;
(8)绑扎面筋:第一、二皮面筋全数排列好后,用绑扎丝在第一、二皮面筋的交点处,提起第一皮面筋(3)将其与第二皮面筋(4)绑扎牢固,遇马凳筋时,将面筋摆放在马凳面上并与面筋绑扎牢固,完成面筋安装;
(9)检查验收:组合楼板双层双向钢筋安装完毕后,对上下层钢筋的间距、位置、马凳筋间距、数量、预埋件、钢筋接头、支座长度全数检查,合格后进行下道工序施工。
CN201710183861.1A 2017-03-24 2017-03-24 一种解决大跨度组合楼板双层双向钢筋安装的施工方法 Pending CN106869506A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710183861.1A CN106869506A (zh) 2017-03-24 2017-03-24 一种解决大跨度组合楼板双层双向钢筋安装的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710183861.1A CN106869506A (zh) 2017-03-24 2017-03-24 一种解决大跨度组合楼板双层双向钢筋安装的施工方法

Publications (1)

Publication Number Publication Date
CN106869506A true CN106869506A (zh) 2017-06-20

Family

ID=59172962

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710183861.1A Pending CN106869506A (zh) 2017-03-24 2017-03-24 一种解决大跨度组合楼板双层双向钢筋安装的施工方法

Country Status (1)

Country Link
CN (1) CN106869506A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905426A (zh) * 2017-11-24 2018-04-13 中民筑友科技投资有限公司 一种双向空心叠合楼板的构造方法

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE8306988D0 (sv) * 1983-12-16 1983-12-16 Graenges Aluminium Ab Forfarande for bockning av en profilerad plat och verktyg for utforande av forfarandet
FR2782335A1 (fr) * 1998-08-11 2000-02-18 Roger Brizard Procede et dispositif pour creation d'une surcouverture sur plaques en fibres d'amiante ciment ondulees
CN2490246Y (zh) * 2001-08-10 2002-05-08 李佩勋 密肋预应力混凝土楼板
CN101476393A (zh) * 2008-11-28 2009-07-08 中铁二局股份有限公司 一种先张法预应力张拉横梁及制作方法
CN201347598Y (zh) * 2008-12-31 2009-11-18 武强 建筑浇筑模板构件
EP2636808A1 (en) * 2012-03-08 2013-09-11 Giuseppe Grande Composite floor element for buildings made of corrugated metal sheet and concrete
CN203320796U (zh) * 2012-09-28 2013-12-04 润弘精密工程事业股份有限公司 钢筋结构及利用其钢筋结构形成的预铸板
CN103437561A (zh) * 2013-07-18 2013-12-11 杭州博数土木工程技术有限公司 简支转连续交叉连接箱梁结构
CN105064221A (zh) * 2015-07-24 2015-11-18 中交第一公路勘察设计研究院有限公司 大跨度钢波纹板拱桥加固结构
CN106121113A (zh) * 2016-08-19 2016-11-16 秦皇岛耐力重工机械有限公司 桁架楼承板
CN205918107U (zh) * 2016-08-23 2017-02-01 武汉建工集团股份有限公司 一种楼板施工缝留置隔断装置

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE8306988D0 (sv) * 1983-12-16 1983-12-16 Graenges Aluminium Ab Forfarande for bockning av en profilerad plat och verktyg for utforande av forfarandet
FR2782335A1 (fr) * 1998-08-11 2000-02-18 Roger Brizard Procede et dispositif pour creation d'une surcouverture sur plaques en fibres d'amiante ciment ondulees
CN2490246Y (zh) * 2001-08-10 2002-05-08 李佩勋 密肋预应力混凝土楼板
CN101476393A (zh) * 2008-11-28 2009-07-08 中铁二局股份有限公司 一种先张法预应力张拉横梁及制作方法
CN201347598Y (zh) * 2008-12-31 2009-11-18 武强 建筑浇筑模板构件
EP2636808A1 (en) * 2012-03-08 2013-09-11 Giuseppe Grande Composite floor element for buildings made of corrugated metal sheet and concrete
CN203320796U (zh) * 2012-09-28 2013-12-04 润弘精密工程事业股份有限公司 钢筋结构及利用其钢筋结构形成的预铸板
CN103437561A (zh) * 2013-07-18 2013-12-11 杭州博数土木工程技术有限公司 简支转连续交叉连接箱梁结构
CN105064221A (zh) * 2015-07-24 2015-11-18 中交第一公路勘察设计研究院有限公司 大跨度钢波纹板拱桥加固结构
CN106121113A (zh) * 2016-08-19 2016-11-16 秦皇岛耐力重工机械有限公司 桁架楼承板
CN205918107U (zh) * 2016-08-23 2017-02-01 武汉建工集团股份有限公司 一种楼板施工缝留置隔断装置

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
冯艳梅: "压型钢板-混凝土组合楼板施工技术", 《科技致富向导》 *
冯镜清等: "无支顶钢-混凝土组合楼盖在半逆作法施工中的应用", 《广东土木与建筑》 *
周敏: "广东现代国际展览中心预应力施工技术", 《广东土木与建筑》 *
杨振海等: "浅谈压型钢板底模混凝土板施工工艺", 《中国医院建筑与装备》 *
杨洪涛: "浅谈桥梁上部结构先简支后连续结构施工技术的探讨", 《黑龙江交通科技》 *
毕玉楠等: "浅谈某工程压型钢板――混凝土组合楼板的施工质量控制", 《科技视界》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905426A (zh) * 2017-11-24 2018-04-13 中民筑友科技投资有限公司 一种双向空心叠合楼板的构造方法

Similar Documents

Publication Publication Date Title
Banks et al. Enhancing high-rise residential construction through design for manufacture and assembly–a UK case study
CN107476482B (zh) 一种带冷弯薄壁型钢肋的预制底板、叠合板及其制作方法
CN109025017A (zh) 钢筋混凝土空心叠合双向密肋楼盖及其建造方法
CN103498533B (zh) 一种预应力工字型钢骨混凝土叠合梁
CN101831976A (zh) 一种预制带钢骨肋底板—混凝土叠合空心楼盖
CN101619603B (zh) 一种网架结构吊装及屋面围护施工方法
CN105926765B (zh) 倒伞状正多边形钢结构模块及其安装方法
CN101614052B (zh) 正六边形钢-混凝土组合空腹双重网格梁楼盖及制作方法
CN105839823A (zh) 一种桁架式密肋空心叠合楼盖
CN104499566A (zh) 装配式异形空心柱框架-剪力墙住宅建筑系统及装配方法
CN112647597A (zh) 一种高空大悬挑混凝土梁板结构施工方法
CN113738007A (zh) 桁架楼层板
CN208219949U (zh) 双向叠合板与预应力混凝土预制板构件
CN111550036A (zh) 一种铝木混合模板结构及其施工方法
CN201433489Y (zh) 正六边形钢-混凝土组合空腹双重网格梁楼盖
CN107386548A (zh) 一种预制装配式轻型梁式楼梯
CN106869506A (zh) 一种解决大跨度组合楼板双层双向钢筋安装的施工方法
CN112391949B (zh) 一种大跨钢混廊桥结构混凝土裂缝控制施工方法
CN203547019U (zh) 一种预应力工字型钢骨混凝土叠合梁
EA036348B1 (ru) Железобетонный каркас многоэтажного здания системы аркос
CN111794425A (zh) 一种分离式叠合板蜂窝组合梁及方法
CN206769148U (zh) 一种大跨度组合楼板双层双向钢筋架构
CN208668274U (zh) 一种钢混组合梁桥
CN103556564A (zh) 一种基于钢横隔板连接的装配式板桥及其施工方法
CN106013562A (zh) 一种带有双向肋的混凝土叠合板预制构件

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170620