CN106869493A - One kind cheats new formwork system and its construction method in hole - Google Patents

One kind cheats new formwork system and its construction method in hole Download PDF

Info

Publication number
CN106869493A
CN106869493A CN201710256839.5A CN201710256839A CN106869493A CN 106869493 A CN106869493 A CN 106869493A CN 201710256839 A CN201710256839 A CN 201710256839A CN 106869493 A CN106869493 A CN 106869493A
Authority
CN
China
Prior art keywords
hole
template
cheated
case mould
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710256839.5A
Other languages
Chinese (zh)
Inventor
包纯南
吴宁青
陈滨雄
刘秋媛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN201710256839.5A priority Critical patent/CN106869493A/en
Publication of CN106869493A publication Critical patent/CN106869493A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0007Base structures; Cellars

Abstract

New formwork system is cheated in being cheated the invention provides one kind, mainly include case mould and support, case mould is the box template of upper opening, it is made up of side template and end template, support includes longitudinal bracing and cross-brace, and end template is spliced by bar template annular, forms the hollow end template of intermediate openings, side template has the spacer bar of hole base plate in hole, and triangle reinforcing plate is respectively provided with case mould inside lock.Present invention additionally comprises following steps:1st, side template and end template are made, and is assembled into opening box mould;The 2nd, case mould is installed;The 3rd, support is set;4th, casting concrete, vibrate and receipts face work.The beneficial effects of the invention are as follows:Effectively solve the problems, such as that case mould floats during concreting, save ballast measure, opening on end template can in time clear up the rubbish and ponding at hole Zhong Keng positions, positioning bar can control the absolute altitude of hole base plate in hole, the percolating water hidden danger of basement bottom board is prevented, the construction quality of the deep position that falls such as hole effectively in lifting hole.

Description

One kind cheats new formwork system and its construction method in hole
Technical field
The present invention relates to basement big bulk concrete constructing technical field, new formwork is cheated in particularly a kind of hole System and its construction method.
Background technology
With gradually increasing for skyscraper, the application cheated in Large Concrete Base Plate, ultra-deep super large hole is increasingly Frequently.The difficulty of construction at hole Zhong Keng positions is big, especially because traditional formwork system is unreasonable, easily cause hole bottom to float, A series of problems, such as base plate concrete placings leakiness, percolating water being cheated in form bracing system inclination, hole, to ensureing basement bottom board, Especially the construction quality of elevator and sump position base plate is extremely disadvantageous, and the construction quality problem at hole Zhong Keng positions is urgently solved Certainly, it is very urgent.
Traditional construction method cheats planar dimension size, height in generally being cheated according to basement in the basement bottom board construction stage Difference sets the box-shaped template of prefabricated overall back cover, used as the inside formwork at the hole such as elevator, sump Zhong Keng positions, concrete Trickling to hole bottom is poured from case mould side, air-vent is reserved on bed die or case mould top ballast is used to prevent concrete placings process raising middle flask The floating of mould, form removal after the completion of concrete placings.This construction method can trigger problems:Bottom absolute altitude is cheated in hole to be difficult to effectively Control, or even there is case film floating, internal support structure is unstable, and hole bottom ponding, rubbish etc. cannot be cleared up, and base plate is cheated in hole and is poured Leakiness is built, concrete strength is low, and impression quality is poor, so as to the hidden danger of quality and percolating water risk that cause the position serious.
Therefore, simultaneously its construction method of specification is particularly important for hole formwork system in improving traditional hole, thoroughly to prevent and disappear Except the position hidden danger of quality.
The content of the invention
To overcome the shortcomings of that conventional construction method is present, cheat new formwork system in being cheated the invention provides one kind and its apply Work method, efficiently solves and cheat in hole case film and float, cheat that the discrepancy in elevation is not enough in hole, cheating that bottom board concrete cannot be vibrated and receipts face etc. is asked in hole Topic, not only ensure that elevator and sump construction of bottom plates quality, greatly reduce the quality such as the percolating water in position later stage hidden Suffer from, meanwhile, hole support system construction technology in hole is simplified, optimize underplate concrete casting method.
To achieve the above object, the technical solution adopted by the present invention is:One kind cheats new formwork system in hole, mainly includes Case mould and support, described case mould is the box template of upper opening, is made up of side template and end template, and described support includes Longitudinal bracing and cross-brace, described end template are spliced by the bar template annular of 200mm ~ 300mm wide, form middle part The hollow end template of opening.
Preferably, described end template is provided with the lumps of wood, and to strengthen the rigidity of end template, described side template is provided with perpendicular It is inwardly stupefied and stupefied lateral out, the vertical interior stupefied use high-quality lumps of wood, lateral out stupefied use double steel pipe.
Preferably, described support is constituted using steel pipe support, and steel pipe support end is equipped with adjustable jack, when hole in hole When the discrepancy in elevation or larger size, steel pipe post, enhancing case mould inside support resistance to overturning are set at middle part.
Preferably, described side template has the spacer bar of hole base plate in hole, to ensure the accurate positioning of case mould.
Preferably, triangle reinforcing plate is respectively provided with described case mould inside lock.
The present invention also provides the construction method that new formwork system is cheated in a kind of above-mentioned hole, mainly includes the following steps that:
Step one:Side template and end template are made, and is assembled into case mould, during making, according to the planar dimension and the discrepancy in elevation cheated in hole Determine each piece of size of template, wherein, the bar template width needed for making end template is 200mm~300mm, after completing assembly Form the hollow end template of intermediate openings;
Step 2:Case mould is installed, is completed and after concealment acceptance after reinforcing bar colligation is cheated in basement bottom board and position hole, hole is set Middle hole side wall and base plate spacer bar, case mould is installed in the position according to spacer bar;
Step 3:Support is set, by the interval setting longitudinal bracing and cross-brace of 800mm~1000mm, it is ensured that concrete is poured When building workman can descend to hole bottom carry out operation, be conducive to concrete effectively vibrate and receipts face work carrying out, support two ends Adjustable jack is respectively provided with, when cheating planar dimension in hole and being larger, steel pipe post enhancing support system monolithic stability is set at middle part Property;
Step 4:Casting concrete, placement layer by layer hole Zhong Keng positions concrete, when the height to end template is poured, bar shaped mould Plate can effectively prevent concrete from running in cartonning mould, and the hollow end template of intermediate openings can avoid floating or the inclination of case mould, no Only ensure the elevation of bottom cheated in hole, more improve the pouring quality cheated in hole.
Further, in step 4, after the completion of concreting, workman is shaken by being inserted at the intermediate openings on end template Tamper vibrates to concrete, and carries out the work of receipts face to hole base concrete, is greatly improved the construction of hole concrete in hole Quality and perception effect.
The beneficial effects of the invention are as follows:New formwork system and its construction method are cheated in a kind of hole that the present invention is provided, is led to The intermediate openings measure for crossing end template efficiently solves the problems, such as that case mould floats during concreting, eliminates to prevent on case mould The measure that top sets ballast is floated over, the opening on end template can also in time clear up the rubbish and ponding at hole Zhong Keng positions, and be Observation hole bottom condition of construction is provided convenience, the positioning bar that side template bottom is set, and can accurately control to cheat base plate in hole Absolute altitude, supporting base end portion set adjustable jack, can flexibly be adjusted in concreting process hole in cheat side wall deviation, Ensure planar dimension and the side wall flatness cheated in hole, meanwhile, optimized by supporting, facilitate in being cheated to hole bottom under workman Cheat concrete vibrating and the work of the face of receipts of base plate, it is ensured that the packing of bottom board concrete is cheated in hole, greatly reduces later stage basement bottom board Percolating water hidden danger, the construction quality of the deep position that falls such as hole effectively in lifting hole, formwork system of the invention construction is simple, operation It is easy, safe and reliable, and repeatable utilization, it is economic and environment-friendly.
Brief description of the drawings
Fig. 1 is to cheat new formwork system floor map during one kind is cheated.
Fig. 2 is to cheat new formwork system generalized section during one kind is cheated.
In accompanying drawing, 1, case mould, 11, side template, 111, it is vertical in it is stupefied, 112, stupefied lateral out, 12, end template, 121, bar shaped Template, 122, the lumps of wood, 2, support, 21, longitudinal bracing, 22, cross-brace, 23, adjustable jack, 3, spacer bar, 4, triangle adds Strong plate.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings and examples.
As shown in Figure 1, 2, new formwork system is cheated in a kind of hole of the present embodiment, mainly includes case mould 1 and support 2, institute The case mould 1 stated is the box template of upper opening, is made up of side template 11 and end template 12, and described support 2 includes that longitudinal direction is propped up Support 21 and cross-brace 22.Described end template 12 is spliced by four pieces of annulars of the bar template of 200mm wide 121, in formation The hollow end template of portion opening.Described end template 12 is provided with the lumps of wood 122, and side template 11 is provided with vertical interior stupefied 111 and horizontal stroke Outwards stupefied 112, vertical interior stupefied 111 the high-quality lumps of wood is used, stupefied 112 use double steel pipe lateral out.Described support 2 uses steel pipe branch Support composition, steel pipe support end is equipped with adjustable jack 23.Described side template 11 has the spacer bar of hole base plate in hole 3, to ensure the accurate positioning of case mould.Triangle reinforcing plate 4 is respectively provided with the described inside lock of case mould 1.
The construction method of new formwork system is cheated in a kind of above-mentioned hole, is mainly included the following steps that:
Step one:Make side template 11 and end template 12, and be assembled into case mould 1, during making, according to the planar dimension cheated in hole with The discrepancy in elevation determines each piece of size of template, wherein, the width of bar template 121 needed for making end template 12 is 200mm, completes to spell Intermediate openings are reserved after dress;
Step 2:Case mould 1 is installed, is completed and after concealment acceptance after reinforcing bar colligation is cheated in basement bottom board and position hole, set Side wall and base plate spacer bar 3 are cheated in hole, case mould 1 is installed in the position according to spacer bar 3;
Step 3:Support 2 is set, by the interval setting longitudinal bracing 21 and cross-brace 22 of 800mm, it is ensured that during concreting Workman can be descended to hole bottom and carry out operation, and adjustable jack 23 is respectively provided with 2 two ends are supported;
Step 4:Casting concrete, placement layer by layer hole Zhong Keng positions concrete.
Further, in step 4, after the completion of concreting, workman is by the intermediate openings insert division on end template 12 Vibrating spear vibrates to concrete, and carries out the work of receipts face to hole base concrete.
Below only just preferably example of the invention is described, but is not to be construed as limiting the scope of the invention.This hair Bright to be not only limited to above example, its concrete structure allows to change, and those skilled in the art can make respectively according to the present invention Plant and change and deform, without departing from spirit of the invention, scope defined in appended claims of the present invention all should be belonged to.

Claims (7)

1. new formwork system is cheated in a kind of hole, it is characterized in that:Mainly include case mould(1)And support(2), described case mould(1) It is the box template of upper opening, by side template(11)And end template(12)Composition, described support(2)Including longitudinal bracing (21)And cross-brace(22), the end template stated(12)By four pieces of bar templates of 200mm ~ 300mm wide(121)Annular splicing and Into the hollow end template of formation intermediate openings.
2. new formwork system is cheated in a kind of hole according to claim 1, it is characterised in that:Described end template(12)On It is provided with the lumps of wood(122), side template(11)It is provided with stupefied in vertical(111)It is stupefied lateral out(112), it is vertical interior stupefied(111)Using The high-quality lumps of wood, it is stupefied lateral out(112)Using double steel pipe.
3. new formwork system is cheated in a kind of hole according to claim 1, it is characterised in that:Described support(2)Using Steel pipe support is constituted, and steel pipe support end is equipped with adjustable jack(23).
4. new formwork system is cheated in a kind of hole according to claim 1, it is characterised in that:Described side template(11)Under It is provided with the spacer bar of hole base plate in hole(3).
5. new formwork system is cheated in a kind of hole according to claim 1, it is characterised in that:Described case mould(1)Interior turn Triangle reinforcing plate is respectively provided with angle(4).
6. the construction method of new formwork system is cheated in a kind of hole described in a kind of claim 1, it is characterised in that mainly included Following steps:
Step one:Make side template(11)And end template(12), and it is assembled into case mould(1), during making, according to the plane cheated in hole Size determines each piece of size of template with the discrepancy in elevation, wherein, make end template(12)Required bar template(121)Width is 200mm ~ 300mm, intermediate openings are reserved after completing assembly;
Step 2:Case mould is installed(1), completed and after concealment acceptance after reinforcing bar colligation is cheated in basement bottom board and position hole, if Put hole side wall and base plate spacer bar in hole(3), according to spacer bar(3)Position install case mould(1);
Step 3:Support is set(2), by the interval setting longitudinal bracing of 800mm~1000mm(21)And cross-brace(22), really Workman can descend to hole bottom and carry out operation when protecting concreting, in support(2)Two ends are respectively provided with adjustable jack(23);
Step 4:Casting concrete, placement layer by layer hole Zhong Keng positions concrete.
7. the construction method of new formwork system is cheated in a kind of hole according to claims 6, it is characterised in that:Concrete After the completion of pouring, workman passes through end template(12)On intermediate openings at insert vibrating spear concrete is vibrated, and to hole Base concrete carries out the work of receipts face.
CN201710256839.5A 2017-04-19 2017-04-19 One kind cheats new formwork system and its construction method in hole Pending CN106869493A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710256839.5A CN106869493A (en) 2017-04-19 2017-04-19 One kind cheats new formwork system and its construction method in hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710256839.5A CN106869493A (en) 2017-04-19 2017-04-19 One kind cheats new formwork system and its construction method in hole

Publications (1)

Publication Number Publication Date
CN106869493A true CN106869493A (en) 2017-06-20

Family

ID=59162570

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710256839.5A Pending CN106869493A (en) 2017-04-19 2017-04-19 One kind cheats new formwork system and its construction method in hole

Country Status (1)

Country Link
CN (1) CN106869493A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612120A (en) * 2018-05-03 2018-10-02 中国二十冶集团有限公司 A kind of sump template and construction method
CN108914969A (en) * 2018-08-30 2018-11-30 江苏南通二建集团有限公司 A kind of large deep foundation pit cheats the secondary pouring construction engineering method of sole plate in hole
CN112096054A (en) * 2020-08-27 2020-12-18 中国二十冶集团有限公司 Simple formwork support and integral casting method for large-depth elevator shaft and collector well in building bottom plate
CN112359870A (en) * 2020-11-09 2021-02-12 上海建工一建集团有限公司 Formwork supporting method for bottom plate well hole of reverse construction method
CN114718112A (en) * 2022-04-12 2022-07-08 中天建设集团有限公司 Construction method for erecting formwork of pit-in-pit of vertical wall pit

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202954570U (en) * 2012-11-22 2013-05-29 中国建筑第二工程局有限公司 High-rise building construction sump template
CN203049588U (en) * 2013-01-15 2013-07-10 龙元建设集团股份有限公司 Pit-in-pit cylindrical mould
CN204282812U (en) * 2014-11-26 2015-04-22 山西省第二建筑工程公司 Elevator shaft template installs structure
CN205804146U (en) * 2016-05-19 2016-12-14 新昌县雷凯科技有限公司 Mould in hollow open type

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202954570U (en) * 2012-11-22 2013-05-29 中国建筑第二工程局有限公司 High-rise building construction sump template
CN203049588U (en) * 2013-01-15 2013-07-10 龙元建设集团股份有限公司 Pit-in-pit cylindrical mould
CN204282812U (en) * 2014-11-26 2015-04-22 山西省第二建筑工程公司 Elevator shaft template installs structure
CN205804146U (en) * 2016-05-19 2016-12-14 新昌县雷凯科技有限公司 Mould in hollow open type

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612120A (en) * 2018-05-03 2018-10-02 中国二十冶集团有限公司 A kind of sump template and construction method
CN108914969A (en) * 2018-08-30 2018-11-30 江苏南通二建集团有限公司 A kind of large deep foundation pit cheats the secondary pouring construction engineering method of sole plate in hole
CN112096054A (en) * 2020-08-27 2020-12-18 中国二十冶集团有限公司 Simple formwork support and integral casting method for large-depth elevator shaft and collector well in building bottom plate
CN112359870A (en) * 2020-11-09 2021-02-12 上海建工一建集团有限公司 Formwork supporting method for bottom plate well hole of reverse construction method
CN114718112A (en) * 2022-04-12 2022-07-08 中天建设集团有限公司 Construction method for erecting formwork of pit-in-pit of vertical wall pit

Similar Documents

Publication Publication Date Title
CN106869493A (en) One kind cheats new formwork system and its construction method in hole
CN104594500B (en) Integrated slab column formwork structure system and construction method
CN208072950U (en) A kind of combination set shaped steel formwork
CN206681359U (en) One kind cheats new formwork system in hole
CN107190983B (en) A kind of construction method of prefabricated assembled cornice
CN109723140A (en) A kind of construction method between precast stair
CN103722613A (en) Construction method for vertically casting and mounting four-foot hollow block in seawall wave resistance engineering
CN111663659B (en) Staggered floor synchronous construction method
CN206205432U (en) Cylinder is to spelling template formwork system
CN107152112A (en) A kind of modularization Prefabricated stacking floor and its construction method for being used to drop plate region
CN107227845A (en) One kind filling wall construction post mold method
CN109773946A (en) A kind of multiple layer combination platform mold of prefabricated large-scale plate-type component
CN110453916A (en) By the arc beam construction method of adjustable arc beams regularization formwork erecting structure
CN205497749U (en) Prefabricated mould of prefabricated section
CN103878868A (en) Application of novel vertical pouring construction process to prefabricated concrete block with four hollow corners
CN110792256A (en) Cast-in-place concrete floor structure falls board construction mould
CN109653445B (en) Thickness adjusting device and method for steel bar protection layer
CN110748221A (en) Prefabricated assembled pond guide wall
CN207244960U (en) A kind of Prefabricated stacking floor with tool-typed formwork for being used to drop plate region
CN110629814A (en) Jacking deviation rectifying device for high-rise shear wall structure and operation method
CN206418513U (en) The integral prefabricated structure of basement bottom board catch pit bar-mat reinforcement
CN112443077A (en) Trapezoidal module brick and construction scheme
CN206267032U (en) Band gradient rectangular pier columns variable area formula hydraulic formwork
CN109914571A (en) A kind of basement drainage ditch formwork system, casting system and construction method
CN219604663U (en) Prefabricated wall with combined metal templates arranged in prefabricated section of wallboard

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170620