CN106869390A - A kind of Hyperbolic vaulted roof plate girder construction of string formula - Google Patents

A kind of Hyperbolic vaulted roof plate girder construction of string formula Download PDF

Info

Publication number
CN106869390A
CN106869390A CN201710226998.0A CN201710226998A CN106869390A CN 106869390 A CN106869390 A CN 106869390A CN 201710226998 A CN201710226998 A CN 201710226998A CN 106869390 A CN106869390 A CN 106869390A
Authority
CN
China
Prior art keywords
arch
hyperbolic
steel pipe
string
concrete arch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710226998.0A
Other languages
Chinese (zh)
Other versions
CN106869390B (en
Inventor
徐文平
袁吉汗
强玮良
郭进
邓欣
戴航
黄明
卢建峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201710226998.0A priority Critical patent/CN106869390B/en
Publication of CN106869390A publication Critical patent/CN106869390A/en
Application granted granted Critical
Publication of CN106869390B publication Critical patent/CN106869390B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/12Roofs; Roof construction with regard to insulation formed in bays, e.g. sawtooth roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Abstract

The invention discloses a kind of Hyperbolic vaulted roof plate girder construction of string formula, the arched plate of Concrete Double winds up as the compressive region of arch tension string beam structure, the fold-line-shaped wire digging line of arch beam string as roofing hyperbolic arch bar tensile region lower edge, arch beam string and roofing hyperbolic arch bar are applied in combination, have complementary advantages, cooperate.Lifting arch beam string lays the micro-bend arch-wave of profiled sheet to single-storey factory building roof between arch rib, and poured in place concrete arch bar, the construction technology for breaking the whole up into parts has fully demonstrated the advantage of industrialization prefabrication and assembly construction.New type roof slab and girder has the advantages that bearing capacity is big, span ability is big, structural stability good, plate-girder unification, good water resistance, quick construction and low cost, can be used for 40~90 meters of Ultra-Long Spans factory building roof slab and girders.

Description

A kind of Hyperbolic vaulted roof plate girder construction of string formula
Technical field
The invention belongs to field of civil engineering, it is related to a kind of Long span built-up roofing plate-girder, more particularly to a kind of string formula Hyperbolic vaulted roof plate girder construction.
Background technology
With society development, it is necessary to the increasing hangar of the interior space, warehouse, gymnasium, exhibition center etc. it is big across Footpath house.With industrial development, it is necessary to Long span industrial premises, to meet huge production space, places production Equipment, the flexible arrangement technological process of production.
Long span roof structure of powerhouse is generally using structure shapes such as door-like steel frame light structure, prestressed concrete double T plates Formula.Wherein door-like steel frame light structure has the advantages that lightweight, industrialization degree is high and span ability is larger, is generally used for 24 ~40 meters of mill constructions of across footpath, but, the erosion of door-like steel frame light structural anticorrosion, fire prevention and heat-proof quality are poor, and portal-rigid frames are light Steel construction scene overhead welding workload is big.Prestressed concrete double T plate is the roof covering constructional elements of beam slab unification, and it has makes Valency is low, good heat preservation performance, humidity, the short anticorrosive, construction period, long service life the advantages of, be generally used for 15~30 meters of across footpaths Mill construction, but, prestressed concrete double T plate is present from great, rigidity is small, low bearing capacity the shortcomings of.
As industrial development, Ultra-Long Spans single-storey factory building demand are more and more, 40~90 meters of across footpaths of research and development are needed badly The Ultra-Long Spans roofing slab and girder of plate-girder unification, to replace the grid structure and the big portal-rigid frames steel knot of steel using amount of costliness Structure.
The content of the invention
Goal of the invention:In order to overcome the deficiencies in the prior art, the present invention to provide a kind of hyperbolic arch of string formula Roofing slab and girder and preparation method thereof.
Technical scheme:In order to solve the above technical problems, the Hyperbolic vaulted roof plate girder construction of a kind of string formula of the invention, Including roofing hyperbolic arch bar, roofing hyperbolic arch bar include steel pipe concrete arch rib, the micro-bend arch-wave of profiled sheet, concrete arch bar, Connection beam and steel channel connector, steel pipe concrete arch rib top set steel channel connector, and connection beam is arranged in concrete-filled steel tube arch Between rib, the micro-bend arch-wave of profiled sheet, casting concrete on the micro-bend arch-wave of profiled sheet are laid between steel pipe concrete arch rib Arch bar;The bottom of steel pipe concrete arch rib sets the vertical strut at least three roads, the upper end of vertical strut and steel pipe concrete arch rib It is connected, fold-line-shaped compressor wire rope connects the lower end of all vertical struts and is connected with steel pipe concrete arch rib two ends, horizontal It is arranged between the vertical strut of span centre to bracing members.
A kind of method of the Hyperbolic vaulted roof plate girder construction for preparing a string formula, comprises the following steps:
Step one, at the construction field (site), according to design requirement, makes steel pipe concrete arch rib, on steel pipe concrete arch rib top The steel channel connector of arch is welded in portion, installs vertical strut, fold-line-shaped compressor wire rope is arranged, using jack tension broken line Shape compressor wire rope, forms arch beam string, lifting arch beam string to the precalculated position of single-storey factory building roofing;
Step 2, connection beam is installed between steel pipe concrete arch rib, horizontal steel is installed at span centre, between vertical strut Support, lays the micro-bend arch-wave of profiled sheet between steel pipe concrete arch rib, casting concrete arch bar forms roofing hyperbolic arch bar;
After step 3, wait concrete arch bar reach age knot firmly, using jack, fold-line-shaped compressor wire rope is adjusted Tension stress, the Hyperbolic vaulted roof plate girder construction of the string formula of single-storey factory building comes into operation.
Beneficial effect:The Hyperbolic vaulted roof plate girder construction of a kind of string formula of the invention, has the advantages that:
The construction technology of double curvature arched bridge is used for reference, is broken the whole up into parts, prefabrication and assembly construction construction, the arched plate of Concrete Double is used as arch The compressive region of beam string structure winds up.The rigid arch flexible cable feature of Long span arch tension string beam structure is used for reference, arch beam string Fold-line-shaped wire digging line as roofing hyperbolic arch bar tensile region lower edge.Arch beam string and roofing hyperbolic arch bar are applied in combination, Have complementary advantages, cooperate.The Hyperbolic vaulted roof plate girder construction of string formula has that bearing capacity is big, span ability is big, structure is steady Qualitative good, industrialization degree is high, plate-girder unification, good water resistance, prefabrication and assembly construction easy construction and the advantages of low cost.
Prestressed concrete double T plate is classical plate-girder unification roofing plate-girder, and T plate bearing capacity is high, and structural behaviour can Lean on, long service life, be widely used in 15~30 meters of single-storey factory building roof systems of across footpath.Compared with prestressed concrete double T plate, The Hyperbolic vaulted roof plate girder construction of string formula is a kind of arch tension string beam structure, the external folding prestressed steel wire of arrangement, is improve Novel compositions plate-girder has bending resistance shear-carrying capacity, improves the rigidity of new slab and girder, substantially increases new plate-girder Span ability.
Compared with traditional concrete filled steel tube arch beam string, the Hyperbolic vaulted roof plate girder construction of a string formula is to arch The compressive region of string beam is reformed, and is winded up as the compressive region of arch tension string beam structure using the arched plate of Concrete Double, prefabricated Assembling speed of application is quick, and the lateral stability of arch beam string is increased substantially, and the arched plate of Concrete Double holds as compressive region Carry what power can ensure, Hyperbolic Roof draining is smooth, roof waterproof performance is greatly improved, and has fully demonstrated novel compositions plate-girder The superiority of plate-girder unification.
The design of Long span tension string beam structure must take into consideration the roof system stable problem under wind suction effect, when wind suction is more than Roof structure conduct oneself with dignity when, cable slack and exit work, structure global failure.Common concrete filled steel tube arch beam string is usually Wind suction stability problem is run into, it is necessary to additional configurations wind resistance cable, increased construction costs, influence building using effect; The Hyperbolic vaulted roof plate girder construction of string formula is the structure of plate-girder unification, and roofing concrete arch bar participates in main arch ring resistance to compression stress, Killed two birds with one stone with heavy load as wind resistance suction stability simultaneously.
The construction technology of double curvature arched bridge is used for reference, lifting arch beam string is set to single-storey factory building precalculated position between arch rib Connection beam, lays the micro-bend arch-wave of profiled sheet of arch between arch rib, then pour roofing arch bar concrete, and prefabrication and assembly construction is applied Work.The Hyperbolic vaulted roof plate girder construction for opening string formula has given full play to the advantage of prefabrication and assembly construction, can construction formwork and pin Hand cradle, saves timber, accelerating construction progress, and consumed labor and materials are seldom, novel compositions plate-girder have industrialization degree it is high, The advantages of easy construction and low cost.
The Hyperbolic vaulted roof plate girder construction for opening string formula is the breakthrough innovation of Long span factory building roof girder construction process, tool There are excellent stress performance, plate-girder unification.Novel compositions plate-girder substitutes portal-rigid frames steel construction and grid structure, shortens the duration, Saving steel, reduces cost.The Hyperbolic vaulted roof plate girder construction prefabrication and assembly construction of string formula is opened, is broken the whole up into parts, realize industrialization Quick production Long span plate-girder, can build 40~90 meters of Long span single-storey factory buildings, be especially suitable for township enterprise factory and Repository entry engineering.
Brief description of the drawings
Fig. 1 is the generalized section of the Hyperbolic vaulted roof plate beam of concrete-filled rectangular steel tube arch rib;
Fig. 2 is the generalized section of the Hyperbolic vaulted roof plate beam for welding three steel tube arch ribs;
Fig. 3 is the generalized section of the Hyperbolic vaulted roof plate beam of three steel tube space truss arch ribs.
Fig. 4 is the schematic three dimensional views of the Hyperbolic vaulted roof plate beam of a string formula;
In figure, 1- hyperbolic arch bars;11- steel pipe concrete arch ribs;The micro-bend arch-wave of 12- profiled sheets;13- concrete arch bars; 14- connection beams;15- steel channel connectors;2- struts;3- fold-line-shaped compressor wire ropes;4- transverse direction bracing members.
Specific embodiment
The present invention is further described below in conjunction with the accompanying drawings.
As Figure 1-Figure 4, the Hyperbolic vaulted roof plate girder construction of a kind of string formula of the invention, by roofing hyperbolic arch bar 1st, strut 2, fold-line-shaped compressor wire rope 3 and horizontal bracing members 4 are constituted.Wherein roofing hyperbolic arch bar 1 is by concrete-filled steel tube arch The micro-bend arch-wave 12 of rib 11, profiled sheet, concrete arch bar 13, connection beam 14 and steel channel connector 15 are constituted, concrete-filled steel tube arch The top of rib 11 sets steel channel connector 15, and connection beam 14 is arranged between steel pipe concrete arch rib 11, steel pipe concrete arch rib 11 Between lay the micro-bend arch-wave 12 of profiled sheet, casting concrete arch bar 13 on the micro-bend arch-wave 12 of profiled sheet;Concrete filled steel tube The bottom of arch rib 11 sets the vertical strut 2 at least three roads, and the upper end of vertical strut 2 is connected with steel pipe concrete arch rib 11, broken line Shape compressor wire rope 3 connects the lower end of all vertical struts 2 and is connected with the two ends of steel pipe concrete arch rib 11, horizontal steel branch Support 4 is arranged between the vertical strut 2 of span centre.
The present invention also provided it is a kind of prepare the above-mentioned method of the Hyperbolic vaulted roof plate girder construction of string formula, it is including following Step:
Step one, at the construction field (site), according to design requirement, makes steel pipe concrete arch rib 11, in steel pipe concrete arch rib The steel channel connector 15 of 11 welded top arches, installs vertical strut 2, arrangement fold-line-shaped compressor wire rope 3, using jack Tensioning fold-line-shaped compressor wire rope 3, forms arch beam string, the pre-determined bit of lifting arch beam string to single-storey factory building roofing Put;
Step 2, the installation connection beam 14 between steel pipe concrete arch rib 11, at span centre, install between vertical strut 2 Horizontal bracing members 4, lay the micro-bend arch-wave 12 of profiled sheet between steel pipe concrete arch rib 11, casting concrete arch bar 13 is formed Roofing hyperbolic arch bar 1;
After step 3, wait concrete arch bar 13 reach age knot firmly, using jack, fold-line-shaped compressor wire is adjusted The tension stress of rope 3, the Hyperbolic vaulted roof plate girder construction of a string formula of single-storey factory building comes into operation.
Specifically, such as the Hyperbolic vaulted roof plate girder construction of certain string formula, Roof Design live load 1.0kN/m2, plate-girder across 60 meters of footpath, plate-girder spacing is 6 meters, and double curvature arch plate-girder arch rib rise is 4.5 meters, and fold-line-shaped compressor wire rope sag is 1.5 meters, Plate-girder span centre total height is 6 meters.Steel pipe concrete arch rib uses 400 × 600 × 16 welding rectangular steel pipe, interior filling C50 coagulations Soil, arch beam string sets the vertical strut in five roads, and fold-line-shaped compressor wire rope uses the high tensile steel wires of Φ 150 × 5.It is existing in construction , assembled arch beam string, stretch-draw prestressing force fold-line-shaped compressor wire rope, lifting arch beam string to single-storey factory building roofing Precalculated position.Connection beam is installed between steel pipe concrete arch rib, horizontal bracing members are installed between the vertical strut in each road.Steel pipe is mixed The micro-bend arch-wave of profiled sheet is laid between solidifying soil arch rib, the micro-bend arch-wave span of profiled sheet is 6 meters, 0.6 meter of arch camber, ratio of rise to span is 0.1, profiled sheet is the model of 1.5mm wave height 75 from thickness.The casting concrete arch bar on the micro-bend arch-wave of profiled sheet, mixes Solidifying soil arch bar is poured using C25.Thickness is 120mm, and concrete arch bar root locally thickeies.Concrete arch bar is waited to reach age After knot is hard, using jack, the tension stress of fold-line-shaped compressor wire rope is further adjusted.It is micro- in profiled sheet every 18 meters Camber arch ripple and concrete arch bar open up window opening, install fiberglass roof light, the hyperbolic arch roofing of a string formula of single-storey factory building Slab and girder comes into operation in order.
Specifically, such as the Hyperbolic vaulted roof plate girder construction of certain string formula, Roof Design live load 1.0kN/m2, plate-girder across 90 meters of footpath, plate-girder spacing is 9 meters, and double curvature arch plate-girder arch rib rise is 6.75 meters, and fold-line-shaped compressor wire rope sag is 2.25 Rice, plate-girder span centre total height is 9 meters.Steel pipe concrete arch rib using equilateral triangle the Φ 377 of three steel tube space truss 3 × 16, C50 concrete is filled in steel pipe, three steel pipes are separated in span centre section, are merged at bearing together, three spacing of steel pipe From equilateral triangle relation is remained, Fig. 3 is bearing section, and Fig. 4 is spaning middle section.It is vertical that arch beam string sets five road V-arrangements Strut, fold-line-shaped compressor wire rope uses the high tensile steel wires of Φ 250 × 5.At the construction field (site), assembled arch beam string, tensioning is pre- Stress fold-line-shaped compressor wire rope, lifting arch beam string to the precalculated position of single-storey factory building roofing.Steel pipe concrete arch rib Between connection beam is installed, horizontal bracing members are installed between the vertical strut in each road.Die mould steel is laid between steel pipe concrete arch rib The micro-bend arch-wave of plate, the micro-bend arch-wave span of profiled sheet is 9 meters, 0.9 meter of arch camber, and ratio of rise to span is 0.1, and profiled sheet is from thickness The model of 2mm wave height 130.The casting concrete arch bar on the micro-bend arch-wave of profiled sheet, concrete arch bar is poured using C25.It is thick It is 150mm to spend, and concrete arch bar root locally thickeies.
The above is only the preferred embodiment of the present invention, it should be pointed out that:For the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (2)

1. a kind of Hyperbolic vaulted roof plate girder construction of string formula, including roofing hyperbolic arch bar (1), it is characterised in that:Roofing is double Arched plate (1) includes steel pipe concrete arch rib (11), the micro-bend arch-wave of profiled sheet (12), concrete arch bar (13), connection beam (14) and steel channel connector (15), steel pipe concrete arch rib (11) top sets steel channel connector (15), connection beam (14) arrangement Between steel pipe concrete arch rib (11), the micro-bend arch-wave of profiled sheet (12), die mould are laid between steel pipe concrete arch rib (11) Casting concrete arch bar (13) on the micro-bend arch-wave of steel plate (12);The bottom of steel pipe concrete arch rib (11) sets at least three roads and erects To strut (2), the upper end of vertical strut (2) is connected with steel pipe concrete arch rib (11), fold-line-shaped compressor wire rope (3) connection The lower end of all vertical struts (2) and it is connected with steel pipe concrete arch rib (11) two ends, horizontal bracing members (4) are arranged in span centre Vertical strut (2) between.
2. a kind of method of the Hyperbolic vaulted roof plate girder construction of the string formula prepared described in claim 1, it is characterised in that bag Include following steps:
Step one, at the construction field (site), according to design requirement, makes steel pipe concrete arch rib (11), in steel pipe concrete arch rib (11) steel channel connector (15) of welded top arch, installs vertical strut (2), and arrangement fold-line-shaped compressor wire rope (3) is adopted With jack tension fold-line-shaped compressor wire rope (3), arch beam string, lifting arch beam string to single-storey factory building roofing are formed Precalculated position;
Step 2, installation connection beam (14) between steel pipe concrete arch rib (11), at span centre, pacify between vertical strut (2) The horizontal bracing members (4) of dress, lay the micro-bend arch-wave of profiled sheet (12), casting concrete arch bar between steel pipe concrete arch rib (11) (13) roofing hyperbolic arch bar (1), is formed;
After step 3, wait concrete arch bar (13) reach age knot firmly, using jack, fold-line-shaped compressor wire rope is adjusted (3) tension stress, the Hyperbolic vaulted roof plate girder construction of a string formula of single-storey factory building comes into operation.
CN201710226998.0A 2017-04-07 2017-04-07 A kind of Hyperbolic vaulted roof plate girder construction of string formula Active CN106869390B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710226998.0A CN106869390B (en) 2017-04-07 2017-04-07 A kind of Hyperbolic vaulted roof plate girder construction of string formula

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710226998.0A CN106869390B (en) 2017-04-07 2017-04-07 A kind of Hyperbolic vaulted roof plate girder construction of string formula

Publications (2)

Publication Number Publication Date
CN106869390A true CN106869390A (en) 2017-06-20
CN106869390B CN106869390B (en) 2019-03-29

Family

ID=59161143

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710226998.0A Active CN106869390B (en) 2017-04-07 2017-04-07 A kind of Hyperbolic vaulted roof plate girder construction of string formula

Country Status (1)

Country Link
CN (1) CN106869390B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111734032A (en) * 2020-06-23 2020-10-02 湖南城市学院 Beamless floor structure with double-curved arch shell and construction method thereof
CN114352035A (en) * 2022-03-18 2022-04-15 清华大学建筑设计研究院有限公司 Large-span assembled combined arched heavy roof structure and construction method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB497000A (en) * 1936-04-08 1938-12-08 Emil Huennebeck Improvements in or relating to roof structures for sheds and hangars
CN2315175Y (en) * 1997-04-22 1999-04-21 郭彦林 Large span colour pressed steel plate wave arc roof
EP0947639A1 (en) * 1998-04-03 1999-10-06 Peter Adler Method for constructing a floor as well as a modular vault system for implementing the method
CN201850793U (en) * 2010-11-05 2011-06-01 中国电力工程顾问集团西北电力设计院 1000kV GIS (gas insulated switchgear) room with corrugated steel arch roof structure
CN104264783A (en) * 2014-07-28 2015-01-07 殷志祥 Novel structure form reticulated shell and beam string combined structure
CN105569187A (en) * 2016-01-18 2016-05-11 江苏沪宁钢机股份有限公司 Inverted arch beam string structure roof of large-span steel structure and construction method thereof
CN105649252A (en) * 2016-01-05 2016-06-08 江苏沪宁钢机股份有限公司 Beam string steel structure roof and installation method thereof
CN105863144A (en) * 2016-05-14 2016-08-17 李雄彦 Large-span double-curvature-arch structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB497000A (en) * 1936-04-08 1938-12-08 Emil Huennebeck Improvements in or relating to roof structures for sheds and hangars
CN2315175Y (en) * 1997-04-22 1999-04-21 郭彦林 Large span colour pressed steel plate wave arc roof
EP0947639A1 (en) * 1998-04-03 1999-10-06 Peter Adler Method for constructing a floor as well as a modular vault system for implementing the method
CN201850793U (en) * 2010-11-05 2011-06-01 中国电力工程顾问集团西北电力设计院 1000kV GIS (gas insulated switchgear) room with corrugated steel arch roof structure
CN104264783A (en) * 2014-07-28 2015-01-07 殷志祥 Novel structure form reticulated shell and beam string combined structure
CN105649252A (en) * 2016-01-05 2016-06-08 江苏沪宁钢机股份有限公司 Beam string steel structure roof and installation method thereof
CN105569187A (en) * 2016-01-18 2016-05-11 江苏沪宁钢机股份有限公司 Inverted arch beam string structure roof of large-span steel structure and construction method thereof
CN105863144A (en) * 2016-05-14 2016-08-17 李雄彦 Large-span double-curvature-arch structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111734032A (en) * 2020-06-23 2020-10-02 湖南城市学院 Beamless floor structure with double-curved arch shell and construction method thereof
CN114352035A (en) * 2022-03-18 2022-04-15 清华大学建筑设计研究院有限公司 Large-span assembled combined arched heavy roof structure and construction method thereof
CN114352035B (en) * 2022-03-18 2022-06-21 清华大学建筑设计研究院有限公司 Large-span assembled combined arched heavy roof structure and construction method thereof

Also Published As

Publication number Publication date
CN106869390B (en) 2019-03-29

Similar Documents

Publication Publication Date Title
CN204530991U (en) A kind of large-span prestressed arch truss and rope film combining structure
CN100554588C (en) A kind of vertical rotation steel-concrete combination arch bridge
CN106760529B (en) Roof steel truss sliding assembly construction platform and installation method
CN103122667B (en) Light-weight steel structure plafond of large-span underground powerhouse of hydroelectric station
CN206903022U (en) A kind of steel bar truss floor support plate
CN110886532A (en) Large-span bidirectional arch truss cable membrane material field closed structure system
CN101629408A (en) Composite anchoring structure on guyed tower end of cable-stayed bridge
CN112458877A (en) Assembled steel-concrete combined rigid frame bridge and construction method thereof
CN112281631A (en) Segmental prefabricated composite section backbone bridge structure system
CN111979891A (en) Semi-through type rectangular concrete-filled steel tube combined truss girder bridge and construction method
CN106869390B (en) A kind of Hyperbolic vaulted roof plate girder construction of string formula
CN201202181Y (en) Connection structure for precast concrete board and beam and construction including the same
CN107268417A (en) A kind of highway steel reinforced concrete combined beam structure based on assembling
CN201972417U (en) Lightweight wood structure roof system
CN202324281U (en) Latticed steel truss ceiling structure of large-span underground workshop of hydropower station
CN112982139A (en) Wide-width large-span hybrid beam and short-tower cable-stayed bridge system and construction method thereof
CN110939067B (en) Method for determining position of bridge closure section of collaboration system
KR20020080931A (en) building construction method using lattice typed cable structure in the plane
CN215563714U (en) Prefabricated assembly type prestressed steel reinforced concrete multi-web hollow composite floor slab
CN214459548U (en) Assembled steel and concrete combined rigid frame bridge
CN205574216U (en) Many portable wind and rain canopies of point type
CN209602938U (en) A kind of composite structure bridge
CN209443661U (en) A kind of parallel trussed roof of large span gradual change polygonal cross-section
CN207295990U (en) A kind of large-span prestressed prefabricated industrial plant building
CN112727157A (en) Assembled double-column overhead station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant