CN106850356A - A kind of Intelligent Building Group control method and device - Google Patents

A kind of Intelligent Building Group control method and device Download PDF

Info

Publication number
CN106850356A
CN106850356A CN201710104772.3A CN201710104772A CN106850356A CN 106850356 A CN106850356 A CN 106850356A CN 201710104772 A CN201710104772 A CN 201710104772A CN 106850356 A CN106850356 A CN 106850356A
Authority
CN
China
Prior art keywords
intelligent building
data
service data
building group
current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710104772.3A
Other languages
Chinese (zh)
Other versions
CN106850356B (en
Inventor
王辰璐
闫冬冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Inspur Intelligent Technology Co Ltd
Original Assignee
Zhengzhou Yunhai Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Yunhai Information Technology Co Ltd filed Critical Zhengzhou Yunhai Information Technology Co Ltd
Priority to CN201710104772.3A priority Critical patent/CN106850356B/en
Publication of CN106850356A publication Critical patent/CN106850356A/en
Application granted granted Critical
Publication of CN106850356B publication Critical patent/CN106850356B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/02Protocols based on web technology, e.g. hypertext transfer protocol [HTTP]
    • H04L67/025Protocols based on web technology, e.g. hypertext transfer protocol [HTTP] for remote control or remote monitoring of applications
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/30Circuit design
    • G06F30/36Circuit design at the analogue level
    • G06F30/367Design verification, e.g. using simulation, simulation program with integrated circuit emphasis [SPICE], direct methods or relaxation methods
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/44Arrangements for executing specific programs
    • G06F9/455Emulation; Interpretation; Software simulation, e.g. virtualisation or emulation of application or operating system execution engines
    • G06F9/45504Abstract machines for programme code execution, e.g. Java virtual machine [JVM], interpreters, emulators
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • G06F9/5061Partitioning or combining of resources
    • G06F9/5077Logical partitioning of resources; Management or configuration of virtualized resources
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/04Processing captured monitoring data, e.g. for logfile generation
    • H04L43/045Processing captured monitoring data, e.g. for logfile generation for graphical visualisation of monitoring data
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/06Generation of reports
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks

Abstract

The invention provides a kind of Intelligent Building Group control method and device, the method is used for cloud computing platform control centre, including:The control system of armamentarium terminal in Intelligent Building Group is deployed in virtual server resource pool, at least one virtual machine is included in virtual server resource pool;According to the deployment logic for pre-setting, each control system is deployed on corresponding virtual machine;According to the current Intelligent Building Group service data report for previously generating, each control system and its corresponding virtual machine is controlled to run.Based on method disclosed by the invention, solve the problems, such as that the level of interaction between Intelligent Building Group different intelligent building system and distinct device terminal is very low, improve user experience.

Description

A kind of Intelligent Building Group control method and device
Technical field
The present invention relates to control system technical field, more specifically to a kind of Intelligent Building Group control method and dress Put.
Background technology
With developing rapidly for global IT application process, it is the main intelligence relied on that human society has been marched toward with intellectual resources Type society.City as economic technology main carriers, the Intelligent Building Group being made up of at least one the intelligence building system is city The inevitable outcome that city's function is developed.
The control system of each device end in current the intelligence building system, for example, Lighting Control Assembly, air-conditioning HVAC control System processed and apparatus for controlling elevator etc., are built based on standard agreement by professional software platform, each control System deployment processed is on specific server.Therefore, control system can only be according to pre- for the control process of corresponding device terminal If control logic, bonding apparatus terminal data carries out coordinated signals.But, can so cause different intelligent building system and not It is very low with the level of interaction between device end, influence user experience.
The content of the invention
In view of this, the present invention provides a kind of Intelligent Building Group control method and device, to solve current Intelligent Building Group Level of interaction between middle different intelligent building system and distinct device terminal is very low, influences the problem of user experience.Skill Art scheme is as follows:
A kind of Intelligent Building Group control method, is applied to cloud computing platform control centre, including:
The control system of armamentarium terminal in Intelligent Building Group is deployed in virtual server resource pool, it is described virtual At least one virtual machine is included in server resource pond;
According to the deployment logic for pre-setting, each described control system is deployed on the corresponding virtual machine;
According to the current Intelligent Building Group service data report for previously generating, each described control system and its correspondence are controlled The virtual machine operation.
Preferably, the detailed process for previously generating current Intelligent Building Group service data report, including:
The current device service data and the intelligence of each device end in the Intelligent Building Group are gathered respectively The current system service data of each the intelligence building system and its when forefathers' vehicle flowrate data in groups of building;
According to the current device service data, the current system service data, it is described when forefathers' vehicle flowrate data with And the Intelligent Building Group service data report generation model for previously generating, generate current Intelligent Building Group service data report.
Preferably, the detailed process for previously generating Intelligent Building Group service data report generation model, including:
The history that each device end in the Intelligent Building Group in the setting period is transferred from background data base sets The legacy system service data and its history people's car of each the intelligence building system in standby service data, the Intelligent Building Group Data on flows;
According to each historical Device service data generation equipment operating data report, according to each legacy system Service data generation system operation data report, and according to each history people vehicle flowrate data genaration people's vehicle flowrate data Report;
Extract first eigenvector, the second feature of system operation data report of the equipment operating data report The third feature vector of people's vehicle flowrate data report described in vector sum;
The third feature according to default machine learning algorithm, the first eigenvector, the second feature vector sum Vector, generates Intelligent Building Group service data report generation model.
Preferably, the method described in above-mentioned any one, the current Intelligent Building Group operation number that the basis is previously generated It was reported that, control each described control system and its corresponding virtual machine to run, afterwards, also include:
When the visualization request of client transmission is received, the current operating data of each control system is transferred, And send to the client.
A kind of Intelligent Building Group control device, including:Virtual server resource pool deployment module, deploying virtual machine module and Control module, the operation module includes report generation unit;
The virtual server resource pool deployment module, for by the control system of armamentarium terminal in Intelligent Building Group It is deployed in virtual server resource pool, at least one virtual machine is included in the virtual server resource pool;
The deploying virtual machine module, for according to the deployment logic for pre-setting, each described control system being disposed On the corresponding virtual machine;
The report generation unit, for previously generating current Intelligent Building Group service data report;
The control module, for according to the current Intelligent Building Group service data report for previously generating, controlling each institute State control system and its corresponding virtual machine operation.
Preferably, the report generation unit includes:Data acquisition unit and data report generation unit, the datagram Accusing generation unit includes model generation unit;
The data acquisition unit, sets for gathering the current of each device end in the Intelligent Building Group respectively The current system service data of each the intelligence building system and its when forefathers' wagon flow in standby service data and the Intelligent Building Group Amount data;
The model generation unit, for previously generating Intelligent Building Group service data report generation model;
The data report generation unit, for according to the current device service data, current system operation number According to, it is described when forefathers' vehicle flowrate data and the Intelligent Building Group service data report generation model for previously generating, generation is current Intelligent Building Group service data is reported.
Preferably, the model generation unit includes:Data transfer subelement, data report generation subelement, feature to Amount extracts subelement and model generation subelement;
The data transfer subelement, each in the Intelligent Building Group in the setting period for being transferred from background data base The department of history of each the intelligence building system in historical Device service data, the Intelligent Building Group of the individual device end System service data and its history people's vehicle flowrate data;
The data report generates subelement, for according to each historical Device service data generation equipment operation number It was reported that, according to each legacy system service data generation system operation data report, and according to each history People's vehicle flowrate data genaration people's vehicle flowrate data report;
The characteristic vector pickup subelement, first eigenvector, institute for extracting the equipment operating data report State the third feature vector of people's vehicle flowrate data report described in the second feature vector sum of system operation data report;
The model generates subelement, for according to default machine learning algorithm, the first eigenvector, described second Characteristic vector and third feature vector, generate Intelligent Building Group service data report generation model.
Preferably, the device described in above-mentioned any one, after the control module, also includes:Visualization model;
The visualization model, for when the visualization request of client transmission is received, transferring each control The current operating data of system, and send to the client.
Compared to prior art, what the present invention was realized has the beneficial effect that:
A kind of Intelligent Building Group control method and device that the above present invention is provided, the method is applied to cloud computing platform control Center processed, each control system is deployed in virtual server resource pool on corresponding virtual machine, and according to previously generating Intelligent Building Group service data report control each control system and its corresponding virtual machine synthetic operation, which solves intelligence The very low problem of level of interaction between groups of building different intelligent building system and distinct device terminal, improves Consumer's Experience Degree.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Inventive embodiment, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis The accompanying drawing of offer obtains other accompanying drawings.
Fig. 1 is a kind of Intelligent Building Group control method flow chart disclosed in the embodiment of the present invention one;
Fig. 2 is a kind of Intelligent Building Group control method partial process view disclosed in the embodiment of the present invention two;
Fig. 3 is another Intelligent Building Group control method partial process view disclosed in the embodiment of the present invention two;
Fig. 4 is a kind of Intelligent Building Group control device structural representation disclosed in the embodiment of the present invention three;
Fig. 5 is a kind of Intelligent Building Group control device part-structure schematic diagram disclosed in the embodiment of the present invention four;
Fig. 6 is another Intelligent Building Group control device part-structure schematic diagram disclosed in the embodiment of the present invention four.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Embodiment one
The embodiment of the invention discloses a kind of Intelligent Building Group control method, cloud computing platform control centre is applied to, should Method flow diagram is as shown in figure 1, comprise the following steps:
S101, the control system of armamentarium terminal in Intelligent Building Group is deployed in virtual server resource pool, empty Intend including at least one virtual machine in server resource pond;
During step S101 is performed, at least one intelligent building system is included in Intelligent Building Group in the prior art System, each the intelligence building system includes at least one device end, and each device end correspond to the control system of itself, Intel Virtualization Technology is relied in this application, and the control system of armamentarium terminal in Intelligent Building Group is deployed in virtual server In resource pool;
In a computer, virtualization is a kind of resource management techniques, is, by the various actual resources of computer, such as to service Device, network, internal memory and storage etc., show after giving abstract, conversion, break the not cleavable obstacle between entity structure, Allow user than the configuration better way of script to apply these resources, and the new virtual part of these resources is not receive The erection mode of existing resource, region or configuration are limited.
S102, according to the deployment logic for pre-setting, each control system is deployed on corresponding virtual machine;
During step S102 is performed, the deployment logic for pre-setting can be to be deployed in specific control system In particular virtual machine, also dependent on the Current resource utilization rate of each virtual machine, script is deployed in Current resource utilization rate low In each control system on the virtual machine of threshold value, random placement has on virtual machine of the Current resource utilization rate higher than threshold value The deployment logic of body can specifically be set according to actual needs.
S103, according to the current Intelligent Building Group service data report for previously generating, controls each control system and its right The virtual machine answered runs;
During step S103 is performed, according to the current Intelligent Building Group service data report for previously generating, control Each control system performs corresponding operating, also, the corresponding virtual machine of control system to its corresponding device end for each is controlled System processed performs operation and provides corresponding computing resource;For example, current Intelligent Building Group service data report can include first Server in machine room opens the mapping relations that quantity opens quantity with air conditioner in machine room in the intelligence building system, when server in machine room is opened At 5, air conditioner in machine room correspondence opens 1.
It should be noted that after step S103, may also include:When the visualization request of client transmission is received, The current operating data of each control system is transferred, and is sent to client;
Specifically, the visualization of Intelligent Building Group can be realized by software, network or other smart machines App, cloud meter Calculation platform courses center, can be by the current operation number of each control system when the visualization request of client transmission is received According to for example, O&M energy consumption data is sent to client;Also, when client receives what cloud computing platform control centre authorized During authority, current Intelligent Building Group service data report can be transferred or even changed.
A kind of Intelligent Building Group control method, Virtual Service is deployed in by each control system disclosed in the embodiment of the present invention In device resource pool on corresponding virtual machine, and according to each control system of Intelligent Building Group service data report control for previously generating System and its corresponding virtual machine synthetic operation, which solves Intelligent Building Group different intelligent building system and distinct device end The very low problem of level of interaction between end, improves user experience.
Embodiment two
The Intelligent Building Group control method with reference to disclosed in above-described embodiment one, in step S103 as shown in Figure 1, pre- Mr. Into the detailed process of current Intelligent Building Group service data report, as shown in Fig. 2 comprising the following steps:
S201, respectively in collection Intelligent Building Group in the current device service data and Intelligent Building Group of each device end The current system service data of each the intelligence building system and its when forefathers' vehicle flowrate data;
During step S201 is performed, the current device operation number of each device end in the Intelligent Building Group of collection According to, the including but not limited to termination property and/or current operating data of device end, wherein, termination property can be brand, inscription Board parameter and/or rated power, current operating data can be fault message, power consumption, enable duration and/or maintenance record;
The current system service data of each the intelligence building system in the Intelligent Building Group of collection, including but not limited to should The current opening information and/or current operating conditions information of each device end, the current fortune in the intelligence building system Row status information includes above-mentioned current operating data;
In the Intelligent Building Group of collection each the intelligence building system when forefathers' vehicle flowrate data include but is not limited to work as Current flow of the people and current vehicle flowrate that preceding parking lot and/or the current entrance guard outpost of the tax office pass through.
S202, according to current device service data, current system service data, as forefathers' vehicle flowrate data and pre- Mr. Into Intelligent Building Group service data report generation model, generate the report of current Intelligent Building Group service data;
Specifically, the detailed process of Intelligent Building Group service data report generation model is previously generated in step S202, such as Shown in Fig. 3, comprise the following steps:
S301, transfers the historical Device fortune of each device end in Intelligent Building Group in the setting period from background data base The legacy system service data of each the intelligence building system and its history people's vehicle flowrate data in row data, Intelligent Building Group;
In step S301 is performed, the historical Device service data including but not limited to equipment in the setting period transferred The termination property and/or history data of terminal;
The history that legacy system service data includes but is not limited to each device end in the intelligence building system is opened Status information and/or history run status information;
History people's vehicle flowrate data include but is not limited to the history people that current parking lot and/or the current entrance guard outpost of the tax office pass through Flow and history vehicle flowrate.
S302, equipment operating data report is generated according to each historical Device service data, is transported according to each legacy system The report of row data genaration system operation data, and according to each history people's vehicle flowrate data genaration people's vehicle flowrate data report;
S303, extraction equipment service data report first eigenvector, system operation data report second feature to The third feature vector of amount and people's vehicle flowrate data report;
S304 is raw according to default machine learning algorithm, first eigenvector, second feature vector sum third feature vector Into Intelligent Building Group service data report generation model;
A kind of Intelligent Building Group control method, Virtual Service is deployed in by each control system disclosed in the embodiment of the present invention In device resource pool on corresponding virtual machine, and according to each control system of Intelligent Building Group service data report control for previously generating System and its corresponding virtual machine synthetic operation, which solves Intelligent Building Group different intelligent building system and distinct device end The very low problem of level of interaction between end, improves user experience.
Embodiment three
The Intelligent Building Group control method with reference to disclosed in above-described embodiment one and embodiment two, the embodiment of the present invention three is then right The device for performing above-mentioned Intelligent Building Group control method, its structural representation should be provided as shown in figure 4, intelligent building group control is filled Putting 100 includes:Virtual server resource pool deployment module 101, deploying virtual machine module 102 and control module 103, control module 103 include report generation unit 1031;
Virtual server resource pool deployment module 101, for by the control system of armamentarium terminal in Intelligent Building Group It is deployed in virtual server resource pool, at least one virtual machine is included in virtual server resource pool;
Deploying virtual machine module 102, for according to the deployment logic for pre-setting, each control system being deployed in into correspondence Virtual machine on;
Report generation unit 1031, for previously generating current Intelligent Building Group service data report;
Control module 103, for according to the current Intelligent Building Group service data report for previously generating, controlling each to control System and its corresponding virtual machine run.
It should be noted that after control module 103, also including:Visualization model;Visualization model, for when reception During the visualization request sent to client, the current operating data of each control system is transferred, and send to client.
A kind of Intelligent Building Group control device, Virtual Service is deployed in by each control system disclosed in the embodiment of the present invention In device resource pool on corresponding virtual machine, and according to each control system of Intelligent Building Group service data report control for previously generating System and its corresponding virtual machine synthetic operation, which solves Intelligent Building Group different intelligent building system and distinct device end The very low problem of level of interaction between end, improves user experience.
Example IV
The Intelligent Building Group control device with reference to disclosed in above-described embodiment three, report generation unit as illustrated in FIG. 4 1031, its structural representation are as shown in figure 5, report generation unit 1031 includes:Data acquisition unit 201 and data report are generated Unit 202, data report generation unit 202 includes model generation unit 2021;
Data acquisition unit 201, the current device for gathering each device end in Intelligent Building Group respectively runs number According to the current system service data with each the intelligence building system in Intelligent Building Group and its when forefathers' vehicle flowrate data;
Model generation unit 2021, for previously generating Intelligent Building Group service data report generation model;
Data report generation unit 202, for according to current device service data, current system service data, work as forefathers Vehicle flowrate data and the Intelligent Building Group service data report generation model for previously generating, generate current Intelligent Building Group operation Data report.
Specifically, model generation unit 2021 as illustrated in FIG. 5, its structural representation are as shown in fig. 6, model generation is single Unit 2021 includes:Data transfer subelement 301, data report generation subelement 302, characteristic vector pickup subelement 303 and mould Type generates subelement 304;
Data transfer subelement 301, and for being transferred from background data base in the setting period, each sets in Intelligent Building Group The legacy system service data of each the intelligence building system and its gone through in historical Device service data, the Intelligent Building Group of standby terminal History people's vehicle flowrate data;
Data report generates subelement 302, for generating equipment operating data report according to each historical Device service data Accuse, system operation data report is generated according to each legacy system service data, and according to each history people's vehicle flowrate data Generation people's vehicle flowrate data report;
Characteristic vector pickup subelement 303, for first eigenvector, the system operation of the report of extraction equipment service data The third feature vector of second feature vector sum people's vehicle flowrate data report of data report;
Model generates subelement 304, for according to default machine learning algorithm, first eigenvector, second feature vector With third feature vector, Intelligent Building Group service data report generation model is generated.
A kind of Intelligent Building Group control device, Virtual Service is deployed in by each control system disclosed in the embodiment of the present invention In device resource pool on corresponding virtual machine, and according to each control system of Intelligent Building Group service data report control for previously generating System and its corresponding virtual machine synthetic operation, which solves Intelligent Building Group different intelligent building system and distinct device end The very low problem of level of interaction between end, improves user experience.
A kind of Intelligent Building Group control method and device provided by the present invention are described in detail above, herein Apply specific case to be set forth principle of the invention and implementation method, the explanation of above example is only intended to help Understand the method for the present invention and its core concept;Simultaneously for those of ordinary skill in the art, according to thought of the invention, Will change in specific embodiments and applications, in sum, this specification content should not be construed as to this The limitation of invention.
It should be noted that each embodiment in this specification is described by the way of progressive, each embodiment weight Point explanation is all difference with other embodiment, between each embodiment identical similar part mutually referring to. For device disclosed in embodiment, because it is corresponded to the method disclosed in Example, so fairly simple, the phase of description Part is closed referring to method part illustration.
Also, it should be noted that herein, such as first and second or the like relational terms are used merely to one Entity or operation make a distinction with another entity or operation, and between not necessarily requiring or implying these entities or operate There is any this actual relation or order.And, term " including ", "comprising" or its any other variant be intended to contain Lid nonexcludability is included, so that process, method, article or the intrinsic key element of equipment including a series of key elements, Or it is these processes, method, article or the intrinsic key element of equipment also to include.In the absence of more restrictions, The key element limited by sentence "including a ...", it is not excluded that in the process including the key element, method, article or equipment In also there is other identical element.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or uses the present invention. Various modifications to these embodiments will be apparent for those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, the present invention The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one The scope most wide for causing.

Claims (8)

1. a kind of Intelligent Building Group control method, it is characterised in that be applied to cloud computing platform control centre, including:
The control system of armamentarium terminal in Intelligent Building Group is deployed in virtual server resource pool, the Virtual Service At least one virtual machine is included in device resource pool;
According to the deployment logic for pre-setting, each described control system is deployed on the corresponding virtual machine;
According to the current Intelligent Building Group service data report for previously generating, each described control system and its corresponding institute are controlled State virtual machine operation.
2. method according to claim 1, it is characterised in that described to previously generate current Intelligent Building Group service data report The detailed process of announcement, including:
The current device service data and the intelligent building of each device end in the Intelligent Building Group are gathered respectively Group in each the intelligence building system current system service data and its when forefathers' vehicle flowrate data;
According to the current device service data, the current system service data, described when forefathers' vehicle flowrate data and pre- The Intelligent Building Group service data report generation model for first generating, generates current Intelligent Building Group service data report.
3. method according to claim 2, it is characterised in that described to previously generate the report life of Intelligent Building Group service data Into the detailed process of model, including:
The historical Device fortune of each device end in the Intelligent Building Group in the setting period is transferred from background data base The legacy system service data of each the intelligence building system and its history people's vehicle flowrate in row data, the Intelligent Building Group Data;
According to each historical Device service data generation equipment operating data report, run according to each described legacy system The report of data generation system service data, and according to each history people vehicle flowrate data genaration people's vehicle flowrate datagram Accuse;
Extract first eigenvector, the second feature vector of system operation data report of the equipment operating data report With the third feature vector of people's vehicle flowrate data report;
The third feature vector according to default machine learning algorithm, the first eigenvector, the second feature vector sum, Generation Intelligent Building Group service data report generation model.
4. the method according to claims 1 to 3 any one, it is characterised in that the current intelligence that the basis is previously generated The service data report of energy groups of building, controls each described control system and its corresponding virtual machine to run, and afterwards, also wraps Include:
When the visualization request of client transmission is received, the current operating data of each control system is transferred, concurrently Deliver to the client.
5. a kind of Intelligent Building Group control device, it is characterised in that including:Virtual server resource pool deployment module, virtual machine Deployment module and control module, the control module include report generation unit;
The virtual server resource pool deployment module, for the control system of armamentarium terminal in Intelligent Building Group to be disposed In virtual server resource pool, at least one virtual machine is included in the virtual server resource pool;
The deploying virtual machine module, for according to the deployment logic for pre-setting, it is right that each described control system is deployed in On the virtual machine answered;
The report generation unit, for previously generating current Intelligent Building Group service data report;
The control module, for according to the current Intelligent Building Group service data report for previously generating, controlling each control System processed and its corresponding virtual machine operation.
6. device according to claim 5, it is characterised in that the report generation unit includes:Data acquisition unit and Data report generation unit, the data report generation unit includes model generation unit;
The data acquisition unit, the current device for gathering each device end in the Intelligent Building Group respectively is transported The current system service data of each the intelligence building system and its when forefathers' vehicle flowrate number in row data and the Intelligent Building Group According to;
The model generation unit, for previously generating Intelligent Building Group service data report generation model;
The data report generation unit, for according to the current device service data, the current system service data, institute State when forefathers' vehicle flowrate data and the Intelligent Building Group service data report generation model for previously generating, the current intelligence of generation is built Build group service data report.
7. device according to claim 6, it is characterised in that the model generation unit includes:Data transfer subelement, Data report generation subelement, characteristic vector pickup subelement and model generation subelement;
The data transfer subelement, for transferring in the setting period each institute in the Intelligent Building Group from background data base State the legacy system fortune of each the intelligence building system in historical Device service data, the Intelligent Building Group of device end Row data and its history people's vehicle flowrate data;
The data report generates subelement, for according to each historical Device service data generation equipment operating data report Accuse, according to each legacy system service data generation system operation data report, and according to each history people car Data on flows generates people's vehicle flowrate data report;
The characteristic vector pickup subelement, first eigenvector, the system for extracting the equipment operating data report The third feature vector of people's vehicle flowrate data report described in the second feature vector sum of system service data report;
The model generates subelement, for according to default machine learning algorithm, the first eigenvector, the second feature Third feature vector described in vector sum, generates Intelligent Building Group service data report generation model.
8. the device according to claim 5~7 any one, it is characterised in that after the control module, also include: Visualization model;
The visualization model, for when the visualization request of client transmission is received, transferring each control system Current operating data, and send to the client.
CN201710104772.3A 2017-02-24 2017-02-24 Intelligent building group control method and device Active CN106850356B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710104772.3A CN106850356B (en) 2017-02-24 2017-02-24 Intelligent building group control method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710104772.3A CN106850356B (en) 2017-02-24 2017-02-24 Intelligent building group control method and device

Publications (2)

Publication Number Publication Date
CN106850356A true CN106850356A (en) 2017-06-13
CN106850356B CN106850356B (en) 2020-05-26

Family

ID=59134999

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710104772.3A Active CN106850356B (en) 2017-02-24 2017-02-24 Intelligent building group control method and device

Country Status (1)

Country Link
CN (1) CN106850356B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108174366A (en) * 2017-12-19 2018-06-15 北京悦畅科技有限公司 Control method, device and the parking lot control system of parking lot system
CN110046456A (en) * 2019-04-26 2019-07-23 中国人民解放军陆军工程大学 A kind of colony intelligence building simulation model simulation run implementation method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101963803A (en) * 2010-09-09 2011-02-02 上海数字智能化系统工程有限公司 Intelligent building integrated system
US20150169795A1 (en) * 2013-12-18 2015-06-18 Johnson Controls Technology Company Systems and methods for determining an appropriate model parameter order
CN104735884A (en) * 2015-04-10 2015-06-24 天津国信浩天三维科技有限公司 Cloud server and physical switch combination based remote lighting control system
CN104969133A (en) * 2013-02-11 2015-10-07 西门子公司 Cloud enabled building automation system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101963803A (en) * 2010-09-09 2011-02-02 上海数字智能化系统工程有限公司 Intelligent building integrated system
CN104969133A (en) * 2013-02-11 2015-10-07 西门子公司 Cloud enabled building automation system
US20150169795A1 (en) * 2013-12-18 2015-06-18 Johnson Controls Technology Company Systems and methods for determining an appropriate model parameter order
CN104735884A (en) * 2015-04-10 2015-06-24 天津国信浩天三维科技有限公司 Cloud server and physical switch combination based remote lighting control system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108174366A (en) * 2017-12-19 2018-06-15 北京悦畅科技有限公司 Control method, device and the parking lot control system of parking lot system
CN110046456A (en) * 2019-04-26 2019-07-23 中国人民解放军陆军工程大学 A kind of colony intelligence building simulation model simulation run implementation method

Also Published As

Publication number Publication date
CN106850356B (en) 2020-05-26

Similar Documents

Publication Publication Date Title
CN107749629A (en) A kind of control method based on the access of charging station load Real-Time Scheduling charging pile
CN109552107A (en) A kind of electric motor intelligent changes electric system and changes method for electrically
CN107069706A (en) A kind of dynamic economic dispatch method that transmission and distribution network based on multi-parametric programming is coordinated
CN109501630A (en) A kind of electric car charging scheme real-time recommendation method and system
CN106796701A (en) Managed using the computing device of modulation electric energy
CN105190558A (en) Accelerated instantiation of cloud resource
CN104300604B (en) A kind of electric automobile electric charging station monitoring system
CN107323296A (en) Policy control device and method, charging pile, charging scheduling system and method
CN104537178B (en) A kind of power system associative simulation modeling method based on Matlab and Netlogo
CN104734303B (en) The control method and device of charging electric vehicle operation
CN104701984A (en) Intelligent electricity terminal plug and play method based on self recognition
CN106740243A (en) A kind of charging pile charging device and method based on block chain
CN109318755A (en) A kind of charging pile power consuming administrative system and method based on intelligent ordered electric device
CN113437754A (en) Electric automobile ordered charging method and system based on platform area intelligent fusion terminal
CN106850356A (en) A kind of Intelligent Building Group control method and device
CN106505624B (en) Determine the regulator control system and method for the optimal ability to arrange jobs of power distribution network distributed generation resource
CN110278194A (en) A kind of vertical three-dimensional garage intelligence control system and its control method with photovoltaic system and charging pile
CN105069702A (en) Power grid integrated information processing method
CN103457326A (en) Distributed uniting coordination control method of large-scale electric automobile charging load
CN112319293A (en) Control method for autonomous coordination power between charging piles
CN106451415A (en) Microgrid power transaction system based on distributed coordination method
CN106130065A (en) A kind of distributed photovoltaic group system
CN106532960A (en) Adaptive SCADA monitoring method applicable to power supply and power distribution field
CN207549973U (en) Policy control device, charging pile, charging schedule system
CN111884214B (en) Hierarchical optimization scheduling method and device suitable for park energy router cluster

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200427

Address after: 215100 No. 1 Guanpu Road, Guoxiang Street, Wuzhong Economic Development Zone, Suzhou City, Jiangsu Province

Applicant after: SUZHOU LANGCHAO INTELLIGENT TECHNOLOGY Co.,Ltd.

Address before: 450018 Henan province Zheng Dong New District of Zhengzhou City Xinyi Road No. 278 16 floor room 1601

Applicant before: ZHENGZHOU YUNHAI INFORMATION TECHNOLOGY Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant