CN106844425A CN201611131842.6A CN201611131842A CN106844425A CN 106844425 A CN106844425 A CN 106844425A CN 201611131842 A CN201611131842 A CN 201611131842A CN 106844425 A CN106844425 A CN 106844425A
Authority
CN
China
Prior art keywords
cable
pipeline
processing module
data
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611131842.6A
Other languages
Chinese (zh)
Inventor
刘皓
闫春江
李光
林轩
林一轩
刘青
赵洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Beijing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611131842.6A priority Critical patent/CN106844425A/en
Publication of CN106844425A publication Critical patent/CN106844425A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/29Geographical information databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Databases & Information Systems (AREA)
  • General Physics & Mathematics (AREA)
  • Water Supply & Treatment (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • General Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Remote Sensing (AREA)
  • Data Mining & Analysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of pipeline and the data handling system of cable.Wherein, the system includes:Basic database, the operational factor for storing the cable for real-time monitoring;Service Processing Module, at least being monitored on-line to pipeline, obtains the operational factor of pipeline;First processing module, is connected with basic database and Service Processing Module respectively, for the operational factor of the operational factor of cable and pipeline to be carried out into data fusion.The present invention solves pipeline in the prior art and being independently managed for cable causes that the technical problem that lean is managed can not be met.

Description

The data handling system of pipeline and cable
Technical field
The present invention relates to field of power communication, in particular to a kind of pipeline and the data handling system of cable.
Background technology
At present, technology and system on cable and pipeline management mainly have GIS-Geographic Information System, production information management system System and cable network operation monitoring technology, wherein, GIS-Geographic Information System is shown to cable and grid figure, account query with And positioning;Production MIS such as is managed, inquires about and counts at the function to cable and pipe-line equipment account;Cable system is transported Row monitoring technology carries out real time on-line monitoring to the parameter such as cable and grid temperature, load, tunnel environment.
But with power network GIS platform and PMS2.0 practical applications, cable management exposes problems.Wherein GIS (GIS-Geographic Information System) and PMS (engineering production management system) data maintenance entrance is not unique, and data maintenance workload is big, Cause accuracy, the information exchange of creation data poor;Do not set up pipeline (hole) topological relation integrated with cable, it is impossible to Power pipe internal resource occupancy situation is embodied, simultaneity factor departs from the appraisal of power pipe equipment running status, it is impossible to Cable system path optimization is effectively instructed according to resource service condition;Lack the overall process closed loop pipe to cable system related business process Reason, it is impossible to the related business process of effective specification cable system, especially conduit resource examination & approval and confined space operation approval process It is inefficient;PMS2.0 also lacks enough supports on pipeline and cable system service management, causes pipeline and cable system to manage Present situation is difficult to meet the Modern Enterprise Administration requirement with assets whole-life cycle fee as core, it is difficult to adapt to be examined with equipment state Repair and required for the production lean of core is managed.
The technology that causes to meet lean management of being independently managed for pipeline in the prior art and cable is asked Topic, not yet proposes effective solution at present.
The content of the invention
The data handling system of a kind of pipeline and cable is the embodiment of the invention provides, at least to solve to manage in the prior art Road and being independently managed for cable cause that the technical problem that lean is managed can not be met.
A kind of one side according to embodiments of the present invention, there is provided the data handling system of pipeline and cable, including:Base Plinth database, the operational factor for storing the cable for real-time monitoring;Service Processing Module, at least to the pipe Road is monitored on-line, obtains the operational factor of the pipeline;First processing module, respectively with the basic database and described Service Processing Module is connected, for the operational factor of the cable to be carried out into data fusion with the operational factor of the pipeline.
In embodiments of the present invention, there is provided the operational factor and fortune of the cable that basic data library storage is real-time monitored Row state, is monitored on-line by Service Processing Module to the pipeline, the operational factor of the pipeline is obtained, by first The operational factor of the cable is carried out data fusion by processing module with the operational factor of the pipeline.Such scheme is by cable Operation and the operation of pipeline carry out data fusion, so as to establish pipeline topological relation integrated with cable, realize power pipe Internal resource occupancy situation transparence, optimizes and revises in combination with power pipe section management work, solves in the prior art Pipeline and being independently managed for cable cause that the technical problem that lean is managed can not be met, and are specification company cable passage money Source control have accumulated experience, lay a good foundation.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, this hair Bright schematic description and description does not constitute inappropriate limitation of the present invention for explaining the present invention.In the accompanying drawings:
Fig. 1 is according to embodiments of the present invention for pipeline and the schematic diagram of the data handling system of cable;
Fig. 2 is a kind of Organization Chart of cable data treatment according to embodiments of the present invention;
Fig. 3 is the operation process chart of a kind of optional confined space operation module according to embodiments of the present invention;
Fig. 4 is a kind of checking flow chart of conduit resource according to embodiments of the present invention;
Fig. 5 is the general frame of the data handling system of a kind of optional pipeline according to embodiments of the present invention and cable Figure;
Fig. 6 is the Technical Architecture of the data handling system of a kind of optional pipeline according to embodiments of the present invention and cable Figure;And
Fig. 7 is the business structure of the data handling system of a kind of optional pipeline according to embodiments of the present invention and cable Figure.
Specific embodiment
In order that those skilled in the art more fully understand the present invention program, below in conjunction with the embodiment of the present invention Accompanying drawing, is clearly and completely described to the technical scheme in the embodiment of the present invention, it is clear that described embodiment is only The embodiment of a part of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill people The every other embodiment that member is obtained under the premise of creative work is not made, should all belong to the model of present invention protection Enclose.
It should be noted that term " first ", " in description and claims of this specification and above-mentioned accompanying drawing Two " it is etc. for distinguishing similar object, without for describing specific order or precedence.It should be appreciated that so using Data can exchange in the appropriate case, so as to embodiments of the invention described herein can with except illustrating herein or Order beyond those of description is implemented.Additionally, term " comprising " and " having " and their any deformation, it is intended that cover Lid is non-exclusive to be included, for example, the process, method, system, product or the equipment that contain series of steps or unit are not necessarily limited to Those steps or unit clearly listed, but may include not list clearly or for these processes, method, product Or other intrinsic steps of equipment or unit.
Embodiment 1
According to embodiments of the present invention, there is provided a kind of for pipeline and the embodiment of the data handling system of cable, Fig. 1 is It is according to embodiments of the present invention for pipeline and the schematic diagram of the data handling system of cable, as shown in figure 1, the system includes:
Basic database 10, the operational factor for storing the cable for real-time monitoring.
Specifically, set up above-mentioned basic database can with graphic resource as core, realize installations and facilities " figure number is integrally Change ", reach the data management target of " source dimension one, altogether dimension are shared ";Based on graphic resource, believe by monitor in real time Breath, the organic combination of monitoring running state information, set up the pipe network resource data model of static dynamic data interaction;Open comprehensively Exhibition cable basic data census operations, for the management of cable lean provides solid data supporting.
Service Processing Module 12, at least being monitored on-line to the pipeline, obtains the operational factor of the pipeline.
First processing module 14, is connected with the basic database and the Service Processing Module respectively, for by described in The operational factor of cable carries out data fusion with the operational factor of the pipeline.
In a kind of optional embodiment, above-mentioned first processing module can be integrated by pipeline and cable system related service And data fusion, set up the intelligent decision analysis system of the strategic layer of covering, operating layer, work layer, be management level, business operation and Controllers provide decision support, comprehensive support pipeline and cable system planning construction and stable operation.
Said system is realized to the operational factor of pipeline (for example:Well lid, temperature, load, water level, gas, video, connect Earth-current etc.) monitor in real time, for two-level scheduler, operation monitoring, O&M maintainer information service and real-time early warning are provided, reality Cable, the real-time control of pipe trench important state information are showed.
From the foregoing, it will be observed that the above embodiments of the present application provide the operation of the cable that basic data library storage is real-time monitored Parameter and running status, are monitored on-line by Service Processing Module to the pipeline, obtain the operational factor of the pipeline, The operational factor of the cable is carried out by data fusion with the operational factor of the pipeline by first processing module.Such scheme The operation of cable and the operation of pipeline are carried out into data fusion, so as to establish pipeline topological relation integrated with cable, is realized Power pipe internal resource occupancy situation transparence, optimizes and revises in combination with power pipe section management work, solves existing Have pipeline and cable in technology is independently managed the technical problem for causing that lean management can not be met, and is specification company electricity The management of cable channel resource have accumulated experience, lay a good foundation.
Fig. 2 is a kind of Organization Chart of cable data treatment according to embodiments of the present invention, optionally, the operation of above-mentioned cable Parameter includes one or more of any as follows:Geo-spatial data, image space data, topological data, attribute data, configuration number According to, interface data, business datum, document data, monitoring of tools data.
Optionally, according to the above embodiment of the present invention, Service Processing Module is additionally operable to the overdue early warning of resource and state evaluation, And can be also used for risk management and control and hidden danger management.
Such scheme can be to obtain Service Processing Module according to optimizing by the management to former pipeline and cable.Industry Business processing module is with through the overall process closed loop management of the links such as planning and designing, ancillary works construction, operational monitoring, O&M maintenance Serve as theme, realize that Automation of Manufacturing Process, operation flow are interactive, omnidirectional support pipeline and cable system integrated services develop.
Optionally, according to the above embodiment of the present invention, the Service Processing Module includes:
Confined space operation module, for determining work flow of the pipeline in confined space operation.
Fig. 3 is the operation process chart of a kind of optional confined space operation module according to embodiments of the present invention, in one kind In optional embodiment, above-mentioned confined space operation module includes engineered tissue module, passage O&M module and fortune inspection module, its In, submit job request to from engineered tissue module to passage O&M module, passage O&M module is right after related data is received Data are verified that prompting engineered tissue module resubmits the application of checking operation in the case where checking does not pass through, and is testing Data are included monthly plan, week plan by card in the case of passing through, and issue monthly plan by transporting inspection module, in fortune inspection module issue Examining module by passage fortune after monthly plan carries out making a report on all plans, and again by transporting after inspection module issue is contemplated in week by engineering group Module is knitted to be operated according to week plan.In the case where needing to drive a well, initiated from engineered tissue module to passage O&M module Drive a well request, and the request that drives a well verified by passage O&M module and is handed over order.
Optionally, according to the above embodiment of the present invention, above-mentioned Service Processing Module also includes:
Section requests verification module, for being verified to the conduit resource.
Fig. 4 is a kind of checking flow chart of conduit resource according to embodiments of the present invention, in a kind of optional embodiment, Section requests verification module can still include engineered tissue module, passage O&M module and fortune inspection module, engineered tissue module Job request is initiated in request stage O&M module in arterial highway to the south, passage O&M module is according to the section (conduit resource) for receiving Request and related data are verified that prompting engineered tissue module resubmits request in the case where checking does not pass through, Qualify Phase is transferred in the case of being verified, is verified by fortune inspection module, in the case where fortune inspection module verification does not pass through Passage O&M module is returned to, ending phase is entered in the case where being verified, it is disconnected according to reply by engineered tissue module Face the result is implemented.In this stage, onsite acceptance can also be carried out by passage O&M module.Above-mentioned management Energy Resources Service Reason module is realized " one-stop to handle ", and General Promotion resolves face management work level.
Such scheme can in real time show to the occupancy situation of any raceway groove section resource, and it is transparent to be that client applies to install offer Section information and optimal path are automatically selected, while realizing the reply overdue early warning of resource.Resource approval and passage operation are realized Three liftings:One be plan complete improved efficiency, under former management mode constituent parts monthly plan completion rate less than 80%, lean pipe Monthly plan completion rate reaches more than 90% after reason lifting;Two is section examination & approval improved efficiency, and section requests verification duration is by average It shorten within 9.5 days 3.5 days, and critical piping section reply duration is completed in 1 day.Three is the lifting of service carrier power, by original More than 590 are brought up to monthly to carry out passage operation 380.
Optionally, according to the above embodiments of the present application, said system also includes:
Second processing module, respectively with the basic database, the Service Processing Module and the first processing module It is connected, the annexation for setting up the pipeline and the cable, and the number obtained according to the first processing module According to fusion results carry out path plan automatically, resource occupation analysis and power supply is automatic reviews and accident is quickly positioned.
Optionally, according to the above embodiments of the present application, said system also includes:GIS modules.
In the case where system includes GIS modules, electric topology and multi-trench topography can be realized based on geographical graphic The linkage of linkage, equipment state and operation flow, static information and multidate information linkage, for the management of cable system lean provides attribute Data and spatial information.
Optionally, according to the above embodiments of the present application, above-mentioned Second processing module includes:
Safety management module, for monitoring the work flow phase determined with the confined space operation module by by well lid Association, the well lid that checking is failed to act in control can not be opened.
Said system realizes operation flow and associates locking with well lid is monitored, fail to act examination and approval procedures to enter ditch operation equal Well lid cannot be opened, it is ensured that confined space job safety, while the typing of all kinds of hidden danger, positioning and warning function are also provided, It is no longer rely on manual management.Only operating personnel can leave scene to operating personnel after live just opening Gong Jing, work well lock, The non-blind area realized into ditch operation is managed.
Optionally, according to the above embodiments of the present application, above-mentioned Second processing module also includes:
Fault location module, the positional information provided according to the GIS modules determines the geographical position that failure occurs.
Geography information based on GIS can realize the fuzzy query and quick positioning of optional position, to answer road pavement to collapse Accident provides Informational support, improves breakdown judge and emergency disposal ability, realizes being accurately positioned and coverage for failure Timely assessment.
Optionally, according to the above embodiments of the present application, Second processing module also includes:
Power supply backward module, the geographical position that the failure for being obtained according to fault location module positioning occurs determines The corresponding power supply in geographical position that the failure occurs.
Power supply backward module provides quick passage for the regular maintenance and emergency disposal of client.Especially for special, one-level Very Important Person, power supply backward is logical for the political power supply guarantee of normalization and the emergency disposal of accident provide fast information service Road, has been obviously improved customer service supportability.
Cable system operational management, resource management, safety management, failure can be studied and judged by said system, customer service Data and information support are provided etc. business, for the specialties such as scheduling, monitoring, safety supervision, planning, fortune inspection, marketing, customer service provide linkage clothes Business.
Fig. 5 is the general frame of the data handling system of a kind of optional pipeline according to embodiments of the present invention and cable Figure, in a kind of optional embodiment, with reference to shown in Fig. 5, the business of the data handling system of the pipeline and cable is refueled and is included Engineering auxiliary, operation management, overhaul management, operational monitoring and underground electrical network figure are as resource management.The number of the pipeline and cable Include pipeline and cable system resource data, geo-spatial data according to the data structure of processing system, produce business datum and set Standby monitoring data.The Technical Architecture (i.e. platform base facility) of the data handling system of the pipeline and cable include data storage, Data access, using logic, application service, using performance, safe design, physics deployment, hardware environment, software environment and deposit Storage planning.In addition to above-mentioned framework, the data handling system of the pipeline and cable also includes security architecture and Application Integration Architecture, Wherein, security architecture also include data safety, using safety, system safety, network completely, physical security and safety management; Application Integration Architecture includes production management, operation monitoring, planning and designing and power grid GIS.
Fig. 6 is the Technical Architecture of the data handling system of a kind of optional pipeline according to embodiments of the present invention and cable Figure, in a kind of optional embodiment, with reference to shown in Fig. 6, the Technical Architecture of the system in presentation layer, that is, is user mutual side Including pipeline and cable application framework (B/S), pipeline and cable system application framework (C/S), operation monitoring function application and number According to Fabric Interface, wherein, data exchange interface is communicated with each master station of operation system (PMS2.0).The system is in application service Layer is connected with electric power GIS platform, and is connected with presentation layer by the JAR packet interfaces based on J2EE, including figure browses service, looks into Ask positioning service, vector image service, power network topology analysis service, spatial analysis service, tile map service, OGC standards clothes Business and on-line monitoring service.The systematic difference logic module is connected by based on C++d com interfaces with application service layer, Including rights management, thematic map management, customization editor, relationship model, generalized edit, data communication, Query Location, spatial statisticses Analysis, topological analysis, figure are rendered and service broker.The data access layer of the system is connected with application logic component layer, bag Include vector graphics access, raster data access, attribute data access, file access, data access agency, Monitoring Data access. The data storage layer of the system include geo-spatial data, grid graph data, grid topology data, group member's attribute data and Operation monitoring data, it can carry out exchange files.
Fig. 7 is the business structure of the data handling system of a kind of optional pipeline according to embodiments of the present invention and cable Figure, in a kind of optional embodiment, with reference to shown in Fig. 7, the business structure of the system includes status monitoring business, production business And image resource business, wherein, condition monitoring business includes earth current monitoring, video monitoring, Real-time Load, well lid prison Control, monitoring temperature, water level monitoring, gas-monitoring, pump monitoring, pump monitoring and fan monitoring;Production business includes:Resource Predicting and early warning, confined space operation, state evaluation, section requests verification, risk management and control, hidden danger management, defect management, repairing pipe Reason and fault management;Image resource business includes that the displaying of section thematic map, GIS general graphicals are safeguarded, cable trace planning divides Analysis, the output of cable query statistic, image, GIS foundation operating function, pipe network data Migration tools, GIS Query Locations and passage Resource analysis.
The system of the embodiment with reference to shown in Fig. 5, Fig. 6 and Fig. 7 can reach following effect:
(1) cable and channel management aspect, realize the maintenance of the figure and machine account information of cable and passage, in geographical map On the basis of generate cable system figure, cable passage sectional drawing, and based on the figure of power cable and passage, topology, machine account, Realize cable trace planning application, section displaying, channel resource is analyzed, power supply point is reviewed.
(2) production service management aspect, is managed by confined space job management and section, realizes cable passage resource Effective management and control, change original section and examine inefficient present situation, resource approval and passage operation realize three liftings:One Be plan complete improved efficiency, under former management mode constituent parts monthly plan completion rate less than 80%, the moon after lean managerial promotion Completion rate of the plan reaches more than 90%;Two is section examination & approval improved efficiency, and section requests verification duration was shorten to by average 9.5 days 3.5 days, and critical piping section reply duration is completed in 1 day.Three is the lifting of service carrier power, logical by monthly carrying out originally Road operation 380 brings up to more than 590;By hidden danger management, the controllable in control of cable passage hidden danger is realized, and combine special Topic figure displaying, is easy to operations staff and administrative staff to grasp hidden danger situation in time, it is ensured that equipment safety stable operation.
(3) cable and channel monitoring aspect, realize the on-line monitoring of power cable state and passage running environment information, Realize cable and passage running state monitoring;State monitoring and management is provided to O&M overhaul management by video, monitoring alarm and lacked Fall into, failure, incipient fault data are originated;Well lid monitoring realizes combining closely in cable passage work flow, it is ensured that limited sky Between operation it is controllable control.
The embodiments of the present invention are for illustration only, and the quality of embodiment is not represented.
In the above embodiment of the present invention, the description to each embodiment all emphasizes particularly on different fields, and does not have in certain embodiment The part of detailed description, may refer to the associated description of other embodiment.
In several embodiments provided herein, it should be understood that disclosed technology contents, can be by other Mode is realized.Wherein, device embodiment described above is only schematical, such as division of described unit, Ke Yiwei A kind of division of logic function, can there is other dividing mode when actually realizing, such as multiple units or component can combine or Person is desirably integrated into another system, or some features can be ignored, or does not perform.Another, shown or discussed is mutual Between coupling or direct-coupling or communication connection can be the INDIRECT COUPLING or communication link of unit or module by some interfaces Connect, can be electrical or other forms.
The unit that is illustrated as separating component can be or may not be it is physically separate, it is aobvious as unit The part for showing can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple On unit.Some or all of unit therein can be according to the actual needs selected to realize the purpose of this embodiment scheme.
In addition, during each functional unit in each embodiment of the invention can be integrated in a processing unit, it is also possible to It is that unit is individually physically present, it is also possible to which two or more units are integrated in a unit.Above-mentioned integrated list Unit can both be realized in the form of hardware, it would however also be possible to employ the form of SFU software functional unit is realized.
If the integrated unit is to realize in the form of SFU software functional unit and as independent production marketing or use When, can store in a computer read/write memory medium.Based on such understanding, technical scheme is substantially The part for being contributed to prior art in other words or all or part of the technical scheme can be in the form of software products Embody, the computer software product is stored in a storage medium, including some instructions are used to so that a computer Equipment (can be personal computer, server or network equipment etc.) perform each embodiment methods described of the invention whole or Part steps.And foregoing storage medium includes:USB flash disk, read-only storage (ROM, Read-Only Memory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic disc or CD etc. are various can be with store program codes Medium.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (10)

1. the data handling system of a kind of pipeline and cable, it is characterised in that including:
Basic database, the operational factor for storing the cable for real-time monitoring;
Service Processing Module, at least being monitored on-line to the pipeline, obtains the operational factor of the pipeline;
First processing module, is connected with the basic database and the Service Processing Module respectively, for by the cable Operational factor carries out data fusion with the operational factor of the pipeline.
2. system according to claim 1, it is characterised in that the operational factor of the cable include it is following one of any or It is various:Geo-spatial data, image space data, topological data, attribute data, configuration data, interface data, business datum, Document data, monitoring of tools data.
3. system according to claim 2, it is characterised in that the Service Processing Module includes:
Confined space operation module, for determining work flow of the pipeline in confined space operation.
4. system according to claim 3, it is characterised in that the Service Processing Module also includes:
Section requests verification module, for being verified to the conduit resource.
5. system according to claim 4, it is characterised in that the Service Processing Module be additionally operable to the overdue early warning of resource and State evaluation.
6. system according to claim 5, it is characterised in that the system also includes:
Second processing module, is connected with the basic database, the Service Processing Module and the first processing module respectively, Annexation for setting up the pipeline and the cable, and the data fusion result obtained according to the first processing module Carry out path plan automatically, resource occupation analysis and power supply is automatic reviews and accident is quickly positioned.
7. system according to claim 6, it is characterised in that the system also includes:GIS modules.
8. system according to claim 7, it is characterised in that the Second processing module includes:
Safety management module, for monitoring related to the work flow of confined space operation module determination by by well lid Connection, the well lid that checking is failed to act in control can not be opened.
9. system according to claim 8, it is characterised in that the Second processing module also includes:
Fault location module, the positional information provided according to the GIS modules determines the geographical position that failure occurs.
10. system according to claim 9, it is characterised in that the Second processing module also includes:
Power supply backward module, for being positioned according to the fault location module described in the geographical position determination that the failure for obtaining occurs The corresponding power supply in geographical position that failure occurs.
CN201611131842.6A 2016-12-09 2016-12-09 The data handling system of pipeline and cable Pending CN106844425A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611131842.6A CN106844425A (en) 2016-12-09 2016-12-09 The data handling system of pipeline and cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611131842.6A CN106844425A (en) 2016-12-09 2016-12-09 The data handling system of pipeline and cable

Publications (1)

Publication Number Publication Date
CN106844425A true CN106844425A (en) 2017-06-13

Family

ID=59140707

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611131842.6A Pending CN106844425A (en) 2016-12-09 2016-12-09 The data handling system of pipeline and cable

Country Status (1)

Country Link
CN (1) CN106844425A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107730117A (en) * 2017-10-17 2018-02-23 中国电力科学研究院 A kind of cable maintenance method for early warning and system based on heterogeneous data comprehensive analysis
CN111445103A (en) * 2020-02-25 2020-07-24 国网河南省电力公司电力科学研究院 Power transmission cable production quality management feedback system based on industrial internet
CN112186613A (en) * 2020-09-30 2021-01-05 国网北京市电力公司 Cable management method, device and system

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101930470A (en) * 2010-09-07 2010-12-29 上海盈隽实业有限公司 Urban power network geographic information system and urban pipeline geographic information system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101930470A (en) * 2010-09-07 2010-12-29 上海盈隽实业有限公司 Urban power network geographic information system and urban pipeline geographic information system

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
俞键 等: ""电缆管道监控系统"", 《农村电气化》 *
刘同旭 等: ""地下电缆及通道精细化管理平台的研究及应用"", 《电子技术与软件工程》 *
魏永 等: ""地下电缆精细化管理系统的研究与实现"", 《电子测试》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107730117A (en) * 2017-10-17 2018-02-23 中国电力科学研究院 A kind of cable maintenance method for early warning and system based on heterogeneous data comprehensive analysis
CN107730117B (en) * 2017-10-17 2021-12-21 中国电力科学研究院 Cable maintenance early warning method and system based on heterogeneous data comprehensive analysis
CN111445103A (en) * 2020-02-25 2020-07-24 国网河南省电力公司电力科学研究院 Power transmission cable production quality management feedback system based on industrial internet
CN111445103B (en) * 2020-02-25 2023-01-31 国网河南省电力公司电力科学研究院 Power transmission cable production quality management feedback system based on industrial internet
CN112186613A (en) * 2020-09-30 2021-01-05 国网北京市电力公司 Cable management method, device and system

Similar Documents

Publication Publication Date Title
Jafari et al. A review on digital twin technology in smart grid, transportation system and smart city: Challenges and future
US10116165B2 (en) Powergrid operation and supervision system
CN102084569B (en) Method and system for managing a power grid
CN105303306B (en) Electric power material dispatching platform system
CN113450065B (en) Production operation management system and method for wind power plant
WO2004104891A1 (en) Automated utility supply management system integrating data sources including geographic information systems (gis) data.
CN102739420A (en) Distributed complex giant system based on digital drainage network operation management and maintenance
CN112988865B (en) Industrial Internet service management system
CN106844425A (en) The data handling system of pipeline and cable
CN108269212A (en) The management method and device of underground communal facility based on BIM and GIS
Chowdhury et al. E-maintenance: Opportunities and challenges
Jiang et al. Research and design of infrastructure monitoring platform of intelligent high speed railway
CN103295164A (en) Power grid safety monitoring management information system and management method
CN109656909A (en) A kind of transmission of electricity expert data management system
CN116991678A (en) Intelligent operation and maintenance system of data center
Taheri et al. Toward operational resilience of smart energy networks in complex infrastructures
CN115115332A (en) Intelligent comprehensive management and control platform suitable for medium and small hydropower stations
CN115277473A (en) Remote operation and maintenance method and device for edge gateway, computer equipment and storage medium
CN104915523B (en) A kind of regulation full-service unified modeling method based on time series
Belmont et al. Digital Asset Performance Management—Taking Utility Asset Management to the Next Level
Ng et al. A social networking enabled crowdsourcing system for integrated infrastructure asset management
Ip et al. SCADA in an integrated maintenance management system
KR20090028670A (en) Integrated operation support system
Rong et al. Optimum post-disruption restoration plan of interdependent critical infrastructures
Alapati Drone routing for damage assessment on power distribution systems under HILF events

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170613

RJ01 Rejection of invention patent application after publication