CN106841881A - The analysis method and device of electricity consumption module - Google Patents

The analysis method and device of electricity consumption module Download PDF

Info

Publication number
CN106841881A
CN106841881A CN201710238029.7A CN201710238029A CN106841881A CN 106841881 A CN106841881 A CN 106841881A CN 201710238029 A CN201710238029 A CN 201710238029A CN 106841881 A CN106841881 A CN 106841881A
Authority
CN
China
Prior art keywords
electricity consumption
electrical equipment
consumption data
target
interval
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710238029.7A
Other languages
Chinese (zh)
Other versions
CN106841881B (en
Inventor
牛栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Juneng Hengye Beijing Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710238029.7A priority Critical patent/CN106841881B/en
Publication of CN106841881A publication Critical patent/CN106841881A/en
Application granted granted Critical
Publication of CN106841881B publication Critical patent/CN106841881B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention provides the analysis method and device of a kind of electricity consumption module, the method includes obtaining the electricity consumption data of multiple electrical equipments in preset time period;The electricity consumption data of each electrical equipment is compared with corresponding standard electricity consumption data, comparative result is obtained;Target electricity consumption data is searched in the electricity consumption data of multiple electrical equipments according to comparative result, and using the corresponding electrical equipment of target electricity consumption data as target electrical equipment, wherein, target electricity consumption data is used to represent that target electrical equipment is in failure operation state.The analysis method of the electricity consumption module in the present invention can fast and accurately determine target electrical equipment (electrical equipment for breaking down) in multiple electrical equipments, so that electrical equipment of the user targetedly to breaking down is repaired.It is determined that break down electrical equipment when, simple and quick, degree of intelligence is high, alleviates when carrying out electrical equipment fault detect in the prior art, inefficiency, the technical problem of degree of intelligence difference.

Description

The analysis method and device of electricity consumption module
Technical field
The present invention relates to technical field of electric power detection, more particularly, to the analysis method and device of a kind of electricity consumption module.
Background technology
With economic fast development, power consumption is increased year by year, and imbalance between power supply and demand is more protruded.In need for electricity amount not While disconnected increase, the problem of Electrical Safety is also gradually highlighted.Modern high building power consumption is big, and user side equipment is of a great variety, and Often there is high-power or high to electrical stability requirement electrical equipment so that requirement of the modern high building to electricity consumption reliability is non- Chang Gao.
In existing electricity protection system, when the electricity consumption data of the power data or electrical equipment for detecting power network is sent out When raw abnormal, leakage protection module can quickly disconnect relay, forbid power network to continue to be powered to electrical equipment.When same During Shi Kaiqi multiple electrical equipments, if some electrical equipment therein breaks down, the electricity consumption data of electrical equipment is caused to be sent out Raw abnormal, control relay disconnects after electricity protection system detectio to the abnormal information of electricity consumption data, can play the work of protection With.
But, it is necessary to be detected to all electrical equipments when user wants specifically to understand the electrical equipment for breaking down, Inefficiency, degree of intelligence is poor.
The content of the invention
In view of this, it is existing to alleviate it is an object of the invention to provide the analysis method and device of a kind of electricity consumption module When carrying out electrical equipment fault detect in technology, inefficiency, the technical problem of degree of intelligence difference.
In a first aspect, a kind of analysis method of electricity consumption module is the embodiment of the invention provides, including:
The electricity consumption data of multiple electrical equipments in preset time period is obtained, wherein, the electricity consumption data includes the electricity consumption The operating current of the operating power of equipment and/or the electrical equipment;
The electricity consumption data of each electrical equipment is compared with corresponding standard electricity consumption data, obtains comparing knot Really, wherein, the corresponding standard electricity consumption data be current power equipment non-faulting run when electricity consumption data;
Target electricity consumption data is searched in the electricity consumption data of the multiple electrical equipment according to the comparative result, and by institute The corresponding electrical equipment of target electricity consumption data is stated as target electrical equipment, wherein, the target electricity consumption data is used to represent institute State target electrical equipment and be in failure operation state.
With reference in a first aspect, the embodiment of the invention provides the first possible implementation method of first aspect, wherein, will The electricity consumption data of each electrical equipment and corresponding standard electricity consumption data be compared including:
Detect the power-up state of the electrical equipment;
When detecting in the electrical equipment after the completion of electricity, the standard of the electrical equipment that receiving terminal apparatus send is used Electric data;
The standard electricity consumption data and the electrical equipment for detecting of the electrical equipment that the terminal device is sent Electricity consumption data be compared.
With reference in a first aspect, the embodiment of the invention provides second possible implementation method of first aspect, wherein, Using the corresponding electrical equipment of the target electricity consumption data as after target electrical equipment, methods described also includes:
Determine that the target electrical equipment occurs the probability of every kind of fault type, obtain determining result, wherein, the failure Type includes at least one of:The target electrical equipment is damaged, and the target electrical equipment is caught fire;
The determination result is sent to terminal device.
With reference in a first aspect, the embodiment of the invention provides the third possible implementation method of first aspect, wherein, The electricity consumption data is the operating current, in the case that the standard electricity consumption data is standard operating current, determines the mesh The probability that mark electrical equipment occurs every kind of fault type includes:
Calculate the operating current of the target electrical equipment and the difference of the standard operating current;
Determine to close interval belonging to the difference, wherein, the quantity for closing interval is multiple, described in each Close the probability that the every kind of fault type of interval correspondence one occurs;
According to determine it is described belonging to close interval, determine that the target electrical equipment occurs every kind of fault type Probability.
With reference in a first aspect, the embodiment of the invention provides the 4th kind of possible implementation method of first aspect, wherein, In the case that the electricity consumption data is the operating power, obtain multiple electrical equipments in preset time period electricity consumption data it Afterwards, and before the electricity consumption data of each electrical equipment is compared with corresponding standard electricity consumption data, methods described Also include:
Predetermined number predetermined power interval is obtained, and the electricity consumption obtained corresponding to each described predetermined power interval sets Standby electricity consumption type;
The interval belonging to the operating power of the electrical equipment is determined in the predetermined number predetermined power is interval, with And determine the affiliated interval corresponding electricity consumption type;
Using the corresponding electricity consumption type as the electrical equipment classification type;
The classification type is sent to terminal device.
Second aspect, the embodiment of the present invention additionally provides a kind of analytical equipment of electricity consumption module, including:
First acquisition module, the electricity consumption data for obtaining multiple electrical equipments in preset time period, wherein, the electricity consumption Data include the operating power of the electrical equipment and/or the operating current of the electrical equipment;
Comparison module, for the electricity consumption data of each electrical equipment to be compared with corresponding standard electricity consumption data Compared with, comparative result is obtained, wherein, the corresponding standard electricity consumption data is electricity consumption number when current power equipment non-faulting is run According to;
Searching modul, uses for searching target in the electricity consumption data of the multiple electrical equipment according to the comparative result Electric data, and using the corresponding electrical equipment of the target electricity consumption data as target electrical equipment, wherein, the target electricity consumption number According to for representing that the target electrical equipment is in failure operation state.
With reference to second aspect, the first possible implementation method of second aspect is the embodiment of the invention provides, wherein, institute Stating comparison module includes:
Detection unit, the power-up state for detecting the electrical equipment;
Receiving unit, when detecting in the electrical equipment after the completion of electricity, the electricity consumption that receiving terminal apparatus send sets Standby standard electricity consumption data;
Comparing unit, for the standard electricity consumption data of the electrical equipment that sends the terminal device with detect The electricity consumption data of the electrical equipment is compared.
With reference to second aspect, second possible implementation method of second aspect is the embodiment of the invention provides, wherein, institute Stating device also includes:
First determining module, for determining that the target electrical equipment occurs the probability of every kind of fault type, is determined As a result, wherein, the fault type include at least one of:The target electrical equipment is damaged, the target electrical equipment Catch fire;
First sending module, for sending the determination result to terminal device.
With reference to second aspect, the third possible implementation method of second aspect is the embodiment of the invention provides, wherein, The electricity consumption data is the operating current, and in the case that the standard electricity consumption data is standard operating current, described first is true Cover half block includes:
Computing unit, for calculating the operating current of the target electrical equipment and the difference of the standard operating current;
First determining unit, for determining to close interval belonging to the difference, wherein, the number for closing interval It is multiple to measure, and the probability that the every kind of fault type of interval correspondence one occurs is closed described in each;
Second determining unit, for according to determine it is described belonging to close interval, determine that the target electricity consumption sets Preparation gives birth to the probability of every kind of fault type.
With reference to second aspect, the 4th kind of possible implementation method of second aspect is the embodiment of the invention provides, wherein, In the case that the electricity consumption data is the operating power, described device also includes:
Second acquisition module, it is interval for obtaining predetermined number predetermined power, and obtain each described predetermined power The electricity consumption type of the electrical equipment corresponding to interval;
Second determining module, the work for determining the electrical equipment in the predetermined number predetermined power is interval Interval belonging to power, and determine the affiliated interval corresponding electricity consumption type;
Setting module, for using the corresponding electricity consumption type as the electrical equipment classification type;
Second sending module, for sending the classification type to terminal device.
The embodiment of the present invention brings following beneficial effect:A kind of analysis side of electricity consumption module provided in an embodiment of the present invention Method and device, the method include:The electricity consumption data of multiple electrical equipments in preset time period is obtained, wherein, electricity consumption data includes The operating power of electrical equipment and/or the operating current of electrical equipment;By the electricity consumption data of each electrical equipment and corresponding mark Quasi- electricity consumption data is compared, and obtains comparative result, wherein, corresponding standard electricity consumption data is transported for current power equipment non-faulting Electricity consumption data during row;Target electricity consumption data is searched in the electricity consumption data of multiple electrical equipments according to comparative result, and by mesh The corresponding electrical equipment of electricity consumption data is marked as target electrical equipment, wherein, target electricity consumption data is used to represent that target electricity consumption sets It is standby to be in failure operation state.
Traditional electricity protection method after the electricity consumption data abnormal information for detecting multiple electrical equipments, can only control after Electrical equipment disconnects, and plays a part of protection, it is impossible to judge the electrical equipment information for breaking down.With traditional electricity protection method Compare, the electricity consumption data of multiple electrical equipments that the analysis method of the electricity consumption module in the embodiment of the present invention will can be detected with The standard electricity consumption data of multiple electrical equipments is compared, and finds target electricity consumption data according to comparative result, and target is used The corresponding electrical equipment of electric data as target electrical equipment, wherein, target electricity consumption data is used to represent at target electrical equipment In failure operation state, then target electrical equipment is failure electrical equipment.Electricity consumption module in the embodiment of the present invention point Analysis method can fast and accurately determine target electrical equipment (electrical equipment for breaking down) in multiple electrical equipments, So that electrical equipment of the user targetedly to breaking down is repaired.It is determined that break down electrical equipment when, letter Single quick, degree of intelligence is high, and practicality is good, alleviates when carrying out electrical equipment fault detect in the prior art, inefficiency, intelligence Can the poor technical problem of degree.
Other features and advantages of the present invention will be illustrated in the following description, also, the partly change from specification Obtain it is clear that or being understood by implementing the present invention.The purpose of the present invention and other advantages are in specification, claims And specifically noted structure is realized and obtained in accompanying drawing.
To enable the above objects, features and advantages of the present invention to become apparent, preferred embodiment cited below particularly, and coordinate Appended accompanying drawing, is described in detail below.
Brief description of the drawings
In order to illustrate more clearly of the specific embodiment of the invention or technical scheme of the prior art, below will be to specific The accompanying drawing to be used needed for implementation method or description of the prior art is briefly described, it should be apparent that, in describing below Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before creative work is not paid Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of flow chart of the analysis method of electricity consumption module provided in an embodiment of the present invention;
Fig. 2 is that the electricity consumption data by each electrical equipment provided in an embodiment of the present invention is entered with corresponding standard electricity consumption data The flow chart that row compares;
Fig. 3 for it is provided in an embodiment of the present invention using the corresponding electrical equipment of target electricity consumption data as target electrical equipment it Method flow diagram afterwards;
Fig. 4 is that determination target electrical equipment provided in an embodiment of the present invention occurs the flow of the probability of every kind of fault type Figure;
Fig. 5 is the method flow diagram that electrical equipment is classified provided in an embodiment of the present invention;
Fig. 6 is a kind of overall structure diagram of the analytical equipment of electricity consumption module provided in an embodiment of the present invention;
Fig. 7 is the concrete structure schematic diagram of the analytical equipment of electricity consumption module provided in an embodiment of the present invention.
Icon:
The analytical equipment of 1- electricity consumption modules;The acquisition modules of 11- first;12- comparison modules;13- searching moduls;14- first Determining module;The sending modules of 15- first;121- detection units;122- receiving units;123- comparing units;141- computing units; The determining units of 142- first;The determining units of 143- second.
Specific embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with accompanying drawing to the present invention Technical scheme be clearly and completely described, it is clear that described embodiment is a part of embodiment of the invention, rather than Whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art are not making creative work premise Lower obtained every other embodiment, belongs to the scope of protection of the invention.
At present, traditional electricity protection method, can only after the electricity consumption data abnormal information for detecting multiple electrical equipments Control relay disconnects, and plays a part of protection, it is impossible to judge the electrical equipment information for breaking down.Protected with traditional electricity consumption Maintaining method is compared, the electricity consumption of multiple electrical equipments that the analysis method of the electricity consumption module in the embodiment of the present invention will can be detected Data are compared with the standard electricity consumption data of multiple electrical equipments, and target electricity consumption data is found according to comparative result, and will The corresponding electrical equipment of target electricity consumption data as target electrical equipment, wherein, target electricity consumption data be used for represent target electricity consumption Equipment is in failure operation state, then target electrical equipment is failure electrical equipment.Electricity consumption mould in the embodiment of the present invention The analysis method of block can fast and accurately determine the (electricity consumption broken down of target electrical equipment in multiple electrical equipments Equipment) so that electrical equipment of the user targetedly to breaking down is repaired.It is determined that the electrical equipment for breaking down When, simple and quick, degree of intelligence is high, and practicality is good.
For ease of understanding the present embodiment, first to a kind of analysis of the electricity consumption module disclosed in the embodiment of the present invention Method describes in detail.
A kind of analysis method of electricity consumption module, with reference to Fig. 1, including:
S101, the electricity consumption data for obtaining multiple electrical equipments in preset time period, wherein, electricity consumption data includes electrical equipment Operating power and/or electrical equipment operating current;
In embodiments of the present invention, electricity consumption module increased electric energy on the basis of original copper-manganese current sampling resistor Memory function algorithm, the operating power of electrical equipment and/or the work of electrical equipment are collected by copper-manganese current sampling resistor After making electric current, due to the presence of battery powered memory function algorithm, the electricity consumption data of multiple electrical equipments can be simultaneously recorded, here Preset time period under normal conditions including electrical equipment start start time and electrical equipment start completion after time.
Electricity consumption module in the present invention can also play a part of protection, when power network power data (for example:Voltage, electricity Stream, power) and electrical equipment electricity consumption data (for example:Electric current, power) it is abnormal when, i.e., the power data of power network conveying is more than the The electricity consumption data of one preset value (magnitude of voltage of such as power network conveying is more than 220V) or electrical equipment is more than the second preset value (such as The operating current of electrical equipment is more than its rated current) when, electricity consumption module meeting control relay disconnects, and prevents power network from continuing as using Electric equipment is powered, so as to play a part of protection.So, it becomes possible to ensure that the voltage that power network is conveyed to electrical equipment is 220V, so, as the operating power of electrical equipment here is substantially with the operating current of electrical equipment.
Wherein, the first preset value and the second preset value are the value that user is previously set as needed.
S102, the electricity consumption data of each electrical equipment is compared with corresponding standard electricity consumption data, obtains comparing knot Really, wherein, corresponding standard electricity consumption data be current power equipment non-faulting run when electricity consumption data;
After the electricity consumption data for obtaining electrical equipment, each electrical equipment has corresponding standard electricity consumption data, will be every The electricity consumption data of individual electrical equipment is compared with corresponding standard electricity consumption data, and generation is just capable of determining that according to comparative result The electrical equipment of failure.Here standard electricity consumption data is electricity consumption data when current power equipment non-faulting is run, that is, Electricity consumption data during current power equipment normal work.
S103, target electricity consumption data is searched in the electricity consumption data of multiple electrical equipments according to comparative result, and by target The corresponding electrical equipment of electricity consumption data as target electrical equipment, wherein, target electricity consumption data be used for represent target electrical equipment In failure operation state.
If the difference that user can be preset between the electricity consumption data and standard electricity consumption data for detecting is pre- more than the 3rd If during value, that is, showing that electrical equipment there occurs failure.For example, the operating power of the electrical equipment for detecting is 100W, and electricity consumption The standard electricity consumption data of equipment is 20W, and the 3rd preset value is 50W, now, you can obtain the electrical equipment and there occurs failure. Be exactly searched in the electricity consumption data of multiple electrical equipments according to comparative result target electricity consumption data (the target electricity consumption data with it is right Difference between the standard electricity consumption data answered is more than the 3rd preset value), and using the corresponding electrical equipment of target electricity consumption data as Target electrical equipment, goal electrical equipment refers to the electrical equipment for breaking down.
It should be noted that being not to detect the difference between electricity consumption data and corresponding standard electricity consumption data a certain moment When value is more than three preset difference values, just obtains the electrical equipment and there occurs failure, but, within the regular hour, detect Difference between electricity consumption data and corresponding standard electricity consumption data is persistently more than the 3rd preset difference value, now, can just obtain the use Electric equipment there occurs the conclusion of failure.
Above-mentioned numerical value understands and is set that the embodiment of the present invention is not particularly limited to it for convenience.
A kind of analysis method of electricity consumption module provided in an embodiment of the present invention, the method includes:Obtain in preset time period The electricity consumption data of multiple electrical equipments, wherein, electricity consumption data includes the work of the operating power and/or electrical equipment of electrical equipment Electric current;The electricity consumption data of each electrical equipment is compared with corresponding standard electricity consumption data, comparative result is obtained, wherein, Corresponding standard electricity consumption data is electricity consumption data when current power equipment non-faulting is run;According to comparative result in multiple electricity consumptions Target electricity consumption data is searched in the electricity consumption data of equipment, and the corresponding electrical equipment of target electricity consumption data is set as target electricity consumption It is standby, wherein, target electricity consumption data is used to represent that target electrical equipment is in failure operation state.
Traditional electricity protection method after the electricity consumption data abnormal information for detecting multiple electrical equipments, can only control after Electrical equipment disconnects, and plays a part of protection, it is impossible to judge the electrical equipment information for breaking down.With traditional electricity protection method Compare, the electricity consumption data of multiple electrical equipments that the analysis method of the electricity consumption module in the embodiment of the present invention will can be detected with The standard electricity consumption data of multiple electrical equipments is compared, and finds target electricity consumption data according to comparative result, and target is used The corresponding electrical equipment of electric data as target electrical equipment, wherein, target electricity consumption data is used to represent at target electrical equipment In failure operation state, then target electrical equipment is failure electrical equipment.Electricity consumption module in the embodiment of the present invention point Analysis method can fast and accurately determine target electrical equipment (electrical equipment for breaking down) in multiple electrical equipments, So that electrical equipment of the user targetedly to breaking down is repaired.It is determined that break down electrical equipment when, letter Single quick, degree of intelligence is high, and practicality is good, alleviates when carrying out electrical equipment fault detect in the prior art, inefficiency, intelligence Can the poor technical problem of degree.
The analysis method to electricity consumption module describes in detail below.
Further, with reference to Fig. 2, the electricity consumption data of each electrical equipment is compared with corresponding standard electricity consumption data Including:
The power-up state of S201, detection electrical equipment;
In the case where electrical equipment is not powered, electricity consumption module does not work;Only when the situation that electrical equipment is powered Under, electricity consumption module is just started working.
S202, after the completion of electricity is detected in electrical equipment, the standard electricity consumption of the electrical equipment that receiving terminal apparatus send Data;
Communicated to connect between terminal device and electricity consumption module, user can on the terminal device set electrical equipment in advance Standard electricity consumption data, standard electricity consumption data can be obtained by the nameplate of each electrical equipment, i.e., in each electrical equipment Rated power is marked with, rated current, user can on the terminal device enter in advance according to the value of rated power and rated current Row setting, after the completion of electricity in electrical equipment, terminal device can just send the standard electricity consumption data of corresponding electrical equipment To electricity consumption module, electricity consumption module is just obtained in that the standard electricity consumption data information of electrical equipment.
The electricity consumption number of S203, standard electricity consumption data and the electrical equipment for detecting of the electrical equipment that terminal device is sent According to being compared.
After the standard electricity consumption data for obtaining electrical equipment, electricity consumption data that electricity consumption module can just arrive real-time detection with Standard electricity consumption data is compared, and then obtains comparative result, determines target electrical equipment (electrical equipment for breaking down).
Further, with reference to Fig. 3, using the corresponding electrical equipment of target electricity consumption data as after target electrical equipment, Method also includes:
S301, the probability for determining the target electrical equipment every kind of fault type of generation, obtain determining result, wherein, failure classes Type includes at least one of:Target electrical equipment is damaged, and target electrical equipment is caught fire;
After target electrical equipment is determined, it is every kind of that electricity consumption module can also further determine that target electrical equipment occurs The probability of fault type, so that user obtains more accurate information.
S302, to terminal device send determine result.
After the probability for obtaining the target electrical equipment every kind of fault type of generation, electricity consumption module can also send to terminal device There is the result of the probability of every kind of fault type in target electrical equipment, enable a user to timely recognize target electricity consumption The fault message of equipment, and then take maintenance measures.
Further, it is operating current in electricity consumption data with reference to Fig. 4, standard electricity consumption data is the feelings of standard operating current Under condition, determine that the probability that target electrical equipment occurs every kind of fault type includes:
The difference of S401, the operating current for calculating target electrical equipment and standard operating current;
When it is determined that target electrical equipment occurs the probability of every kind of fault type, the target electricity consumption for detecting is calculated first and is set Standby operating current and the difference of standard operating current.
S402, determine to close interval belonging to difference, wherein, it is multiple to close the quantity of interval, and each closes value The probability that correspondence one every kind of fault type in interval occurs;
And then determine to close interval belonging to difference, interval quantity of closing here is multiple, and each closes value The probability that correspondence one every kind of fault type in interval occurs.For example, when difference is between [0A, 5A], target electrical equipment is damaged Probability be 80%, the probability that target electrical equipment is caught fire be 20%;When difference is between [5A, 10A], target electrical equipment is damaged Bad probability is 60%, and the probability that target electrical equipment is caught fire is 40%;When difference is between [10A, 15A], target electricity consumption sets The standby probability for damaging is 40%, and the probability that target electrical equipment is caught fire is 60%;Difference when for+∞, by target electrical equipment The probability of fire is 100%;Here numerical intervals understand and are set that the embodiment of the present invention is not done to it for convenience Concrete restriction.
S403, according to determine it is affiliated close interval, determine that target electrical equipment occurs every kind of fault type Probability.
As described above understand, obtain belonging to difference close interval after, it becomes possible to further determine that target There is the probability of every kind of fault type in electrical equipment.
Further, it is multiple in preset time period obtaining in the case where electricity consumption data is operating power with reference to Fig. 5 After the electricity consumption data of electrical equipment, and compared with corresponding standard electricity consumption data by the electricity consumption data of each electrical equipment Before relatively, method also includes:
S501, acquisition predetermined number predetermined power are interval, and obtain the electricity consumption corresponding to each predetermined power interval The electricity consumption type of equipment;
Here predetermined number predetermined power is interval and each predetermined power interval corresponding to electrical equipment use Electric type can be realized setting on the terminal device, be sent to electricity consumption module by terminal device again after the completion of setting.Such as, at end It is superpower electrical equipment when setting power is more than 1000W in end equipment;It is big when power interval is [600W, 1000W] Power electrical equipment;It is small-power electrical equipment when power interval is [200W, 600W];It is miniature use when power is less than 200W Electric equipment.Here numerical intervals understand and are set that the embodiment of the present invention is not particularly limited to it for convenience.
S502, the interval in predetermined number predetermined power is interval belonging to the operating power of determination electrical equipment, and It is determined that affiliated interval corresponding electricity consumption type;
After the electricity consumption data of electrical equipment is detected, the interval belonging to the operating power of electrical equipment is determined, and then just Affiliated interval corresponding electricity consumption type is can determine that out, the electricity consumption type of electrical equipment also can be just obtained.
S503, using corresponding electricity consumption type as electrical equipment classification type;
After electricity consumption type is obtained, the electricity consumption type just can obtain different classes of as the classification type of electrical equipment Under various electrical equipments title.
S504, to terminal device send classification type.
After the classification type for obtaining electrical equipment, the classification type is sent to terminal device.Electrical equipment is divided The purpose of class is that present electrical equipment species is various, and carrying out classification according to the size of power can facilitate user in terminal device Upper lookup electrical equipment, after user finds the electrical equipment for needing inquiry, clicks on corresponding electrical equipment, it becomes possible to show Go out the power information of the electrical equipment, wherein, power information includes at least one of:The electricity use information of electrical equipment, The electricity charge information of electrical equipment, the current information of electrical equipment.Wherein, power information is that electricity consumption module is collected, electricity consumption After module collects the power information of electrical equipment, the power information that will can be collected is sent to terminal device, so that user looks into Ask.
In addition, the process classified to electrical equipment can also be carried out on the terminal device, specifically, user is according to need Set that predetermined number predetermined power is interval and each predetermined power interval corresponding to electrical equipment electricity consumption type, eventually End equipment obtains the electricity consumption data (specifically referring to the operating power of electrical equipment) of electricity consumption module transmission in real time, determines electrical equipment Operating power belonging to the interval and corresponding electrical equipment of predetermined power electricity consumption type, so as to complete electrical equipment Classification.
What the analysis method of the electricity consumption module in the present invention was realized essentially by algorithm, the analysis side of the electricity consumption module Method can quickly determine target electrical equipment, and electrical equipment can be classified so that user can according to point Class result easily inquires about the power information of the electrical equipment for needing inquiry, more facilitates.
The embodiment of the present invention additionally provides a kind of analytical equipment 1 of electricity consumption module, with reference to Fig. 6, including:
First acquisition module 11, the electricity consumption data for obtaining multiple electrical equipments in preset time period, wherein, electricity consumption number According to operating power and/or the operating current of electrical equipment including electrical equipment;
Comparison module 12, for the electricity consumption data of each electrical equipment to be compared with corresponding standard electricity consumption data, Comparative result is obtained, wherein, corresponding standard electricity consumption data is electricity consumption data when current power equipment non-faulting is run;
Searching modul 13, for searching target electricity consumption number in the electricity consumption data of multiple electrical equipments according to comparative result According to, and using the corresponding electrical equipment of target electricity consumption data as target electrical equipment, wherein, target electricity consumption data is used to represent mesh Mark electrical equipment is in failure operation state.
Further, with reference to Fig. 7, comparison module 12 includes:
Detection unit 121, the power-up state for detecting electrical equipment;
Receiving unit 122, after the completion of electricity is detected in electrical equipment, the mark of the electrical equipment that receiving terminal apparatus send Quasi- electricity consumption data;
Comparing unit 123, for the standard electricity consumption data of electrical equipment for sending terminal device and the electricity consumption for detecting The electricity consumption data of equipment is compared.
Further, with reference to Fig. 7, device also includes:
First determining module 14, for determining that target electrical equipment occurs the probability of every kind of fault type, obtains determining knot Really, wherein, fault type include at least one of:Target electrical equipment is damaged, and target electrical equipment is caught fire;
First sending module 15, result is determined for being sent to terminal device.
Further, it is operating current in electricity consumption data with reference to Fig. 7, standard electricity consumption data is the feelings of standard operating current Under condition, the first determining module 14 includes:
Computing unit 141, for calculating the operating current of target electrical equipment and the difference of standard operating current;
First determining unit 142, for determining to close interval belonging to difference, wherein, the quantity for closing interval is Multiple, each closes the probability that one every kind of fault type of interval correspondence occurs;
Second determining unit 143, for closing interval according to belonging to determining, determines that target electrical equipment occurs The probability of every kind of fault type.
Further, in the case where electricity consumption data is operating power, device also includes:
Second acquisition module, it is interval for obtaining predetermined number predetermined power, and obtain each predetermined power interval The electricity consumption type of corresponding electrical equipment;
Second determining module, for belonging to the operating power of determination electrical equipment in predetermined number predetermined power is interval Interval, and determine belonging to interval corresponding electricity consumption type;
Setting module, for using corresponding electricity consumption type as electrical equipment classification type;
Second sending module, for sending classification type to terminal device.
The analytical equipment of electricity consumption module is corresponding with the analysis method of above-mentioned electricity consumption module, is no longer repeated herein.
A kind of computer program product of the analysis method of electricity consumption module that the embodiment of the present invention is provided, including store The computer-readable recording medium of program code, the instruction that described program code includes can be used in execution previous methods embodiment Described method, implements and can be found in embodiment of the method, will not be repeated here.
It is apparent to those skilled in the art that, for convenience and simplicity of description, the system of foregoing description With the specific work process of device, the corresponding process in preceding method embodiment is may be referred to, will not be repeated here.
In addition, in the description of the embodiment of the present invention, unless otherwise clearly defined and limited, term " installation ", " phase Company ", " connection " should be interpreted broadly, for example, it may be being fixedly connected, or being detachably connected, or be integrally connected;Can Being to mechanically connect, or electrically connect;Can be joined directly together, it is also possible to be indirectly connected to by intermediary, Ke Yishi Two connections of element internal.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this Concrete meaning in invention.
If the function is to realize in the form of SFU software functional unit and as independent production marketing or when using, can be with Storage is in a computer read/write memory medium.Based on such understanding, technical scheme is substantially in other words The part contributed to prior art or the part of the technical scheme can be embodied in the form of software product, the meter Calculation machine software product is stored in a storage medium, including some instructions are used to so that a computer equipment (can be individual People's computer, server, or network equipment etc.) perform all or part of step of each embodiment methods described of the invention. And foregoing storage medium includes:USB flash disk, mobile hard disk, read-only storage (ROM, Read-Only Memory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), magnetic disc or CD etc. are various can be with the medium of store program codes.
In the description of the invention, it is necessary to explanation, term " " center ", " on ", D score, "left", "right", " vertical ", The orientation or position relationship of the instruction such as " level ", " interior ", " outward " be based on orientation shown in the drawings or position relationship, merely to Be easy to the description present invention and simplify describe, rather than indicate imply signified device or element must have specific orientation, With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.Additionally, term " first ", " second ", " the 3rd " is only used for describing purpose, and it is not intended that indicating or implying relative importance.
Finally it should be noted that:Embodiment described above, specific embodiment only of the invention, is used to illustrate the present invention Technical scheme, rather than its limitations, protection scope of the present invention is not limited thereto, although with reference to the foregoing embodiments to this hair It is bright to be described in detail, it will be understood by those within the art that:Any one skilled in the art The invention discloses technical scope in, it can still modify to the technical scheme described in previous embodiment or can be light Change is readily conceivable that, or equivalent is carried out to which part technical characteristic;And these modifications, change or replacement, do not make The essence of appropriate technical solution departs from the spirit and scope of embodiment of the present invention technical scheme, should all cover in protection of the invention Within the scope of.Therefore, protection scope of the present invention described should be defined by scope of the claims.

Claims (10)

1. a kind of analysis method of electricity consumption module, it is characterised in that including:
The electricity consumption data of multiple electrical equipments in preset time period is obtained, wherein, the electricity consumption data includes the electrical equipment Operating power and/or the electrical equipment operating current;
The electricity consumption data of each electrical equipment is compared with corresponding standard electricity consumption data, comparative result is obtained, its In, the corresponding standard electricity consumption data is electricity consumption data when current power equipment non-faulting is run;
Target electricity consumption data is searched in the electricity consumption data of the multiple electrical equipment according to the comparative result, and by the mesh The corresponding electrical equipment of electricity consumption data is marked as target electrical equipment, wherein, the target electricity consumption data is used to represent the mesh Mark electrical equipment is in failure operation state.
2. method according to claim 1, it is characterised in that by the electricity consumption data of each electrical equipment with it is corresponding Standard electricity consumption data be compared including:
Detect the power-up state of the electrical equipment;
After the completion of electricity is detected in the electrical equipment, the standard electricity consumption number of the electrical equipment that receiving terminal apparatus send According to;
The standard electricity consumption data of the electrical equipment that the terminal device is sent and the use of the electrical equipment for detecting Electric data are compared.
3. method according to claim 1, it is characterised in that make by the corresponding electrical equipment of the target electricity consumption data After for target electrical equipment, methods described also includes:
Determine that the target electrical equipment occurs the probability of every kind of fault type, obtain determining result, wherein, the fault type Including at least one of:The target electrical equipment is damaged, and the target electrical equipment is caught fire;
The determination result is sent to terminal device.
4. method according to claim 3, it is characterised in that in the electricity consumption data be the operating current, the mark In the case that quasi- electricity consumption data is standard operating current, determine that the target electrical equipment occurs the probability packet of every kind of fault type Include:
Calculate the operating current of the target electrical equipment and the difference of the standard operating current;
Determine to close interval belonging to the difference, wherein, the quantity for closing interval is multiple, closes described in each and takes The probability that the every kind of fault type of the interval correspondence one of value occurs;
According to determine it is described belonging to close interval, determine that the target electrical equipment occurs the general of every kind of fault type Rate.
5. method according to claim 1, it is characterised in that in the situation that the electricity consumption data is the operating power Under, obtaining in preset time period after the electricity consumption data of multiple electrical equipments, and by the electricity consumption of each electrical equipment Before data are compared with corresponding standard electricity consumption data, methods described also includes:
Acquisition predetermined number predetermined power is interval, and obtains the electrical equipment corresponding to each described predetermined power interval Electricity consumption type;
The interval belonging to the operating power of the electrical equipment is determined in the predetermined number predetermined power is interval, and really The fixed affiliated interval corresponding electricity consumption type;
Using the corresponding electricity consumption type as the electrical equipment classification type;
The classification type is sent to terminal device.
6. a kind of analytical equipment of electricity consumption module, it is characterised in that including:
First acquisition module, the electricity consumption data for obtaining multiple electrical equipments in preset time period, wherein, the electricity consumption data The operating current of operating power and/or the electrical equipment including the electrical equipment;
Comparison module, for the electricity consumption data of each electrical equipment to be compared with corresponding standard electricity consumption data, obtains To comparative result, wherein, the corresponding standard electricity consumption data is electricity consumption data when current power equipment non-faulting is run;
Searching modul, for searching target electricity consumption number in the electricity consumption data of the multiple electrical equipment according to the comparative result According to, and using the corresponding electrical equipment of the target electricity consumption data as target electrical equipment, wherein, the target electricity consumption data is used Failure operation state is in the expression target electrical equipment.
7. device according to claim 6, it is characterised in that the comparison module includes:
Detection unit, the power-up state for detecting the electrical equipment;
Receiving unit, after the completion of electricity is detected in the electrical equipment, the electrical equipment that receiving terminal apparatus send Standard electricity consumption data;
Comparing unit, for the standard electricity consumption data of the electrical equipment that sends the terminal device with detect described in The electricity consumption data of electrical equipment is compared.
8. device according to claim 6, it is characterised in that described device also includes:
First determining module, for determining that the target electrical equipment occurs the probability of every kind of fault type, obtains determining result, Wherein, the fault type includes at least one of:The target electrical equipment is damaged, and the target electrical equipment is caught fire;
First sending module, for sending the determination result to terminal device.
9. device according to claim 8, it is characterised in that in the electricity consumption data be the operating current, the mark In the case that quasi- electricity consumption data is standard operating current, first determining module includes:
Computing unit, for calculating the operating current of the target electrical equipment and the difference of the standard operating current;
First determining unit, for determining to close interval belonging to the difference, wherein, it is described close interval quantity be Multiple, closes the probability that the every kind of fault type of interval correspondence one occurs described in each;
Second determining unit, for according to determine it is described belonging to close interval, determine target electrical equipment hair The probability of the every kind of fault type of life.
10. device according to claim 6, it is characterised in that in the situation that the electricity consumption data is the operating power Under, described device also includes:
Second acquisition module, it is interval for obtaining predetermined number predetermined power, and obtain each described predetermined power interval The electricity consumption type of corresponding electrical equipment;
Second determining module, the operating power for determining the electrical equipment in the predetermined number predetermined power is interval Affiliated interval, and determine the affiliated interval corresponding electricity consumption type;
Setting module, for using the corresponding electricity consumption type as the electrical equipment classification type;
Second sending module, for sending the classification type to terminal device.
CN201710238029.7A 2017-04-12 2017-04-12 Analysis method and device for electricity utilization module Active CN106841881B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710238029.7A CN106841881B (en) 2017-04-12 2017-04-12 Analysis method and device for electricity utilization module

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710238029.7A CN106841881B (en) 2017-04-12 2017-04-12 Analysis method and device for electricity utilization module

Publications (2)

Publication Number Publication Date
CN106841881A true CN106841881A (en) 2017-06-13
CN106841881B CN106841881B (en) 2019-12-31

Family

ID=59147656

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710238029.7A Active CN106841881B (en) 2017-04-12 2017-04-12 Analysis method and device for electricity utilization module

Country Status (1)

Country Link
CN (1) CN106841881B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019128373A1 (en) * 2017-12-28 2019-07-04 深圳市欧瑞博科技有限公司 Detection method, device, computer device and storage medium for faulty device
WO2020010531A1 (en) * 2018-07-10 2020-01-16 北京中电普华信息技术有限公司 Fault detection method and device
CN111289813A (en) * 2018-12-07 2020-06-16 珠海格力电器股份有限公司 Power utilization abnormity judgment method and device, storage medium and server
CN112202170A (en) * 2020-10-10 2021-01-08 深圳市电创科技有限公司 Direct-current microgrid load fault diagnosis method and device and storage medium
CN112631140A (en) * 2020-12-15 2021-04-09 重庆电子工程职业学院 Household electricity utilization management control system
CN115147098A (en) * 2022-09-06 2022-10-04 天津理工大学 Automatic planning method and system for equipment maintenance scheme
CN117554691A (en) * 2024-01-11 2024-02-13 四川中威能电力科技有限公司 Remote self-adaptive intelligent ammeter

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070053968A (en) * 2005-11-22 2007-05-28 지승욱 Apparatus and method for detecting failure signal of electrical equipment
CN101614776A (en) * 2009-04-25 2009-12-30 安徽海圣电气有限公司 Electric equipment intelligent recognition methods and device
CN102255387A (en) * 2011-07-11 2011-11-23 兰州陇能电力科技有限公司 Monitoring system of electric equipment
CN103278719A (en) * 2013-06-06 2013-09-04 广东电网公司佛山供电局 Power equipment fault detection method and system based on matrix diagram and confidence coefficient
CN103529343A (en) * 2013-03-27 2014-01-22 Tcl集团股份有限公司 Intelligent diagnosing method and system of electrical device
CN104597350A (en) * 2015-01-23 2015-05-06 国家电网公司 System and method capable of automatically classifying building electricity based on energy efficiency monitoring
CN104866632A (en) * 2015-04-30 2015-08-26 广东美的制冷设备有限公司 Failure data acquisition method, device and terminal of electric household appliance
CN105429300A (en) * 2015-12-16 2016-03-23 徐承柬 Electricity utilization monitoring method and system
CN105588998A (en) * 2015-12-31 2016-05-18 国网浙江奉化市供电公司 Remote fault monitoring method and system of electric power equipment
CN105652119A (en) * 2015-12-31 2016-06-08 国网浙江奉化市供电公司 Method, device and system for acquiring fault information

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070053968A (en) * 2005-11-22 2007-05-28 지승욱 Apparatus and method for detecting failure signal of electrical equipment
CN101614776A (en) * 2009-04-25 2009-12-30 安徽海圣电气有限公司 Electric equipment intelligent recognition methods and device
CN102255387A (en) * 2011-07-11 2011-11-23 兰州陇能电力科技有限公司 Monitoring system of electric equipment
CN103529343A (en) * 2013-03-27 2014-01-22 Tcl集团股份有限公司 Intelligent diagnosing method and system of electrical device
CN103278719A (en) * 2013-06-06 2013-09-04 广东电网公司佛山供电局 Power equipment fault detection method and system based on matrix diagram and confidence coefficient
CN104597350A (en) * 2015-01-23 2015-05-06 国家电网公司 System and method capable of automatically classifying building electricity based on energy efficiency monitoring
CN104866632A (en) * 2015-04-30 2015-08-26 广东美的制冷设备有限公司 Failure data acquisition method, device and terminal of electric household appliance
CN105429300A (en) * 2015-12-16 2016-03-23 徐承柬 Electricity utilization monitoring method and system
CN105588998A (en) * 2015-12-31 2016-05-18 国网浙江奉化市供电公司 Remote fault monitoring method and system of electric power equipment
CN105652119A (en) * 2015-12-31 2016-06-08 国网浙江奉化市供电公司 Method, device and system for acquiring fault information

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019128373A1 (en) * 2017-12-28 2019-07-04 深圳市欧瑞博科技有限公司 Detection method, device, computer device and storage medium for faulty device
CN109975629A (en) * 2017-12-28 2019-07-05 深圳市欧瑞博科技有限公司 Detection method, device, computer equipment and the storage medium of faulty equipment
WO2020010531A1 (en) * 2018-07-10 2020-01-16 北京中电普华信息技术有限公司 Fault detection method and device
CN111289813A (en) * 2018-12-07 2020-06-16 珠海格力电器股份有限公司 Power utilization abnormity judgment method and device, storage medium and server
CN112202170A (en) * 2020-10-10 2021-01-08 深圳市电创科技有限公司 Direct-current microgrid load fault diagnosis method and device and storage medium
CN112631140A (en) * 2020-12-15 2021-04-09 重庆电子工程职业学院 Household electricity utilization management control system
CN115147098A (en) * 2022-09-06 2022-10-04 天津理工大学 Automatic planning method and system for equipment maintenance scheme
CN117554691A (en) * 2024-01-11 2024-02-13 四川中威能电力科技有限公司 Remote self-adaptive intelligent ammeter
CN117554691B (en) * 2024-01-11 2024-03-29 四川中威能电力科技有限公司 Remote self-adaptive intelligent ammeter

Also Published As

Publication number Publication date
CN106841881B (en) 2019-12-31

Similar Documents

Publication Publication Date Title
CN106841881A (en) The analysis method and device of electricity consumption module
CN107942255B (en) Transformer substation storage battery state evaluation method based on data fusion technology
CN106740132A (en) A kind of electric automobile lithium battery intelligent monitoring management system
CN101232110A (en) Method and apparatus for charging batteries
CN115494404B (en) Online monitoring method for storage battery pack
CN104237645A (en) Online monitoring system and method for insulation state of substation DC system
CN104950216B (en) A kind of distribution line failure localization method based on waveform comparison
CN110988724B (en) Method, system, medium, and electronic device for detecting insulation failure of battery cluster
CN108226708A (en) A kind of fast failure method of discrimination of the power grid of multiterminal element containing MMC
CN104483633B (en) Lead-acid accumulator monitoring system
CN108232347A (en) Battery module management method and device of automatic guided transport vehicle
CN105162215A (en) Distributed battery management system and method for lead-acid storage battery pack equalization
CN112034260B (en) Accurate analysis and anti-electricity-stealing accurate positioning method for low-voltage line loss of distribution transformer area
CN113641723B (en) Power theft prediction method based on line impedance parameter estimation
CN104198942A (en) Online judging system for invalidation of valve regulated lead acid storage battery
CN110174636A (en) A kind of detection method, system and the read/write memory medium of electric energy meter period switching
CN106773993A (en) Field data acquiring terminal and system
CN115002166B (en) Intelligent battery monitoring and leasing management system and method based on Internet of things
CN109065974A (en) A kind of battery management system
CN106160108A (en) A kind of charging method and charging device
CN105071489B (en) A kind of charging method and device of the terminal with data exchanging function
CN202395113U (en) Intelligent battery unit
CN103023075A (en) Charging and discharging control method of battery, and electronic device
CN101895138A (en) Method and system for storage battery management
CN105259497A (en) Circuit breaker arc fault circuit breaker system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230906

Address after: Room 506, No. 17 Xiguan Sanjiaodi, Chengnan Street, Changping District, Beijing 102200

Patentee after: Juneng Hengye (Beijing) Technology Co.,Ltd.

Address before: No. 2, Group 2, Xiaochang Village, Xiaochang Town, Guyuan County, Zhangjiakou City, Hebei Province, 076571

Patentee before: Niu Dong