CN106840997B - The estimation device and method of big gap bituminous pavement horizontal infiltration flow - Google Patents

The estimation device and method of big gap bituminous pavement horizontal infiltration flow Download PDF

Info

Publication number
CN106840997B
CN106840997B CN201611242060.XA CN201611242060A CN106840997B CN 106840997 B CN106840997 B CN 106840997B CN 201611242060 A CN201611242060 A CN 201611242060A CN 106840997 B CN106840997 B CN 106840997B
Authority
CN
China
Prior art keywords
test specimen
horizontal infiltration
bituminous pavement
horizontal
big gap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611242060.XA
Other languages
Chinese (zh)
Other versions
CN106840997A (en
Inventor
陈俊
姚成
马谢
孔燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201611242060.XA priority Critical patent/CN106840997B/en
Publication of CN106840997A publication Critical patent/CN106840997A/en
Application granted granted Critical
Publication of CN106840997B publication Critical patent/CN106840997B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N15/00Investigating characteristics of particles; Investigating permeability, pore-volume or surface-area of porous materials
    • G01N15/08Investigating permeability, pore-volume, or surface area of porous materials

Landscapes

  • Chemical & Material Sciences (AREA)
  • Dispersion Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of estimation device and method of big gap bituminous pavement horizontal infiltration flow, device includes catch basin and pedestal, and wherein through-hole is arranged in the bottom plate of catch basin, and drain hole is arranged in side;The baffle and position-limit mechanism for baffle through-hole are provided on the bottom plate;The pedestal is provided with upper plate, lower plate and height adjustment device.Method includes: the molding board-like test specimen of mixture identical with practical big gap bituminous pavement gradation and asphalt content in laboratory, and two faces for choosing test specimen respectively are sealed as draining face and permeable face, and by its lap;Drain hole height is selected, the gradient for adjusting upper plate is consistent with practical road surface horizontal slope;Test specimen is measured under each width in the horizontal infiltration water volume of set period of time;Estimate the horizontal infiltration flow of the practical big gap bituminous pavement of every linear meter(lin.m.).The present invention can simply, quickly estimate the horizontal infiltration flow of big gap bituminous pavement, at the same can effectively simulated precipitation intensity and road surface horizontal slope, improve estimation effect.

Description

The estimation device and method of big gap bituminous pavement horizontal infiltration flow
Technical field
The present invention relates to a kind of estimation device and methods of big gap bituminous pavement horizontal infiltration flow, belong to bituminous pavement The technical field of drain calculation.
Background technique
When rainfall is larger, there are problems on most of tradition close-graded road surface, such as: surface gathered water, tire with Water membrane is formed between road surface, coefficient of friction reduces, and vehicle easily skids;In vehicle travel process, surface gathered water not only can Water mist is formed, pilot's line of vision is influenced, causes the reduction of traffic safety performance.Compared with traditional close-graded road surface, big gap pitch Road surface has the performances such as superior antiskid, water-mist-proof, Anti-splashing sanitary, anti-dazzle and noise reduction.In big gap asphalt pavement structure design In, perfect pumping equipment is set and is had a very important role to the service performance and service life that guarantee bituminous pavement, When pumping equipment designs, the horizontal infiltration flow on practical road surface is estimated, can choose suitable pumping equipment, reaches unobstructed row The effect of water.
But around the evaluation method of big gap bituminous pavement horizontal infiltration flow, there is many problems, main tables at present It is existing are as follows:
(1) in big gap asphalt pavement structure design, it is anti-that one layer of waterproof is also done in middle surface layer top layer under normal circumstances Parting, road surface water penetrate into middle surface layer top surface by surface layer, due to crown slope, can be discharged from inside by rainwater rapidly, edge Drainage system should have preferable drainage performance.Existing " bituminous pavement design for highway specification " (JTG D50-2006) requires road Face drainage system is made of water penetration filler collecting gutter, longitudinal drainage pipe, lateral outlet pipe and filtration fabrics (geotextiles), is preferably tied Local experience is closed to be designed, and there is no clearly stipulate that if can be to the horizontal infiltration flow of big gap bituminous pavement When pumping equipment designs, the horizontal infiltration flow of big gap bituminous pavement is estimated, can not only achieve the effect that unobstructed draining, and And material cost can be reduced.
(2) the measurement infiltrative mode in road surface is divided into two major classes in the past, and one kind is that permeameter is placed directly on road surface is enterprising Row in-site measurement, another kind of is that road surface drill hole sampling either makes marshal piece, and test specimen is then put into Laboratory Instruments Upper test.These methods can only measure vertical infiltration water, cannot measure big gap bituminous pavement horizontal infiltration water, and the second class The Laboratory Instruments of method is unable to simulated precipitation intensity and road surface horizontal slope.
In conclusion big gap bituminous pavement has some good performances, set carrying out big gap bituminous pavement draining Timing is arranged, the horizontal infiltration flow of big gap bituminous pavement is estimated, those skilled in the art can be made preferably to carry out road surface Pumping equipment design, but that there is presently no a kind of quick, simple methods is big empty under specific grade, specific precipitation to estimate Gap bituminous pavement horizontal infiltration flow.
Summary of the invention
Technical problem to be solved by the present invention lies in overcome the deficiencies of the prior art and provide a kind of big gap bituminous pavement The estimation device and method of horizontal infiltration flow, vertical infiltration water can only be measured by solving existing method, and cannot be simulated simultaneously Precipitation intensity and road surface horizontal slope, the problem of can not quickly, simply estimating big gap bituminous pavement horizontal infiltration flow.
The present invention specifically uses following technical scheme to solve above-mentioned technical problem:
The present invention proposes a kind of estimation device of big gap bituminous pavement horizontal infiltration flow, including catch basin and pedestal, Wherein several through-holes are arranged in the bottom plate of catch basin, and the side of catch basin is provided with several sluicing positioned at different height Hole;The pedestal is provided with upper plate and lower plate, and the height adjustment device for adjusting upper plate is provided on lower plate; The surrounding of the upper plate is provided with enclosing and partition is fixedly installed on enclosing, and enclosing is divided into first surface and arranged by the partition Water collection portion and the second horizontal infiltration water collection portion;Divide in the one surface drainage collection portion and the second horizontal infiltration water collection portion It She Zhi not drain valve;The surface setting of the upper plate is for removing draining face and permeable face for upper plate surface and test specimen thereon The impermeability material layer of outer its lap sealing;The baffle for baffle through-hole and limit are provided on the bottom plate of the sink Mechanism, one end of the baffle is hinged through the hinge to the bottom surface of bottom plate, and the other end of baffle is limited by position-limit mechanism Position.
Further, as a preferred technical solution of the present invention: the position-limit mechanism includes threaded rod and rotary sleeve The nut being placed on threaded rod.
Further, as a preferred technical solution of the present invention: being arranged on the upper plate for fixing catch basin Card slot.
The present invention also proposes a kind of estimation side of estimation device based on the big gap bituminous pavement horizontal infiltration flow Method, comprising the following steps:
Step 1, molding and practical gap bituminous pavement gradation greatly and asphalt content is identical mixes flitch in laboratory Formula test specimen, two faces for choosing the board-like test specimen of mixture respectively are sealed as draining face and permeable face, and by its lap;Selection institute The gradient for needing the drain hole of height, and adjusting upper plate keeps it consistent with practical road surface horizontal slope;
Step 2 obtains test specimen of different size to test specimen truncation, and is gradually placed in test specimen of different size On bottom plate;Desired height is filled into catch basin, make water in catch basin through drain hole when bottom plate overhead gage is opened and Through-hole releases respectively, and obtains the horizontal infiltration water volume of the test specimen in the set time period of test specimen under each width;
Step 3 is calculated and is tried under each width in the horizontal infiltration water volume of set period of time according to test specimen under each width of gained The horizontal infiltration flow of part, and estimate the horizontal infiltration flow of the practical big gap bituminous pavement of every linear meter(lin.m.).
Further, as a preferred technical solution of the present invention: the step 2 further includes to the board-like test specimen of mixture Gap between upper plate and enclosing is sealed.
Further, as a preferred technical solution of the present invention: the practical big gap asphalt road of the every linear meter(lin.m.) of step 3 The horizontal infiltration flow in face is estimated using formula:
It is described,AndAnd
In above formula, LnThe value after 0.01m is subtracted for the n width of test specimen;QnTo be the transverse direction measured under n kind width Seepage discharge;VnIt is L for widthnHorizontal infiltration water volume of the board-like test specimen in T time;K is by knDetermining coefficient, and n For 1 or more natural number.
The present invention by adopting the above technical scheme, can have the following technical effects:
The estimation device and method of big gap bituminous pavement horizontal infiltration flow provided by the invention, can pass through height adjustment Device adjusts the gradient simulated roadway horizontal slope of upper plate, by adjusting discharge opening altitude simulation rainfall intensity, by board-like examination Part is truncated, and the test specimen of different in width is obtained, mixed according to the big gap pitch of different in width under specific grade, specific precipitation The horizontal infiltration flow for closing material test specimen, extrapolates the horizontal infiltration flow of big gap bituminous pavement, to the infiltration of research bituminous pavement The design of aqueous and water discharger for road is significant.
The present invention can simply, quickly estimate the horizontal infiltration flow of big gap bituminous pavement, and simultaneously can Enough effective simulated precipitation intensity and road surface horizontal slope improve estimation effect to select suitable pumping equipment and reach unobstructed draining Effect.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the estimation device of the big gap bituminous pavement horizontal infiltration flow of the present invention.
Fig. 2 is the flow diagram of the method for the present invention.
Fig. 3 is the structural schematic diagram of pedestal upper and lower bottom plate in the device of the invention.
Wherein Symbol explanation: 1- catch basin, 2- drain hole, the first drain valve of 3-, the second drain valve of 4-, 5- enclosing, 6- card Slot, 7- through-hole, 8- lower plate, 9- upper plate, 10- test specimen.
Specific embodiment
Embodiments of the present invention are described with reference to the accompanying drawings of the specification.
As shown in Figure 1, the present invention devises a kind of estimation device of big gap bituminous pavement horizontal infiltration flow, the device Including catch basin 1 and pedestal 5, wherein several through-holes 7 are arranged in the bottom plate of catch basin 1, and 1 base areas of catch basin is 300mm × 50mm, water by through-hole to flow down, simulated rainfall, the side of catch basin be provided with positioned at different height several Drain hole 2, drain hole 2 described in the present embodiment be 5, the drain hole 2 away from bottom plate distance be respectively 9cm, 14cm, 19cm, 24cm and 29cm, corresponding rainfall intensity is respectively 12.5ml/sm to the height of 5 drain holes 2 from low to high2、15.7ml/ s·m2、21.2ml/s·m2、24.7ml/s·m2And 27.1ml/sm2, head difference is adjusted by different drain holes 2, is obtained Different rainfall intensities need to be closed by the drain hole of 9cm if necessary to the head difference of 14cm.
The pedestal 5 is provided with upper plate 9 and lower plate 8, as shown in figure 3, on lower plate 8 be provided with for adjust The height adjustment device of bottom plate;The surrounding of the upper plate is provided with enclosing and partition is fixedly installed on enclosing, the partition Enclosing is divided into first surface drainage collection portion and the second horizontal infiltration water collection portion;One surface drainage collection portion setting the Second drain valve 4 is set in one drain valve 3 and the second horizontal infiltration water collection portion;The surface setting of the upper plate is used for will The impermeability material layer of its lap sealing of the upper plate surface with test specimen 10 thereon in addition to draining face and permeable face;The water The baffle and position-limit mechanism for baffle through-hole are provided on the bottom plate of slot, one end of the baffle is hinged through the hinge to bottom plate Bottom surface, and the other end of baffle is limited by position-limit mechanism.And it is arranged on the upper plate for fixing catch basin Card slot 6.The catch basin can be inserted into card slot and fix, and fall on the water in catch basin on test specimen.
When injecting water in catch basin 1, baffle is used for 7 baffle of through-hole, and the limit of baffle is realized by position-limit mechanism, It is set to be tightly attached to backplate surface, to prevent through-hole from leaking out water;And water is injected in catch basin 1 when reaching desired height, limit Mechanism is unclamped, and baffle is removed from through-hole, water via through holes 7 and drain hole 2 are flowed to respectively on the test specimen 10 of upper plate, then by receiving Collecting action is realized respectively in collection portion.
Further, the position-limit mechanism includes threaded rod and the nut that rotation is placed on threaded rod.By nut in spiral shell Rotatably interaction up and down, realizes the fixation or release to baffle on rasp bar.Upper plate 9 described in described device and lower plate 8 lean on One end of nearly partition is articulated connection.The height adjustment device for adjusting upper plate is provided on lower plate, the present embodiment is given Height adjustment device out is the distance between two layers adjustable by rotary screw and nut, changes the gradient on upper layer.
On this basis, the present invention also proposes a kind of evaluation method of big gap bituminous pavement horizontal infiltration flow, the party Method can be used for above-mentioned apparatus progress horizontal infiltration flow and be calculated, but be not limited to the device of this kind of structure;This method process is shown It is intended to as shown in Fig. 2, detailed process is as follows:
Step 1, molding and practical gap bituminous pavement gradation greatly and asphalt content is identical mixes flitch in laboratory Formula test specimen, two faces for choosing the board-like test specimen 10 of mixture respectively are sealed as draining face and permeable face, and by its lap;It will dress Placement location is steady, and the gradient for selecting the drain hole of desired height, and adjusting upper plate keeps it consistent with practical road surface horizontal slope.
Step 2 obtains test specimen of different size to the test specimen 10 truncation, and is gradually placed in test specimen of different size On upper plate 9;It is filled to desired height into catch basin 1, makes the water in catch basin through sluicing when bottom plate overhead gage is opened Hole 2 and through-hole 7 release respectively, and obtain under each width test specimen in the horizontal infiltration water volume of set period of time.
By taking the test specimen of 4 kinds of width as an example, detection obtains test specimen under each width and seeps in the transverse direction of set period of time the present embodiment Permeable volume, but the present invention is not limited to the test specimen of 4 kinds of width, the test specimen of other quantity and width is equally applicable to of the invention In method.The process specifically:
Test specimen is placed on upper plate, the test specimen is identical as divider height close to partition one end height, and permeable face is corresponding Partition side further includes the gap between sealed test piece and enclosing, catch basin is put into card slot, above the bottom plate of catch basin One piece of partition is placed, the leak in the injecting process of the through-hole of bottom plate is prevented, is filled the water into catch basin, after specified altitude assignment to be achieved, It detaches partition and starts timing, start to test horizontal infiltration water volume in test specimen 1min after 5min.
Test specimen is successively truncated 3 times using cutting instruments, obtains the test specimen of different in width, cleans test specimen after truncation every time New section, and step 2 is repeated, finally measuring width is LnBoard-like test specimen 1min in horizontal infiltration water volume Vn, wherein n=1, 2,3,4.
Above the preferably described intercept certain applications impermeability material connection asphalt draining face of the process and partition, And be sealed, prevent surface water from entering bottom plate.And every time after truncation, original test specimen part far from permeable face is taken, will newly be cut Face continues infiltration experiment as new permeable face, and the position being truncated every time is at the 5cm of permeable face side.
Step 3, according to the horizontal infiltration flow of test specimen under calculated each width, it is practical big empty to estimate the every linear meter(lin.m.) of the gradation The horizontal infiltration flow of gap bituminous pavement.
That is: according toAs T=60s, can determineLateral infiltration of the calculation testing piece under 4 kinds of width Saturating flow, obtainsByIt can determineRoot According to formulaThe horizontal infiltration flow for estimating the practical big gap bituminous pavement of every linear meter(lin.m.) calculates that process is as follows:
As shown in figure 3, according to hydrodynamics formula:
Q=Sv (3)
In formula: H be side upper surface and other side lower surface of the test specimen when being placed on upper plate in Fig. 3 it is vertical away from From;Because when being sealed between board-like test specimen and catch basin, should reserve the space of 1cm, L is that specimen width subtracts Value after 0.01m;T is time of penetration;V is flow velocity;Q is horizontal infiltration flow, is obtained:
Then:
2lnQm-2lnQn=lnLm-lnLn (9)
That is:
By formula (11) it is found that optimum k value should makeIt is minimized, in formula: because When being sealed between board-like test specimen and catch basin, the space of 1cm should be reserved, so Ln(n=1,2,3,4) is 4 kinds of test specimen Width subtracts the value after 0.01m, Qn(n=1,2,3,4) is the horizontal infiltration flow measured under 4 kinds of width.It enables:
Then:
So having:
It finally obtains:
In the present embodiment, because the length of the board-like test specimen of mixture is 30cm, the big gap pitch of the every linear meter(lin.m.) of this gradation The horizontal infiltration flow on road surface are as follows:
Preferably, in the step 1, the sample dimensions be 300mm × 300mm × 50mm, the test specimen by 300mm × Two faces 300mm and 300mm × 50mm are respectively as draining face and permeable face.
Therefore, this method is according to the Asphalt mix for open-graded friction course test specimen of different in width under specific grade, specific precipitation Horizontal infiltration flow can quickly extrapolate the horizontal infiltration flow of big gap bituminous pavement.
The horizontal infiltration flow of big gap bituminous pavement can be read to extrapolate fastly in order to verify apparatus and method of the present invention, Spy enumerates a verifying example and is illustrated.
Verify example: estimation is located at the OGFC-13 bituminous pavement horizontal infiltration flow of Nanjing City, includes the following steps:
1. the molding of track plate
By mineral aggregate gradation shown in table 1, using 5.0% petroleum ratio, compact dimensions are 300mm × 300mm × 50mm, sky The board-like test specimen of Asphalt mix for open-graded friction course that gap rate is 23%.Wherein, gather materials for basalt, using No.1 material 4188.8g, No. two Expect 4502.96g, No. three material 418.88g, No. four material 1047.2g;Filler is limestone mineral powder, dosage 314.16g;Pitch is High-viscosity modified asphalt, dosage 528g.
1 OGFC-13 gradation of table
Sieve pore (mm) 16 13.2 9.5 4.75 2.36 1.18 0.6 0.3 0.15 0.075
Percent of pass (%) 100 92.0 66.4 28.1 16.7 13.1 10.3 7.4 6.3 4.9
2. the selection of drain hole height and the gradient
According to Nanjing Rain Intensity Formula BasedChoose suitable drain hole height, in formula: Q is rainfall intensity (L/shm2);T is rainfall duration (min);P is return period (year).
In Nanjing repetition period of rainfall was met by 2 years one, P=2;The time of the duration of rainfall takes t=60min, and list is calculated by formula The flow of plane product is q=137.4L/shm2, i.e. rainfall intensity is 13.74ml/sm2.The water creep appearance used is tested, each The height of drain hole be it is fixed, can choose with the drain hole height of practical rainfall intensity relatively, finally choose catch basin The middle drain hole apart from bottom 14cm, corresponding rainfall intensity are 15.7ml/sm2, take respectively road surface horizontal slope be 1%, 1.5%, 2%.
3. the estimation of different in width OGFC-13 bituminous pavement horizontal infiltration flow
When choosing the drain hole in catch basin apart from bottom 14cm, when road surface horizontal slope is respectively 1%, 1.5%, 2%, test Data are as shown in table 2,3,4.
The horizontal infiltration flow of different in width OGFC-13 asphalt when 2 horizontal slope of table is 1%
Width L (cm) 30 25 20 15
Seepage discharge Q (ml/s) 49.62 46.93 40.25 36.87
The horizontal infiltration flow of different in width OGFC-13 asphalt when 3 horizontal slope of table is 1.5%
Width L (cm) 30 25 20 15
Seepage discharge Q (ml/s) 49.49 46.53 36.53 31.53
The horizontal infiltration flow of different in width OGFC-13 asphalt when 4 horizontal slope of table is 2%
Width L (cm) 30 25 20 15
Seepage discharge Q (ml/s) 50.11 46.20 32.01 31.65
(1) when rainfall intensity is 15.7ml/sm2, when road surface horizontal slope is 1%, the big gap drip of estimation this gradation of 14m wide The green every linear meter(lin.m.) horizontal infiltration flow in road surface:
WhenZ takes minimum Value, then
So as L=14m, the every linear meter(lin.m.) horizontal infiltration flow of big gap bituminous pavement of this gradation is
(2) when rainfall intensity is 15.7ml/sm2, when road surface horizontal slope is 1.5%, estimate the big sky of this gradation of 10.5m wide The every linear meter(lin.m.) horizontal infiltration flow of gap bituminous pavement:
WhenZ takes minimum Value, then
So as L=10.5m, the every linear meter(lin.m.) horizontal infiltration flow of big gap bituminous pavement of this gradation are as follows:
(3) when rainfall intensity is 15.7ml/sm2, when road surface horizontal slope is 2%, the big gap drip of estimation this gradation of 7m wide The green every linear meter(lin.m.) horizontal infiltration flow in road surface:
WhenZ takes minimum Value, then
So as L=7m, the every linear meter(lin.m.) horizontal infiltration flow of big gap bituminous pavement of this gradation is
Accordingly, by means of the invention it is also possible to obtain the big gap bituminous pavement of other specific rainfalls, specific grade Horizontal infiltration flow achieve the effect that unobstructed draining to select suitable pumping equipment.
Embodiments of the present invention are explained in detail above in conjunction with attached drawing, but the present invention is not limited to above-mentioned implementations Mode within the knowledge of a person skilled in the art can also be without departing from the purpose of the present invention It makes a variety of changes.

Claims (2)

1. the evaluation method of big gap bituminous pavement horizontal infiltration flow, which is characterized in that the device that method uses includes water storage Slot and pedestal, wherein several through-holes are arranged in the bottom plate of catch basin, and if the side of catch basin be provided with positioned at different height Dry drain hole;The pedestal is provided with upper plate and lower plate, and the height for adjusting upper plate is provided on lower plate Regulating device;The surrounding of the upper plate is provided with enclosing and partition is arranged on enclosing, and enclosing is divided into first by the partition Surface drainage collection portion and the second horizontal infiltration water collection portion;First surface drainage collection portion and the second horizontal infiltration water are received Drain valve is respectively set in portion in collection;It is characterized in that, the surface setting of the upper plate for by upper plate surface with thereon The impermeability material layer of its lap sealing of the test specimen in addition to draining face and permeable face;It is provided with and is used on the bottom plate of the sink The baffle and position-limit mechanism of baffle through-hole, one end of the baffle is hinged through the hinge to the bottom surface of bottom plate, and baffle is another End is limited by position-limit mechanism;Method includes the following steps:
Step 1, the molding board-like examination of mixture identical with practical big gap bituminous pavement gradation and asphalt content in laboratory Part, two faces for choosing the board-like test specimen of mixture respectively are sealed as draining face and permeable face, and by its lap;It is high needed for selection The drain hole of degree, and the gradient for adjusting upper plate keeps it consistent with practical road surface horizontal slope;
Step 2 obtains test specimen of different size to test specimen truncation, and test specimen of different size is gradually placed in upper plate On;It is filled to desired height into catch basin, makes the water in catch basin through drain hole and through-hole when bottom plate overhead gage is opened It releases respectively, and obtains under each width test specimen in the horizontal infiltration water volume of set period of time;
Step 3, according to test specimen under each width of gained in the horizontal infiltration water volume of set period of time, calculate test specimen under each width Horizontal infiltration flow, and the horizontal infiltration flow of the practical big gap bituminous pavement of every linear meter(lin.m.) is estimated, estimation uses following formula:
Wherein:
In above formula, LnThe value after 0.01m is subtracted for the n width of test specimen;QnFor the horizontal infiltration measured under n width Flow;VnIt is L for widthnThe horizontal infiltration water volume that is measured in T time of test specimen;K is by knDetermining coefficient, and n is 1 Above natural number;L is the width of test specimen.
2. the evaluation method of big gap bituminous pavement horizontal infiltration flow, spy are according to claim 1, the step 2 further include being sealed to the gap between the board-like test specimen of mixture and upper plate and enclosing.
CN201611242060.XA 2016-12-29 2016-12-29 The estimation device and method of big gap bituminous pavement horizontal infiltration flow Active CN106840997B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611242060.XA CN106840997B (en) 2016-12-29 2016-12-29 The estimation device and method of big gap bituminous pavement horizontal infiltration flow

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611242060.XA CN106840997B (en) 2016-12-29 2016-12-29 The estimation device and method of big gap bituminous pavement horizontal infiltration flow

Publications (2)

Publication Number Publication Date
CN106840997A CN106840997A (en) 2017-06-13
CN106840997B true CN106840997B (en) 2019-08-20

Family

ID=59113865

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611242060.XA Active CN106840997B (en) 2016-12-29 2016-12-29 The estimation device and method of big gap bituminous pavement horizontal infiltration flow

Country Status (1)

Country Link
CN (1) CN106840997B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109543149B (en) * 2018-11-06 2023-01-31 东南大学 Safe parking sight distance calculation method for asphalt pavement in rainy days
CN110231267A (en) * 2019-03-28 2019-09-13 广州珠江黄埔大桥建设有限公司 A kind of device and method of indoor test drainage type asphalt drainage performance
CN113567320A (en) * 2021-07-23 2021-10-29 上海仁聚新材料科技有限公司 Method and device for measuring drainage capacity in permeable pavement structure based on cross-section flow

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6055850A (en) * 1997-12-24 2000-05-02 Turner; Daniel R. Multi-directional permeameter
CN101738363A (en) * 2009-12-28 2010-06-16 上海嘉洁环保工程有限公司 Instrument and method for testing permeability coefficient
CN201965079U (en) * 2011-01-12 2011-09-07 长安大学 Multi-gradient seepage tester
CN102507410A (en) * 2011-10-14 2012-06-20 河海大学 Device and method for simultaneously testing water seepage and drainage capacities of asphalt mixture
CN103323381A (en) * 2013-06-09 2013-09-25 河海大学 Method for evaluating attenuation degree of porous asphalt mixture void
CN203658219U (en) * 2014-01-15 2014-06-18 长安大学 Water penetration test device for large-gap bituminous mixture
CN104677800A (en) * 2015-02-03 2015-06-03 云南省交通规划设计研究院 Simulated rainfall pattern macro-porous pavement water drainage capacity testing equipment and method
CN105136647A (en) * 2015-09-30 2015-12-09 河海大学 Bituminous mixture permeability testing device and method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6055850A (en) * 1997-12-24 2000-05-02 Turner; Daniel R. Multi-directional permeameter
CN101738363A (en) * 2009-12-28 2010-06-16 上海嘉洁环保工程有限公司 Instrument and method for testing permeability coefficient
CN201965079U (en) * 2011-01-12 2011-09-07 长安大学 Multi-gradient seepage tester
CN102507410A (en) * 2011-10-14 2012-06-20 河海大学 Device and method for simultaneously testing water seepage and drainage capacities of asphalt mixture
CN103323381A (en) * 2013-06-09 2013-09-25 河海大学 Method for evaluating attenuation degree of porous asphalt mixture void
CN203658219U (en) * 2014-01-15 2014-06-18 长安大学 Water penetration test device for large-gap bituminous mixture
CN104677800A (en) * 2015-02-03 2015-06-03 云南省交通规划设计研究院 Simulated rainfall pattern macro-porous pavement water drainage capacity testing equipment and method
CN105136647A (en) * 2015-09-30 2015-12-09 河海大学 Bituminous mixture permeability testing device and method

Also Published As

Publication number Publication date
CN106840997A (en) 2017-06-13

Similar Documents

Publication Publication Date Title
CN106840997B (en) The estimation device and method of big gap bituminous pavement horizontal infiltration flow
CN106525689B (en) Water seepage instrument and method for measuring multidirectional permeability coefficient of large-gap pavement structure
CN105136647A (en) Bituminous mixture permeability testing device and method
Gruber et al. A computational study of the effect of structural anisotropy of porous asphalt on hydraulic conductivity
CN104677800B (en) Simulated rainfall pattern macro-porous pavement water drainage capacity testing equipment and method
Garcia et al. Analysis of permeability reduction in drainage asphalt mixtures due to decrease in void volume
Afonso et al. Characterization of the skid resistance and mean texture depth in a permeable asphalt pavement
Chen et al. Investigation of permeability of open graded asphalt mixture considering effects of anisotropy and two-dimensional flow
Luo et al. Development of a new analytical water film depth (WFD) prediction model for asphalt pavement drainage evaluation
CN108982823A (en) Speeding-up simulation device and method in a kind of Asphalt mix for open-graded friction course drainage performance decaying behavior room
CN110231267A (en) A kind of device and method of indoor test drainage type asphalt drainage performance
Chen et al. Relationship of coefficient of permeability, porosity, and air voids in fine-graded HMA
CN108613914A (en) A kind of multidirectional seepage flow test device of the asphalt of constant head
CN105806764A (en) Device and method for testing permeability anisotropy of large-porosity bituminous mixture
Sedyowati et al. Runoff velocity behaviour on smooth pavement and paving blocks surfaces measured by a tilted plot
JP2002250002A (en) Water permeability testing device for drainage pavement
Ranieri Runoff control in porous pavements
CN106769792B (en) Device and method of the Asphalt mix for open-graded friction course eight to infiltration coefficient is tested simultaneously
CN105806776A (en) Device and method for testing skid resistance of asphalt mixture in damp state
Suozzo et al. Evaluation of Strength and Hydraulic Testing Methods of Pervious Concrete.
Lu et al. Material characteristics of long lasting asphalt pavements
CN112710592A (en) Method for establishing relation between porosity and permeability coefficient of permeable pavement material
Leipard et al. Hydraulic characterization and design of permeable interlocking concrete pavement
Dierkes et al. Pollution retention of different permeable pavements with reservoir structure at high hydraulic loads
Afonso et al. Hydraulic conductivity of the permeable asphalt pavement–laboratory vs in situ test

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant