CN106840238A - Adjustable sensor synthesis erecting by overhang - Google Patents
Adjustable sensor synthesis erecting by overhang Download PDFInfo
- Publication number
- CN106840238A CN106840238A CN201710106595.2A CN201710106595A CN106840238A CN 106840238 A CN106840238 A CN 106840238A CN 201710106595 A CN201710106595 A CN 201710106595A CN 106840238 A CN106840238 A CN 106840238A
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- standpipe
- telescoping tube
- reel
- erecting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01D—MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- G01D11/00—Component parts of measuring arrangements not specially adapted for a specific variable
- G01D11/30—Supports specially adapted for an instrument; Supports specially adapted for a set of instruments
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
A kind of adjustable sensor synthesis erecting by overhang, including base, submounts are fixedly connected with standpipe, it is up and down in standpipe to be plugged with telescoping tube, hanging cross bar is fixedly connected with telescoping tube, hanging cross bar is orthogonal with telescoping tube, multiple hanging hooks are fixedly connected with hanging cross bar, standpipe upper end rotates against and is connected with pulley, hanger wire is connected with pulley, wherein one end of hanger wire is fixedly connected on telescoping tube lower end, and the other end of hanger wire is connected with reel, reel carries crank, and reel is fixedly linked with standpipe.Many hanging cross bars are fixedly connected on telescoping tube.Stationary jaw is also fixedly connected with outside standpipe.Fixed chuck is fixedly connected with outside standpipe, reel is fixedly mounted on fixed chuck.Use of the invention can reduce the labour intensity of on-site personnel, it is to avoid the potential safety hazard formed because ascending a height operation, safe and reliable.
Description
Technical field
The present invention relates to a kind of mining device, more particularly to a kind of adjustable sensor synthesis erecting by overhang.
Background technology
According to《Safety regulations in coal mine》Relevant regulations, neat various kinds of sensors should be pacified at 10-15m of getting working face return side,
And periodicity calibration is carried out to methane transducer, with the increase and the lifting of production technique of mining depth, some coal masters will
Getting working face is presented the trend of big cross section, and head-room is too high, and installation, commissioning staff need to ascend a height operation, easily be formed uneasy
Full hidden danger, directly influences the safety in production of personal security or even mine.
The content of the invention
The present invention is for deficiency, there is provided a kind of safe and reliable adjustable sensor synthesis erecting by overhang.
The technical scheme that the present invention solves above-mentioned technical problem is as follows:
A kind of adjustable sensor synthesis erecting by overhang, including base, submounts are fixedly connected with standpipe, standpipe and live up and down
Dynamic to be plugged with telescoping tube, it is characterised in that hanging cross bar is fixedly connected with telescoping tube, hanging cross bar hangs down mutually with telescoping tube
Directly, multiple hanging hooks are fixedly connected with hanging cross bar, standpipe upper end rotates against and is connected with pulley, is connected with pulley
Hanger wire, wherein one end of hanger wire is fixedly connected on telescoping tube lower end, and the other end of hanger wire is connected with reel, twines
Line device carries crank, and reel is fixedly linked with standpipe.
According to described adjustable sensor synthesis erecting by overhang, it is characterised in that be fixedly connected on the telescoping tube many
Cross bar is hung described in root.
According to described adjustable sensor synthesis erecting by overhang, it is characterised in that be also fixedly connected with outside the standpipe
Stationary jaw.
According to described adjustable sensor synthesis erecting by overhang, it is characterised in that be fixedly connected with outside the standpipe
Determine chuck, the reel is fixedly mounted on fixed chuck.
The present invention engages to realize hanging sliding up and down for cross bar using the rotation of pulley with the gear of reel.In peace
When dress, debugging sensor, pylon is slided down using crank, reel and pulley, after debugging, installing, recycled
Sensor is slid into setting position by the slip of the device with linkage, so as to realize the hanging of sensor and adjustable dual up and down
Effect.
Use of the invention can reduce the labour intensity of on-site personnel, it is to avoid the safety formed because ascending a height operation is hidden
Suffer from, it is safe and reliable.
Brief description of the drawings
Fig. 1 is main structure diagram of the invention;
Fig. 2 is left view structural representation of the invention;
Fig. 3 is overlooking the structure diagram of the invention.
In accompanying drawing:
1st, hanging hook;2nd, cross bar is hung;3rd, telescoping tube;4th, pulley;5th, hanger wire;6th, standpipe;7th, fixed chuck;8th, crank;9、
Reel;10th, stationary jaw;11st, base.
Specific embodiment
Principle of the invention and feature are described below in conjunction with accompanying drawing, example is served only for explaining the present invention, and
It is non-for limiting the scope of the present invention.
As shown in Figure 1, Figure 2 and Figure 3, a kind of adjustable sensor synthesis erecting by overhang, including base 11, above base 11
Standpipe 6 is fixedly connected with, it is up and down in standpipe 6 to be plugged with telescoping tube 3, hanging cross bar 2 is fixedly connected with telescoping tube 3, hang
Hang cross bar 2 orthogonal with telescoping tube 3, multiple hanging hooks 1 are fixedly connected with hanging cross bar 2, the upper end of standpipe 6 rotates against company
Pulley 4 is connected to, hanger wire 5 is connected with pulley 4, wherein one end of hanger wire 5 is fixedly connected on the lower end of telescoping tube 3, hangs
The other end of hanging wire 5 is connected with reel 9, and reel 9 carries crank 8, and reel 9 is fixedly linked with standpipe 6.
In the present embodiment, many hanging cross bars 2 are fixedly connected on the telescoping tube 3.Standpipe 6 is outer to be also fixedly connected
There is stationary jaw 10.Fixed chuck 7 is fixedly connected with outside standpipe 6, the reel 9 is fixedly mounted on fixed chuck 7.
When making the present invention, using the steel pipe of a diameter of 15mm and 20mm as the telescoping tube and standpipe being slidably connected, and
In top soldered sensor hanging cross bar and the hanging hook of telescoping tube, two stationary jaws and a hand-rail type are welded on standpipe
Reel, is coupled together telescoping tube with reel using hanger wire by pulley.
Using preceding, the present invention is fixed on the rod of belt holder station, hand crank unwrapping wire, telescoping tube declines is specifying height
Degree, is operated in order to personnel.After installation, maintenance, debugging are finished, then hand crank carries out kinking, in the effect of kinking
Under, hanger wire is risen by the telescoping tube that pulley driving is connected, and reaches height or appointed place that code specifies, thus real
Being freely lifted and safety work for sensor is showed.
Making of the invention can make full use of the materials such as waste and old chain block, steel pipe and steel strand wires, realize benefit
Maximize, while sensor can be also freely lifted according to field condition convenient installation, reduce the labor of on-site personnel
Fatigue resistance, has prevented operation phenomenon of ascending a height, and realizes safety in production.
Claims (4)
1. a kind of adjustable sensor synthesis erecting by overhang, including base(11), base(11)Standpipe is fixedly connected with above
(6), standpipe(6)It is interior up and down to be plugged with telescoping tube(3), it is characterised in that telescoping tube(3)On be fixedly connected with hanging cross bar
(2), hang cross bar(2)With telescoping tube(3)It is orthogonal, hang cross bar(2)On be fixedly connected with multiple hanging hooks(1), standpipe
(6)Upper end rotates against and is connected with pulley(4), pulley(4)On be connected with hanger wire(5), hanger wire(5)Wherein one end
It is fixedly connected on telescoping tube(3)Lower end, hanger wire(5)The other end be connected with reel(9), reel(9)With shaking
(8), reel(9)With standpipe(6)It is fixedly linked.
2. adjustable sensor synthesis erecting by overhang according to claim 1, it is characterised in that the telescoping tube(3)On
It is fixedly connected many hanging cross bars(2).
3. adjustable sensor synthesis erecting by overhang according to claim 2, it is characterised in that the standpipe(6)It is outer to go back
It is fixedly connected with stationary jaw(10).
4. adjustable sensor synthesis erecting by overhang according to claim 3, it is characterised in that the standpipe(6)It is outer solid
Surely it is connected with fixed chuck(7), the reel(9)It is fixedly mounted on fixed chuck(7)On.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710106595.2A CN106840238A (en) | 2017-02-27 | 2017-02-27 | Adjustable sensor synthesis erecting by overhang |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710106595.2A CN106840238A (en) | 2017-02-27 | 2017-02-27 | Adjustable sensor synthesis erecting by overhang |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106840238A true CN106840238A (en) | 2017-06-13 |
Family
ID=59134659
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710106595.2A Pending CN106840238A (en) | 2017-02-27 | 2017-02-27 | Adjustable sensor synthesis erecting by overhang |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106840238A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09227079A (en) * | 1996-02-22 | 1997-09-02 | Matsushima Denki Setsubi Koji:Kk | Random winding preventing device for hoisting wire winding winch in pole type enclosed net device |
CN203865912U (en) * | 2014-05-30 | 2014-10-08 | 中煤平朔集团有限公司 | Lifting device of coal mine underground excavation working face head-on sensors |
CN204661194U (en) * | 2015-05-13 | 2015-09-23 | 徐州矿务集团有限公司庞庄煤矿 | Firedamp sensor jacking system |
CN204854714U (en) * | 2015-05-08 | 2015-12-09 | 长安大学 | On -board bathymetric survey device |
CN205916932U (en) * | 2016-08-26 | 2017-02-01 | 永城煤电控股集团有限公司 | Hand over -and -under type coal mine tunnel environment monitoring sensor cable suspension device |
CN205944836U (en) * | 2016-08-15 | 2017-02-08 | 广东电网有限责任公司东莞供电局 | Handcart switch repair support |
CN206450239U (en) * | 2017-02-27 | 2017-08-29 | 枣庄矿业(集团)有限责任公司柴里煤矿 | Adjustable sensor integrates erecting by overhang |
-
2017
- 2017-02-27 CN CN201710106595.2A patent/CN106840238A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09227079A (en) * | 1996-02-22 | 1997-09-02 | Matsushima Denki Setsubi Koji:Kk | Random winding preventing device for hoisting wire winding winch in pole type enclosed net device |
CN203865912U (en) * | 2014-05-30 | 2014-10-08 | 中煤平朔集团有限公司 | Lifting device of coal mine underground excavation working face head-on sensors |
CN204854714U (en) * | 2015-05-08 | 2015-12-09 | 长安大学 | On -board bathymetric survey device |
CN204661194U (en) * | 2015-05-13 | 2015-09-23 | 徐州矿务集团有限公司庞庄煤矿 | Firedamp sensor jacking system |
CN205944836U (en) * | 2016-08-15 | 2017-02-08 | 广东电网有限责任公司东莞供电局 | Handcart switch repair support |
CN205916932U (en) * | 2016-08-26 | 2017-02-01 | 永城煤电控股集团有限公司 | Hand over -and -under type coal mine tunnel environment monitoring sensor cable suspension device |
CN206450239U (en) * | 2017-02-27 | 2017-08-29 | 枣庄矿业(集团)有限责任公司柴里煤矿 | Adjustable sensor integrates erecting by overhang |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106927370B (en) | A kind of suspender turns linked to assembly | |
CN204311720U (en) | High-lift operation hanging cradle | |
CN205743770U (en) | A kind of collapsible dynamic catwalk device | |
CN204252879U (en) | A kind of hydraulic drilling rod box | |
CN106553038A (en) | The spring clamp device of iron core spring feeder | |
CN206450239U (en) | Adjustable sensor integrates erecting by overhang | |
CN103147404A (en) | System and method for hanging stay cable at tower end of height limiting cable-stayed bridge | |
CN109231053A (en) | A kind of sensor lifting device | |
CN106840238A (en) | Adjustable sensor synthesis erecting by overhang | |
CN201276577Y (en) | Compact vertical stock rod | |
CN203021241U (en) | Banner lifting device | |
CN204732808U (en) | A kind of cable testing bridge laying apparatu | |
CN205294724U (en) | Can tertiary formula flexible frame of lifting | |
CN207406013U (en) | A kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING curtain wall lifting device | |
CN201258228Y (en) | Single column support type rotary arm hoist | |
CN201268550Y (en) | Material clamp | |
CN203033702U (en) | Lifting device for being matched with coal mine fully-mechanized mining hydraulic support | |
CN206244295U (en) | A kind of crane with closing suspension hook | |
CN205675942U (en) | Lifting device for scaffold | |
CN201799750U (en) | Wire feeding device for welding | |
CN201846045U (en) | Mine hanger for manual underground power cable hanging | |
CN209668610U (en) | A kind of small-sized PC prefabricated part hanging device based on BIM | |
CN209242558U (en) | A kind of sensor lifting device | |
CN203865941U (en) | Scissor jack | |
CN207121361U (en) | It is a kind of can precise positioning tower crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170613 |