CN106839745A - A kind of hot-air blowing with interior circulation dehumidification function sets - Google Patents
A kind of hot-air blowing with interior circulation dehumidification function sets Download PDFInfo
- Publication number
- CN106839745A CN106839745A CN201611233839.5A CN201611233839A CN106839745A CN 106839745 A CN106839745 A CN 106839745A CN 201611233839 A CN201611233839 A CN 201611233839A CN 106839745 A CN106839745 A CN 106839745A
- Authority
- CN
- China
- Prior art keywords
- case
- air
- hot
- post
- air inlet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F26—DRYING
- F26B—DRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
- F26B21/00—Arrangements or duct systems, e.g. in combination with pallet boxes, for supplying and controlling air or gases for drying solid materials or objects
- F26B21/001—Drying-air generating units, e.g. movable, independent of drying enclosure
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F26—DRYING
- F26B—DRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
- F26B21/00—Arrangements or duct systems, e.g. in combination with pallet boxes, for supplying and controlling air or gases for drying solid materials or objects
- F26B21/003—Supply-air or gas filters
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F26—DRYING
- F26B—DRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
- F26B21/00—Arrangements or duct systems, e.g. in combination with pallet boxes, for supplying and controlling air or gases for drying solid materials or objects
- F26B21/004—Nozzle assemblies; Air knives; Air distributors; Blow boxes
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F26—DRYING
- F26B—DRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
- F26B21/00—Arrangements or duct systems, e.g. in combination with pallet boxes, for supplying and controlling air or gases for drying solid materials or objects
- F26B21/02—Circulating air or gases in closed cycles, e.g. wholly within the drying enclosure
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F26—DRYING
- F26B—DRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
- F26B21/00—Arrangements or duct systems, e.g. in combination with pallet boxes, for supplying and controlling air or gases for drying solid materials or objects
- F26B21/06—Controlling, e.g. regulating, parameters of gas supply
- F26B21/08—Humidity
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Drying Of Gases (AREA)
Abstract
The present invention proposes a kind of hot-air blowing equipment with interior circulation dehumidification function, including installs case, air inlet pipe, blower fan, dust arrester, heater, part flow arrangement, desiccant body and blast pipe;Air inlet pipe is arranged on installs lower box part, air inlet pipe is provided with multiple passages, heater includes multiple spiral heating silks, part flow arrangement includes that multiple first shunts post, first shunting mast axis are parallel to horizontal plane, first shunting post sets gradually in the horizontal direction, and the first shunting post cross-sectional area gradually increases from the bottom to top;Install and division board is installed in case, division board is provided with air guide through hole, and including moisture ingress pipe, except wet tank and air delivery line, blast pipe is connected desiccant body with box cavity is installed, and blast pipe is located above division board with box cavity connectivity part is installed.The present invention is easy to use, and air heats are more uniform, and drying effect is preferable.
Description
Technical field
The present invention relates to drying equipment, and in particular to a kind of hot-air blowing with interior circulation dehumidification function sets.
Background technology
Many objects are required for drying during production, the efficiency that natural air drying is dried be it is extremely low, in order to
Increase the dry efficiency of object, people have been invented a kind of hot air sweeping device, the dry efficiency of object is improved by hot blast, but
Be hot air sweeping device work environment in humidity it is larger and uneven by the air heats of hot air sweeping device, these
All have a strong impact on the dry effect of object.
The content of the invention
Based on the technical problem that background technology is present, the present invention proposes a kind of hot blast with interior circulation dehumidification function and blows
Sweep and set.
A kind of hot-air blowing equipment with interior circulation dehumidification function proposed by the present invention, including case, air inlet pipe, wind are installed
Machine, dust arrester, heater, part flow arrangement, desiccant body and blast pipe;
Air inlet pipe is arranged on installs lower box part, and case exterior space is installed in air inlet pipe connection, and air inlet pipe is located to be installed in case
Part is provided with multiple passages, and dust arrester is arranged on to be installed in case, and positioned at air inlet pipe top, heater is arranged on peace
In vanning, and positioned at dust arrester top, heater includes multiple spiral heating silks, and part flow arrangement is arranged on to be installed in case,
Part flow arrangement includes that multiple first shunts post, and the first shunting post is located at heater top, and the first shunting mast axis are parallel to water
Plane, the first shunting post sets gradually in the horizontal direction, and the first shunting post cross-sectional area gradually increases from the bottom to top;Case is installed
Division board is inside installed, division board is located at the first shunting post top, and division board is provided with air guide through hole, and fan air inlet connection is led
Vent hole, blower fan gas outlet connection division board upper space;
Desiccant body includes moisture ingress pipe, except wet tank and air delivery line, the connection of moisture ingress pipe install box cavity with
Except wet tank, moisture ingress pipe with box cavity connectivity part be installed be located at division board top, the connection of air delivery line install box cavity with
Except wet tank, air delivery line and installation case connectivity part are located between air inlet pipe and dust arrester;
Blast pipe is connected with box cavity is installed, and blast pipe is located at division board top with box cavity connectivity part is installed.
Preferably, the hot-air blowing equipment with interior circulation dehumidification function also includes multiple lifting apparatus, lifting dress
Put including mounting bracket, screw rod and universal wheel, mounting bracket is arranged on to be installed on case, and mounting bracket is provided with the interior spiral shell being adapted with screw rod
Pit, screw rod is connected by internal thread hole with mounting bracket, and universal wheel is arranged on screw rod lower end.
Preferably, rotating disk is installed on screw rod.
Preferably, turntable periphery is provided with elastic layer.
Preferably, installing removable installation on case has choke block, and the movement of choke block can block air exhaust duct or moisture is led
Enter pipe.
Preferably, part flow arrangement also includes that multiple second shunts post, and the second shunting post is located at heater and dust arrester
Between, the second shunting mast axis set gradually in the horizontal direction parallel to horizontal plane, and the second shunting post cross-sectional area is under
It is supreme gradually to increase.
Preferably, part flow arrangement also includes that multiple three shunt posts, the 3rd shunting post be located at air inlet pipe and dust arrester it
Between, and positioned at air delivery line and installation case connectivity part top, second shunts mast axis parallel to horizontal plane, and in the horizontal direction
Set gradually.
Preferably, the 3rd shunting post is cylinder.
In blower fan work, air can be entered by air inlet pipe to be installed in case the present invention, and passage can be effectively improved and removed
The utilization rate of dirt device, air is heated up after being filtered by dust arrester in the presence of heater, and part flow arrangement is conducive to
The utilization rate of dust arrester is improved, and is conducive to air thermally equivalent, portion gas can be discharged by blast pipe, one in addition
Divide gas to enter by moisture ingress pipe and remove wet tank, installation case is then returned to by air delivery line, air is dehumidified.This
Invention is easy to use, and air heats are more uniform, and drying effect is preferable.
Brief description of the drawings
Fig. 1 is a kind of hot-air blowing device structure schematic diagram with interior circulation dehumidification function proposed by the present invention.
Specific embodiment
Shown in reference picture 1, a kind of hot-air blowing equipment with interior circulation dehumidification function proposed by the present invention, including install
Case 1, air inlet pipe 2, blower fan 3, dust arrester 4, heater 5, part flow arrangement, desiccant body and blast pipe 8;
Air inlet pipe 2 is arranged on installs the bottom of case 1, and the exterior space of case 1 is installed in the connection of air inlet pipe 2, and air inlet pipe 2 is located at installs case
Part in 1 is provided with multiple passages, and dust arrester 4 is arranged on to be installed in case 1, and positioned at the top of air inlet pipe 2, heater
5 are arranged in installation case 1, and positioned at the top of dust arrester 4, heater 5 includes multiple spiral heating silks, part flow arrangement installation
Installing in case 1, part flow arrangement includes that multiple first shunts post 61, and the first shunting post 61 is located at the top of heater 5, first point
In horizontal plane, the first shunting post 61 sets gradually the diameter parallel of fluidization tower 61 in the horizontal direction, the first shunting cross-sectional area of post 61
Gradually increase from the bottom to top;Install and division board 11 is installed in case 1, division board 11 is located at the top of the first shunting post 61, division board
11 are provided with air guide through hole 111, and the air inlet of blower fan 3 connection air guide through hole 111, the gas outlet of blower fan 3 connection division board 11 top is empty
Between;
Desiccant body including moisture ingress pipe 71, except wet tank 72 and air delivery line 73, install by the connection of moisture ingress pipe 71
The inner chamber of case 1 is located at the top of division board 11, air delivery line with except wet tank 72 at moisture ingress pipe 71 and the installation inner space of case 1
73 connections are installed the inner chamber of case 1 and are located at air inlet pipe 2 and dust arrester 4 with the connectivity part of case 1 is installed with wet tank 72, air delivery line 73 is removed
Between;
Blast pipe 8 and the installation inner space of case 1, the top of division board 11 is located at blast pipe 8 and the installation inner space of case 1.
When blower fan 3 works, air can be entered by air inlet pipe 2 to be installed in case 1 present invention, and passage can be effectively improved
The utilization rate of dust arrester 4, air is heated up after being filtered by dust arrester 4 in the presence of heater 5, and part flow arrangement has
Beneficial to the utilization rate of raising dust arrester 4, and be conducive to air thermally equivalent, portion gas can be discharged by blast pipe 8, separately
Outer a part of gas is entered except wet tank 72 by moisture ingress pipe 71, is then returned by air delivery line 73 and is installed case 1, to sky
Gas is dehumidified.
In present embodiment, the hot-air blowing equipment with interior circulation dehumidification function also includes multiple lifting apparatus,
Lifting apparatus include mounting bracket 91, screw rod 92 and universal wheel 93, and mounting bracket 91 is arranged on to be installed on case 1, and mounting bracket 91 is provided with
The internal thread hole being adapted with screw rod 92, screw rod 92 is connected by internal thread hole with mounting bracket 91, and universal wheel is arranged on screw rod 92
Lower end, is provided with rotating disk 921 on screw rod 92, the periphery of rotating disk 921 is provided with elastic layer, and the present invention can be with according to whether mobile next
The position of universal wheel 93 is adjusted, the regulation of the position of universal wheel 93 only needs to rotate rotating disk 921 it is achieved that effectively facilitating this
The placement and stabilization movement of invention.
In present embodiment, installing removable installation on case 1 has choke block 12, and the movement of choke block 12 can block air exhaust
Pipe 8 or moisture ingress pipe 71, user can adjust air by moving choke block 12 and be led into the amount of blast pipe 8 and entrance
Enter the amount of pipe 71.
In present embodiment, part flow arrangement also includes that multiple second shunts post 62, and the second shunting post 62 is located at heater 5
And dust arrester 4 between, the second shunting diameter parallel of post 62 sets gradually in the horizontal direction in horizontal plane, the second shunting post
62 cross-sectional areas gradually increase from the bottom to top, and part flow arrangement also includes that the multiple 3rd shunts post 63, and the 3rd shunting post 63 is located at
Between air inlet pipe 2 and dust arrester 4, and positioned at air delivery line 73 and installation case 1 connectivity part top, the second shunting axis of post 62
Parallel to horizontal plane, and set gradually in the horizontal direction, the 3rd shunting post 63 is cylinder, by the second shunting post 62 and the 3rd
Shunting post 63 can further improve the utilization rate of dust arrester 4, and can effectively improve the effect of air thermally equivalent.
The above, the only present invention preferably specific embodiment, but protection scope of the present invention is not limited thereto,
Any one skilled in the art the invention discloses technical scope in, technology according to the present invention scheme and its
Inventive concept is subject to equivalent or change, should all be included within the scope of the present invention.
Claims (8)
1. a kind of hot-air blowing equipment with interior circulation dehumidification function, it is characterised in that:Including installing case (1), air inlet pipe
(2), blower fan (3), dust arrester (4), heater (5), part flow arrangement, desiccant body and blast pipe (8);
Air inlet pipe (2) installs case (1) exterior space installed in case (1) bottom, air inlet pipe (2) connection is installed, and air inlet pipe (2) is located at
Part in case (1) is installed and is provided with multiple passages, dust arrester (4) is interior installed in case (1) is installed, and positioned at air inlet pipe
(2) top, heater (5) is interior installed in case (1) is installed, and positioned at dust arrester (4) top, heater (5) is including more
Individual spiral heating silk, part flow arrangement is arranged on to be installed in case (1), and part flow arrangement includes that multiple first shunts post (61), first point
, positioned at heater (5) top, in horizontal plane, the first shunting post (61) is along water for first shunting post (61) diameter parallel for fluidization tower (61)
Square to setting gradually, first shunting post (61) cross-sectional area gradually increases from the bottom to top;Install in case (1) and isolation is installed
Plate (11), division board (11) is provided with air guide through hole (111), blower fan (3) positioned at the first shunting post (61) top, division board (11)
Air inlet connects air guide through hole (111), blower fan (3) gas outlet connection division board (11) upper space;
Desiccant body is including moisture ingress pipe (71), except wet tank (72) and air delivery line (73), moisture ingress pipe (71) connection
Case (1) inner chamber is installed and wet tank (72) is removed, is located on division board (11) at moisture ingress pipe (71) and installation case (1) inner space
Side, air delivery line (73) connection is installed case (1) inner chamber and is connected with case (1) is installed with wet tank (72), air delivery line (73) is removed
Place is located between air inlet pipe (2) and dust arrester (4);
Blast pipe (8) and installation case (1) inner space, division board (11) is located at blast pipe (8) and installation case (1) inner space
Top.
2. the hot-air blowing equipment with interior circulation dehumidification function according to claim 1, it is characterised in that:It is described to have
The hot-air blowing equipment of interior circulation dehumidification function also includes multiple lifting apparatus, and lifting apparatus include mounting bracket (91), screw rod
(92) and universal wheel (93), installed in installing on case (1), mounting bracket (91) is provided with and is adapted with screw rod (92) mounting bracket (91)
Internal thread hole, screw rod (92) is connected by internal thread hole with mounting bracket (91), and universal wheel is arranged on screw rod (92) lower end.
3. the hot-air blowing equipment with interior circulation dehumidification function according to claim 2, it is characterised in that:Screw rod (92)
On rotating disk (921) is installed.
4. the hot-air blowing equipment with interior circulation dehumidification function according to claim 3, it is characterised in that:Rotating disk
(921) periphery is provided with elastic layer.
5. the hot-air blowing equipment with interior circulation dehumidification function according to claim 1, it is characterised in that:Case is installed
(1) removable installation has choke block (12) on, and choke block (12) movement can block air exhaust duct (8) or moisture ingress pipe
(71)。
6. the hot-air blowing equipment with interior circulation dehumidification function according to claim 1, it is characterised in that:Part flow arrangement
Also include that multiple second shunt post (62), the second shunting post (62) between heater (5) and dust arrester (4), second
Shunting post (62) diameter parallel sets gradually in the horizontal direction in horizontal plane, and second shunting post (62) cross-sectional area is under
It is supreme gradually to increase.
7. the hot-air blowing equipment with interior circulation dehumidification function according to claim 1, it is characterised in that:Part flow arrangement
Also include that the multiple 3rd shunts post (63), the 3rd shunting post (63) is located between air inlet pipe (2) and dust arrester (4)
Air delivery line (73) and installation case (1) connectivity part top, second shunts post (62) diameter parallel in horizontal plane, and along level side
To setting gradually.
8. the hot-air blowing equipment with interior circulation dehumidification function according to claim 7, it is characterised in that:3rd shunting
Post (63) is cylinder.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611233839.5A CN106839745A (en) | 2016-12-28 | 2016-12-28 | A kind of hot-air blowing with interior circulation dehumidification function sets |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611233839.5A CN106839745A (en) | 2016-12-28 | 2016-12-28 | A kind of hot-air blowing with interior circulation dehumidification function sets |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106839745A true CN106839745A (en) | 2017-06-13 |
Family
ID=59114436
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611233839.5A Pending CN106839745A (en) | 2016-12-28 | 2016-12-28 | A kind of hot-air blowing with interior circulation dehumidification function sets |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106839745A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107864582A (en) * | 2017-11-10 | 2018-03-30 | 西藏世峰高科能源技术有限公司 | Electric automobile protection against the tide thermostatic type charging pile |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102353238A (en) * | 2011-08-01 | 2012-02-15 | 上海海事大学 | Intermittent type vacuum microwave drying device and method for processing core material of vacuum heat insulation plate by using intermittent type vacuum microwave drying device |
CN204787677U (en) * | 2015-06-19 | 2015-11-18 | 安徽国源电气有限公司 | Be convenient for remove hot -blast device that sweeps of multiple heating |
CN105344192A (en) * | 2015-11-05 | 2016-02-24 | 无锡新人居科贸有限公司 | Recyclable waste gas treatment device |
CN106091155A (en) * | 2016-08-04 | 2016-11-09 | 成都蜀尚星科技有限公司 | A kind of indoor air purification equipment |
-
2016
- 2016-12-28 CN CN201611233839.5A patent/CN106839745A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102353238A (en) * | 2011-08-01 | 2012-02-15 | 上海海事大学 | Intermittent type vacuum microwave drying device and method for processing core material of vacuum heat insulation plate by using intermittent type vacuum microwave drying device |
CN204787677U (en) * | 2015-06-19 | 2015-11-18 | 安徽国源电气有限公司 | Be convenient for remove hot -blast device that sweeps of multiple heating |
CN105344192A (en) * | 2015-11-05 | 2016-02-24 | 无锡新人居科贸有限公司 | Recyclable waste gas treatment device |
CN106091155A (en) * | 2016-08-04 | 2016-11-09 | 成都蜀尚星科技有限公司 | A kind of indoor air purification equipment |
Non-Patent Citations (2)
Title |
---|
中国轻工总会编: "《轻工业技术装备手册 (第5卷)》", 31 January 1998, 机械工业出版社 * |
黄翔主编: "《空调工程(2014.1)》", 31 January 2014, 机械工业出版社 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107864582A (en) * | 2017-11-10 | 2018-03-30 | 西藏世峰高科能源技术有限公司 | Electric automobile protection against the tide thermostatic type charging pile |
CN107864582B (en) * | 2017-11-10 | 2024-03-29 | 西藏世峰高科能源技术有限公司 | Dampproofing constant temperature formula fills electric pile of electric automobile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106758064A (en) | A kind of clothing intelligence dryer and method | |
CN207035346U (en) | A kind of high-efficiency dehumidifier | |
CN204757611U (en) | Novel grain dryer | |
CN107513850A (en) | The clothes airing machine of drying function | |
CN206992515U (en) | A kind of high-tension switch cabinet dehydrating unit | |
CN107611786A (en) | It is a kind of except the distribution box of moisture | |
CN206450054U (en) | A kind of hollow glass micropearl production, which is air-dried, uses circulating silica gel drying device | |
CN106440683B (en) | A kind of adjustable reversed bay-type efficient hot-air drying baker equipment in space | |
CN206160368U (en) | Curing chamber temperature control system | |
CN106839745A (en) | A kind of hot-air blowing with interior circulation dehumidification function sets | |
CN205037720U (en) | Energy -conserving baking house | |
CN202644231U (en) | Wardrobe | |
CN207021538U (en) | One kind is even to blow formula energy-saving power cabinet dehydrating unit | |
CN207391857U (en) | The clothes airing machine of drying function | |
CN205975071U (en) | Loosening heat setting machine | |
CN205808041U (en) | A kind of garment material production circulation drying device | |
CN215809912U (en) | Drying room | |
CN213811435U (en) | Drying device is used in mahogany furniture production | |
CN207525526U (en) | The clothes airing machine of drying function | |
CN207193626U (en) | A kind of drying unit | |
CN107576175A (en) | A kind of garment material production circulation drying device | |
CN209165976U (en) | A kind of PCB circuit board fast-drying device | |
CN102003869A (en) | Vertical double-cylinder drier | |
CN208504887U (en) | A kind of electric automatization drying room | |
CN206796809U (en) | A kind of mobile phone shell colored drawing machine wind-heat device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170613 |