CN106836252A - Tower crane combination precipitation pipe well forms the construction method of natural drainage and recycling - Google Patents

Tower crane combination precipitation pipe well forms the construction method of natural drainage and recycling Download PDF

Info

Publication number
CN106836252A
CN106836252A CN201710149041.0A CN201710149041A CN106836252A CN 106836252 A CN106836252 A CN 106836252A CN 201710149041 A CN201710149041 A CN 201710149041A CN 106836252 A CN106836252 A CN 106836252A
Authority
CN
China
Prior art keywords
tower crane
pipe well
pipeline
precipitation pipe
drainage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710149041.0A
Other languages
Chinese (zh)
Inventor
魏发利
石磊
孙则树
张冀
张进涛
徐洪函
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201710149041.0A priority Critical patent/CN106836252A/en
Publication of CN106836252A publication Critical patent/CN106836252A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B1/00Methods or layout of installations for water supply
    • E03B1/04Methods or layout of installations for water supply for domestic or like local supply
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B1/00Methods or layout of installations for water supply
    • E03B1/04Methods or layout of installations for water supply for domestic or like local supply
    • E03B1/041Greywater supply systems
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/30Relating to industrial water supply, e.g. used for cooling

Abstract

The invention discloses the construction method that a kind of tower crane combination precipitation pipe well forms natural drainage and recycling, mainly tower crane gully is built by laying bricks or stones by each tower crane side, be set with drainage pipeline networks couples together each tower crane gully, a pipeline is set on drainage pipeline networks to be connected with precipitation pipe well, one immersible pump is set in precipitation pipe well, build plash by laying bricks or stones by precipitation pipe well and the water pipe of immersible pump is placed in plash, spray system is set by plash, plash and spray system is connected by spray pipe network.The ponding at the low-lying place of tower crane can be cleverly discharged using the present invention, and the ponding to discharging, carry out that ground spray etc. is secondary to be used, both dredging for job site ponding had been met, waste water reuse is solved the problems, such as again simultaneously, is that a kind of tower crane ponding dredges very effective method with green construction.

Description

Tower crane combination precipitation pipe well forms the construction method of natural drainage and recycling
Technical field:
The present invention is to be related to building field, and more particularly to a kind of tower crane combination precipitation pipe well forms natural drainage and again The construction method for utilizing.
Background technology:
At present, as infrastructure develops, heavy buildings' projects indicate as urban construction and development, general large-scale room The project of building must have under ground portion, and site, underground garage, underground civil defense engineering are managed in such as underground, and above-mentioned engineering structure is basic All it is that, more than 3 meters of underground, what is had is even more more than 5 meters of underground, when underground structure reaches such depth, must be related to To the problem of underground water, precipitation will be as underground construction necessary program, and precipitation pipe well is also as essential in work progress Content.
In foundation construction early stage, first have to do is exactly the construction of tower crane, necessarily there is some building structure in design Part can launch under ground portion, and tower crane must be embedded in underground, the need for meeting construction lift.According to safety standard It is required that, tower crane is not allow to be immersed in water.Overwhelming majority unit in charge of construction solution is all utilized in tower crane at present Build a Fang Jing on base side by laying bricks or stones, then extract ponding out with water pump, this method can not in time discharge tower crane part mostly Ponding, and drainage effect is also bad, directly affects tower crane safety, meanwhile, the ponding of discharge does not have secondary utilization, makes Into the waste of water resource, it is also possible to permeate the ground again, engineering construction is influenceed again.
For above-mentioned situation, it is necessary to a kind of can effectively solve the problems, such as what tower crane ponding secondary to ponding can be utilized again Method.
The content of the invention:
The technical problem to be solved in the present invention is:A kind of tower crane combination precipitation pipe well is provided and forms natural drainage and again The construction method for utilizing, the ponding of tower crane part can be in time discharged using the present invention, and sharp again to the ponding of discharge With, construct simple, with low cost, can increase economic efficiency, safety can be simultaneously met and improved again and green construction quality will Ask.
A kind of tower crane combination precipitation pipe well of the present invention forms the construction method of natural drainage and recycling, including following Step:
A () is surveyed to the water level in the depth and well of precipitation pipe well, and carry out level measurement to tower crane cushion cap;
B () is built retaining wall to height by laying bricks or stones and is exceeded in the outside of each tower crane structure, positioned at tower crane cushion cap edge brick Ground, when building retaining wall by laying bricks or stones, a drain outlet is left in its bottom, after the completion of retaining wall is built by laying bricks or stones, draining is left in retaining wall Tower crane gully of the square and bottom less than tower crane cushion cap elevation of bottom is built on the outside of outlet side by laying bricks or stones, in tower crane Foundation drainage well is provided with two mouths of pipe, and a mouth of pipe is connected with the drain outlet of retaining wall, and another mouth of pipe is located at tower crane The bottom sidewall of foundation drainage well, the drainage pipeline networks with follow-up be set with is connected;
C () during be set with drainage pipeline networks, notes pipeline slope according to the tower crane cushion cap absolute altitude be set with drainage pipeline networks of measurement Degree, the pipeline of drainage pipeline networks is stretched into the mouth of pipe that is left on each tower crane gully and is firmly connected, while to drainage pipeline networks In each pipeline be also carried out fix;
D () sets a pipeline on drainage pipeline networks and is connected with precipitation pipe well side wall, the pipeline opening of the pipeline stretches into precipitation Pipe well;
E () builds plash by laying bricks or stones by precipitation pipe well and carries out the basic waterproof of plash, spray system is set by plash , with spray system be connected plash by setting spray pipe network by system;
F () places an immersible pump in precipitation pipe well, the outlet pipe of immersible pump is placed in plash.
Further, step (b) the retaining wall 30cm above ground level.
Further, the pipeline opening of the mouth of pipe left on each tower crane gully is stretched into the step (c) with stainless Steel wire is sealed.
Further, set a pipeline on drainage pipeline networks in the step (d) to be connected with precipitation pipe well side wall, the pipe The pipeline opening in road stretches into precipitation pipe well 5cm.
Further, the pipeline connected with precipitation pipe well side wall for being set on drainage pipeline networks in the step (d), the pipe Road is first bent downwardly horizontal curvature again between drainage pipeline networks and precipitation pipe well, and pipeline opening finally is stretched into precipitation pipe well.
Further, the pipeline connected with precipitation pipe well side wall for being set on drainage pipeline networks in the step (d), the pipe Road is first bent downwardly 500mm horizontal curvatures again between drainage pipeline networks and precipitation pipe well, and pipeline opening finally is stretched into precipitation pipe well.
Further, a float switch being connected with immersible pump is provided with the step (f) on precipitation pipe well inwall.
The present invention has advantages below:(1) easy, simple to operate, safe and reliable, effect of constructing is obvious;
(2) coupled together tower crane gully is ingenious with precipitation pipe well by reasonable Arrangement drainage pipeline networks, using slope Degree natural drainage, drainage effect significantly, makes the security of tower crane be guaranteed;(3) it is by setting plash and spray System, the secondary waste water utilizing that will be discharged, meets the quality requirement of green construction;(4) construction material is common materials, while again Can be to secondary waste water utilizing, with good economic benefit.
Brief description of the drawings
Fig. 1 is plane of the present invention and external channeling schematic diagram.
Fig. 2 is elevational schematic view of the invention.
Fig. 3 is another elevational schematic view of the invention.
In figure:1. the plash of 2. tower crane gully of tower crane cushion cap, 3. drainage pipeline networks, 4. tower crane structure 5. 6. the float switch of 7. precipitation pipe well of spray pipe network, 8. spray system, 9. retaining wall, 10. immersible pump 11..
Specific embodiment
In order to preferably explain the present invention, come in the present invention is furture elucidated with specific embodiment below in conjunction with the accompanying drawings Hold, but present disclosure is not limited only to following examples.
As depicted in figs. 1 and 2, a kind of tower crane combination precipitation pipe well forms the construction party of natural drainage and recycling Method, comprises the following steps:
A () is surveyed to the water level in the depth and well of precipitation pipe well 7, and carry out absolute altitude survey to tower crane cushion cap 1 Amount;
B () builds retaining wall 9 by laying bricks or stones in the outside of each tower crane structure 4, positioned at the edge brick of tower crane cushion cap 1 super to height Go out ground, when building retaining wall 9 by laying bricks or stones, a drain outlet is left in its bottom, after the completion of retaining wall 9 is built by laying bricks or stones, in leaving for retaining wall 9 Build tower crane gully 2 of the square and bottom less than the elevation of bottom of tower crane cushion cap 1 on the outside of drain outlet side by laying bricks or stones, Two mouths of pipe are provided with tower crane gully 2, a mouth of pipe is connected with the drain outlet of retaining wall 9, another mouth of pipe Positioned at the bottom sidewall of tower crane gully 2, it is connected with the drainage pipeline networks 3 of follow-up be set with;
C () during be set with drainage pipeline networks 3, notes pipeline according to the absolute altitude be set with drainage pipeline networks 3 of tower crane cushion cap 1 of measurement The gradient, the pipeline of drainage pipeline networks 3 is stretched into the mouth of pipe that is left on each tower crane gully 2 and is firmly connected, while to draining Each pipeline in pipe network 3 is also carried out fixing;
D () sets a pipeline on drainage pipeline networks 3 and is connected with the side wall of precipitation pipe well 7, the pipeline opening of the pipeline stretches into drop Water pipe manhole 7;
E () builds plash 5 by laying bricks or stones by precipitation pipe well 7 and carries out the basic waterproof of plash 5, spray is set on the side of plash 5 , with spray system 8 be connected plash 5 by setting spray pipe network 6 by pouring system 8;
F () places an immersible pump 10 in precipitation pipe well 7, the outlet pipe of immersible pump 10 is placed in plash 5.
The present invention builds tower crane of the bottom less than the elevation of bottom of tower crane cushion cap 1 by laying bricks or stones by the edge of tower crane cushion cap 1 Foundation drainage well 2, can make the ponding in tower crane because difference in height automatically flows into tower crane gully 2, then tower crane base Ponding in plinth gully 2 passes through in the inflow precipitation of drainage pipeline networks 3 pipe well 7, will by setting immersible pump 10 in precipitation pipe well 7 Water is evacuated in plash 5, is set spray system 8 and is coupled together by spray pipe network 6, realizes the secondary profit to discharging ponding With such as vehicle cleaning, the spray in lavatory flushing and greenery patches.The present invention has construction method simple, and effect is significant was both solved Problem, makes water resource be utilized again again, meets the quality requirement of green construction while improving security again, with very high Economic benefit.
Step (b) retaining wall 9 can be with 30cm above ground level.By the 30cm above ground level of retaining wall 9, mud can be effectively prevented Soil, crushed stone etc. are fallen into tower crane, make the drain outlet impeded drainage of retaining wall 9, product occur so as to cause tower crane Water, causes safety problem.
The pipeline opening that the mouth of pipe left on each tower crane gully 2 is stretched into the step (c) can use stainless steel wire Net sealing.The pipeline opening of the mouth of pipe that will be left on each tower crane gully 2 with stainless steel cloth seal, can prevent soil, Stone etc. blocks drainage pipeline networks 3, causes impeded drainage, and then tower crane part ponding, the peace of influence tower crane structure 4 is occurred Quan Xing.
A pipeline is set in the step d on drainage pipeline networks 3 to be connected with the side wall of precipitation pipe well 7, the pipeline of the pipeline Mouth can stretch into precipitation pipe well 7 5cm.A pipeline is set on drainage pipeline networks 3 to be connected with the side wall of precipitation pipe well 7, and this is managed The pipeline opening in road stretches into precipitation pipe well 7 5cm, advantage of this is that not interfering with being put into and extracting for immersible pump 10.
The pipeline connected with the side wall of precipitation pipe well 7 set on drainage pipeline networks 3 in the step (d), the pipeline is in row Horizontal curvature again can be first bent downwardly between grid 3 and precipitation pipe well 7, pipeline opening is finally stretched into precipitation pipe well 7.Will be On drainage pipeline networks 3 set the pipeline connected with the side wall of precipitation pipe well 7 between drainage pipeline networks 3 and precipitation pipe well 7 can first to It is lower to bend horizontal curvature again, pipeline opening is finally stretched into precipitation pipe well 7, advantage of this is that constituting a difference in height, ponding Precipitation pipe well 7 can all be flowed into, it is to avoid influence of the ponding to tower crane security.
The pipeline connected with the side wall of precipitation pipe well 7 set on drainage pipeline networks 3 in the step (d), the pipeline is in row 500mm horizontal curvatures again are first bent downwardly between grid 3 and precipitation pipe well 7, pipeline opening is finally stretched into precipitation pipe well 7.Will The pipeline connected with the side wall of precipitation pipe well 7 set on drainage pipeline networks 3 can be first between drainage pipeline networks 3 and precipitation pipe well 7 500mm horizontal curvatures again are bent downwardly, pipeline opening is finally stretched into precipitation pipe well 7, advantage of this is that constituting a 500mm Difference in height, ponding can all flow into precipitation pipe well 7 using this height fall, it is to avoid shadow of the ponding to tower crane security Ring.
A float switch 11 being connected with immersible pump 10 can be provided with the step (f) on the inwall of precipitation pipe well 7.If It is that, when the water in precipitation pipe well 7 reach a certain height, float switch 11 connects immersible pump 10 simultaneously will product to put float switch benefit Water is drained into plash 5, so can in time discharge ponding, it is to avoid the excessive recharge of the ponding of precipitation pipe well 7 enters in tower crane, makes Into potential safety hazard, meanwhile, the ponding of discharge can be used between carwash, flushing sanitation by spray system, pour green plant in time Quilt, waste water reuse, it is to avoid use other clean stagnant water resources, saving water resource.

Claims (7)

1. a kind of tower crane combination precipitation pipe well forms the construction method of natural drainage and recycling, it is characterised in that:Including Following steps:
A () is surveyed to the water level in the depth and well of precipitation pipe well (7), and carry out absolute altitude survey to tower crane cushion cap (1) Amount;
B () builds retaining wall (9) to height by laying bricks or stones in the outside of each tower crane structure (4) positioned at tower crane cushion cap (1) edge brick Beyond ground, when building retaining wall (9) by laying bricks or stones, a drain outlet is left in its bottom, after the completion of retaining wall (9) is built by laying bricks or stones, in retaining wall (9) tower crane of the square and bottom less than tower crane cushion cap (1) elevation of bottom is built in leave by laying bricks or stones on the outside of drain outlet side Foundation drainage well (2), is provided with the drain outlet of two mouths of pipe, a mouth of pipe and retaining wall (9) on tower crane gully (2) It is connected, another mouth of pipe is located at the bottom sidewall of tower crane gully (2), is connected with the drainage pipeline networks (3) of follow-up be set with;
C () during be set with drainage pipeline networks (3), notes pipe according to tower crane cushion cap (1) absolute altitude be set with drainage pipeline networks (3) of measurement The road gradient, the pipeline of drainage pipeline networks (3) is stretched into the mouth of pipe that is left on each tower crane gully (2) and is firmly connected, while Each pipeline in drainage pipeline networks (3) is also carried out to fix;
D () sets a pipeline on drainage pipeline networks (3) and is connected with precipitation pipe well (7) side wall, the pipeline opening of the pipeline stretches into drop Water pipe manhole (7);
E () builds plash (5) by laying bricks or stones and carries out the basic waterproof of plash (5) by precipitation pipe well (7), set by plash (5) Spray system (8) is put, plash (5) is connected with spray system (8) by setting spray pipe network (6);
F () places an immersible pump (10) in precipitation pipe well (7), the outlet pipe of immersible pump (10) is placed in plash (5).
2. a kind of tower crane combination precipitation pipe well forms the construction party of natural drainage and recycling according to claim 1 Method, it is characterised in that:Step (b) retaining wall (9) 30cm above ground level.
3. a kind of tower crane combination precipitation pipe well forms the construction party of natural drainage and recycling according to claim 1 Method, it is characterised in that:The pipeline opening of the mouth of pipe left on each tower crane gully (2) is stretched into the step (c) with stainless Steel wire is sealed.
4. a kind of tower crane combination precipitation pipe well forms the construction party of natural drainage and recycling according to claim 1 Method, it is characterised in that:A pipeline is set in the step (d) on drainage pipeline networks (3) to be connected with precipitation pipe well (7) side wall, The pipeline opening of the pipeline stretches into precipitation pipe well (7) 5cm.
5. a kind of tower crane combination precipitation pipe well forms the construction party of natural drainage and recycling according to claim 1 Method, it is characterised in that:The pipeline connected with precipitation pipe well (7) side wall set on drainage pipeline networks (3) in the step (d), The pipeline is first bent downwardly horizontal curvature again between drainage pipeline networks (3) and precipitation pipe well (7), and pipeline opening finally is stretched into precipitation Pipe well (7).
6. a kind of tower crane combination precipitation pipe well forms the construction party of natural drainage and recycling according to claim 5 Method, it is characterised in that:The pipeline connected with precipitation pipe well (7) side wall set on drainage pipeline networks (3) in the step (d), The pipeline is first bent downwardly 500mm horizontal curvatures again between drainage pipeline networks (3) and precipitation pipe well (7), finally stretches pipeline opening Enter precipitation pipe well (7).
7. a kind of tower crane combination precipitation pipe well forms the construction party of natural drainage and recycling according to claim 1 Method, it is characterised in that:A ball float being connected with immersible pump (10) is provided with the step (f) on precipitation pipe well (7) inwall to open Close (11).
CN201710149041.0A 2017-03-14 2017-03-14 Tower crane combination precipitation pipe well forms the construction method of natural drainage and recycling Pending CN106836252A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710149041.0A CN106836252A (en) 2017-03-14 2017-03-14 Tower crane combination precipitation pipe well forms the construction method of natural drainage and recycling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710149041.0A CN106836252A (en) 2017-03-14 2017-03-14 Tower crane combination precipitation pipe well forms the construction method of natural drainage and recycling

Publications (1)

Publication Number Publication Date
CN106836252A true CN106836252A (en) 2017-06-13

Family

ID=59143502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710149041.0A Pending CN106836252A (en) 2017-03-14 2017-03-14 Tower crane combination precipitation pipe well forms the construction method of natural drainage and recycling

Country Status (1)

Country Link
CN (1) CN106836252A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110318415A (en) * 2019-07-22 2019-10-11 中国一冶集团有限公司 Tower crane pre-embedded bolt anti-soaking method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03229978A (en) * 1990-02-01 1991-10-11 Fujita Corp Pumping/discharging control system
CN101705691A (en) * 2009-10-30 2010-05-12 南通建工集团股份有限公司 Construction method of dewatering well under foundation slab in foundation pit
CN102535488A (en) * 2012-03-13 2012-07-04 广东中城建设集团有限公司 Waterproof construction method and system for bottom plate of high-water-level basement
CN102677675A (en) * 2011-03-11 2012-09-19 中国建筑第四工程局有限公司 Tower crane foundation in building basement and manufacturing method of tower crane foundation
CN203947484U (en) * 2014-06-04 2014-11-19 中国建筑第二工程局有限公司 A kind of drainage of foundation pit and circulating water utilization system
CN204000919U (en) * 2014-07-31 2014-12-10 中建四局第五建筑工程有限公司 A kind of novel from drainage type tower-crane foundation structure
CN205382501U (en) * 2016-01-21 2016-07-13 中冶建工集团有限公司 Tower crane basis automatic drainage system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03229978A (en) * 1990-02-01 1991-10-11 Fujita Corp Pumping/discharging control system
CN101705691A (en) * 2009-10-30 2010-05-12 南通建工集团股份有限公司 Construction method of dewatering well under foundation slab in foundation pit
CN102677675A (en) * 2011-03-11 2012-09-19 中国建筑第四工程局有限公司 Tower crane foundation in building basement and manufacturing method of tower crane foundation
CN102535488A (en) * 2012-03-13 2012-07-04 广东中城建设集团有限公司 Waterproof construction method and system for bottom plate of high-water-level basement
CN203947484U (en) * 2014-06-04 2014-11-19 中国建筑第二工程局有限公司 A kind of drainage of foundation pit and circulating water utilization system
CN204000919U (en) * 2014-07-31 2014-12-10 中建四局第五建筑工程有限公司 A kind of novel from drainage type tower-crane foundation structure
CN205382501U (en) * 2016-01-21 2016-07-13 中冶建工集团有限公司 Tower crane basis automatic drainage system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110318415A (en) * 2019-07-22 2019-10-11 中国一冶集团有限公司 Tower crane pre-embedded bolt anti-soaking method

Similar Documents

Publication Publication Date Title
CN203947484U (en) A kind of drainage of foundation pit and circulating water utilization system
CN102418347B (en) Drainage construction method for blind drain and sump wells in deep foundation pit
CN102561402B (en) Treatment method for construction joint between top plate and wall of individual underground civil air defense project constructed by covered top-down excavation method
CN103046565B (en) Draining method for ultra-deep batholith deep foundation pit
CN106639180A (en) Rainwater collecting system for roof garden and construction method
CN103967015B (en) A kind of water seal for deep foundation pit excavation method and structure thereof
CN203049630U (en) Building foundation slab waterproof system
CN204080839U (en) A kind of Yield rainfall relation device
CN105756100B (en) Basement post-pouring zone system and preparation method thereof
CN207633496U (en) A kind of super large square sponge city Integral rain recycling system
CN109235911A (en) A kind of water-saving depositing dust construction method of construction site
CN106223351B (en) Self priming pump reduces local groundwater level construction method
CN106836252A (en) Tower crane combination precipitation pipe well forms the construction method of natural drainage and recycling
CN104328836B (en) A kind of environment-friendly type prefabricated pair of case deep hole type catch pit and construction method thereof
CN206477382U (en) Rainwater recycle comprehensively utilizes structure
CN109763552A (en) A kind of basis is dark to apply gravity type draining regeneration application system and its construction method
CN213204424U (en) Integrated intercepting well
CN108457340A (en) High-building construction washes pump water discharge recycling system
CN203795512U (en) Rainwater recycling device
CN106703157B (en) Construction method of rainwater recycling and comprehensive utilizing structure
CN204225257U (en) A kind of environment-friendly type prefabricated pair of case deep hole type catch pit
CN104863168A (en) Hydrophobic device on lower part of basic baseplate and usage method of same
CN203452433U (en) Slurry accident pool
CN109577464A (en) A kind of prefabricated wisdom Vatch basin
CN216552030U (en) Basement outer wall fat groove falls drainage structures

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170613