CN106835996B - The reinforcing bar moulding bed and construction method of construction bridges T beam - Google Patents

The reinforcing bar moulding bed and construction method of construction bridges T beam Download PDF

Info

Publication number
CN106835996B
CN106835996B CN201710163551.3A CN201710163551A CN106835996B CN 106835996 B CN106835996 B CN 106835996B CN 201710163551 A CN201710163551 A CN 201710163551A CN 106835996 B CN106835996 B CN 106835996B
Authority
CN
China
Prior art keywords
steelframe
net
reinforcing bar
main girder
moulding bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710163551.3A
Other languages
Chinese (zh)
Other versions
CN106835996A (en
Inventor
王阳松
谢逸敏
史文杰
赵国良
吴守远
白长江
施建兰
周静增
张海国
王妙荣
陈芳芳
赵国华
罗维
戴婷婷
徐建锋
毛利炎
陈可可
张平
戚兰兰
朱叶儿
章铭荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Albert Hangzhou Municipal Garden Construction Co Ltd
HANGZHOU XIAOHONG CONSTRUCTION GROUP Ltd
Zhejiang Quzhou Communications Construction Group Co Ltd
Original Assignee
Albert Hangzhou Municipal Garden Construction Co Ltd
HANGZHOU XIAOHONG CONSTRUCTION GROUP Ltd
Zhejiang Quzhou Communications Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Albert Hangzhou Municipal Garden Construction Co Ltd, HANGZHOU XIAOHONG CONSTRUCTION GROUP Ltd, Zhejiang Quzhou Communications Construction Group Co Ltd filed Critical Albert Hangzhou Municipal Garden Construction Co Ltd
Priority to CN201710163551.3A priority Critical patent/CN106835996B/en
Publication of CN106835996A publication Critical patent/CN106835996A/en
Application granted granted Critical
Publication of CN106835996B publication Critical patent/CN106835996B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention discloses a kind of reinforcing bar moulding bed of construction bridges T beam and construction methods, the moulding bed includes along Y shape steelframe (1), bottom steelframe (2) and longitudinal main girder steel (3), and longitudinal main girder steel (3) is integral by whole Y shape steelframes (1) and bottom steelframe (2) connection;Y shape steelframe (1) is equipped with upper positioning plate (4) and lower positioning plate (5), longitudinal main girder steel (3) is equipped with fishback (6), and a main girder steel in longitudinal direction (3) is fixed with abutment plate (8) through attachment beam (7);The key of this method are as follows: roof steel bar net is bound on reinforcing bar moulding bed, so that each longitudinal reinforcement of roof steel bar net, lateral tie all align accurately.The reinforcing bar moulding bed and construction method make that simple and convenient, time saving and energy saving, roof steel bar net each reinforcement location of operating process is accurate, roof steel bar net is high-quality, can accelerate construction progress, shorten the construction period, securely and reliably.

Description

The reinforcing bar moulding bed and construction method of construction bridges T beam
Technical field
The present invention relates to science of bridge building fields, are especially the reinforcing bar moulding bed and construction method of a kind of construction bridges T beam.
Background technique
T beam is one kind of science of bridge building central sill, is made of the web of the top plate on top and lower part, cross section be it is T-shaped, because And it gains the name.It is convenient for statement, introduce two orientation concepts, the length direction of the length direction of T beam also bridge be it is longitudinal, The width direction of T beam also bridge width direction be laterally.
The construction method of the construction of bridge T beam of the prior art is first to bind web reinforcement net, props up vertical web side template, sets up and fall Ground scaffold operating platform binds roof steel bar net on the operational platform, and installs the backform board mount of semi-finished product formula, and Roof plate template is set up on backform board mount, then the concrete of formed by integrally casting web and top plate, last tensioning maintenance.
The construction method of the construction of bridge T beam of the prior art suffers from the drawback that the process of binding roof steel bar net belongs to high-altitude Operation, when the assembling reinforcement of high-altitude, operating difficulties, each reinforcing bar contraposition inaccuracy, the steel mesh bound out is of poor quality, time-consuming and laborious, Construction speed is slow, long in time limit, quality safety is uncontrollable, moreover, high-altitude binding needs up to set up design of coupler scaffold from ground Operating platform, this just further increases the consumable quantity of steel tube fastener, further increases labor intensity, schedule delays.
Summary of the invention
The invention solves a technical problem be to provide it is a kind of can make operating process it is simple and convenient, it is time saving and energy saving, top Each reinforcement location of plate steel mesh is accurate, roof steel bar net is high-quality, can accelerate construction progress, shorten the construction period, securely and reliably Construction bridges T beam reinforcing bar moulding bed.
The technical solution of the invention is as follows, provides a kind of reinforcing bar moulding bed of construction bridges T beam with flowering structure, it is wrapped The Y shape steelframe being parallel to each other and the main girder steel of the one-to-one bottom steelframe of Y shape steelframe and longitudinal direction of longitudinally spaced laying are included, often A Y shape steelframe is fixed on corresponding bottom steelframe, and longitudinal main girder steel connects whole Y shape steelframes with bottom steelframe integral;Each Y It is equipped with positioning plate and lower positioning plate on two cant beams of shaped steel frame, is equipped with opening upwards on upper positioning plate and lower positioning plate Locating notch, longitudinal main girder steel are equipped with fishback, and a main girder steel in longitudinal direction is fixed with parallel with longitudinal main girder steel through attachment beam Abutment plate.
Another technical problem to be solved by the present invention is that providing, a kind of operating process is simple and convenient, time saving and energy saving, top plate steel Each reinforcement location of muscle net is accurate, roof steel bar net is high-quality, can accelerate construction progress, shorten the construction period, securely and reliably, and Web reinforcement net and roof steel bar net or even web and top plate be firmly combined using reinforcing bar moulding bed of the invention come construction bridges T The method of beam.
Another technical solution of the invention be to provide it is a kind of using reinforcing bar moulding bed of the invention come construction bridges T beam Method, it includes following construction procedure:
A, web reinforcement net is bound, and is fixed with vertical cable wire in the online welded sleeve of web reinforcement, sleeve, and is vertical Web reinforcement net is stretched out on cable wire top, then props up vertical web side template;
B, roof steel bar net is bound on reinforcing bar moulding bed, wherein by the every longitudinal reinforcement of a upper row for roof steel bar net It is shelved in the locating notch of the upper positioning plate of each Y shape steelframe, every longitudinal reinforcement of the next row of roof steel bar net is put It sets in the locating notch of the lower positioning plate of each Y shape steelframe, the per pass lateral tie of roof steel bar net is stuck in fishback two In the gap of adjacent fingers, and by the side of per pass lateral tie in abutment plate against alignment;
C, the backform board mount of semi-finished product is installed, and sets up roof plate template on backform board mount, then will be bound The lifting of roof steel bar net it is in place, and by vertical cable wire top stretch out the part of web reinforcement net and roof steel bar net bind it is solid It is fixed;
D, the concrete of formed by integrally casting web and top plate, last tensioning maintenance.
The reinforcing bar moulding bed of construction bridges T beam of the present invention and using the reinforcing bar moulding bed come the method for construction bridges T beam and existing There is technology to compare, there is following remarkable advantage and beneficial effect.
Firstly, since reinforcing bar moulding bed is placed in ground, so binding roof steel bar net no longer needs high altitude operation, this With regard to convenient process of binding, the risk of operation is reduced, and Ground Operation can ensure that each reinforcing bar contraposition is accurate, improve behaviour Make the quality constructed, and without up setting up steel tube fastener formula operating platform from ground, further convenient operation reduces labour Intensity is accelerated speed of application, is shortened the construction period;When especially with reinforcing bar moulding bed assembling reinforcement net, whole upper row longitudinal direction steel Muscle is all shelved in the locating notch of upper positioning plate of Y shape reinforcing bar, and the positioning that next placing of reinforcement is then shelved on lower positioning plate lacks In mouthful, and per pass lateral tie is then stuck in the gap of two comb teeth of fishback, and the side of whole lateral ties all with abutment plate Alignment is pushed against, so, each reinforcing bar, the stirrup of steel mesh all align accurately, which improves the binding quality of steel mesh, into And improve the integral strength of last molding T beam;Due also to cable wire is fixed in web reinforcement net, and cable wire upper end and top The binding of plate steel mesh, therefore the connection and globality of web reinforcement net and roof steel bar net are strengthened, effectively increase the secured of T beam Degree and stability.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the reinforcing bar moulding bed of construction bridges T beam of the present invention.
Fig. 2 is sectional structure signal when being constructed using reinforcing bar moulding bed of the invention come the method for construction bridges T beam Figure.
As shown in the figure 1, Y shape steelframe, 1.1, cant beam, 1.2, middle standing pillar, 2, bottom steelframe, 2.1, bottom cross beam, 2.2, edge-on Column, 3, longitudinal main girder steel, 4, upper positioning plate, 5, lower positioning plate, 6, fishback, 7, attachment beam, 8, abutment plate, 9, web reinforcement Net, 10, sleeve, 11, cable wire, 12, web side template, 13, roof steel bar net, 13.1, longitudinal reinforcement, 13.2, lateral tie, 14, roof plate template.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings and specific examples.
As shown in Figure 1 and Figure 2, the reinforcing bar moulding bed of construction bridges T beam of the present invention, it includes the phase of longitudinally spaced laying Mutually parallel Y shape steelframe 1 and the one-to-one bottom steelframe 2 of Y shape steelframe 1 and longitudinal main girder steel 3.Each Y shape steelframe 1 is fixed on On corresponding bottom steelframe 2, longitudinal main girder steel 3 connects whole Y shape steelframes 1 and bottom steelframe 2 integral.
More specifically, each Y shape steelframe 1 includes middle standing pillar 1.2 and is fixed on 1.2 top of middle standing pillar and right Claim outer two cant beams 1.1 chosen.And each bottom steelframe 2 is made of a foundation crossbeam 2.1 and two heel posts 2.2, bottom cross beam 2.1 Both ends are fixed with two heel posts, 2.2 bottom end respectively.The bottom end of each 1 middle standing pillar 1.2 of Y shape steelframe is fixed on the bottom of bottom steelframe 2 Among crossbeam 2.1.The top of every heel post 2.2 and the lower wing plate of the main girder steel 3 in a longitudinal direction are fixed, every 1.1 outer end of cant beam It is fixed on the inside of the web of the main girder steel 3 in a longitudinal direction.
It is equipped with positioning plate 4 and lower positioning plate 5 on two cant beams 1.1 of each Y shape steelframe 1, above-mentioned positioning plate is equipped with The locating notch of opening upwards, longitudinal main girder steel 3 are equipped with longitudinal fishback 6, and the main girder steel 3 in a longitudinal direction is solid through attachment beam 7 Surely there is the abutment plate 8 parallel with longitudinal main girder steel 3.
As shown in Figure 1 and Figure 2, using reinforcing bar moulding bed of the invention come the method for construction bridges T beam, step includes.
A, web reinforcement net 9, and the welded sleeve 10 on web reinforcement net 9 are bound, is fixed with vertical cable wire in sleeve 10 11, and web reinforcement net 9 is stretched out on vertical 11 top of cable wire, then props up vertical web side template 12;In the step, sleeve 10 and cable wire 11 There are multiple groups, every group of sleeve 10 and cable wire 11 are longitudinally spaced layings.
B, roof steel bar net 13 is bound on reinforcing bar moulding bed, wherein by the every longitudinal direction of a upper row for roof steel bar net 13 Reinforcing bar 13.1 is shelved in the locating notch of the upper positioning plate 4 of each Y shape steelframe 1, by the every of the next row of roof steel bar net 13 Root longitudinal reinforcement 13.1 is shelved in the locating notch of the lower positioning plate 5 of each Y shape steelframe 1, by the per pass of roof steel bar net 13 Lateral tie 13.2 is stuck in the gap of 6 liang of adjacent fingers of fishback, and by the side of per pass lateral tie 13.2 in abutment plate 8 Against alignment.
C, the backform board mount of semi-finished product is installed, and sets up roof plate template 14 on backform board mount, it then will binding Good roof steel bar net 13 lifts in place, and will stretch out web reinforcement with fixed 11 top of vertical cable wire of web reinforcement net 9 The part of net 9 and 13 binding and fixing of roof steel bar net.
D, the concrete of formed by integrally casting web and top plate, last tensioning maintenance.

Claims (2)

1. a kind of reinforcing bar moulding bed of construction bridges T beam, it is characterised in that: it includes being parallel to each other for longitudinally spaced laying Y shape steelframe (1) is fixed with Y shape steelframe (1) one-to-one bottom steelframe (2) and longitudinal main girder steel (3), each Y shape steelframe (1) On corresponding bottom steelframe (2), longitudinal main girder steel (3) is integral by whole Y shape steelframes (1) and bottom steelframe (2) connection;Each Y Positioning plate (4) and lower positioning plate (5), upper positioning plate (4) and lower positioning plate are equipped on two cant beams (1.1) of shaped steel frame (1) (5) locating notch of opening upwards is equipped on, longitudinal main girder steel (3) is equipped with fishback (6), a main girder steel in longitudinal direction (3) The abutment plate (8) parallel with longitudinal main girder steel (3) is fixed with through attachment beam (7).
2. step includes: using reinforcing bar moulding bed described in claim 1 come the method for construction bridges T beam
A, web reinforcement net (9) are bound, and the welded sleeve (10) on web reinforcement net (9), is fixed in sleeve (10) vertical Cable wire (11), and web reinforcement net (9) are stretched out on vertical cable wire (11) top, then prop up vertical web side template (12);
B, roof steel bar net (13) are bound on reinforcing bar moulding bed, wherein by the every longitudinal direction of a upper row for roof steel bar net (13) Reinforcing bar (13.1) is shelved in the locating notch of the upper positioning plate (4) of each Y shape steelframe (1), will be under roof steel bar net (13) The every longitudinal reinforcement (13.1) of one row is shelved in the locating notch of the lower positioning plate (5) of each Y shape steelframe (1), by top plate The per pass lateral tie (13.2) of steel mesh (13) is stuck in the gap of (6) two adjacent fingers of fishback, and per pass is laterally bound round The side of muscle (13.2) is in abutment plate (8) against alignment;
C, the backform board mount of semi-finished product is installed, and sets up roof plate template (14) on backform board mount, then will be bound Roof steel bar net (13) lifting it is in place, and vertical cable wire (11) top is stretched out to part and the top plate of web reinforcement net (9) Steel mesh (13) binding and fixing;
D, the concrete of formed by integrally casting web and top plate, last tensioning maintenance.
CN201710163551.3A 2017-03-20 2017-03-20 The reinforcing bar moulding bed and construction method of construction bridges T beam Active CN106835996B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710163551.3A CN106835996B (en) 2017-03-20 2017-03-20 The reinforcing bar moulding bed and construction method of construction bridges T beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710163551.3A CN106835996B (en) 2017-03-20 2017-03-20 The reinforcing bar moulding bed and construction method of construction bridges T beam

Publications (2)

Publication Number Publication Date
CN106835996A CN106835996A (en) 2017-06-13
CN106835996B true CN106835996B (en) 2018-12-28

Family

ID=59129225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710163551.3A Active CN106835996B (en) 2017-03-20 2017-03-20 The reinforcing bar moulding bed and construction method of construction bridges T beam

Country Status (1)

Country Link
CN (1) CN106835996B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08165611A (en) * 1994-12-14 1996-06-25 Fujisen Kyoryo Doboku Kk Reinforcement assembling support member and construction method of bridge using this support member
JP2014224342A (en) * 2013-04-19 2014-12-04 株式会社進興 Support of pc steel material in prc bridge girder
CN204875544U (en) * 2015-08-14 2015-12-16 中国葛洲坝集团第六工程有限公司 T type roof beam pterygoid lamina reinforcing bar fetal membrane
CN205116018U (en) * 2015-06-29 2016-03-30 中交一公局第一工程有限公司 T roof beam reinforcement makes up bed -jig
CN105735136A (en) * 2016-03-24 2016-07-06 浙江大学城市学院 Box girder top plate steel bar integral forming formwork and construction method
CN205382420U (en) * 2016-01-13 2016-07-13 浙江省交通工程建设集团有限公司 Whole mould of making of T roof beam framework of steel reinforcement
CN106400690A (en) * 2016-09-30 2017-02-15 中交路桥华南工程有限公司 Manufacturing method of reinforcing steel bar section and adjustable reinforcing steel bar section splitting jig frame thereof
CN206616463U (en) * 2017-03-20 2017-11-07 浙江省衢州市交通建设集团有限公司 The reinforcing bar moulding bed of construction bridges T beams

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08165611A (en) * 1994-12-14 1996-06-25 Fujisen Kyoryo Doboku Kk Reinforcement assembling support member and construction method of bridge using this support member
JP2014224342A (en) * 2013-04-19 2014-12-04 株式会社進興 Support of pc steel material in prc bridge girder
CN205116018U (en) * 2015-06-29 2016-03-30 中交一公局第一工程有限公司 T roof beam reinforcement makes up bed -jig
CN204875544U (en) * 2015-08-14 2015-12-16 中国葛洲坝集团第六工程有限公司 T type roof beam pterygoid lamina reinforcing bar fetal membrane
CN205382420U (en) * 2016-01-13 2016-07-13 浙江省交通工程建设集团有限公司 Whole mould of making of T roof beam framework of steel reinforcement
CN105735136A (en) * 2016-03-24 2016-07-06 浙江大学城市学院 Box girder top plate steel bar integral forming formwork and construction method
CN106400690A (en) * 2016-09-30 2017-02-15 中交路桥华南工程有限公司 Manufacturing method of reinforcing steel bar section and adjustable reinforcing steel bar section splitting jig frame thereof
CN206616463U (en) * 2017-03-20 2017-11-07 浙江省衢州市交通建设集团有限公司 The reinforcing bar moulding bed of construction bridges T beams

Also Published As

Publication number Publication date
CN106835996A (en) 2017-06-13

Similar Documents

Publication Publication Date Title
CN102418386B (en) Reinforced concrete prefabricated integrally-cast building structure system and construction method thereof
CN102322101A (en) Construction method for formed steel reinforced concrete beam-column nodes
CN106884541B (en) Positioning assembly, positioning device and positioning method for reserved dowel bars in shear wall
CN103088942A (en) Building structure without form removal
CN110965474A (en) Construction method of cable tower cross beam
CN102418425A (en) Prefabrication integral casting building structure system with cast-in-site haunched beams, and construction method for prefabrication integral casting building structure system
CN102605883A (en) Light steel joist partition connecting structure and construction method thereof
CN106835996B (en) The reinforcing bar moulding bed and construction method of construction bridges T beam
CN206616463U (en) The reinforcing bar moulding bed of construction bridges T beams
CN109083401A (en) The template erection method and formwork structure of cylinder beam and frame girder connection
CN106639328B (en) Concrete beam steel reinforcement framework construction device and construction method
CN109773960B (en) Multi-size assembled T-beam tooth block steel bar pre-binding device
CN101392558B (en) Steel column free type steel beam joint construction process
CN208685450U (en) Steel girder bridge assembling support system
CN110713104A (en) Super-long and super-large reinforcement cage processing device, hoisting device and hoisting method
CN103921347B (en) Precast T-Beam floor reinforcing bar, prestress pipe are fixed draw and insert-type and are installed mould bases
CN207296399U (en) Continuous placing is molded overall assembled stair template system
CN101294420A (en) Construction method for special structure layer of cone bottom wheat-immersion
CN216587693U (en) Floor skeleton and floor
CN212919870U (en) Rack for binding prefabricated box girder bottom plate web steel reinforcement frameworks
CN210827109U (en) Arc-shaped stepped cable tower cross beam side template
CN203765784U (en) Fixed drawing-inserting type installing mould frame for prefabricated T-beam rib plate reinforcing steel bar and pre-stressed pipeline
KR101615118B1 (en) Rahmen bridge construction method using temporary support member and tendon and the rahmen bridge therewith
CN208899862U (en) Formwork structure for cylinder beam and Vierendeel girder node construction
CN111890549A (en) Rack for binding prefabricated box girder bottom plate web steel reinforcement frameworks

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant