CN106827399B - On-board clamping head assembly of plastic ring injection mold - Google Patents

On-board clamping head assembly of plastic ring injection mold Download PDF

Info

Publication number
CN106827399B
CN106827399B CN201611164042.4A CN201611164042A CN106827399B CN 106827399 B CN106827399 B CN 106827399B CN 201611164042 A CN201611164042 A CN 201611164042A CN 106827399 B CN106827399 B CN 106827399B
Authority
CN
China
Prior art keywords
clamping head
clamping
product
plastic ring
chuck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611164042.4A
Other languages
Chinese (zh)
Other versions
CN106827399A (en
Inventor
刘亚良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Longyou Precision Parts Manufacturing Co ltd
Original Assignee
Jiangsu Longyou Precision Parts Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Longyou Precision Parts Manufacturing Co ltd filed Critical Jiangsu Longyou Precision Parts Manufacturing Co ltd
Priority to CN201611164042.4A priority Critical patent/CN106827399B/en
Publication of CN106827399A publication Critical patent/CN106827399A/en
Application granted granted Critical
Publication of CN106827399B publication Critical patent/CN106827399B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/26Moulds
    • B29C45/2602Mould construction elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/38Cutting-off equipment for sprues or ingates
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/40Removing or ejecting moulded articles
    • B29C45/42Removing or ejecting moulded articles using means movable from outside the mould between mould parts, e.g. robots

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Mechanical Engineering (AREA)
  • Robotics (AREA)
  • Moulds For Moulding Plastics Or The Like (AREA)
  • Injection Moulding Of Plastics Or The Like (AREA)

Abstract

The application discloses a board-mounted chuck assembly of a plastic ring injection mold, which is attached to the tail end of an automatic mechanical arm for discharging finished products of injection molding equipment, and is characterized in that: the on-board clamping head assembly comprises a bottom plate and more than two clamping jaw units connected to the bottom plate, wherein any clamping jaw unit is provided with a rubber mouth clamping head corresponding to the center of the plastic ring and a product clamping head corresponding to the side wall of the plastic ring, and the clamping head buses of all parts are connected with a controller of injection molding equipment in time sequence. The die-withdrawing unit for the injection molding equipment, which is applied to the on-board chuck assembly, has the beneficial effects that: the injection molding part is clamped by the rubber mouth clamping head and the product clamping head in a time sequence, so that clamping damage of the clamping head to an unsecured and shaped product in the early stage of die withdrawal is effectively avoided, automatic rubber cutting of the product is realized by dislocation of the two clamping heads, and the product discharging efficiency is greatly improved.

Description

On-board clamping head assembly of plastic ring injection mold
Technical Field
The present disclosure relates to mold designs, and more particularly, to a chuck assembly for ejecting an injection molded part applied to a plastic ring.
Background
The injection molding process is a preferable process capable of meeting the processing production of various nonstandard special-shaped parts, and has the remarkable advantages of one-step molding and large-scale production compared with the traditional cutting and milling operation modes. Of course, to increase productivity, particularly for plastic rings of relatively small gauge size, such products are typically produced by one-mold, multi-cavity injection molding.
In the traditional one-die multi-cavity injection molding process, the product is usually taken directly with a glue channel in the process of die withdrawal, die withdrawal and part removal are carried out, and the finished product discharging of the plastic ring can be completed only by carrying out manual sorting and glue cutting operation. And the die is directly withdrawn for discharging, so that the products are disordered, and the loss of the die cavity cannot be tracked and positioned to timely overhaul the die.
Disclosure of Invention
In view of the defects in the prior art, the application aims to provide an on-board chuck assembly of a plastic ring injection mold, which solves the problems of mold withdrawal, glue cutting and material separation and pickup of multi-cavity injection molding pieces.
The aim of the application is achieved by the following technical scheme: the utility model provides a plastics ring injection mold's on-board chuck subassembly, attaches in the automatic mechanical arm tail end of injection molding equipment finished product ejection of compact, its characterized in that: the on-board clamping head assembly comprises a bottom plate and more than two clamping jaw units connected to the bottom plate, wherein any clamping jaw unit is provided with a rubber mouth clamping head corresponding to the center of the plastic ring and a product clamping head corresponding to the side wall of the plastic ring, and the clamping head buses of all parts are connected with a controller of injection molding equipment in time sequence.
Further, three rows and four columns of matrix clamping jaw units are arranged on the bottom plate, and each clamping jaw unit is independently controlled by the clamping and releasing action of the controller.
Further, the end parts of the rubber port chucks are provided with gyro-shaped bulges, and each rubber port chuck is controlled to radially shrink and clamp a casting part positioned at the center of the plastic ring, or controlled to radially expand and release the casting part.
Further, the body of the product chuck is positioned and attached to the bottom plate, and the product chuck is controlled to clamp the plastic ring to move forward and backward in the axial direction, so that a height difference is formed between the product chuck and the rubber mouth chuck.
The die-withdrawing unit for the injection molding equipment, which is applied to the on-board chuck assembly, has the beneficial effects that: the injection molding part is clamped by the rubber mouth clamping head and the product clamping head in a time sequence, so that clamping damage of the clamping head to an unsecured and shaped product in the early stage of die withdrawal is effectively avoided, automatic rubber cutting of the product is realized by dislocation of the two clamping heads, and the product discharging efficiency is greatly improved.
Drawings
Fig. 1 is a schematic perspective view of an on-board chuck assembly according to the present application.
Fig. 2 is an enlarged partial schematic view of the on-board chuck assembly of fig. 1.
Detailed Description
The following detailed description of the embodiments of the present application is provided with reference to the accompanying drawings, so that the technical scheme of the present application can be understood and mastered more easily.
The application relates to a plate-mounted chuck assembly of a plastic ring injection mold, which aims at the weak condition of the design of a multi-cavity injection mold withdrawal and extraction mechanism, and solves the problems of withdrawal, glue cutting and material separation and extraction of multi-cavity injection molding parts.
Fig. 1 and 2 are schematic perspective views and partially enlarged schematic views of an on-board chuck assembly according to the present application. The on-board chuck assembly is attached to the tail end of an automatic mechanical arm for discharging finished products of injection molding equipment (the tail end is not shown because the part has a complex structure and does not relate to the core of the application), and is mainly used for automatically clamping the plastic ring products after mold opening under the control of the mechanical arm, thereby releasing manpower and improving the production operation efficiency. From the general structural features, the on-board chuck assembly comprises a bottom plate 1 and more than two clamping jaw units 2 connected to the bottom plate, wherein any clamping jaw unit 2 is provided with two parts of a glue mouth chuck 21 corresponding to the center of a plastic ring and a product chuck 22 corresponding to the side wall of the plastic ring, and the chuck buses of the parts are connected with a controller (not shown in conventional configuration) of the injection molding equipment in time sequence. The two chucks are controlled by the controller to sequentially carry out clamping actions, so that the residual operation of the formed product after discharging is completed.
As can be seen from the illustrated embodiment, three rows of four columns of matrix 12 jaw units 2 are provided on the base plate 1, each jaw unit being independently controlled by the controller clamping action. The corresponding mold in this example is a multi-cavity injection mold with a single mold and two sets of 12 plastic rings. Of course, the on-board chuck assembly can also be correspondingly changed according to the number and the positions of the mold cavities and the shape change of the injection molding product, but two sets of chucks which are respectively clamped for the glue mouth and the product are reserved.
From the respective function of the two chucks, the end 211 of the aforementioned glue-mouth chuck 21 is provided as a top-shaped bulge, each of which is controlled to radially contract, grip the casting 31 positioned in the centre of the plastic ring 3, or to radially expand and release the casting. The glue mouth chuck is a multi-rod gathering chuck, and the end part is provided with a limit structure for preventing the casting part from further travel.
The body of the product chuck 22 is fixed by being attached to the base plate 1 through a adapting base 221, and the product chuck 22 can also be controlled to clamp the plastic ring to move forward and backward axially, so as to form a height difference with the rubber-mouth chuck. Because the connection point between the casting part and the product is formed to be very thin and narrow in the design process of the mould, when the product chuck moves forward and backward, the connection point can be twisted off naturally, and automatic glue cutting is realized.
As can be seen from the description of the embodiments with reference to the drawings, the beneficial effects of the application of the on-board clamping head assembly of the present application to the mold withdrawing unit of the injection molding apparatus are as follows: the injection molding part is clamped by the rubber mouth clamping head and the product clamping head in a time sequence, so that clamping damage of the clamping head to an unsecured and shaped product in the early stage of die withdrawal is effectively avoided, automatic rubber cutting of the product is realized by dislocation of the two clamping heads, and the product discharging efficiency is greatly improved.
The application has various embodiments, and all technical schemes formed by equivalent transformation or equivalent transformation fall within the protection scope of the application.

Claims (2)

1. The utility model provides a plastics ring injection mold's on-board chuck subassembly, attaches in the automatic mechanical arm tail end of injection molding equipment finished product ejection of compact, its characterized in that: the on-board clamping head assembly comprises a bottom plate and more than two clamping jaw units connected to the bottom plate, wherein any clamping jaw unit is provided with a rubber mouth clamping head corresponding to the center of the plastic ring and a product clamping head corresponding to the side wall of the plastic ring, the end parts of the rubber mouth clamping heads are arranged to be top-shaped bulges, and each rubber mouth clamping head is controlled to radially shrink and clamp a pouring part positioned at the center of the plastic ring or controlled to radially expand and release the pouring part; the body of the product chuck is positioned and attached to the bottom plate, the product chuck is controlled to clamp the plastic ring to move forward and backward in the axial direction, a height drop is formed between the product chuck and the rubber mouth chuck, and the buses of all the chuck parts are connected with the controller of the injection molding equipment in time sequence.
2. The plastic ring injection mold on-board clip assembly of claim 1, wherein: and three rows of four rows of matrix clamping jaw units are arranged on the bottom plate, and each clamping jaw unit is independently controlled by the clamping and releasing action of the controller.
CN201611164042.4A 2016-12-16 2016-12-16 On-board clamping head assembly of plastic ring injection mold Active CN106827399B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611164042.4A CN106827399B (en) 2016-12-16 2016-12-16 On-board clamping head assembly of plastic ring injection mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611164042.4A CN106827399B (en) 2016-12-16 2016-12-16 On-board clamping head assembly of plastic ring injection mold

Publications (2)

Publication Number Publication Date
CN106827399A CN106827399A (en) 2017-06-13
CN106827399B true CN106827399B (en) 2023-11-24

Family

ID=59140158

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611164042.4A Active CN106827399B (en) 2016-12-16 2016-12-16 On-board clamping head assembly of plastic ring injection mold

Country Status (1)

Country Link
CN (1) CN106827399B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202412628U (en) * 2012-01-17 2012-09-05 东莞市伯朗特自动化科技有限公司 Jig taking-out device
CN104890201A (en) * 2015-05-22 2015-09-09 亿和精密工业(苏州)有限公司 Reclaiming device
CN205395047U (en) * 2016-03-02 2016-07-27 东江精创注塑(深圳)有限公司 A get an anchor clamps automatically for cyclic annular injection moulding product
CN205800031U (en) * 2016-07-14 2016-12-14 惠州联韵声学科技股份有限公司 A kind of blanking mechanical hand tool
CN206357557U (en) * 2016-12-16 2017-07-28 苏州工业园区协利塑胶有限公司 A kind of onboard chuck component of plastic hoop injection mold

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202412628U (en) * 2012-01-17 2012-09-05 东莞市伯朗特自动化科技有限公司 Jig taking-out device
CN104890201A (en) * 2015-05-22 2015-09-09 亿和精密工业(苏州)有限公司 Reclaiming device
CN205395047U (en) * 2016-03-02 2016-07-27 东江精创注塑(深圳)有限公司 A get an anchor clamps automatically for cyclic annular injection moulding product
CN205800031U (en) * 2016-07-14 2016-12-14 惠州联韵声学科技股份有限公司 A kind of blanking mechanical hand tool
CN206357557U (en) * 2016-12-16 2017-07-28 苏州工业园区协利塑胶有限公司 A kind of onboard chuck component of plastic hoop injection mold

Also Published As

Publication number Publication date
CN106827399A (en) 2017-06-13

Similar Documents

Publication Publication Date Title
CN202336981U (en) Secondary demoulding mechanism of pull rod of injection mould
CN201881517U (en) Injection mold
CN203031870U (en) Lens double-ejection mold assembly
CN201784137U (en) Injection die
CN106827399B (en) On-board clamping head assembly of plastic ring injection mold
CN203472072U (en) Banana-shaped gate structure
CN202764141U (en) Pent-roof die structure
CN202388722U (en) Injection mold capable of automatically removing nozzle
CN207044564U (en) A kind of mould for being easy to grip glue frame
CN210705872U (en) Injection mold for internal thread part
CN204687276U (en) A kind of quick-replaceable ejector pin mechanism on injection mould
CN204546959U (en) Automatic Break Gate Structure
CN208841739U (en) Back-off production of plastics parts mold with secondary ejecting mechanism
CN202862462U (en) Mould with secondary ejecting mechanism
CN202462876U (en) Demolding mechanism with rubber ring flaring mold
CN206357557U (en) A kind of onboard chuck component of plastic hoop injection mold
CN110091479A (en) A kind of back-off loose-core injection mould
CN218700995U (en) Device for demoulding injection molding product
CN210969742U (en) A mould structure that is used for accurate car brake system to use filter injection molding
CN209176064U (en) A kind of mold that screwed tooth structure takes off by force
CN204526018U (en) Delayed goring mould
CN206765271U (en) One kind injection diel
CN202572824U (en) Injection molding mould for processing long and thin push rod
CN219213931U (en) Die carrier capable of assisting stripping
CN203092940U (en) Mould for injection moulding of product with spiral groove in centre hole

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20230928

Address after: No.19 Qiliang Road, Danyang Economic Development Zone, Zhenjiang City, Jiangsu Province

Applicant after: Jiangsu Longyou Precision Parts Manufacturing Co.,Ltd.

Address before: 215122 No. 12, Litang East Road, Weiting Town, Suzhou Industrial Park, Jiangsu Province

Applicant before: SUZHOU INDUSTRIAL PARK XIELI PLASTIC Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant