CN106827345A - Lamination conveyer belt continuous calendering moulding process and device - Google Patents

Lamination conveyer belt continuous calendering moulding process and device Download PDF

Info

Publication number
CN106827345A
CN106827345A CN201710008521.5A CN201710008521A CN106827345A CN 106827345 A CN106827345 A CN 106827345A CN 201710008521 A CN201710008521 A CN 201710008521A CN 106827345 A CN106827345 A CN 106827345A
Authority
CN
China
Prior art keywords
canvas
band
cloth storage
draw
gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710008521.5A
Other languages
Chinese (zh)
Other versions
CN106827345B (en
Inventor
许应周
李松峰
王瑞典
李军
李辉
冯艳
武涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KAIFENG IRON TOWER RUBBER (GROUP) CO Ltd
Original Assignee
KAIFENG IRON TOWER RUBBER (GROUP) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KAIFENG IRON TOWER RUBBER (GROUP) CO Ltd filed Critical KAIFENG IRON TOWER RUBBER (GROUP) CO Ltd
Priority to CN201710008521.5A priority Critical patent/CN106827345B/en
Publication of CN106827345A publication Critical patent/CN106827345A/en
Application granted granted Critical
Publication of CN106827345B publication Critical patent/CN106827345B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/22Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor of articles of indefinite length
    • B29C43/24Calendering
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/22Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor of articles of indefinite length
    • B29C43/30Making multilayered or multicoloured articles
    • B29C43/305Making multilayered articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/32Component parts, details or accessories; Auxiliary operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/32Component parts, details or accessories; Auxiliary operations
    • B29C43/58Measuring, controlling or regulating
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29LINDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
    • B29L2029/00Belts or bands

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Treatment Of Fiber Materials (AREA)

Abstract

The present invention proposes a kind of lamination conveyer belt continuous calendering moulding process and device, complex procedures, poor hygienic, production discontinuous problem when solving lamination conveyer belt production in the prior art.The present invention includes leading open-shelf and accesses band; also include being arranged on splicer, toe-out force measuring device, deviation correcting device and the draw-gear for leading open-shelf rear by production-line arrangement; draw-gear rear has been sequentially arranged four-roll calender, backward pull protection device, cooling roller device and coiling machine; canvas cloth storage device is disposed between toe-out force measuring device, deviation correcting device, the first adhesive plaster cloth storage device is there also is provided between cooling roller device and coiling machine, draw-gear is laminated and the second adhesive plaster cloth storage device.Canvas calendering is covered glue, identical tension lamination, laminating side glue and the continuously shaped completion of upper and lower rubber cover by the present invention, reduce the turnover and carrying of production process and material, reduce the hidden danger of quality in production process, production operation personnel are reduced, the automaticity and labor productivity of production is improve.

Description

Lamination conveyer belt continuous calendering moulding process and device
Technical field
The present invention relates to conveying belt forming field, more particularly to a kind of lamination apron fabric calendering, lamination, laminating side Glue, upper and lower rubber cover continuous forming process of fitting.
Background technology
Traditional lamination conveying belt forming process route is to roll canvas and rubber cover on calender respectively, is batched standby With, after rubberizing canvas will be rolled on forming machine by technological requirement lamination, fitted on forming machine or calender side glue and laminating Upper and lower rubber cover is made semi-finished product band embryo.Complex procedures in this technique, work consuming takes, and pilot process batches calendering adhesive plaster and glue Need a large amount of shields, craft sanitary during piece it is difficult to ensure that, hidden danger of quality is more.
The content of the invention
The present invention proposes a kind of lamination conveyer belt continuous calendering moulding process and device, solves lamination in the prior art defeated Complex procedures, poor hygienic, production discontinuous problem when sending band to produce.
The technical proposal of the invention is realized in this way:A kind of lamination conveyer belt continuous calendering shaped device, including lead out Frame and band is accessed, also include being arranged on splicer, toe-out force measuring device, the deviation correcting device for leading open-shelf rear by production-line arrangement And draw-gear, draw-gear rear has been sequentially arranged four-roll calender, backward pull protection device, cooling roller device and has batched Machine, is disposed with canvas cloth storage device between toe-out force measuring device, deviation correcting device, be there also is provided between cooling roller device and coiling machine First adhesive plaster cloth storage device, laminate draw-gear and the second adhesive plaster cloth storage device.
The band that accesses includes that be arranged between toe-out force measuring device, deviation correcting device first accesses band, also including setting Between cooling roller device, coiling machine second is put to access band, the 3rd access band and the 4th and access band.
The canvas cloth storage device includes cloth storage machine frame, and cloth storage machine frame is provided with upper roller group, bottom roller group and middle disk roller, There are upper bend wheel and lower bend wheel on cloth storage machine frame sidepiece.
Backward pull protection device includes protective cradle, and expansion bracket is fixed with protective cradle, and expansion bracket is provided with flexible dress Put, retractor device drives left regulation wheel to move up and down, and left regulation wheel both sides are respectively provided with a contact roller.
A kind of lamination conveyer belt continuous calendering moulding process, realizes in the following manner:
(1)Glue is covered in canvas top and bottom, and canvas calendering covers glue and passes through canvas, leads start, splicer, toe-out force measuring device, canvas Cloth storage device, deviation correcting device, draw-gear enter the four-roll calender of S types, and covering glue simultaneously to canvas top and bottom obtains covering rubberized canvas, Splicer is used to couple together on the canvas of interruption;
(2)Laminate and obtain being molded belt carcass, cover rubberized canvas and access band, cooling roller device by the 5th, the first adhesive plaster cloth storage device, laminate Draw-gear, into the second adhesive plaster cloth storage device, after the second adhesive plaster cloth storage device storage cloth reaches production requirement length, draws adhesive plaster, Band is accessed by the 3rd, into draw-gear is laminated, two-layer canvas is completed and is laminated, the completion of the second adhesive plaster cloth storage device is entered back into afterwards Ground floor canvas laminates shaping, circulates successively repeatedly, reaches after production requirement canvas laminates the number of plies, is crimped onto on coiling machine, complete Into belt carcass shaping;
(3)Semi-finished product band embryo forming, will shaping belt carcass be arranged on lead start on, by toe-out force measuring device, first access band, Deviation correcting device, draw-gear, roller releasing device are covered with lower rubber cover work into completion squish lip glue, calendering after S type four-roll calenders Skill, obtains semi-finished product band embryo;
(4)Semi-finished product band embryo by the 5th access band, backward pull protection device, cooling roller device, second access with, the 3rd access Band, the 4th access band, are crimped onto on coiling machine and complete semi-finished product band embryo forming.
Canvas calendering is covered glue, identical tension lamination, laminating side glue and the continuously shaped completion of upper and lower rubber cover by the present invention, is reduced The turnover and carrying of production process and material, reduce the hidden danger of quality in production process, reduce production operation personnel, improve The automaticity and labor productivity of production.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is structural representation of the invention.
Fig. 2 is the structural representation of canvas cloth storage device.
Fig. 3 is the structural representation of backward pull protection device.
Fig. 4 is to cover glue and laminate schematic flow sheet.
Fig. 5 is semi-finished product band embryo schematic flow sheet.
Wherein:1. open-shelf is led, 2. toe-out force measuring device, 3. splicer, 4. canvas cloth storage device, 4-1. cloth storage machines Disk roller in the middle of frame, 4-2. upper roller groups, 4-3., 4-4. bottom roller groups, the upper bend wheels of 4-5., bend wheel under 4-6., 5. Deviation correcting device, 6. draw-gear, 7. four-roll calender, 8. support roller device, 9. the 5th accesses band, 10. backward pull protection dress Put, 10-1. protective cradles, 10-2. contact rollers, 10-3. retractor devices, 10-4. left regulation wheels, 10-5. expansion brackets, 11. Cooling roller device, 12. first adhesive plaster cloth storage devices, 13. first access band, and 14. laminate draw-gear, and 15. the 3rd access band, 16. second adhesive plaster cloth storage devices, 17. the 4th access band, 18. coiling machines, and 19. second access band.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not paid Embodiment, belongs to the scope of protection of the invention.
As shown in Fig. 1 ~ 3, a kind of lamination conveyer belt continuous calendering shaped device, including lead open-shelf 1 and access band, in addition, The present invention also is included being arranged on splicer 3, toe-out force measuring device 2, the deviation correcting device 5 for leading the rear of open-shelf 1 by production-line arrangement With draw-gear 6, the rear of draw-gear 6 has been sequentially arranged four-roll calender 7, backward pull protection device 10, cooling roller device 11 With coiling machine 18, canvas cloth storage device 4 is disposed between toe-out force measuring device 2, deviation correcting device 5, cooling roller device 11 and batch The first adhesive plaster cloth storage device 12 is there also is provided between machine 18, the adhesive plaster cloth storage device 16 of draw-gear 14 and second is laminated.
The band that accesses includes that be arranged between toe-out force measuring device 2, deviation correcting device 5 first accesses band 13, also wraps Include second be arranged between cooling roller device 11, coiling machine 18 access band the 19, the 3rd access band 15 and the 4th access band 17.
As shown in Fig. 2 the canvas cloth storage device 4 includes that cloth storage machine frame 4-1, cloth storage machine frame 4-1 are provided with upper roller group 4- 2nd, bottom roller group 4-4 and middle disk roller 4-3, there is upper bend wheel 4-5 and lower bend wheel 4-6 on cloth storage machine frame 4-1 sidepieces.Due to sail Cloth is not continuous, often saves canvas 200 ~ 300 and grows, therefore be provided with splicer 3 and realize two connections of canvas, in splicer work During work, can temporarily cease and convey canvas backward, it is possible to cause subsequent technique to suspend, in order to avoid this phenomenon, this Invention is provided with canvas cloth storage device 4, and canvas as long as possible can be stored in limited space, when splicer works Wait, the enough subsequent techniques of canvas of canvas cloth storage device storage are used, and so prevent shutdown from causing the phenomenon that shows money or valuables one carries unintentionally so that production Continuity is strong, and quality is good.
First adhesive plaster cloth storage device 12, the second adhesive plaster cloth storage device 16 structure it is identical with canvas cloth storage device 4.
As shown in figure 3, backward pull protection device 10 includes protective cradle 10-1, expansion bracket is fixed with protective cradle 10-1 10-5, expansion bracket 10-5 are provided with retractor device 10-3, and retractor device 10-3 drives left regulation wheel 10-4 to move up and down, left regulation wheel 10-4 both sides are respectively provided with a contact roller 10-2.In actual production, the elastic of canvas can change, excessively pine or tension meeting Influence product quality, this when drives left regulation wheel 10-4 to move by retractor device 10-3, can adjust the elastic of canvas, institute It can be oil cylinder etc. to state retractor device 10-3.
Lamination conveyer belt continuous calendering moulding process of the invention, realizes in the following manner:(1)Canvas top and bottom Glue is covered, as shown in figure 4, B is moved towards to for canvas, canvas calendering covers glue and passes through canvas, leads start 1, the measurement of splicer 3, forward pull Device 2, canvas cloth storage device 4, deviation correcting device 5, draw-gear 6 enters S types four-roll calender 7, and glue is covered simultaneously to canvas top and bottom Obtain covering rubberized canvas, splicer 3 is used to couple together on the canvas of interruption;
(2)Laminate and obtain being molded belt carcass, cover rubberized canvas and access band 9, cooling roller device 11, the first adhesive plaster cloth storage device by the 5th 12nd, draw-gear 14 is laminated, into the second adhesive plaster cloth storage device 16, production requirement length is reached in the storage cloth of the second adhesive plaster cloth storage device 16 Afterwards, adhesive plaster is drawn, band 15 is accessed by the 3rd, into draw-gear 14 is laminated, completed two-layer canvas and laminate, the is entered back into afterwards Two adhesive plaster cloth storage device 16 completes ground floor canvas and laminates shaping, circulates successively repeatedly, reaches after production requirement canvas laminates the number of plies, It is crimped onto on coiling machine 18, completes belt carcass shaping;
(3)Semi-finished product band embryo forming, as shown in figure 5, A is moved towards to cover adhesive tape core, shaping belt carcass is arranged on and is led in start 1, Band 13, deviation correcting device 5, draw-gear 6, roller releasing device 8 are accessed by toe-out force measuring device 2, first enter S type four-roll calendarings Squish lip glue, calendering are completed after machine 7 and is covered with lower covering adhesive process, obtain semi-finished product band embryo;
(4)Semi-finished product band embryo by the 5th access band 9, backward pull protection device 10, cooling roller device 11, second access band 19, 3rd accesses band the 15, the 4th accesses band 17, is crimped onto on coiling machine 18 and completes semi-finished product band embryo forming.

Claims (5)

1. a kind of lamination conveyer belt continuous calendering shaped device, including lead open-shelf(1)With access band, it is characterised in that:By production Line arrangement also includes being arranged on leading open-shelf(1)The splicer at rear(3), toe-out force measuring device(2), deviation correcting device(5)With lead Leading-in device(6), draw-gear(6)Rear has been sequentially arranged four-roll calender(7), backward pull protection device(10), chill roll dress Put(11)And coiling machine(18), toe-out force measuring device(2), deviation correcting device(5)Between be disposed with canvas cloth storage device(4), cooling Roller arrangement(11)And coiling machine(18)Between there also is provided the first adhesive plaster cloth storage device(12), laminate draw-gear(14)With the second glue Cloth cloth storage device(16).
2. lamination conveyer belt continuous calendering shaped device according to claim 1, it is characterised in that:The band that accesses includes It is arranged on toe-out force measuring device(2), deviation correcting device(5)Between first access band(13), also including being arranged on chill roll dress Put(11), coiling machine(18)Between second access band(19), the 3rd access band(15)Band is accessed with the 4th(17).
3. lamination conveyer belt continuous calendering shaped device according to claim 1, it is characterised in that:The canvas cloth storage device (4)Including cloth storage machine frame(4-1), cloth storage machine frame(4-1)It is provided with upper roller group(4-2), bottom roller group(4-4)With middle disk roller (4-3), cloth storage machine frame(4-1)There is upper bend wheel on sidepiece(4-5)With lower bend wheel(4-6).
4. lamination conveyer belt continuous calendering shaped device according to claim 1, it is characterised in that:Backward pull protection device (10)Including protective cradle(10-1), protective cradle(10-1)On be fixed with expansion bracket(10-5), expansion bracket(10-5)It is provided with Retractor device(10-3), retractor device(10-3)Drive left regulation wheel(10-4)Move up and down, left regulation wheel(10-4)Both sides are respectively provided with One contact roller(10-2).
5. a kind of lamination conveyer belt continuous calendering moulding process, it is characterised in that realize in the following manner:
(1)Glue is covered in canvas top and bottom, and canvas calendering covers glue and passes through canvas, leads start(1), splicer(3), toe-out force measuring device (2), canvas cloth storage device(4), deviation correcting device(5), draw-gear(6)Into the four-roll calender of S types(7), to canvas top and bottom Simultaneously glue is covered to obtain covering rubberized canvas, splicer(3)For the canvas of interruption to be coupled together;
(2)Laminate and obtain being molded belt carcass, cover rubberized canvas and access band by the 5th(9), cooling roller device(11), the first adhesive plaster storage cloth Device(12), laminate draw-gear(14), into the second adhesive plaster cloth storage device(16), in the second adhesive plaster cloth storage device(16)Storage cloth reaches life After product requires length, adhesive plaster is drawn, band is accessed by the 3rd(15), into laminating draw-gear(14), complete two-layer canvas and fold Pressure, enters back into the second adhesive plaster cloth storage device afterwards(16)Complete ground floor canvas and laminate shaping, circulate successively repeatedly, reaching production will After asking canvas to laminate the number of plies, coiling machine is crimped onto(18)On, complete belt carcass shaping;
(3)Semi-finished product band embryo forming, shaping belt carcass is arranged on and leads start(1)On, by toe-out force measuring device(2), first Access band(13), deviation correcting device(5), draw-gear(6), roller releasing device(8)Into S type four-roll calenders(7)Extruding is completed afterwards Side glue, calendering are covered with lower covering adhesive process, obtain semi-finished product band embryo;
(4)Semi-finished product band embryo accesses band by the 5th(9), backward pull protection device(10), cooling roller device(11), second access Band(19), the 3rd access band(15), the 4th access band(17), it is crimped onto coiling machine(18)Upper completion semi-finished product band embryo forming.
CN201710008521.5A 2017-01-05 2017-01-05 Lamination conveyer belt continuous calendering moulding process and device Active CN106827345B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710008521.5A CN106827345B (en) 2017-01-05 2017-01-05 Lamination conveyer belt continuous calendering moulding process and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710008521.5A CN106827345B (en) 2017-01-05 2017-01-05 Lamination conveyer belt continuous calendering moulding process and device

Publications (2)

Publication Number Publication Date
CN106827345A true CN106827345A (en) 2017-06-13
CN106827345B CN106827345B (en) 2019-01-22

Family

ID=59117002

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710008521.5A Active CN106827345B (en) 2017-01-05 2017-01-05 Lamination conveyer belt continuous calendering moulding process and device

Country Status (1)

Country Link
CN (1) CN106827345B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110171089A (en) * 2019-05-09 2019-08-27 江阴市勤力橡塑机械有限公司 A kind of tire calendering technology
CN113334729A (en) * 2021-06-05 2021-09-03 河北安耐胶带有限公司 Four-roller calendering device and production process for laminated conveyor belt covered with welting adhesive

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102642313A (en) * 2012-05-10 2012-08-22 北京化工大学 Rubber sheet lamination composite production line and sheet producing method thereof
CN203125828U (en) * 2013-03-21 2013-08-14 开封铁塔橡胶(集团)有限公司 Cloth storing device for four-roll calendering production line
CN103963328A (en) * 2013-02-01 2014-08-06 李继刚 Production technology for conveying belt with each edge covered by two rubber strips
CN104339680A (en) * 2014-09-29 2015-02-11 山西德邦橡胶制品有限公司 Double-surface rubber sticking production line of belt core
CN104925575A (en) * 2015-06-23 2015-09-23 浙江双箭橡胶股份有限公司 Canvas core conveying belt production device and method
CN106006155A (en) * 2016-07-01 2016-10-12 江苏太平橡胶股份有限公司 Equally-dividing and winding device for cord fabric frictioning

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102642313A (en) * 2012-05-10 2012-08-22 北京化工大学 Rubber sheet lamination composite production line and sheet producing method thereof
CN103963328A (en) * 2013-02-01 2014-08-06 李继刚 Production technology for conveying belt with each edge covered by two rubber strips
CN203125828U (en) * 2013-03-21 2013-08-14 开封铁塔橡胶(集团)有限公司 Cloth storing device for four-roll calendering production line
CN104339680A (en) * 2014-09-29 2015-02-11 山西德邦橡胶制品有限公司 Double-surface rubber sticking production line of belt core
CN104925575A (en) * 2015-06-23 2015-09-23 浙江双箭橡胶股份有限公司 Canvas core conveying belt production device and method
CN106006155A (en) * 2016-07-01 2016-10-12 江苏太平橡胶股份有限公司 Equally-dividing and winding device for cord fabric frictioning

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110171089A (en) * 2019-05-09 2019-08-27 江阴市勤力橡塑机械有限公司 A kind of tire calendering technology
CN113334729A (en) * 2021-06-05 2021-09-03 河北安耐胶带有限公司 Four-roller calendering device and production process for laminated conveyor belt covered with welting adhesive
CN113334729B (en) * 2021-06-05 2022-08-23 河北安耐胶带有限公司 Four-roller calendering device and production process for laminated conveyor belt covered with welting adhesive

Also Published As

Publication number Publication date
CN106827345B (en) 2019-01-22

Similar Documents

Publication Publication Date Title
CN106827345A (en) Lamination conveyer belt continuous calendering moulding process and device
CN211843299U (en) Full-automatic three-drum forming machine special for wide base tire
CN101767451A (en) Combined embossing technology and equipment of polyvinyl chloride (PVC) sheet
CN214821081U (en) Automatic bonding linkage device for carcass reinforcing layer
CN101966941B (en) Doubling hot pack device of belted layer and doubling hot pack production process
CN105235247B (en) Cord rolls up double-station unwinding equipment
CN102173069B (en) Radial tire full-automatic flexible production method (TRS)
CN111016240B (en) Zero-degree winding storage system and storage method
CN217435072U (en) Tread rubber feeding device
CN211843300U (en) Steel wire crown belt unwinding device
CN208326409U (en) A kind of conveyer belt made-up belt molding laminating apparatus
CN204209982U (en) The two-sided rubberizing production line of belt carcass
CN205112443U (en) Engineering meridian child make -up machine
CN104210214A (en) Elevator box body sheet material bonding production automatic assembly line
CN217553195U (en) Extrusion, glue application and cutting integrated machine for wirecord fabric
CN112936676A (en) Nylon sheet base band drum type vulcanization hot-pressing cooling preparation device
CN215039583U (en) Film unwinding trolley
CN110978590A (en) Steel wire crown belt unwinding system and unwinding method thereof
CN211843301U (en) Winding storage device for zero-degree winding
CN205381780U (en) Automatic lap joint apparatus for producing
CN105667052B (en) Vehicle sheet material is compound to cut on line production system
CN211892086U (en) PE paper winding device applied to zero-degree winding device
CN204914633U (en) One section make -up machine on tire and have its tire forming device
CN215325978U (en) Device for laminating steel wire wrapping cloth by light-weight secondary forming machine
CN220390315U (en) Online corona device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant