The assemble method of ladle turret top revolving support assembly
Technical field
The invention belongs to installing construction method, more particularly, to a kind of group of the revolving support of Con casting ladle panoramic table
Dress method.
Background technology
It in existing continuous casting is most also generally pass of the most frequently used carrying steel ladle to be cast that ladle turret is
Key plant equipment, ladle turret is arranged on the top of conticaster casting position, is the transfer of the receiving with the casting that are connected molten steel
Equipment, when ladle turret is installed, generally, need to can just be carried out always component thereon after ground is assembled into part
Dress, wherein, the part of the top revolving support assembly of ladle turret is various, due to the top revolving support of ladle turret
The trailing arm (support arm) arranged in 180 degree carried on assembly, structure is more special, and coordinated is needed during assembling, assembles difficulty
Larger, less efficient, assembly precision is the emphasis of control.
At present, the data of the assemble method of the top revolving support assembly on ladle turret is not yet retrieved.
The content of the invention
The purpose of the present invention proposes a kind of group of ladle turret top revolving support assembly aiming above mentioned problem
Dress method, it is safe and reliable, improve assembly schedule, precision, it is ensured that quality, reduces cost.
The object of the present invention is achieved like this:A kind of assembling side of ladle turret top revolving support assembly
Method, because the ladle turret top revolving support assembly includes left support abutment 3, right support abutment 4, bearing pin 6, end cap 7, front support arm
8th, rear support arm 9 and pretectum 12, back header 13, it is characterized in that:During assembling, the special tooling for installing bearing pin 6 is employed, used
Double crane synchronous synergetics liftings, the assemble method of the ladle turret top revolving support assembly, its construction procedure is as follows:
The first, assembly platform is set, left and right bearing is in place:(see Fig. 1)
Will before assembling ladle turret top revolving support assembly (hereinafter referred to as top revolving support assembly)
Assembly platform is set, and the assembly platform is according to design or the mattess or the rectangle steel construction of level of job site
Platform 1, described mattess can be normal concrete ground, and described steel structure platform 1 can be welded with shaped steel and steel plate
Set up and form, described shaped steel can be the shaped steel of H350, the length x width of described steel structure platform 1 can for 8000 ㎜~
12000 ㎜ × 8000 ㎜, this steel structure platform 1 is set up firmly, acceptance(check);
On mattess or steel structure platform 1, left support abutment 3 and right support abutment 4 are lifted into place and symmetrical, interval
Set, according to the absolute altitude of the design requirement on drawing, spacing centering it is complete after, left support abutment 3 base and right support abutment 4 base it
Between limited support 2 is fixedly installed, it is correct to ensure the spacing between left support abutment 3 and the base of right support abutment 4 and center, it is ensured that follow-up
The stabilization of assembling and the precision of assembling;
2nd, the cleaning of equipment component and the preparation of frock:
Get out install the special tooling of bearing pin 6, the special tooling is the supporting plate 5 of circular arc of the one end with flanged plate,
Described supporting plate 5 can cut open system and form with seamless steel pipe in decile, and described supporting plate 5 can be 530 ㎜ × 12 with diameter × wall thickness
The seamless steel pipe quartering of ㎜ is made;(explanation:The special tooling separately applies for utility model patent, so herein not
It is explained in detail);
Bearing pin 6, end cap 7, front support arm 8 and rear support arm 9 are transported on mattess or steel structure platform 1, to pin
The protection grease on the surface of axle 6 is cleaned, and the part for checking end cap 7 whether there is shortcoming, to left support abutment 3, right support abutment 4, front support arm 8
Cleaned with the protection grease on the pin shaft hole on rear support arm 9, after cleaning is finished, each pin shaft hole, bearing pin 6 are using clear
Clean plastic sheeting is covered;
3rd, top revolving support assembly is assembled:(see Fig. 2, Fig. 3)
It is first that each supporting plate 5 corresponds to pin shaft hole (the i.e. bearing on the left support abutment 3 and right support abutment 4 respectively by special tooling
Hole) end face bottom, it is fixed after bearing pin 6 is placed on each supporting plate 5, using crane I 10 and crane II 11 respectively by front support arm
8th, rear support arm 9 is synchronous slings, and described crane I 10 and crane II 11 can be common 25t truck cranes, by the front support arm 8, after
Support arm 9 (is staggeredly overlappingly corresponded to correspond to insertion left support abutment 3 and right support abutment 4 with being gently overlapping in i.e. on left support abutment 3
Inserting front support arm 8, rear support arm 9, corresponds to inserting front support arm 8, rear support arm 9 with being also overlapping on right support abutment 4),
After after front support arm 8, the stabilization of rear support arm 9, the correspondence of bearing pin 6 that will be placed on each supporting plate 5 is elapsed, inserted into left support abutment 3, right branch
In pin shaft hole on seat 4, front support arm 8, rear support arm 9, after the inserting of each bearing pin 6 is finished, then corresponding installation end cap 7, then, profit
Correspond to crane I 10 and the synchronous pretectum 12 of slinging of crane II 11, back header 13 and respectively installed in two front support arms 8 and two
On individual rear support arm 9, the revolving support assembly assembling of ladle turret top is finished, and removes crane I 10 and crane II 11.
The assemble method of ladle turret top revolving support assembly proposed by the invention has the advantages that:
The work installed in high-altitude is transferred on ground or platform to be carried out, safe and reliable, reduces and avoid high-altitude work
The danger that industry is brought;
Time-consuming, ground packaging efficiency is improved, convenient and swift;
Assembly precision control is obvious, the either control for installing quality and spacing center of bearing pin, can reach design rule
The requirement of model.
Ladle turret top revolving support assembly assemble method proposed by the invention, improves safe effect, plus
Fast construction speed, it is ensured that construction precision, improves comprehensive benefit, low cost, efficiency high, practical.
Assembling in conjunction with drawings and Examples to ladle turret top revolving support assembly proposed by the invention
Method is further described.
Brief description of the drawings
Fig. 1 is left support abutment 3, the right support abutment 4 in ladle turret top revolving support assembly proposed by the invention
Assemble schematic diagram in place
Fig. 2 is the part 8 in ladle turret top revolving support assembly proposed by the invention:Front support arm, part 9:
Rear support arm and part 3:The assembling schematic diagram of left support abutment
Fig. 3 is the assembling schematic diagram of ladle turret top revolving support assembly proposed by the invention
In Fig. 1, Fig. 2, Fig. 1:
1st, platform 2, limited support 3, left support abutment 4, right support abutment 5, supporting plate 6, bearing pin 7, end cap 8, front support arm
9th, rear support arm 10, crane I 11, crane II 12, pretectum 13, back header
Specific embodiment (embodiment)
The assemble method of ladle turret top revolving support assembly proposed by the present invention, is used in certain four steel for 2012
Supporting continuous casting project is rolled, is 300 tons of installations of ladle turret top revolving support assembly, construction procedure is as follows:
One:The setting of assembly platform and bearing are in place:
1. by the use of job site length × a width of 10m × 10m normal concrete ground as assembly platform (1);
2. left support abutment (3) and right support abutment (4) are hung to and are placed on assembly platform (1) respectively, according on design drawing
Absolute altitude, the requirement centering of spacing finish, be welded between the base of left support abutment (3) and right support abutment (4) and add limited support
(2);
2nd, the cleaning of equipment component and the preparation of frock:
1. as shown in Fig. 2 corresponding to mounting pin in the end face outside of left support abutment (3) and the bearing hole of right support abutment (4) respectively
The position of axle (6), installs special tooling;I.e. one end carries the supporting plate (5) of the circular arc of flanged plate, the supporting plate (5) of the circular arc
With diameter × wall thickness by the seamless steel pipe quartering of 530 ㎜ × 12 ㎜ is made;
2. check another, the part of end cap (7), cleaning bearing pin (6) and left support abutment (3), right support abutment (4), front support arm (8),
The grease on pin shaft hole on rear support arm (9);
3rd, top revolving support assembly is assembled:
1. each bearing pin (6) is placed on each supporting plate (5);
2. using common 25t truck cranes crane I (10) and crane II (11) respectively by rear support arm (9), front support arm (8)
Synchronously sling, gently staggeredly in insertion left support abutment (3), right support abutment (4), after hand fit's stabilization to be employed, using supporting plate
(5) in the pin shaft hole for, bearing pin (6) is elapsed, installing on rear support arm (9), front support arm (8), bearing pin (6) is installed
Afterwards, then corresponding end cap (7) is installed;
3., pretectum 12, back header 13 are sling and is corresponded to respectively respectively using crane I (10) and crane II (11) and install
On two front support arms (8) and two rear support arms (9), the revolving support assembly assembling of ladle turret top is finished, and is torn open
Except crane I (10) and crane II (11).
The assemble method of ladle turret top revolving support assembly proposed by the invention, is to assemble on the ground,
Construction speed is fast, high precision, security risk are low, compared with construction speed is lifted in the air with single-piece, fast 8 days of the time of installation, from
And duration, the use of work equipment and artificial are saved, direct economic benefit is up to 6.7 ten thousand yuan.