CN106812315A - A kind of alien invasion moulding controls construction method - Google Patents

A kind of alien invasion moulding controls construction method Download PDF

Info

Publication number
CN106812315A
CN106812315A CN201710145365.7A CN201710145365A CN106812315A CN 106812315 A CN106812315 A CN 106812315A CN 201710145365 A CN201710145365 A CN 201710145365A CN 106812315 A CN106812315 A CN 106812315A
Authority
CN
China
Prior art keywords
moulding
assembly
template
construction
alien invasion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710145365.7A
Other languages
Chinese (zh)
Inventor
谭国良
李川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201710145365.7A priority Critical patent/CN106812315A/en
Publication of CN106812315A publication Critical patent/CN106812315A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

Construction method, including alien invasion edge list, plastic formwork and waste and old template are controlled the invention discloses a kind of alien invasion moulding, in accordance with the following steps:1) using plastic formwork as outside reinforcing template;Using waste and old template, one layer of iron plate of outsourcing is processed into the irregular moulding assembly of moulding post, and assembly is combined as entirety with outside reinforcing template;2) assembly is reinforced on the outside of moulding post reinforcing bar with housing reinforcing template;3) edge list concrete is poured;4) outside reinforcing template is first removed when concrete strength reaches form removal requirement, then removes assembly, that is, complete the structure construction of moulding post;5) recycling assembly carries out down batch moulding post construction.It is an advantage of the invention that method is simple, the purpose that building complexity alien invasion is constructed can be reached using common material, it is ensured that the molding effect of alien invasion edge list, presentation quality, construction speed, save construction material, construction cost is low.

Description

A kind of alien invasion moulding controls construction method
Technical field
The invention belongs to moulding technical field, more particularly to a kind of alien invasion moulding control construction method.
Background technology
In current building trade, either civil buildings or business public building more and more consider novel appearance Unique design, alien invasion moulding also begins to changeable, but from from the aspect of construction, the changeable of alien invasion moulding causes operational procedure Complexity, the increase of cost.Conventional template construction method is to construct step by step, i.e., main body of first constructing, after main body construction is complete again Substep installs moulding shape, casting concrete.Have the disadvantage that traditional wooden model board construction method is cumbersome, complex process wastes material Material, construction cost are high.
The content of the invention
To overcome the deficiencies in the prior art, it is an object of the invention to provide a kind of alien invasion moulding control construction party Method, construction method is simple, can reach the purpose that building complexity alien invasion is constructed using common material, it is ensured that building beyond the region of objective existence stands The molding effect of face edge list, it is ensured that edge list presentation quality, construction speed, construction cost are low.
To achieve the above object, the present invention is adopted the following technical scheme that:A kind of alien invasion moulding controls construction method, Including alien invasion edge list, plastic formwork and waste and old template, it is characterized in that the method is carried out in accordance with the following steps:
1) using plastic formwork as outside reinforcing template;Then waste and old template is used, one layer of 0.05mm iron plate of outsourcing adds Work is processed into the irregular moulding of moulding post into assembly, and assembly is combined in an entirety with outside reinforcing template;
2) assembly and outside reinforcing template are reinforced on the outside of moulding post reinforcing bar, constitutes the moulding of moulding post;
3) edge list concrete is poured;
4) outside reinforcing template is first removed when concrete strength reaches form removal requirement, then removes assembly, that is, complete to make The structure construction of type post;
5) recycling assembly carries out down batch moulding post construction.
Compared with prior art, it is an advantage of the invention that construction method is simple, building can be reached using common material The purpose of complicated alien invasion construction, it is ensured that the molding effect of outside vertical surface of building edge list, it is ensured that edge list presentation quality, construction Progress, saves construction material, and construction cost is low.
Brief description of the drawings
The invention will be further described below in conjunction with the accompanying drawings.
Fig. 1 is that a kind of alien invasion moulding control construction method is implemented to show 1 schematic diagram.
Fig. 2 is that a kind of alien invasion moulding control construction method is implemented to show 2 schematic diagrames.
Fig. 3 is that a kind of alien invasion moulding control construction method is implemented to show 3 schematic diagrames.
In figure:The 101- moulding post A 102- plastic formwork A waste and old template A 201- moulding post B 202- plastic formworks of 103- The waste and old template C of the waste and old template B 301- moulding post C 302- plastic formworks C 303- of B 203-.
Specific embodiment
With reference to embodiment, the invention will be further described.
Embodiment 1
As shown in figure 1, a kind of alien invasion moulding control construction method, including alien invasion edge list 101, plastic formwork 102 and waste and old template 103, it is characterized in that the method is carried out in accordance with the following steps:
1) using plastic formwork 102 as outside reinforcing template;Then waste and old template 103, one layer of 0.05mm of outsourcing are used Iron plate is processed into assembly, that is, be processed into the irregular moulding of moulding post 101, and assembly combines whole in one with outside reinforcing template Body;
2) assembly and outside reinforcing template are reinforced on the outside of moulding post reinforcing bar, the moulding of composition moulding post 101;
3) edge list concrete is poured;
4) outside reinforcing template is first removed when concrete strength reaches form removal requirement, then removes assembly, that is, complete to make The structure construction of type post 101;
5) recycling assembly carries out down batch moulding post construction.
Embodiment 2
As shown in Fig. 2 a kind of alien invasion moulding control construction method, including alien invasion edge list 201, plastic formwork 202 and waste and old template 203, it is characterized in that the method is carried out in accordance with the following steps:
1) using plastic formwork 202 as outside reinforcing template;Then waste and old template 203, one layer of 0.05mm of outsourcing are used Iron plate is processed into assembly, that is, be processed into the irregular moulding of moulding post 201, and assembly combines whole in one with outside reinforcing template Body;
2) assembly and outside reinforcing template are reinforced on the outside of moulding post reinforcing bar, the moulding of composition moulding post 201;
3) edge list concrete is poured;
4) outside reinforcing template is first removed when concrete strength reaches form removal requirement, then removes assembly, that is, complete to make The structure construction of type post 201;
5) recycling assembly carries out down batch moulding post construction.
Embodiment 3
As shown in figure 3, a kind of alien invasion moulding control construction method, including alien invasion edge list 301, plastic formwork 302 and waste and old template 303, it is characterized in that the method is carried out in accordance with the following steps:
1) using plastic formwork 302 as outside reinforcing template;Then waste and old template 303, one layer of 0.05mm of outsourcing are used Iron plate is processed into assembly, that is, be processed into the irregular moulding of moulding post 301, and assembly combines whole in one with outside reinforcing template Body;
2) assembly and outside reinforcing template are reinforced on the outside of moulding post reinforcing bar, the moulding of composition moulding post 301;
3) edge list concrete is poured;
4) outside reinforcing template is first removed when concrete strength reaches form removal requirement, then removes assembly, that is, complete to make The structure construction of type post 301;
5) recycling assembly carries out down batch moulding post construction.
The preferred embodiments of the present invention are the foregoing is only, is not intended to limit the invention, although with reference to the foregoing embodiments The present invention is described in detail, for a person skilled in the art, it still can be to foregoing embodiments institute The technical scheme of record is modified, or carries out equivalent replacement to which part technical characteristic.It is all it is of the invention spirit and Within principle, any modification, equivalent substitution and improvements made etc. should be included within the scope of the present invention.

Claims (1)

1. a kind of alien invasion moulding controls construction method, including alien invasion edge list, plastic formwork and waste and old template, and it is special Levy is that the method is carried out in accordance with the following steps:
1) using plastic formwork as outside reinforcing template;Then waste and old template is used, one layer of 0.05mm iron plate of outsourcing is processed into Assembly, that is, be processed into the irregular moulding of moulding post, and assembly is combined in an entirety with outside reinforcing template;
2) assembly and outside reinforcing template are reinforced on the outside of moulding post reinforcing bar, constitutes the moulding of moulding post;
3) edge list concrete is poured;
4) outside reinforcing template is first removed when concrete strength reaches form removal requirement, then removes assembly, that is, complete moulding post Structure construction;
5) recycling assembly carries out down batch moulding post construction.
CN201710145365.7A 2017-03-13 2017-03-13 A kind of alien invasion moulding controls construction method Pending CN106812315A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710145365.7A CN106812315A (en) 2017-03-13 2017-03-13 A kind of alien invasion moulding controls construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710145365.7A CN106812315A (en) 2017-03-13 2017-03-13 A kind of alien invasion moulding controls construction method

Publications (1)

Publication Number Publication Date
CN106812315A true CN106812315A (en) 2017-06-09

Family

ID=59114824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710145365.7A Pending CN106812315A (en) 2017-03-13 2017-03-13 A kind of alien invasion moulding controls construction method

Country Status (1)

Country Link
CN (1) CN106812315A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2247909A (en) * 1990-09-15 1992-03-18 Jerez Requena Jose Luis Method of and apparatus for casting
CN203795847U (en) * 2013-12-12 2014-08-27 中国建筑第四工程局有限公司 Formwork set for concrete specially-shaped section column
CN204781945U (en) * 2015-06-30 2015-11-18 芜湖弛科排水材料贸易有限公司 A combination plastic formwork for concrete cylinder is built
CN105201211A (en) * 2015-10-08 2015-12-30 济南凯旋塑胶制品有限公司 Assembling and disassembling process for combined type plastic building formworks
CN105525753A (en) * 2015-06-05 2016-04-27 中建四局第一建筑工程有限公司 Method and structure for simultaneously constructing constructional column and main body structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2247909A (en) * 1990-09-15 1992-03-18 Jerez Requena Jose Luis Method of and apparatus for casting
CN203795847U (en) * 2013-12-12 2014-08-27 中国建筑第四工程局有限公司 Formwork set for concrete specially-shaped section column
CN105525753A (en) * 2015-06-05 2016-04-27 中建四局第一建筑工程有限公司 Method and structure for simultaneously constructing constructional column and main body structure
CN204781945U (en) * 2015-06-30 2015-11-18 芜湖弛科排水材料贸易有限公司 A combination plastic formwork for concrete cylinder is built
CN105201211A (en) * 2015-10-08 2015-12-30 济南凯旋塑胶制品有限公司 Assembling and disassembling process for combined type plastic building formworks

Similar Documents

Publication Publication Date Title
CN103061267A (en) Construction method of combined prefabricated bridge anti-collision wall
CN106812315A (en) A kind of alien invasion moulding controls construction method
CN207620638U (en) A kind of seamless medical door leaf structure
CN105862894B (en) A kind of installation method of catch pit anti-floating integral mold plate
CN204919959U (en) Hollow bricks
CN104060757B (en) Precast concrete frame supports shear wall wallboard
CN207003823U (en) A kind of new prefabricated side bar
CN103878868A (en) Application of novel vertical pouring construction process to prefabricated concrete block with four hollow corners
CN202064448U (en) Reinforced concrete structure used for antique building
CN105984036A (en) Bubble control technique for producing PC (polycarbonate) boards with modular molds
CN103171021A (en) Method for enhancing concrete strength, improving volume stability and reducing cracking
CN203145375U (en) Simulated stone covering layer for wall body
CN203238853U (en) Concrete cushion block for protection layer of building heat preservation system
CN106142288A (en) Shuttering precast concrete slightly vibrates technology
CN102425297B (en) Mass concrete vacuum dehydration sliding template device, filtering layer and construction layer
CN204983352U (en) Hollow brick of diamond hole
CN205935633U (en) Cast -in -place wall body fast assembly template
CN202787992U (en) Constructional column top concrete pouring structure
CN205969426U (en) Precast concrete component mold modeling
CN109493252A (en) A kind of Urban Design Guidelines control system construction method towards implementation
CN207700514U (en) A kind of high intensity EPS steel plastic wall boards
CN110005188A (en) Carbon fiber and plastics composite shuttering
CN204040461U (en) A kind of MST wall construction part
CN109483725A (en) A kind of composite construction concrete segment and its production method
CN208267316U (en) A kind of architectural decoration concrete-pouring template

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170609