CN106812213A - The quick construction method in place of post muscle at PC Structure Beam-column nodes - Google Patents

The quick construction method in place of post muscle at PC Structure Beam-column nodes Download PDF

Info

Publication number
CN106812213A
CN106812213A CN201710130448.9A CN201710130448A CN106812213A CN 106812213 A CN106812213 A CN 106812213A CN 201710130448 A CN201710130448 A CN 201710130448A CN 106812213 A CN106812213 A CN 106812213A
Authority
CN
China
Prior art keywords
post
place
lifting
mould
muscle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710130448.9A
Other languages
Chinese (zh)
Other versions
CN106812213B (en
Inventor
沙峰峰
吕厚俊
罗曙东
黄国春
刘洋
高路恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG HUAXIN CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
NANTONG HUAXIN CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG HUAXIN CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical NANTONG HUAXIN CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN201710130448.9A priority Critical patent/CN106812213B/en
Publication of CN106812213A publication Critical patent/CN106812213A/en
Application granted granted Critical
Publication of CN106812213B publication Critical patent/CN106812213B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor

Abstract

The invention discloses a kind of quick construction method in place of post muscle at PC Structure Beam-columns node, comprise the following steps:Prefabricated post lifts front pillar muscle position adjustment;The lifting of prefabricated post;The lifting of precast beam;Bullet controls mould control line in place;Control mould installion, fixation;Bean column node template construction;Bean column node concreting and maintenance;Control mould is removed, turnover;Upper segmented column lifting is in place.The present invention is during PC Structure Beam-column node constructions using control mould as the quick aid in place of prefabricated post lifting, post muscle position after being poured to post muscle position and node concrete at bean column node by controlling mould before the lifting of upper segmented column is in place carries out repeatedly adjustment and controls, ensure during construction in later period post muscle can quickly, it is accurate in place, effectively increase lifting efficiency, substantial amounts of mounting cost is saved, the duration is greatly shortened.

Description

The quick construction method in place of post muscle at PC Structure Beam-column nodes
Technical field
The present invention relates to a kind of post muscle control method in place, and in particular to post muscle is quick just at a kind of PC Structure Beam-columns node Position construction method.
Background technology
At home and abroad development speed is very fast for prefabricated construction, and in China, prefabricated construction construction technology is ripe Degree is not also very high, especially PC structural elements connecting node tectonic sievings and component be accurate, quick aspect in place, is strengthened It is a major issue for being currently badly in need of capturing to component connecting node tectonic sieving, construction and quick location control, so as to subtract Few cost.
The content of the invention
Goal of the invention:The present invention is directed to deficiency of the prior art, using control during PC Structure Beam-column node constructions Molding jig lifts quick aid in place as prefabricated post, by controlling mould to bean column node before the lifting of upper segmented column is in place Post muscle position after place post muscle position and node concrete are poured carries out repeatedly adjustment and control, it is ensured that post muscle energy during construction in later period It is enough quick, accurate in place, lifting efficiency is effectively increased, substantial amounts of mounting cost is saved, greatly shorten a kind of PC knots of duration The quick construction method in place of post muscle at structure bean column node.
Technical scheme:The quick construction method in place of post muscle at a kind of PC Structure Beam-columns node of the present invention, including such as Lower step:
(1)Prefabricated post site acceptance:Prefabricated post is transported to during engineering site from factory and can aid in prefabricated post by controlling mould Checking and accepting, to post muscle design attitude deviation exceed code requirement component, forbid to march into the arena;
(2)Prefabricated post lifts front pillar muscle position adjustment:Prefabricated post is secondary to check prefabricated post post using control mould before lifting The deviation situation of muscle, and appropriate first successive step is carried out, the structure of the excessive error caused due to human factors such as liftings to post muscle Part, during construction also forbid lifting, it is to be adjusted after lifted;
(3)The lifting of prefabricated post:To post muscle by controlling the precast column unit of mould secondary passed examination, can be lifted Construction, will strengthen the protection work to component, especially to the protection of post muscle during lifting, it is to avoid the factor such as lifting collision causes post Muscle position produces larger deviation.Therefore, to also to strengthen by code requirement with the post muscle error for treating prefabricated post in place in place Control;
(4)The lifting of precast beam:Before hoisting beam, the Hoisting Position of check column is simultaneously adjusted, and the good beam of bullet is controlled in place on shaft The lifting of the laggard cross girders of line, and the lifting error of beam is rationally controlled, while avoiding interference prefabricated post in precast beam hoisting process Post muscle;
(5)Bullet controls mould control line in place:After prefabricated beam column lifting is in place, the position of mould will be controlled in the top surface of precast beam Line is ejected, and control mould control line in place is preferably ejected again based on the position line for controlling mould again, in order to construction in later period During check work;
(6)Bean column node template construction;Template uses aluminum dipping form at bean column node, it is ensured that node concrete presentation quality, in formwork During, the protection of post muscle at node should be strengthened;
(7)Bean column node concreting with vibrate;Carry out bean column node concreting and vibrate according to design requirement, construct During avoid causing post muscle cross large disturbances;
(8)Control mould installion, fixation:Bean column node concreting is finished with vibrating, before concrete initial set, according to prefabricated The control die location line and control line of top surface of the beam are controlled mould installion and fixation immediately, and fixed U-shaped is passed through using steel wire Ring is fixed in beam body, and fixation is checked again for post muscle position after finishing, adjusted;
(9)Control mould is removed, turnover:With regard to dismountable control mould after bean column node concrete actual strength reaches certain requirement Tool, and control mould is used in turn, lifting is in place to be required to control the post muscle position after mould dismounting substantially to meet, The best position of check column muscle again;
(10)Upper segmented column lifting is in place:Adjustment control, the segmented column in lifting have been carried out to post muscle position by using control mould When can quickly, accurate contraposition, the lifting of segmented column works in place in completion.
Further, the step(2)In prefabricated post lifting before single post muscle position adjustment error must not exceed 2mm, always Scapus muscle error must not exceed 5mm.
Further, the step(3)In prefabricated post lifting control errors:Plane error is no more than 2mm, and absolute altitude error is not More than 3mm, the error of perpendicularity is no more than 0.4%.
Further, the step(4)In beam install it is fixed after error be no more than 2mm.
Further, the step(5)The error of position line of middle control mould is no more than 3mm, controls the control in place of mould Linear distance position line 100-200mm, in order to carry out control in place and adjustment to control mould.
Further, the step(8)The interim fixed of middle mould passes through fixed U-loop to be fixed in beam body using steel wire, Wherein steel wire uses the high tensile steel wire of diameter 3-6mm, and the absolute altitude in place of control die top should be bigger than PC structure top surface of the beam absolute altitudes 150-200mm, so that slot milling carries out Local treatment of node concrete etc..
Further, the step(9)Node concrete intensity when middle control mould is removed must reach design strength More than 85%.
Beneficial effect:The present invention is fast as prefabricated post lifting using control mould during PC Structure Beam-column node constructions Fast aid in place, by controlling mould to post muscle position and node concrete at bean column node before the lifting of upper segmented column is in place Post muscle position after pouring carries out repeatedly adjustment and control, it is ensured that during construction in later period post muscle can quickly, it is accurate in place, effectively carry Lifting efficiency high, saves substantial amounts of mounting cost, greatly shortens the duration.
Specific embodiment
With reference to specific embodiment, the invention will be further described:
Embodiment 1
The quick construction method in place of post muscle, comprises the following steps at a kind of PC Structure Beam-columns node:
(1)Prefabricated post site acceptance:Prefabricated post is transported to during engineering site from factory and can aid in prefabricated post by controlling mould Checking and accepting, to post muscle design attitude deviation exceed code requirement component, forbid to march into the arena;
(2)Prefabricated post lifts front pillar muscle position adjustment:Prefabricated post is secondary to check prefabricated post post using control mould before lifting The deviation situation of muscle, and appropriate first successive step is carried out, the structure of the excessive error caused due to human factors such as liftings to post muscle Part, during construction also forbid lifting, it is to be adjusted after lifted, prefabricated post lifting before single post muscle position adjustment error must not exceed 2mm, total scapus muscle error must not exceed 5mm;
(3)The lifting of prefabricated post:To post muscle by controlling the precast column unit of mould secondary passed examination, can be lifted Construction, will strengthen the protection work to component, especially to the protection of post muscle during lifting, it is to avoid the factor such as lifting collision causes post Muscle position produces larger deviation.Therefore, to also to strengthen by code requirement with the post muscle error for treating prefabricated post in place in place Control, prefabricated post lifting control errors:Plane error is no more than 2mm, and absolute altitude error is no more than 3mm, and the error of perpendicularity is no more than 0.4%;
(4)The lifting of precast beam:Before hoisting beam, the Hoisting Position of check column is simultaneously adjusted, and the good beam of bullet is controlled in place on shaft The lifting of the laggard cross girders of line, and the lifting error of beam is rationally controlled, while avoiding interference prefabricated post in precast beam hoisting process Post muscle, beam installs the error after fixing and is no more than 2mm;
(5)Bullet controls mould control line in place:After prefabricated beam column lifting is in place, the position of mould will be controlled in the top surface of precast beam Line is ejected, and control mould control line in place is preferably ejected again based on the position line for controlling mould again, in order to construction in later period During check work, control mould the error of position line be no more than 3mm, control mould control line position line by distance in place 100mm, in order to carry out control in place and adjustment to control mould;
(6)Bean column node template construction;Template uses aluminum dipping form at bean column node, it is ensured that node concrete presentation quality, in formwork During, the protection of post muscle at node should be strengthened;
(7)Bean column node concreting with vibrate;Carry out bean column node concreting and vibrate according to design requirement, construct During avoid causing post muscle cross large disturbances;
(8)Control mould installion, fixation:Bean column node concreting is finished with vibrating, before concrete initial set, according to prefabricated The control die location line and control line of top surface of the beam are controlled mould installion and fixation immediately, and fixed U-shaped is passed through using steel wire Ring is fixed in beam body, and wherein steel wire uses the high tensile steel wire of diameter 3mm, and the absolute altitude in place of control die top should be than PC structure The big 150mm of top surface of the beam absolute altitude, so that slot milling carries out Local treatment of node concrete etc.;
(9)Control mould is removed, turnover:With regard to dismountable control mould after bean column node concrete actual strength reaches certain requirement Tool, and control mould is used in turn, lifting is in place to be required to control the post muscle position after mould dismounting substantially to meet, The best position of check column muscle again, node concrete intensity when control mould is removed must reach the 85% of design strength with On.
(10)Upper segmented column lifting is in place:Adjustment control is carried out to post muscle position by using control mould, in lifting During segmented column can quickly, accurate contraposition, the lifting of segmented column works in place in completion.
Embodiment 2
The quick construction method in place of post muscle, comprises the following steps at a kind of PC Structure Beam-columns node:
(1)Prefabricated post site acceptance:Prefabricated post is transported to during engineering site from factory and can aid in prefabricated post by controlling mould Checking and accepting, to post muscle design attitude deviation exceed code requirement component, forbid to march into the arena;
(2)Prefabricated post lifts front pillar muscle position adjustment:Prefabricated post is secondary to check prefabricated post post using control mould before lifting The deviation situation of muscle, and appropriate first successive step is carried out, the structure of the excessive error caused due to human factors such as liftings to post muscle Part, during construction also forbid lifting, it is to be adjusted after lifted, prefabricated post lifting before single post muscle position adjustment error must not exceed 2mm, total scapus muscle error must not exceed 5mm;
(3)The lifting of prefabricated post:To post muscle by controlling the precast column unit of mould secondary passed examination, can be lifted Construction, will strengthen the protection work to component, especially to the protection of post muscle during lifting, it is to avoid the factor such as lifting collision causes post Muscle position produces larger deviation.Therefore, to also to strengthen by code requirement with the post muscle error for treating prefabricated post in place in place Control, prefabricated post lifting control errors:Plane error is no more than 2mm, and absolute altitude error is no more than 3mm, and the error of perpendicularity is no more than 0.4%;
(4)The lifting of precast beam:Before hoisting beam, the Hoisting Position of check column is simultaneously adjusted, and the good beam of bullet is controlled in place on shaft The lifting of the laggard cross girders of line, and the lifting error of beam is rationally controlled, while avoiding interference prefabricated post in precast beam hoisting process Post muscle, beam installs the error after fixing and is no more than 2mm;
(5)Bullet controls mould control line in place:After prefabricated beam column lifting is in place, the position of mould will be controlled in the top surface of precast beam Line is ejected, and control mould control line in place is preferably ejected again based on the position line for controlling mould again, in order to construction in later period During check work, control mould the error of position line be no more than 3mm, control mould control line position line by distance in place 150mm, in order to carry out control in place and adjustment to control mould;
(6)Bean column node template construction;Template uses aluminum dipping form at bean column node, it is ensured that node concrete presentation quality, in formwork During, the protection of post muscle at node should be strengthened;
(7)Bean column node concreting with vibrate;Carry out bean column node concreting and vibrate according to design requirement, construct During avoid causing post muscle cross large disturbances;
(8)Control mould installion, fixation:Bean column node concreting is finished with vibrating, before concrete initial set, according to prefabricated The control die location line and control line of top surface of the beam are controlled mould installion and fixation immediately, and fixed U-shaped is passed through using steel wire Ring is fixed in beam body, and wherein steel wire uses the high tensile steel wire of diameter 5mm, and the absolute altitude in place of control die top should be than PC structure The big 200mm of top surface of the beam absolute altitude, so that slot milling carries out Local treatment of node concrete etc.;
(9)Control mould is removed, turnover:With regard to dismountable control mould after bean column node concrete actual strength reaches certain requirement Tool, and control mould is used in turn, lifting is in place to be required to control the post muscle position after mould dismounting substantially to meet, The best position of check column muscle again, node concrete intensity when control mould is removed must reach the 85% of design strength with On.
(10)Upper segmented column lifting is in place:Adjustment control is carried out to post muscle position by using control mould, in lifting During segmented column can quickly, accurate contraposition, the lifting of segmented column works in place in completion.
Embodiment 3
The quick construction method in place of post muscle, comprises the following steps at a kind of PC Structure Beam-columns node:
(1)Prefabricated post site acceptance:Prefabricated post is transported to during engineering site from factory and can aid in prefabricated post by controlling mould Checking and accepting, to post muscle design attitude deviation exceed code requirement component, forbid to march into the arena;
(2)Prefabricated post lifts front pillar muscle position adjustment:Prefabricated post is secondary to check prefabricated post post using control mould before lifting The deviation situation of muscle, and appropriate first successive step is carried out, the structure of the excessive error caused due to human factors such as liftings to post muscle Part, during construction also forbid lifting, it is to be adjusted after lifted, prefabricated post lifting before single post muscle position adjustment error must not exceed 2mm, total scapus muscle error must not exceed 5mm;
(3)The lifting of prefabricated post:To post muscle by controlling the precast column unit of mould secondary passed examination, can be lifted Construction, will strengthen the protection work to component, especially to the protection of post muscle during lifting, it is to avoid the factor such as lifting collision causes post Muscle position produces larger deviation.Therefore, to also to strengthen by code requirement with the post muscle error for treating prefabricated post in place in place Control, prefabricated post lifting control errors:Plane error is no more than 2mm, and absolute altitude error is no more than 3mm, and the error of perpendicularity is no more than 0.4%;
(4)The lifting of precast beam:Before hoisting beam, the Hoisting Position of check column is simultaneously adjusted, and the good beam of bullet is controlled in place on shaft The lifting of the laggard cross girders of line, and the lifting error of beam is rationally controlled, while avoiding interference prefabricated post in precast beam hoisting process Post muscle, beam installs the error after fixing and is no more than 2mm;
(5)Bullet controls mould control line in place:After prefabricated beam column lifting is in place, the position of mould will be controlled in the top surface of precast beam Line is ejected, and control mould control line in place is preferably ejected again based on the position line for controlling mould again, in order to construction in later period During check work, control mould the error of position line be no more than 3mm, control mould control line position line by distance in place 200mm, in order to carry out control in place and adjustment to control mould;
(6)Bean column node template construction;Template uses aluminum dipping form at bean column node, it is ensured that node concrete presentation quality, in formwork During, the protection of post muscle at node should be strengthened;
(7)Bean column node concreting with vibrate;Carry out bean column node concreting and vibrate according to design requirement, construct During avoid causing post muscle cross large disturbances;
(8)Control mould installion, fixation:Bean column node concreting is finished with vibrating, before concrete initial set, according to prefabricated The control die location line and control line of top surface of the beam are controlled mould installion and fixation immediately, and fixed U-shaped is passed through using steel wire Ring is fixed in beam body, and wherein steel wire uses the high tensile steel wire of diameter 6mm, and the absolute altitude in place of control die top should be than PC structure The big 200mm of top surface of the beam absolute altitude, so that slot milling carries out Local treatment of node concrete etc.;
(9)Control mould is removed, turnover:With regard to dismountable control mould after bean column node concrete actual strength reaches certain requirement Tool, and control mould is used in turn, lifting is in place to be required to control the post muscle position after mould dismounting substantially to meet, The best position of check column muscle again, node concrete intensity when control mould is removed must reach the 85% of design strength with On.
(10)Upper segmented column lifting is in place:Adjustment control is carried out to post muscle position by using control mould, in lifting During segmented column can quickly, accurate contraposition, the lifting of segmented column works in place in completion.
This hair is during PC Structure Beam-column node constructions using control mould as the quick auxiliary in place of prefabricated post lifting Instrument, the post after being poured to post muscle position and node concrete at bean column node by controlling mould before the lifting of upper segmented column is in place Muscle position carries out repeatedly adjustment and control, it is ensured that during construction in later period post muscle can quickly, it is accurate in place, effectively increase lifting and imitate Rate, saves substantial amounts of mounting cost, greatly shortens the duration.
The above, is only presently preferred embodiments of the present invention, and any formal limitation is not made to the present invention, though So the present invention is disclosed above with preferred embodiment, but is not limited to the present invention, any to be familiar with this professional technology people Member, without departing from the scope of the present invention, when making a little change or modification using the technology contents of the disclosure above It is the Equivalent embodiments of equivalent variations, as long as being the content without departing from technical solution of the present invention, according to technical spirit of the invention Any simple modification, equivalent variations and the modification made to above example, still fall within the range of technical solution of the present invention.

Claims (7)

1. the quick in place construction method of post muscle at a kind of PC Structure Beam-columns node, it is characterised in that:Comprise the following steps:
(1)Prefabricated post site acceptance:Prefabricated post is transported to during engineering site from factory and can aid in prefabricated post by controlling mould Checking and accepting, to post muscle design attitude deviation exceed code requirement component, forbid to march into the arena;
(2)Prefabricated post lifts front pillar muscle position adjustment:Prefabricated post is secondary to check prefabricated post post using control mould before lifting The deviation situation of muscle, and appropriate first successive step is carried out, the structure of the excessive error caused due to human factors such as liftings to post muscle Part, during construction also forbid lifting, it is to be adjusted after lifted;
(3)The lifting of prefabricated post:To post muscle by controlling the precast column unit of mould secondary passed examination, can be lifted Construction, will strengthen the protection work to component, especially to the protection of post muscle during lifting, it is to avoid the factor such as lifting collision causes post Muscle position produces larger deviation.Therefore, to also to strengthen by code requirement with the post muscle error for treating prefabricated post in place in place Control;
(4)The lifting of precast beam:Before hoisting beam, the Hoisting Position of check column is simultaneously adjusted, and the good beam of bullet is controlled in place on shaft The lifting of the laggard cross girders of line, and the lifting error of beam is rationally controlled, while avoiding interference prefabricated post in precast beam hoisting process Post muscle;
(5)Bullet controls mould control line in place:After prefabricated beam column lifting is in place, the position of mould will be controlled in the top surface of precast beam Line is ejected, and control mould control line in place is preferably ejected again based on the position line for controlling mould again, in order to construction in later period During check work;
(6)Bean column node template construction;Template uses aluminum dipping form at bean column node, it is ensured that node concrete presentation quality, in formwork During, the protection of post muscle at node should be strengthened;
(7)Bean column node concreting with vibrate;Carry out bean column node concreting and vibrate according to design requirement, construct During avoid causing post muscle cross large disturbances;
(8)Control mould installion, fixation:Bean column node concreting is finished with vibrating, before concrete initial set, according to prefabricated The control die location line and control line of top surface of the beam are controlled mould installion and fixation immediately, and fixed U-shaped is passed through using steel wire Ring is fixed in beam body, and fixation is checked again for post muscle position after finishing, adjusted;
(9)Control mould is removed, turnover:With regard to dismountable control mould after bean column node concrete actual strength reaches certain requirement Tool, and control mould is used in turn, lifting is in place to be required to control the post muscle position after mould dismounting substantially to meet, The best position of check column muscle again;
(10)Upper segmented column lifting is in place:Adjustment control, the segmented column in lifting have been carried out to post muscle position by using control mould When can quickly, accurate contraposition, the lifting of segmented column works in place in completion.
2. the quick in place construction method of post muscle at a kind of PC Structure Beam-columns node according to claim 1, it is characterised in that: The step(2)In prefabricated post lifting before single post muscle position adjustment error must not exceed 2mm, total scapus muscle error must not surpass Cross 5mm.
3. the quick in place construction method of post muscle at a kind of PC Structure Beam-columns node according to claim 1, it is characterised in that: The step(3)In prefabricated post lifting control errors:Plane error is no more than 2mm, and absolute altitude error is no more than 3mm, perpendicularity Error is no more than 0.4%.
4. the quick in place construction method of post muscle at a kind of PC Structure Beam-columns node according to claim 1, it is characterised in that: The step(4)In beam install it is fixed after error be no more than 2mm.
5. the quick in place construction method of post muscle at a kind of PC Structure Beam-columns node according to claim 1, it is characterised in that: The step(5)The error of position line of middle control mould is no more than 3mm, controls the control line position line by distance 100- in place of mould 200mm, in order to carry out control in place and adjustment to control mould.
6. the quick in place construction method of post muscle at a kind of PC Structure Beam-columns node according to claim 1, it is characterised in that: The step(8)The interim fixed of middle mould passes through fixed U-loop to be fixed in beam body using steel wire, and wherein steel wire uses diameter The high tensile steel wire of 3-6mm, the absolute altitude in place of control die top should be than the PC structure big 150-200mm of top surface of the beam absolute altitude, to stay Going out space carries out Local treatment of node concrete etc..
7. the quick in place construction method of post muscle at a kind of PC Structure Beam-columns node according to claim 1, it is characterised in that: The step(9)Node concrete intensity when middle control mould is removed must reach more than the 85% of design strength.
CN201710130448.9A 2017-03-07 2017-03-07 The quick construction method in place of column muscle at PC Structure Beam-column node Active CN106812213B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710130448.9A CN106812213B (en) 2017-03-07 2017-03-07 The quick construction method in place of column muscle at PC Structure Beam-column node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710130448.9A CN106812213B (en) 2017-03-07 2017-03-07 The quick construction method in place of column muscle at PC Structure Beam-column node

Publications (2)

Publication Number Publication Date
CN106812213A true CN106812213A (en) 2017-06-09
CN106812213B CN106812213B (en) 2019-06-14

Family

ID=59114636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710130448.9A Active CN106812213B (en) 2017-03-07 2017-03-07 The quick construction method in place of column muscle at PC Structure Beam-column node

Country Status (1)

Country Link
CN (1) CN106812213B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0447739B2 (en) * 1984-10-08 1992-08-04 Shimizu Construction Co Ltd
JPH0754397A (en) * 1993-08-16 1995-02-28 Fujita Corp Erection construction method of precast concrete column
CN105625730A (en) * 2015-12-25 2016-06-01 中民筑友有限公司 Method for assembling precast column
CN205369939U (en) * 2015-12-25 2016-07-06 中民筑友有限公司 Bar reinforcement positioning device
CN205444945U (en) * 2015-12-25 2016-08-10 中民筑友有限公司 Bar reinforcement positioning device
CN106013434A (en) * 2016-07-18 2016-10-12 江苏工程职业技术学院 Prefabricated assembled structural intermediate beam column node fixing structure and installation method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0447739B2 (en) * 1984-10-08 1992-08-04 Shimizu Construction Co Ltd
JPH0754397A (en) * 1993-08-16 1995-02-28 Fujita Corp Erection construction method of precast concrete column
CN105625730A (en) * 2015-12-25 2016-06-01 中民筑友有限公司 Method for assembling precast column
CN205369939U (en) * 2015-12-25 2016-07-06 中民筑友有限公司 Bar reinforcement positioning device
CN205444945U (en) * 2015-12-25 2016-08-10 中民筑友有限公司 Bar reinforcement positioning device
CN106013434A (en) * 2016-07-18 2016-10-12 江苏工程职业技术学院 Prefabricated assembled structural intermediate beam column node fixing structure and installation method

Also Published As

Publication number Publication date
CN106812213B (en) 2019-06-14

Similar Documents

Publication Publication Date Title
AU2009231216A1 (en) Method for producing concrete prefinished parts
CN108978473B (en) A kind of construction method using short-line prefabrication bridge subsection
CN110219461A (en) A kind of inner cylinder aluminum alloy pattern plate and outline border plank sheathing gang form construction method
CN105863275A (en) Construction method for assembly type annular reinforcement buckling concrete shear wall system
CN105908902A (en) Positioning frame for prefabricated pier column reinforcing bar cages and construction method of pier column reinforcing bar cages
CN104631822A (en) Construction method for high-rise reinforced concrete elevator shaft
CN108035594A (en) The prefabricated decompression cone construction method of concrete silo structure
CN111395783B (en) Construction method for carrying out positioning fine adjustment on bolts
CN105421792A (en) Lifting construction process of modular steel structural components
CN105178604A (en) Construction method of assembly type superimposed floor slab
CN113752379A (en) Concrete T-beam prefabricating method adopting secondary tensioning process and movable pedestal
CN105839784B (en) Assembled jacking type construction techniques
CN218508722U (en) Shock insulation buttress positioning pouring structure
CN102337782B (en) Lift system for constructing truss platform on top of tall and large space
CN108000690A (en) Precast prestressed concrete composite beam production mould, production equipment and production technology
CN106812213A (en) The quick construction method in place of post muscle at PC Structure Beam-column nodes
CN102561196A (en) Turnover construction process of high-pier forms
CN201714056U (en) Truss-type operating platform
CN100510296C (en) High precision mounting construction method of super sized iron piece
KR20040039164A (en) Pier coping pre-assembly method
CN115012575A (en) Construction process for lifting hyperbolic square pipe truss roof of railway station house in blocks
CN205712473U (en) A kind of PC beam column node connection device
CN110536992A (en) The method of the false conjugation precast concrete unit of production
CN207920076U (en) The stair tread formwork that both sides are provided with shear wall installs device
CN107542164A (en) Build the suspension column terrace crack resistence construction method of pillar

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant