CN106812148A - 一种沉井施工工艺 - Google Patents

一种沉井施工工艺 Download PDF

Info

Publication number
CN106812148A
CN106812148A CN201710162418.6A CN201710162418A CN106812148A CN 106812148 A CN106812148 A CN 106812148A CN 201710162418 A CN201710162418 A CN 201710162418A CN 106812148 A CN106812148 A CN 106812148A
Authority
CN
China
Prior art keywords
open caisson
perpendicularity
construction technique
concrete plate
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710162418.6A
Other languages
English (en)
Inventor
武思宇
李建平
李耀晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Zhongyan Dadi Technology Co Ltd
Original Assignee
Beijing Zhongyan Dadi Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Zhongyan Dadi Technology Co Ltd filed Critical Beijing Zhongyan Dadi Technology Co Ltd
Priority to CN201710162418.6A priority Critical patent/CN106812148A/zh
Publication of CN106812148A publication Critical patent/CN106812148A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • E02D23/08Lowering or sinking caissons

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

一种沉井施工工艺,将千斤顶组放入基坑中,将砼板放置在千斤顶组上端,在基坑周围注入润滑止水剂,润滑止水剂起到降低周围土体位移,增加砼块下沉力,止水的作用;千斤顶组起到调整垂直度的作用;刃脚起到切土下沉的作用;电脑监控系统通过垂直度监测点实时监测沉井的垂直度。本发明克服了传统施工工艺下沉速度无法控制,周围沉降大,对周边的环境破坏大,垂直度调节不方便灵活,施工质量无法保证的问题,使施工变得简单,节约造价。

Description

一种沉井施工工艺
技术领域
本发明涉及一种沉井施工工艺,主要用于桥梁工程、市政工程、给排水工程、隧道工程、民建工程的施工。
背景技术
随着我国工程建设和社会经济的发展,城市土地资源逐渐稀缺,城市地下空间的开发越来越成为城市发展的趋势,在城市中心建筑物密集的区开挖建设大深度地下空间,往往面临场地狭小、周围环境复杂的情况。严重时可能会引起周围地层的塌陷,给邻近的建筑物带来严重的影响,相比之下,沉井施工更能符合施工的特点,满足施工的需要,但在沉井施工中,保证沉井的垂直度及周边沉降,是沉井施工的关键。传统沉井施工中,由于土的侧压力不同,导致施工中难以掌控垂直度,容易出现倾斜的现象,周边出现塌陷下沉,并且沉降的速度无法控制,沉降过程中止水困难,为解决以上问题,需要研发一种新型沉井技术施工,该新型沉井施工工艺可很好的保证沉井的垂直度,满足了施工的需要和设计要求,采用新型沉井技术可降低施工成本,节省人工,同时安全可靠。
发明内容
本发明克服了传统施工工艺下沉速度无法控制,无法满足设计要求,垂直度调节不方便灵活,周边下沉塌陷,施工质量无法保证的问题。
本发明的沉井施工工艺,包括以下步骤:
步骤1)场地平整;
步骤2)测量定位;
步骤3)基坑开挖,搭设施工平台、设备;
步骤4)土方开挖,将千斤顶组3放入基坑中;
步骤5)继续挖土,将砼板2放置在千斤顶组3上端,等待调整垂直度;
步骤6)在基坑周围注入润滑止水剂1;
步骤7)当垂直度监测点5发现位置偏移时,调整千斤顶,控制砼板2的垂直度;
步骤8)重复步骤4)到 步骤7),直到沉井到设计深度。
所述垂直度监测点5可随时根据施工状况反馈数据;电脑监控系统6通过垂直度监测点5实时监测沉井的垂直度,并根据数据进行调整。
所述的润滑止水剂1起到降低周围土体位移,增加砼板下沉力,止水的作用;千斤顶组放置在砼板2底部,起到调整垂直度的作用。
所述的砼板2为分区预制或现浇,可灵活设置多个部分;砼板2底部设有用于下沉切土的刃脚4。
砼板2为现浇砼板,则上述步骤5)为将混凝土浇筑模板搭置于千斤顶组3上,插入钢筋,浇筑混凝土,待混凝土达到预定强度后,继续开挖。
本发明使沉井施工变得简单,可以在狭小作业空间内作业,对改善工人施工环境有积极意义;可适应不同沉井场地,应用范围广,节约人力成本,提高经济效益及施工质量。具体有益效果如下:
1. 通过电脑监控系统可随时检测到沉井的垂直度.
2. 通过注入润滑止水剂降低周围土体的位移,增加砼块下沉力并起到止水的作用。
3. 增加千斤顶组的设计,通过调节千斤顶组,控制沉井预制板变形量,沉降速度及垂直度,使沉井施工变得可控,满足设计需要。
4. 砼板为分区预制或现浇,划分多个部分,使千斤顶组更容易控制沉降的垂直度。
5. 砼板在底部放置千斤顶组,使调整幅度大幅提高,做到方便灵活。
附图说明
图1为本发明的沉井施工剖面图;
图2为本发明的沉井施工俯视图;
附图中数字所表示的相应部件名称:
1-润滑止水剂;2-砼板;3-千斤顶组;4-刃脚;5-垂直度监测点;6-电脑监控系统。
具体实施方式
下面结合实施例中的附图,对本发明的技术方案进行示例性的描述,但本发明不受下述实施例的限制,可根据本发明的技术方案与实际情况来确定具体的实施方式。
实施例一
本发明采用的一种沉井技术施工工艺,包括以下步骤:
步骤1)场地平整;
步骤2)测量定位;
步骤3)基坑开挖搭设施工平台、设备;
步骤4)土方开挖,将千斤顶组3放入坑中;
步骤5)继续挖土将预制的砼板2放置千斤顶组3上端等待调垂,设置垂直度监测点5由电脑监控系统6监控;
步骤6)在基坑周围注入润滑止水剂1,起到降低周围土体位移,减小砼板2与土体之间的摩擦力,增加砼板2下沉力,并具有止水的作用;
步骤7)当垂直度监测点5发现位置偏移时调整千斤顶组3,控制砼板2的垂直度。
步骤8)重复步骤4)到 步骤7)直到沉井到设计深度。
实施例二
本发明采用的另一种沉井技术施工工艺的方法,包括以下步骤:
步骤1)场地平整;
步骤2)测量定位;
步骤3)基坑开挖搭设施工平台、设备;
步骤4)土方开挖,放置千斤顶组3;
步骤5)将浇筑模板放入基坑中,搭置于千斤顶组3上,插入钢筋,浇筑混凝土,等待混凝土达到预定强度,继续开挖,设置垂直度监测点5由电脑监控系统6监控;
步骤6)在基坑周围注入润滑止水剂1,起到降低周围土体位移,减小砼板与土体之间的摩擦力,增加砼板下沉力,并具有止水的作用;
步骤7)当垂直度监测点5发现位置偏移时调整千斤顶组3,将现浇的砼板2调正。
步骤8)重复步骤4)到 步骤7)直到沉井到设计深度。

Claims (7)

1.一种沉井施工工艺,其特征在于,包括以下步骤:
步骤1)场地平整;
步骤2)测量定位;
步骤3)基坑开挖,搭设施工平台、设备;
步骤4)土方开挖,将千斤顶组(3)放入基坑中;
步骤5)继续挖土,将砼板(2)放置在千斤顶组(3)上端,等待调整垂直度;
步骤6)在基坑周围注入润滑止水剂(1);
步骤7)当垂直度监测点(5)发现位置偏移时,调整千斤顶,控制砼板(2)的垂直度;
步骤8)重复步骤4)到步骤7),直到沉井到设计深度。
2.如权利要求1所述的一种沉井施工工艺,其特征在于:砼板(2)是预制砼板。
3.如权利要求1所述的一种沉井施工工艺,其特征在于:砼板(2)是现浇砼板。
4.如权利要求3所述的一种沉井施工工艺,其特征在于:步骤5)为将混凝土浇筑模板搭置于千斤顶组(3)上,插入钢筋,浇筑混凝土,待混凝土达到预定强度后,继续开挖。
5.如权利要求1所述的一种沉井施工工艺,其特征在于:电脑监控系统(6)通过垂直度监测点(5)实时监测沉井的垂直度。
6.如权利要求1所述的一种沉井施工工艺,其特征在于:砼板(2)为分区预制或浇筑,可灵活设置多个部分。
7.如权利要求1所述的一种沉井施工工艺,其特征在于:砼板(2)底部设有用于下沉切土的刃脚(4)。
CN201710162418.6A 2017-03-18 2017-03-18 一种沉井施工工艺 Pending CN106812148A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710162418.6A CN106812148A (zh) 2017-03-18 2017-03-18 一种沉井施工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710162418.6A CN106812148A (zh) 2017-03-18 2017-03-18 一种沉井施工工艺

Publications (1)

Publication Number Publication Date
CN106812148A true CN106812148A (zh) 2017-06-09

Family

ID=59115597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710162418.6A Pending CN106812148A (zh) 2017-03-18 2017-03-18 一种沉井施工工艺

Country Status (1)

Country Link
CN (1) CN106812148A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824503A (zh) * 2018-07-09 2018-11-16 贵州新联爆破工程集团有限公司 一种沉井垂直度检测及调整装置
CN111705828A (zh) * 2020-07-02 2020-09-25 中铁工程装备集团有限公司 一种刃脚管节支护结构及其纠偏支护方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102235010A (zh) * 2010-04-27 2011-11-09 中国华冶科工集团有限公司 沉井因膨胀土悬挂停沉的处理方法
JP2011256652A (ja) * 2010-06-11 2011-12-22 Maruto Industry Co Ltd ニューマチックケーソンの沈設工法
JP2014047523A (ja) * 2012-08-31 2014-03-17 Kajima Corp 地下構造体の沈設方法
CN104060623A (zh) * 2013-03-20 2014-09-24 中国二十冶集团有限公司 带有降阻机构的沉井结构及干挖沉井方法
CN105696614A (zh) * 2016-01-27 2016-06-22 中国十七冶集团有限公司 一种采用上拉下顶解决沉井超沉复位装置及其施工方法
CN106088127A (zh) * 2016-07-02 2016-11-09 天鸿建设集团有限公司 沉井施工方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102235010A (zh) * 2010-04-27 2011-11-09 中国华冶科工集团有限公司 沉井因膨胀土悬挂停沉的处理方法
JP2011256652A (ja) * 2010-06-11 2011-12-22 Maruto Industry Co Ltd ニューマチックケーソンの沈設工法
JP2014047523A (ja) * 2012-08-31 2014-03-17 Kajima Corp 地下構造体の沈設方法
CN104060623A (zh) * 2013-03-20 2014-09-24 中国二十冶集团有限公司 带有降阻机构的沉井结构及干挖沉井方法
CN105696614A (zh) * 2016-01-27 2016-06-22 中国十七冶集团有限公司 一种采用上拉下顶解决沉井超沉复位装置及其施工方法
CN106088127A (zh) * 2016-07-02 2016-11-09 天鸿建设集团有限公司 沉井施工方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824503A (zh) * 2018-07-09 2018-11-16 贵州新联爆破工程集团有限公司 一种沉井垂直度检测及调整装置
CN111705828A (zh) * 2020-07-02 2020-09-25 中铁工程装备集团有限公司 一种刃脚管节支护结构及其纠偏支护方法

Similar Documents

Publication Publication Date Title
US11143027B2 (en) Rectangular working well with preset pipe jacking hole and sliding back wall in water-rich stratum and construction method thereof
CN105735322B (zh) 一种刚柔复合防渗可回收支护结构的设计施工方法
CN106988302B (zh) 一种大倾角坚硬岩层旋挖桩施工工法
CN105714772B (zh) 岩溶地区嵌岩桩成孔复钻砼护壁方法
CN106400782A (zh) 一种利用旋挖钻机施工基坑围护钻孔咬合桩的施工方法
CN105464074B (zh) 一种人工挖孔桩高聚物注浆防护结构及其施工方法
CN108547641A (zh) 富水软弱地层重载铁路隧道的基底加固体系及其施工方法
CN105442532A (zh) 桩头扩大钻孔灌注桩施工方法
CN103243740B (zh) 旋挖、长螺旋组合钻孔压灌混凝土咬合桩连续墙施工方法
CN111705786A (zh) 一种复合地层地下连续墙与钻孔灌注桩竖向结合施工的方法
CN107653878A (zh) 钻孔灌注桩可重复使用纵向分离式钢护筒施工工法
CN106759269A (zh) 大起伏岩面地层中地下连续墙的施工方法
CN106812148A (zh) 一种沉井施工工艺
CN102912789A (zh) 喀斯特地貌下机械成孔技术
CN110206071A (zh) 一种地下连续墙接缝加固方法与装置
CN106087996B (zh) 基于自我调平反压装置的人工挖孔桩施工方法
CN207582471U (zh) 一种设有深层预应力锚索的双排桩支护结构
CN103806444A (zh) 一种软土层旋挖桩施工方法
CN101748735A (zh) 软土地区减少桩偏斜的基坑开挖方法
CN103866787B (zh) 一种敞挖逆筑法混凝土防渗墙建造施工工艺
CN217053672U (zh) 一种大直径检查井钻桩法施工系统
CN106337418A (zh) 一种狭小区域深基坑的支护结构及支护方法
CN104727305B (zh) 钻孔高压注浆抗拔桩施工方法
JP2726621B2 (ja) ケーソンの沈設方法およびケーソン刃口構造
CN107476293A (zh) 一种软土地基灌注桩快速接长结构配置及其接长方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170609

WD01 Invention patent application deemed withdrawn after publication