CN106810034A - Earthworm removes the device and minimizing technology of Heavy Metals in Sludge - Google Patents

Earthworm removes the device and minimizing technology of Heavy Metals in Sludge Download PDF

Info

Publication number
CN106810034A
CN106810034A CN201710133412.6A CN201710133412A CN106810034A CN 106810034 A CN106810034 A CN 106810034A CN 201710133412 A CN201710133412 A CN 201710133412A CN 106810034 A CN106810034 A CN 106810034A
Authority
CN
China
Prior art keywords
sludge
earthworm
process chamber
processing room
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710133412.6A
Other languages
Chinese (zh)
Other versions
CN106810034B (en
Inventor
王昊
全炳旭
田灿
钟卉元
刘晓
王丹虎
刘跃强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Send Environmental Technology Co Ltd
North China University of Science and Technology
Original Assignee
Beijing Send Environmental Technology Co Ltd
North China University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Send Environmental Technology Co Ltd, North China University of Science and Technology filed Critical Beijing Send Environmental Technology Co Ltd
Priority to CN201710133412.6A priority Critical patent/CN106810034B/en
Publication of CN106810034A publication Critical patent/CN106810034A/en
Application granted granted Critical
Publication of CN106810034B publication Critical patent/CN106810034B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F11/00Treatment of sludge; Devices therefor
    • C02F11/02Biological treatment
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2101/00Nature of the contaminant
    • C02F2101/10Inorganic compounds
    • C02F2101/20Heavy metals or heavy metal compounds
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2301/00General aspects of water treatment
    • C02F2301/08Multistage treatments, e.g. repetition of the same process step under different conditions

Abstract

The present invention relates to the removal device and method of Heavy Metals in Sludge, particularly a kind of earthworm removes the device and minimizing technology of Heavy Metals in Sludge.Be provided with dividing plate between first process chamber and second processing room, dividing plate top is provided with through hole, dividing plate top be provided with can pull thin plate, bottom sludge blanket, earthworm layer and upper strata sludge blanket are disposed with the first process chamber, earthworm layer is blended with culture medium;Sludge is placed in the first process chamber first, the cloth for completing the first process chamber is postponed, and second processing room is arranged;Cover lucifuge insulation case lid;Treat;When Sludge Surface has piled with wormcast, top layer wormcast is struck off;First process chamber earthworm all after transfer, is processed second processing room:Lucifuge insulation case lid is covered, treats that top layer wormcast strikes off, two process chamber reciprocation cycles after Heavy Metals in Sludge is up to standard, change untreated sludge.Heavy metals removal continuous prodution can be shortened process cycle, the sludge that can have conveniently processed is recycled.

Description

Earthworm removes the device and minimizing technology of Heavy Metals in Sludge
Technical field
The present invention relates to the removal device and method of Heavy Metals in Sludge, particularly a kind of earthworm removal Heavy Metals in Sludge Device and minimizing technology.
Background technology
In recent years, resource recycling turns into the hot issue of social sustainable development, big to what is contained in municipal sludge The Collection utilization of the fertilizer elements such as amount N, P, K and organic matter has long-range development prospect.And it is same in the engineering of sewage disposal Sample is had during the heavy metal ion such as more Cu, Zn remain in sludge, and its direct recycling to sludge causes obstruction. Found in constantly studying, more satisfactory removal effect can be reached using chemical method, but due to the addition of chemical reagent So that processing cost can be in any more, and side reaction of the different chemical treatment technologies to nutrient is indefinite, is also easy to cause Secondary pollution, realizes that extensive treatment Shang Yaowu can the phase;Bioanalysis goes removing heavy metals easy to operate, and clearance is high, economic benefit Substantially, especially the hotter earthworm biological decomposition technology of research not only can be with enriching heavy metal recently, can also be by digestive system Stabile fertilizer, decomposing organic matter eliminates part germ, removes stink, improves sludge edaphic condition.By earthworm life habit system About, earthworm go the method for removing heavy metals to exist the cycle is long, the uneven problem of processing region.
The content of the invention
Earthworm active is improved it is an object of the invention to provide one kind, shortens a huge sum of money in the earthworm removal sludge of process cycle The device and minimizing technology of category.
Device of the invention is adopted the following technical scheme that:
A kind of earthworm removes the device of Heavy Metals in Sludge, including the first process chamber for being set up in parallel and second processing room, and first Be provided with dividing plate between process chamber and second processing room, dividing plate top is provided with through hole, dividing plate top be provided with can pull it is thin Plate, the first chamber bottom is provided with the first osculum and the first feed pipe, and second processing room bottom is provided with the second osculum With the second drainpipe, the first process chamber and second processing room top are incubated case lid equipped with lucifuge;Set gradually in first process chamber There are bottom sludge blanket, earthworm layer and upper strata sludge blanket, earthworm layer is blended with culture medium;Second processing is disposed with bottom in room Sludge blanket, culture medium layer and upper strata sludge blanket, culture medium layer are blended with attractant;Upper strata sludge distance in first process chamber One 10 to 20 centimetres of process chamber top, the upper strata sludge cloth in the upper strata sludge arrangement form of second processing room and the first process chamber Put mode identical.
Using the device of above-mentioned technical proposal, compared with prior art, the growth conditions that can improve earthworm improves work Property, expand scope of activities, promote the accumulation rate of heavy metal.
The preferred scheme of device is:
Dividing plate top be located at through hole side be provided with can pull thin plate, the both sides of dividing plate are respectively provided with locating piece, locating piece On be provided with detent, detent built with can pull thin plate, can be provided with pull thin plate and match with detent Convex shoulder, can the top of pull thin plate be provided with positioning wedged block, positioning wedged block is stuck in the upper end of detent.
The first water supply hole is placed with first feed pipe, the second water supply hole is placed with the second feed pipe.
Serpentine-like structure is arranged in the first process chamber and second processing room respectively for first feed pipe and the second feed pipe.
The top of the first process chamber and second processing room is respectively provided with lighting device.
The bottom of the first process chamber and second processing room is respectively provided with feet, bearing metal protection network in feet.
The method of the present invention use technical scheme be:
The method that device removes earthworm, is carried out as follows:
1)Sludge is placed in the first process chamber first, uniform inoculation earthworm, places culture medium, so in earthworm layer on sludge blanket Afterwards, sludge is sprinkled again in earthworm layer, upper strata sludge thickness is kept for 10 to 12 centimetres, and uniform spreading keeps nature porosity, upper strata Sludge should ensure that Sludge Surface has 10 to 20 centimetres of distance with the first process chamber top edges;
2)The cloth for completing the first process chamber is postponed, and second processing room is arranged:Bottom sludge is first arranged, on bottom sludge Attractant is blended while spreading culture medium;Then, sludge blanket is arranged again in culture medium layer, upper strata sludge thickness keeps 10 to 12 Centimetre, uniform spreading keeps nature porosity, upper strata sludge to should ensure that Sludge Surface has 10 with second processing room top edges To 20 centimetres of distance;
3)Lucifuge insulation case lid is covered, and the temperature of routine observation earthworm active and the first process chamber, moisture and pH value are extraneous Condition, keeps the stable condition of suitable earthworm growth and breeding, while being sampled survey to sludge total heavy metal amount and single earthworm Fixed, observation index content and earthworm breed situation;
4)When Sludge Surface has piled with wormcast, top layer wormcast is struck off, if detection Heavy Metal Level In Sludge is below standard, Sludge is put back to after smashing to pieces;Open lighting device, and extract centre can pull thin plate, protect the first process chamber and second processing room Hold connected state;Then open water pump be slowly injected into water to the first process chamber, it is ensured that water level reach dividing plate bottommost through hole with It is lower 1 to 2 centimetre, you can to switch off the pump;
5)After all entering second processing room by the through hole on dividing plate Deng earthworm, at the same time, to sludge in the first process chamber Uniformly turn over and smash, it manually be transferred to second processing room if finding still to have remaining earthworm, can pull thin plate turn back to, resistance Disconnected first process chamber and second processing room, then open the first chamber bottom osculum, and the water control in the first process chamber is done; If after Heavy Metals in Sludge detection is up to standard, taking out soil and drying recovery, then, by step 2)Cloth is carried out to the first process chamber Put:The new untreated sludge of bottom, training agent base and attractant are inserted, upper strata covers new untreated sludge;If below standard, at first Reason room uniformly turn over and smashes, then add earthworm culture medium and attractant;
6)First process chamber earthworm all after transfer, is handled as follows to second processing room:
6-1)Lucifuge insulation case lid is covered, and outside the temperature of routine observation earthworm active and second processing room, moisture and pH value Boundary's condition, keeps the stable condition of suitable earthworm growth and breeding, while being sampled to sludge total heavy metal amount and single earthworm Determine, observation index content and earthworm breed situation;
6-2)When Sludge Surface has piled with wormcast, top layer wormcast is struck off, if detection Heavy Metal Level In Sludge does not reach Mark, sludge is put back to after smashing to pieces;Open lighting device, and extract centre can pull thin plate, make the first process chamber and second processing Room keeps connected state;Then open water pump and be slowly injected into water to second processing room, it is ensured that water level reaches dividing plate bottommost insertion 1 to 2 centimetre below hole, you can switch off the pump;
6-3)After all entering the first process chamber by the through hole on dividing plate Deng earthworm, at the same time, to dirty in second processing room Mud uniformly turn over and smash, and it is manually transferred into the first process chamber if finding still to have remaining earthworm, can pull thin plate turn back to, The first process chamber and second processing room are blocked, second processing room bottom drain holes is then opened, by the water control in second processing room It is dry;If after Heavy Metals in Sludge detection is up to standard, taking out soil and drying recovery, then, by step 2)Second processing room is carried out Arrangement:Insert bottom sludge, culture medium and the attractant of new untreated layer, the untreated sludge in new upper strata;If below standard, Then add earthworm culture medium and attractant;In this way, two process chamber reciprocation cycles, after Heavy Metals in Sludge is up to standard, change not Treatment sludge.
The processing method of above-mentioned technical proposal, because earthworm is placed in circular treatment in two process chambers, earthworm is entered by water Row is driven, and the effect for passing through attractant, realizes the fanout free region transfer of earthworm, by increasing capacitance it is possible to increase activity of the earthworm in sludge, Improve the efficiency of enriching heavy metal;This processing method can be used in the continuous prodution of heavy metals removal, shorten process cycle, together When the sludge that can conveniently process recycle.
The preferred scheme of processing method is:
Step 4)In top layer earthworm excrement, if detection is up to standard, be can be directly used for after smashing to pieces fertilising, if detection after heavy metal not It is up to standard, put back to after smashing to pieces.
15 centimetres of bottom sludge thickness in first process chamber and second processing room, earthworm layer and training in the first process chamber Support 5 centimetres of the mixed layer thickness of base, 10 centimetres of upper strata sludge thickness.
Attractant uses carbohydrate essence.
Brief description of the drawings
Fig. 1 is structural representation of the invention.
Fig. 2 is can pull thin plate and partition plate connecting structure schematic diagram.
Fig. 3 is the top view of Fig. 2.
Fig. 4 is the B direction views of Fig. 2.
Fig. 5 is the arrangement schematic diagram in two process chambers.
Specific embodiment
Below in conjunction with the accompanying drawings and embodiment describe in detail the present invention:
In the present embodiment, the first process chamber 1, the first osculum 2, the first feed pipe 3, the second feed pipe 4, the second osculum 5, Two process chambers 6, dividing plate 7, through hole 8 can pull thin plate 9, lighting device 10, insulation case lid 11, feet 12, Chain Link Fence 13,
First process chamber 1 and both the concordant settings side by side of second processing room 6,6 are set between the first process chamber 1 and second processing room There is dividing plate 7, dividing plate 7 blocks the first process chamber 1 and second processing room 2 completely;The top of dividing plate 7 is provided with uniform through hole 8, Through hole 8 is arranged in several rows ordered series of numbers, and uniform through hole 8 occupies about the position of the top half of dividing plate 7.
The top of dividing plate 7 be located at through hole 8 side be provided with can pull thin plate 9, can the one side of pull thin plate 9 be close to dividing plate 7 one side is set, and the both sides of dividing plate 7 are respectively provided with locating piece 701, and detent 702 is provided with locating piece 701, is positioned recessed Groove 702 built with can pull thin plate 9, the convex shoulder 902 matched with detent 702 can be provided with pull thin plate 9, can pull The top of thin plate 9 is provided with positioning wedged block 901, and positioning wedged block 901 is stuck in the upper end of detent 701.
The bottom high of locating piece 701 is less than the upper tip edge of dividing plate 7, after positioning wedged block 901 is placed on locating piece 901, with The upper top of dividing plate 7 connects edge flush.
The bottom of first process chamber 1 is provided with the first osculum 2 and the first feed pipe 3, and the bottom of the first osculum 2 is equipped with the One blocks, and has been evenly arranged the first water supply hole on the first feed pipe 3, and the first feed pipe 3 is tortuous or serpentine configuration is arranged in The bottom of first process chamber 3, one end of the first feed pipe 3 is stretched out the outside of the first process chamber 1 and is connected with the first supply-water pump.
The bottom of second processing room 6 is provided with the second osculum 6 and the second feed pipe 4, and the bottom of the second osculum 5 is equipped with the Two block, and have been evenly arranged the second water supply hole on the second feed pipe 4, and the second feed pipe 4 is tortuous or serpentine configuration is arranged in The bottom of second processing room 6, one end of the second feed pipe 4 is stretched out the outside of second processing room 6 and is connected with the second supply-water pump.
Due to the first process chamber 1 and second processing room 6, both are concordant side by side is set, therefore, both top is equipped with same Individual lucifuge is incubated case lid 11, and the insulation case lid 11 is breathed freely light tight;Top in first process chamber 1 and second processing room 6(On four sides Inwall on be respectively provided with lighting device 10)Position close to insulation case lid 11 is respectively provided with lighting device 10;Lighting device 10 Can be that, in order to prevent during primary vaccination earthworm, earthworm repels new environment and climbs out of device using small bulb etc.
Four corners bottom of the first process chamber 1 and second processing room 2 is respectively provided with square feet 12, and square backing plate is used Four prisms cylinder, bearing metal protection network 13 in feet 12, the effect of Chain Link Fence 13 is to protect the first feed pipe 3 and with the The external part of two feed pipes 4 and the base plate to two process chambers play supporting role;Chain Link Fence 13 and two process chambers Base areas sum it is equal.
Bottom sludge blanket 101, earthworm layer 102 and upper strata sludge blanket 103, earthworm layer are disposed with first process chamber 1 102 are blended with culture medium, and culture medium is a little;Bottom sludge blanket 102, culture medium layer 202 are disposed with second processing room 6 With upper strata sludge blanket 203, culture medium layer 202 is blended with attractant, and attractant uses carbohydrate essence;It is upper in first process chamber 1 20 centimetres of the first process chamber of distance top of layer sludge blanket 101, the upper strata sludge blanket 202 of second processing room 6 is apart from second processing room 6 20 centimetres of top.
Embodiment 1:
The method for removing earthworm, based on foregoing processing unit, is carried out as follows:
1st, sludge is placed in the first process chamber 1 first, the uniform inoculation earthworm layer 102 on bottom sludge blanket 101, in earthworm layer 102 place culture medium, and culture medium is using a little(The dosage of culture medium accounts for the 10% of earthworm weight), the effect of culture medium is to make The vigorous breeding of earthworm simultaneously adapts to sludge environment.Then, upper strata sludge 103 is sprinkled again in earthworm layer 102, upper strata sludge blanket 103 is thick Degree is kept for 10 centimetres, and uniform spreading keeps nature porosity, upper strata sludge blanket 103 to should ensure that Sludge Surface and the first process chamber 1 There is 20 centimetres of distance in top edges;The earthworm layer cm of 102 thickness 5;The cm of bottom sludge blanket thickness 15.
2nd, the cloth for completing the first process chamber 1 is postponed, and second processing room 6 is arranged:Bottom sludge blanket 201 is first arranged, A small amount of attractant is blended while spreading culture medium on bottom sludge blanket(The mass ratio of culture medium and attractant is 2:1, the two matter Amount sum accounts for the 10% to 15% of earthworm quality),;Then, sludge blanket is arranged again in culture medium layer, upper strata sludge thickness keeps 13.5 centimetres, uniform spreading keeps nature porosity, upper strata sludge to should ensure that Sludge Surface is deposited with second processing room top edges In 20 centimetres of distance.The cm of culture medium layer thickness 1.5, the cm of bottom sludge blanket thickness 15.
3rd, lucifuge insulation case lid 11, and the temperature of routine observation earthworm active and the first process chamber 1, moisture and pH are covered The external conditions such as value, keep the stable condition of suitable earthworm growth and breeding, while entering to sludge total heavy metal amount and single earthworm Line sampling is determined, and observation index content and earthworm breed situation.
4th, when wormcast discharges inactive or Sludge Surface and piled with wormcast, illustrate that earthworm has reached a kind of relatively steady Fixed inertia weather, need to be driven to excite earthworm active to it.Top layer wormcast is struck off, if weight in detection sludge Tenor is below standard, and sludge is put back to after smashing to pieces;Open lighting device 10, and extract centre can pull thin plate 9, make at first Reason room 1 and second processing room 6 keep connected state;Then water pump is opened by the first feed pipe 3 to slow in the first process chamber 1 Injection water, it is ensured that water level is reached 1 to 2 centimetre below the edge of dividing plate bottommost through hole 8, you can switched off the pump.
Top layer earthworm excrement in step 4, if detection is up to standard, can be directly used for fertilising after smashing to pieces, if a huge sum of money after detection Category is below standard, is put back to after smashing to pieces.
5th, etc. after earthworm almost all enters second processing room 6 by the through hole 8 on dividing plate 7, at the same time, at first Sludge uniformly turn over and smash in reason room 1, and it is manually transferred in second processing room 6 if finding still to have remaining earthworm, can Pull thin plate 9 is turned back to, and blocks the first process chamber 1 and second processing room 6, then opens the first osculum of bottom of the first process chamber 1 2, the water control in the first process chamber 1 is done;If after Heavy Metals in Sludge detection is up to standard, taking out soil and drying recovery, then, press The first process chamber of step 2 pair 1 is arranged:The new untreated sludge of bottom, training agent base and attractant are inserted, upper strata covering is not located newly Reason sludge;If below standard, earthworm culture medium and attractant are added;First process chamber is carried out uniformly to turn over and is smash.
6th, after the earthworm of the first process chamber 1 all shifts, second processing room is handled as follows:
6-1, cover lucifuge insulation case lid 11, and the temperature of routine observation earthworm active and second processing room 6, moisture and pH value Etc. external condition, the stable condition of suitable earthworm growth and breeding is kept, while being carried out to sludge total heavy metal amount and single earthworm Sampling is determined, and observation index content and earthworm breed situation.
6-2, whne wormcast discharge inactive or Sludge Surface piled with wormcast when, top layer wormcast is struck off, if inspection Survey Heavy Metal Level In Sludge is below standard, and sludge is put back to after smashing to pieces;Open lighting device 11, and extract centre can pull thin plate 9, the first process chamber 1 and second processing room 6 is kept connected state;Then the second water pump is opened by the second feed pipe 4 to the Two process chambers 6 are slowly injected into water, it is ensured that water level is reached 1 to 2 centimetre below the bottommost through hole of dividing plate 7, you can close the second water Pump.
6-3, etc. earthworm almost all by the through hole on dividing plate 7 enter the first process chamber 4 after, at the same time, to second Sludge uniformly turn over and smash in process chamber 6, and it is manually transferred to the first process chamber 1 if finding still to have remaining earthworm, can Pull way-board 9 is turned back to, and blocks the first process chamber 1 and second processing room 6, then opens the second row of the bottom of second processing room 6 Water hole 5, the water control in second processing room 6 is done;If after Heavy Metals in Sludge detection is up to standard, taking out soil and drying recovery.So Afterwards, second processing room 6 is arranged by step 2:Bottom sludge, culture medium and the attractant of new untreated layer are inserted, newly The untreated sludge in upper strata;If below standard, earthworm culture medium and attractant are added;In this way, two process chamber reciprocation cycles, After Heavy Metals in Sludge is up to standard, untreated sludge is changed.
Additionally, in whole processing method operating process, can be determined by preliminary experiment for sludge and earthworm inoculum concentration, I.e. before experiment starts, the homotype earthworm of the sludge quantity of different gradients and different gradients is placed in same indoor culture, with culture Heavy metal removing rate is detected after time, heavy metal removing rate one group of gradient of highest is chosen, the amount of inserting of sludge during as experiment With the inoculum concentration of earthworm, wherein the amount of earthworm experiment when should ensure that to be 1.8 to 2.0 times of preliminary experiment.
Embodiment 2:
The minimizing technology of the device based on earthworm removal Heavy Metals in Sludge, is carried out as follows:
1st, sludge is placed in the first process chamber 1 first, the uniform inoculation earthworm layer 102 on bottom sludge blanket 101, in earthworm layer 102 place culture medium, and culture medium is using a little(The dosage of culture medium accounts for the 10% of earthworm weight), the effect of culture medium is to make The vigorous breeding of earthworm simultaneously adapts to sludge environment.Then, upper strata sludge 103 is sprinkled again in earthworm layer 102, upper strata sludge blanket 103 is thick Degree is kept for 10 centimetres, and uniform spreading keeps nature porosity, upper strata sludge blanket 103 to should ensure that Sludge Surface and the first process chamber 1 There is 20 centimetres of distance in top edges;The earthworm layer cm of 102 thickness 5;The cm of bottom sludge blanket thickness 15.
2nd, the cloth for completing the first process chamber 1 is postponed, and second processing room 6 is arranged:Bottom sludge blanket 201 is first arranged, Blend a small amount of attractant while spreading culture medium on bottom sludge blanket, the mass ratio of culture medium and attractant is 2:1, the two matter Amount sum accounts for the 15% of earthworm quality;Then, sludge blanket is arranged again in culture medium layer, upper strata sludge thickness is kept for 13.5 lis Rice, uniform spreading keeps nature porosity, upper strata sludge to should ensure that Sludge Surface has 20 lis with second processing room top edges The distance of rice.The cm of culture medium layer thickness 1.5, the cm of bottom sludge blanket thickness 15.
3rd, lucifuge insulation case lid 11, and the temperature of routine observation earthworm active and the first process chamber 1, moisture and pH are covered The external conditions such as value, keep the stable condition of suitable earthworm growth and breeding, while entering to sludge total heavy metal amount and single earthworm Line sampling is determined, and observation index content and earthworm breed situation.
4th, when Sludge Surface has piled with wormcast, illustrate that earthworm has reached a kind of metastable inertia weather, Need to it be driven to excite earthworm active.Top layer wormcast is struck off, it is dirty if detection Heavy Metal Level In Sludge is below standard Mud is put back to after smashing to pieces;Open lighting device 10, and extract centre can pull thin plate 9, make the first process chamber 1 and second processing room 6 keep connected state;Then water pump is opened by the first feed pipe 3 to being slowly injected into water in the first process chamber 1, it is ensured that water level reaches 2 centimetres below to the edge of dividing plate bottommost through hole 8, you can switch off the pump.
Top layer earthworm excrement in step 4, if detection is up to standard, can be directly used for fertilising after smashing to pieces, if a huge sum of money after detection Category is below standard, is put back to after smashing to pieces.
5th, etc. after earthworm all enters second processing room 6 by the through hole 8 on dividing plate 7, at the same time, to the first process chamber Sludge uniformly turn over and smash in 1, and it is manually transferred in second processing room 6 if finding still to have remaining earthworm, can pull Thin plate 9 is turned back to, and blocks the first process chamber 1 and second processing room 6, then opens the first osculum of bottom 2 of the first process chamber 1, will Water control in first process chamber 1 is done;If after Heavy Metals in Sludge detection is up to standard, taking out soil and drying recovery, then, by step 2 pairs of the first process chambers 1 are arranged:Insert the new untreated sludge of bottom, training agent base and attractant, the new untreated dirt of upper strata covering Mud;If below standard, earthworm culture medium and attractant are added;First process chamber is carried out uniformly to turn over and is smash.
6th, after the earthworm of the first process chamber 1 all shifts, second processing room is handled as follows:
6-1, cover lucifuge insulation case lid 11, and the temperature of routine observation earthworm active and second processing room 6, moisture and pH value Etc. external condition, the stable condition of suitable earthworm growth and breeding is kept, while being carried out to sludge total heavy metal amount and single earthworm Sampling is determined, and observation index content and earthworm breed situation.
6-2, when Sludge Surface has piled with wormcast, top layer wormcast is struck off, if detection Heavy Metal Level In Sludge Below standard, sludge is put back to after smashing to pieces;Open lighting device 11, and extract centre can pull thin plate 9, make the He of the first process chamber 1 Second processing room 6 keeps connected state;Then the second water pump is opened to be slowly injected into second processing room 6 by the second feed pipe 4 Water, it is ensured that water level is reached 1 to 2 centimetre below the bottommost through hole of dividing plate 7, you can close the second water pump.
6-3, etc. earthworm all by the through hole on dividing plate 7 enter the first process chamber 4 after, at the same time, to second processing Sludge uniformly turn over and smash in room 6, and it is manually transferred to the first process chamber 1 if finding still to have remaining earthworm, can pull Way-board 9 is turned back to, and blocks the first process chamber 1 and second processing room 6, then opens the second osculum of the bottom of second processing room 6 5, the water control in second processing room 6 is done;If after Heavy Metals in Sludge detection is up to standard, taking out soil and drying recovery.Then, press Step 2 is arranged to second processing room 6:Insert bottom sludge, culture medium and the attractant of new untreated layer, new upper strata Untreated sludge;If below standard, earthworm culture medium and attractant are added;In this way, two process chamber reciprocation cycles, treat sludge After middle heavy metal is up to standard, untreated sludge is changed.
Additionally, in whole processing method operating process, can be determined by preliminary experiment for sludge and earthworm inoculum concentration, I.e. before experiment starts, the homotype earthworm of the sludge quantity of different gradients and different gradients is placed in same indoor culture, with culture Heavy metal removing rate is detected after time, heavy metal removing rate one group of gradient of highest is chosen, the amount of inserting of sludge during as experiment With the inoculum concentration of earthworm, wherein the amount of earthworm experiment when should ensure that to be 1.8 to 2.0 times of preliminary experiment.

Claims (10)

1. a kind of earthworm removes the device of Heavy Metals in Sludge, including the first process chamber for being set up in parallel and second processing room, its It is characterised by:Dividing plate is provided between first process chamber and second processing room, dividing plate top is provided with through hole, and dividing plate top sets Be equipped with can pull thin plate, the first chamber bottom is provided with the first osculum and the first feed pipe, and second processing room bottom is set There are the second osculum and the second drainpipe, the first process chamber and second processing room top are incubated case lid equipped with lucifuge;First treatment Interior is disposed with bottom sludge blanket, earthworm layer and upper strata sludge blanket, and earthworm layer is blended with culture medium;In second processing room according to Secondary to be provided with bottom sludge blanket, culture medium layer and upper strata sludge blanket, culture medium layer is blended with attractant;It is upper in first process chamber 10 to 20 centimetres of layer sludge the first process chamber of distance top, in the upper strata sludge arrangement form of second processing room and the first process chamber Upper strata sludge arrangement it is identical.
2. earthworm according to claim 1 removes the device of Heavy Metals in Sludge, it is characterised in that:Dividing plate top is located at and passes through The side of through hole be provided with can pull thin plate, the both sides of dividing plate are respectively provided with locating piece, detent are provided with locating piece, fixed Position groove built with can pull thin plate, can be provided with the convex shoulder matched with detent on pull thin plate, can pull thin plate Top is provided with positioning wedged block, and positioning wedged block is stuck in the upper end of detent.
3. earthworm according to claim 1 removes the device of Heavy Metals in Sludge, it is characterised in that:Arranged on first feed pipe The first water supply hole is furnished with, the second water supply hole is placed with the second feed pipe.
4. earthworm according to claim 1 removes the device of Heavy Metals in Sludge, it is characterised in that:First feed pipe and Serpentine-like structure is arranged in the first process chamber and second processing room to two feed pipes respectively.
5. earthworm according to claim 1 removes the device of Heavy Metals in Sludge, it is characterised in that:First process chamber and Lighting device is respectively provided with the top of two process chambers.
6. earthworm according to claim 1 removes the device of Heavy Metals in Sludge, it is characterised in that:First process chamber and The bottom of two process chambers is respectively provided with feet, bearing metal protection network in feet.
7. the method that the device in a kind of utilization right 1 to 6 described in any one removes earthworm, is carried out as follows:
1)Sludge is placed in the first process chamber first, uniform inoculation earthworm, places culture medium, so in earthworm layer on sludge blanket Afterwards, sludge is sprinkled again in earthworm layer, upper strata sludge thickness is kept for 10 to 12 centimetres, and uniform spreading keeps nature porosity, upper strata Sludge should ensure that Sludge Surface has 10 to 20 centimetres of distance with the first process chamber top edges;
2)The cloth for completing the first process chamber is postponed, and second processing room is arranged:Bottom sludge is first arranged, on bottom sludge Attractant is blended while spreading culture medium;Then, sludge blanket is arranged again in culture medium layer, upper strata sludge thickness keeps 10 to 12 Centimetre, uniform spreading keeps nature porosity, upper strata sludge to should ensure that Sludge Surface has 10 with the first process chamber top edges To 20 centimetres of distance;
3)Lucifuge insulation case lid is covered, and the temperature of routine observation earthworm active and the first process chamber, moisture and pH value are extraneous Condition, keeps the stable condition of suitable earthworm growth and breeding, while being sampled survey to sludge total heavy metal amount and single earthworm Fixed, observation index content and earthworm breed situation;
4)When wormcast discharges inactive or Sludge Surface and piled with wormcast, top layer wormcast is struck off, if detection sludge Middle content of beary metal is below standard, and sludge is put back to after smashing to pieces;Open lighting device, and extract centre can pull thin plate, make first Process chamber and second processing room keep connected state;Then open water pump and be slowly injected into water to the first process chamber, it is ensured that water level reaches 1 to 2 centimetre below to dividing plate bottommost through hole, you can switch off the pump;
5)After all entering second processing room by the through hole on dividing plate Deng earthworm, at the same time, to sludge in the first process chamber Uniformly turn over and smash, it be manually transferred to second processing room if finding still to have remaining earthworm, can pull way-board turn back to, The first process chamber and second processing room are blocked, the first chamber bottom osculum is then opened, by the water control in the first process chamber It is dry;If after Heavy Metals in Sludge detection is up to standard, taking out soil and drying recovery, then, by step 2)First process chamber is carried out Arrangement:The new untreated sludge of bottom, training agent base and attractant are inserted, upper strata covers new untreated sludge;If below standard, to first Process chamber uniformly turn over and smash, then add earthworm culture medium and attractant;
6)First process chamber earthworm all after transfer, is handled as follows to second processing room:
6-1)Lucifuge insulation case lid is covered, and outside the temperature of routine observation earthworm active and second processing room, moisture and pH value Boundary's condition, keeps the stable condition of suitable earthworm growth and breeding, while being sampled to sludge total heavy metal amount and single earthworm Determine, observation index content and earthworm breed situation;
6-2)When Sludge Surface has piled with wormcast, top layer wormcast is struck off, if detection Heavy Metal Level In Sludge does not reach Mark, sludge is put back to after smashing to pieces;Open lighting device, and extract centre can pull thin plate, make the first process chamber and second processing Room keeps connected state;Then open water pump and be slowly injected into water to second processing room, it is ensured that water level reaches dividing plate bottommost insertion 1 to 2 centimetre below hole, you can switch off the pump;
6-3)After all entering the first process chamber by the through hole on dividing plate Deng earthworm, at the same time, to dirty in second processing room Mud uniformly turn over and smash, and it is manually transferred into the first process chamber if finding still to have remaining earthworm, can pull thin plate turn back to, The first process chamber and second processing room are blocked, second processing room bottom drain holes is then opened, by the water control in second processing room It is dry;If after Heavy Metals in Sludge detection is up to standard, taking out soil and drying recovery, then, by step 2)Second processing room is carried out Arrangement:Insert bottom sludge, culture medium and the attractant of new untreated layer, the untreated sludge in new upper strata;If below standard, Then add earthworm culture medium and attractant;In this way, two process chamber reciprocation cycles, after Heavy Metals in Sludge is up to standard, change not Treatment sludge.
8. the method that device according to claim 7 removes earthworm, it is characterised in that:Step 4)In top layer earthworm excrement, such as Fruit detects up to standard, and fertilising is can be directly used for after smashing to pieces, if heavy metal is below standard after detection, is put back to after smashing to pieces.
9. the method that device according to claim 1 removes earthworm, it is characterised in that:First process chamber and second processing room 15 centimetres interior of bottom sludge thickness, earthworm layer and 5 centimetres of the mixed layer thickness of culture medium, upper strata sludge in the first process chamber 10 centimetres of thickness.
10. the method that device according to claim 7 removes earthworm, it is characterised in that:Attractant uses carbohydrate essence.
CN201710133412.6A 2017-03-08 2017-03-08 Device and method for removing heavy metals in sludge by using earthworms Active CN106810034B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710133412.6A CN106810034B (en) 2017-03-08 2017-03-08 Device and method for removing heavy metals in sludge by using earthworms

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710133412.6A CN106810034B (en) 2017-03-08 2017-03-08 Device and method for removing heavy metals in sludge by using earthworms

Publications (2)

Publication Number Publication Date
CN106810034A true CN106810034A (en) 2017-06-09
CN106810034B CN106810034B (en) 2020-06-02

Family

ID=59116173

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710133412.6A Active CN106810034B (en) 2017-03-08 2017-03-08 Device and method for removing heavy metals in sludge by using earthworms

Country Status (1)

Country Link
CN (1) CN106810034B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107721109A (en) * 2017-11-16 2018-02-23 北京派润环境科技有限公司 Vermiculture handles device of sludge and method
CN110655293A (en) * 2019-10-18 2020-01-07 南京师范大学 Earthworm reactor with frame composite structure and method for treating sludge by earthworm reactor
CN112642858A (en) * 2020-12-04 2021-04-13 张宁 Soil remediation ecological net and remediation method thereof
CN113475466A (en) * 2021-07-22 2021-10-08 广东省科学院生态环境与土壤研究所 Method for breeding deep-habitat earthworms

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101391841A (en) * 2008-10-20 2009-03-25 同济大学 High-load angleworm bio-filter for processing rural decentralized wastewater
KR20120090570A (en) * 2011-02-08 2012-08-17 주식회사 삼안 Treating apparatus of waste food
CN103803771A (en) * 2014-03-05 2014-05-21 北京德怀生物科技有限公司 Method for disposing urban sludge by using earthworms
RU2521707C1 (en) * 2013-01-22 2014-07-10 Общество с ограниченной ответственностью "ХомоБиоЦикл" (ООО "ХомоБиоЦикл") Biorecycling method of oil sludge and oil production and processing waste
CN203768194U (en) * 2014-02-24 2014-08-13 沈阳环境科学研究院 Device for treating residual sludge by using earthworms
CN104920074A (en) * 2015-07-07 2015-09-23 海南农垦科技发展有限公司 Method for improving soil organic matter through fungus cultivation
CN105314797A (en) * 2015-11-23 2016-02-10 上海应用技术学院 Bacterial earthworm filter for synchronous treatment of sewage and sludge and application thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101391841A (en) * 2008-10-20 2009-03-25 同济大学 High-load angleworm bio-filter for processing rural decentralized wastewater
KR20120090570A (en) * 2011-02-08 2012-08-17 주식회사 삼안 Treating apparatus of waste food
RU2521707C1 (en) * 2013-01-22 2014-07-10 Общество с ограниченной ответственностью "ХомоБиоЦикл" (ООО "ХомоБиоЦикл") Biorecycling method of oil sludge and oil production and processing waste
CN203768194U (en) * 2014-02-24 2014-08-13 沈阳环境科学研究院 Device for treating residual sludge by using earthworms
CN103803771A (en) * 2014-03-05 2014-05-21 北京德怀生物科技有限公司 Method for disposing urban sludge by using earthworms
CN104920074A (en) * 2015-07-07 2015-09-23 海南农垦科技发展有限公司 Method for improving soil organic matter through fungus cultivation
CN105314797A (en) * 2015-11-23 2016-02-10 上海应用技术学院 Bacterial earthworm filter for synchronous treatment of sewage and sludge and application thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107721109A (en) * 2017-11-16 2018-02-23 北京派润环境科技有限公司 Vermiculture handles device of sludge and method
CN110655293A (en) * 2019-10-18 2020-01-07 南京师范大学 Earthworm reactor with frame composite structure and method for treating sludge by earthworm reactor
CN112642858A (en) * 2020-12-04 2021-04-13 张宁 Soil remediation ecological net and remediation method thereof
CN113475466A (en) * 2021-07-22 2021-10-08 广东省科学院生态环境与土壤研究所 Method for breeding deep-habitat earthworms
CN113475466B (en) * 2021-07-22 2022-06-17 广东省科学院生态环境与土壤研究所 Method for breeding deep-habitat earthworms

Also Published As

Publication number Publication date
CN106810034B (en) 2020-06-02

Similar Documents

Publication Publication Date Title
CN106810034A (en) Earthworm removes the device and minimizing technology of Heavy Metals in Sludge
Medema et al. Catchment characterisation and source water quality
Gao et al. Seasonal and diurnal dynamics of physicochemical parameters and gas production in vertical water column of a eutrophic pond
CN106359263A (en) Ecological pig breeding method
Wang et al. Exotic Spartina alterniflora invasion enhances sediment N-loss while reducing N retention in mangrove wetland
CN102786195A (en) Method for synchronously treating hydrocotyle verticillata and dewatered sludge by utilizing Peace-II earthworms
WO2010055985A1 (en) Fermentation apparatus for livestock excrement
US10926307B1 (en) Polluted site by thermal decomposition at normal temperature combined with biological heap
Cui et al. Constructed wetland as an alternative solution to maintain urban landscape lake water quality: Trial of Xing-Qing lake in Xi’an city
Harmel et al. Vegetated treatment area (VTAs) efficiencies for E. coli and nutrient removal on small-scale swine operations
CN111960534A (en) ECR sewage treatment device
CN104860398B (en) Intensive device and its method of construction for processing domestic sewage in rural areas
Toze et al. Determination of water quality improvements due to the artificial recharge of treated effluent
CN104016543B (en) A kind of Sewage treatment systems
CN106111062A (en) A kind of parasol bamboo biological carbon preparation method and applications based on artificial wet land system
CN108163986A (en) A kind of endogenous nitrogen phosphorus complex repairation control system based on eel grass-SMFC
CN107805658A (en) A kind of screening technique of the eucaryon miniature organism T RFLP fragment sensitive to water quality
CN204058166U (en) A kind of Sewage treatment systems
CN203700032U (en) Device for treating sewage by water planting root system of wetland plants
CN205455431U (en) Contamination cleaning device
CN208640575U (en) A kind of village ecological dry pail latrine system
CN207435263U (en) Wastewater from pig farm processing system
Brenner et al. Use of plaque assay to detect enteric viruses in a rural watershed
He et al. Linking fluorescent dissolved organic matters to microbial carbon metabolism in the overlying water during submerged macrophyte Potamogeton crispus L decomposition in the presence/absence of Vallisneria natans
CN105753162B (en) A kind of horizontal drowned flow artificial wet land and its application for the processing of Ship Building and Repairing saline sewage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant