CN1068085C - 预加反力封桩施工方法及预加反力封桩加荷装置 - Google Patents
预加反力封桩施工方法及预加反力封桩加荷装置 Download PDFInfo
- Publication number
- CN1068085C CN1068085C CN 97108992 CN97108992A CN1068085C CN 1068085 C CN1068085 C CN 1068085C CN 97108992 CN97108992 CN 97108992 CN 97108992 A CN97108992 A CN 97108992A CN 1068085 C CN1068085 C CN 1068085C
- Authority
- CN
- China
- Prior art keywords
- stake
- envelope
- pile
- counterforce
- loading
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Foundations (AREA)
Abstract
本发明涉及一种对已有沉裂、倾斜建筑物的基础进行补桩加固的预加反力封桩施工方法及预加反力封桩加荷装置,其要点是通过一个在锚杆螺栓1上装有封桩梁2及接杆4,在接杆上固定有反力梁5及安全拉板6并在封桩梁与反力梁之间放置千斤顶7的预加反力封桩加荷装置进行加荷封桩,以使对沉降地基加固的补桩迅速发挥承载作用并减少压桩施工产生的附加沉降。本发明只要一套预加反力封桩加荷装置就可对所有需要进行预加反力封桩的补桩孔进行封桩。
Description
本发明涉及一种建筑物基础补桩加固技术,特别是涉及一种对已有沉裂、倾斜建筑物的基础进行补桩加固的施工方法及装置。
建筑物由于施工质量等问题常会产生不均匀沉降,并使建筑物发生裂缝、倾斜,而建筑物发生倾斜往往是由于地基承载力不足引起的,因此对沉裂,倾斜建筑物一般要进行地基加固处理,地基加固一般采用补桩措施。而在补桩施工时,又往往会由于对地基扰动而产生附加沉降,致使地基加速下沉。为了减少压桩施工引起的附加沉降或为了使补桩尽快发挥承载作用,往往需要进行预加反力封桩。目前使用的预加反力封桩施工方法,一个补桩孔需要一套预加反力加荷架,每个加荷架上都要装一个千斤顶,这样一般的补桩加固工程也就需要数十套加荷架及数十个千斤顶,设备投资比较大,因此实际应用时,往往因资金困难而较难实施。
本发明的目的在于提供一种施工简便,设备投资省,易于推广应用的预加反力封桩施工方法及预加反力封桩加荷装置,利用该方法和装置无论有多少个补桩孔需要进行预加反力封桩,只需一套预加反力封桩加荷装置和若干个封桩钢梁即可实现。
本发明的目的可通过如下技术方案来实现:
本发明的预加反力封桩施工方法包括:
a.将桩顶送入桩孔或砍桩头使桩顶落在桩孔内以满足封桩要求;
b.桩孔内放入钢桩垫;
c.在埋设于补桩孔两侧的锚杆螺栓1上部安装预加反力封桩加荷装置;
d.通过预加反力封桩加荷装置进行加荷封桩;
e.加荷达到预定值后,拆除预加反力封桩加荷装置,并在桩孔内浇筑封桩砼;
所述的加荷封桩采用千斤顶顶升加荷,并按分级进行,每加一级荷载,就将固定封桩的螺帽3拧紧,当加荷达到预定值时,再将封桩梁螺帽拧紧。
所述的加荷预定值为设计预加反力的1.2倍左右。
本发明的预加反力封桩加荷装置包括锚杆螺栓1,封桩梁2、螺帽3及千斤顶7,其要点在于该装置是在锚杆螺栓1上装有封桩梁2和接杆4,封桩梁2通过螺帽3固定,接杆4通过螺纹连接套9与锚杆螺栓相连接,接杆4上固定有反力梁5及安全拉板6,封桩梁2与反力梁5之间放置有千斤顶7。
所述的封桩梁2与反力梁5为相同的钢制结构,它们由纵梁21、51与固定于纵梁两端部的横梁22、52组成,每根横梁的两端部各有一个U形槽221、521,封桩梁2通过U形槽221套在锚杆螺栓1上,反力梁5通过U形槽521套在接杆4上,并通过螺帽10加以固定。
利用本发明的方法和装置,只要一套预加反力封桩加荷装置和若干个封桩梁,就可对所有需要进行预加反力封桩的补桩孔进行封桩,因而使得预加反力封桩施工变得简单容易,并能较大幅度地节省设备投资。因此也使本发明容易推广应用。
图1是本发明的预加反力封桩加荷装置俯视图。
图2是预加反力封桩加荷装置主视图。
图3是预加反力封桩加荷装置侧视图。
图4是封桩梁及反力梁立体示意图。
实施例:
本发明的预加反力封桩施工方法采用如图1~4所示的装置进行,现结合一具体实例描述如下:
珠海某办公楼主楼为六层砼框架结构,长53.7m,宽9.6m,高24m。该楼由于沉管灌注桩桩身质量缺陷产生不均匀沉降,主体结构建成后发现沉降量急增,其中有两个沉降观测点在17天时间内沉降量分别增加23mm、37mm,相应沉降速度分别为1.35mm/day,2.18mm/day。同时发现办公楼轴墙、梁、板部位多处开裂,,严重威胁建筑物的安全,急需进行基础加固处理,以便使沉降能够得到控制,并在较短的时间内趋于稳定,防止结构产生更大的损坏。为此,我们对该建筑物基础进行了补桩加固处理,共补280×280mm2断面砼方砖114根,桩长17~24m,设计单桩承载力500KN。补桩前,先将原柱基承台进行托换加固,使之连成一个整体,成条形基础状,并预留出补桩孔,补桩孔两侧埋设四根锚杆螺栓1。为了尽量减少补桩施工对地基扰动所引起的附加沉降造成办公楼的倾斜加剧,对沉降多一侧部分补桩32根运用了本发明的预加反力封桩施工方法及装置。预加反力为400KN。
进行预加反力封桩施工时,先将桩顶送入预留的补桩孔内,或进行砍桩头处理,使桩顶落在补桩孔内,以满足封桩要求。接着按图2所示,在桩孔内放入钢桩垫8,在补桩孔两侧锚杆螺栓1上安装预加反力加荷装置。预加反力封桩加荷装置结构如图1~4所示,它是在锚杆螺栓1上装有封桩梁2和接杆4,封桩梁2由纵梁21和焊接固定于纵梁两端的横梁22组成,每根横梁的两端部各开有一个U形槽221,封桩梁2通过U形槽221套在锚杆螺栓1上,并通过通过螺帽3固定。接杆4通过螺纹连接套9与锚杆螺栓1连接固定,接杆4上部固定有反力梁5及安全拉板6,反力梁5具有与封桩梁2相同的结构,它由纵梁51和焊接固定于纵梁两端的横梁52组成,每根横梁的两端各开有一个U形槽521,反力梁通过四个U形槽521套在接杆4上,在反力梁的两横梁上部的接杆上套有安全拉板6,通过螺帽10将反力梁及安全拉板固定。在封桩梁2与反力梁5之间放置有千斤顶7,通过千斤顶7进行顶升加荷。顶升加荷按分级进行,每加一级荷载,就将固定封桩的螺帽3拧紧,当加荷达到设计预加反力的1.2倍时,再将封桩钢梁的螺帽拧紧。加荷达到预定值后,千斤顶卸荷,拆除拉板,接杆和反力梁,并浇筑封桩砼。待封桩砼达到一定强度时,拆除封桩梁,预加反力封桩施工结束。
通过预加反力封桩使补桩迅速发挥了承载作用,有效地防止了办公楼的倾斜、沉降继续发展。加固后观测资料表明办公楼的沉降已经稳定。
Claims (5)
1、一种预加反力封桩施工方法,其特征在于该方法包括:
a.将桩顶送入桩孔或砍桩头使桩顶落在桩孔内以满足封桩要求;
b.桩孔内放人钢桩垫;
c.在埋设于补桩孔两侧的锚杆螺栓(1)上部安装预加反力封桩加荷装置;
d.通过预加反力封桩加荷装置进行加荷封桩;
e.加荷达到预定值后,拆除预加反力封桩加荷装置,并在桩孔内浇筑封桩砼。
2、根据权利要求1所述的预加反力封桩施工方法,其特征在于所述的加荷封桩采用千斤顶顶升加荷,并按分级进行,每加一级荷载,就将固定封桩的螺帽(3)拧紧,当加荷达到预定值时,再将封桩梁螺帽拧紧。
3、根据权利要求2所述的预加反力封桩施工方法,其特征在于所述的加荷预定值为设计预加反力的1.2倍左右。
4、一种权利要求1所述方法中的预加反力封桩加荷装置,其包括锚杆螺栓(1),封桩梁(2)、螺帽(3)及千斤顶(7),其特征在于该装置是在锚杆螺栓(1)上装有封桩粱(2)和接杆(4),封桩粱(2)通过螺帽(3)固定,接杆(4)通过螺纹连接套(9)与锚杆螺栓相连接,接杆(4)上部固定有反力梁(5)及安全拉板(6),封桩梁(2)与反力梁(5)之间放置有千斤顶(7)。
5、根据权利要求4所述的预加反力封桩加荷装置,其特征在于所述的封桩梁(2)与反力梁(5)为相同的钢制结构,它们由纵梁(21)、(51)与固定于纵梁两端部的横梁(22)、(52)组成,每根横梁的两端部各有一个U形槽(221)、(521),封桩梁(2)通过U形槽(221)套在锚杆螺栓(1)上,反力梁(5)通过U形槽(521)套在接杆(4)上,并通过螺帽(10)加以固定。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 97108992 CN1068085C (zh) | 1997-07-23 | 1997-07-23 | 预加反力封桩施工方法及预加反力封桩加荷装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 97108992 CN1068085C (zh) | 1997-07-23 | 1997-07-23 | 预加反力封桩施工方法及预加反力封桩加荷装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1182818A CN1182818A (zh) | 1998-05-27 |
CN1068085C true CN1068085C (zh) | 2001-07-04 |
Family
ID=5170820
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 97108992 Expired - Fee Related CN1068085C (zh) | 1997-07-23 | 1997-07-23 | 预加反力封桩施工方法及预加反力封桩加荷装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1068085C (zh) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2005028759A1 (en) | 2003-09-24 | 2005-03-31 | So.L.E.S. - Società Lavori Edili E Serbatoi S.P.A. | Method of constructing a pile foundation |
US8926227B2 (en) * | 2007-12-31 | 2015-01-06 | SO.L.E.S.—Societa' Lavori Edili E Serbatoi S.p.A. | Method and system for raising a building structure |
MY147517A (en) * | 2008-11-21 | 2012-12-31 | Ong Chin Dr Ir Chai | Pile driver for use in a confined space with limited head room |
CN102605785A (zh) * | 2012-04-01 | 2012-07-25 | 江苏东南特种技术工程有限公司 | 锚杆静压桩预加压力封桩装置 |
CN103510517A (zh) * | 2013-10-21 | 2014-01-15 | 江苏东南特种技术工程有限公司 | 大吨位锚杆静压桩简易压桩架 |
CN104555705B (zh) * | 2014-12-24 | 2017-04-05 | 中国化学工程第三建设有限公司 | 一种悬挂式立置容器快速起吊的方法 |
CN105133851B (zh) * | 2015-08-18 | 2017-12-12 | 深圳市苏勘岩土工程有限公司 | 一种软土地基上地坪提升调平修复的方法及其提升结构 |
CN105525620B (zh) * | 2016-01-15 | 2018-10-02 | 中交第一航务工程局有限公司 | 一种沉箱顶升装置及其操作方法 |
CN106404372B (zh) * | 2016-10-12 | 2019-03-08 | 济南轨道交通集团有限公司 | 一种轨道交通u梁静荷载试验装置及方法 |
CN106400859A (zh) * | 2016-11-16 | 2017-02-15 | 贵州正业工程技术投资有限公司 | 一种预试桩静压施加系统 |
CN109653264A (zh) * | 2018-12-24 | 2019-04-19 | 焦作大学 | 一种浅基础建筑物纠偏加固结构 |
CN109797787A (zh) * | 2019-03-06 | 2019-05-24 | 中国电建集团北京勘测设计研究院有限公司 | 一种调节运行期风力发电机基础差异沉降的调平装置 |
CN111622281A (zh) * | 2020-06-08 | 2020-09-04 | 广东精特建设工程有限公司 | 一种筏板基础建筑物同步顶升纠偏的施工方法 |
-
1997
- 1997-07-23 CN CN 97108992 patent/CN1068085C/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN1182818A (zh) | 1998-05-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1068085C (zh) | 预加反力封桩施工方法及预加反力封桩加荷装置 | |
CN1078285C (zh) | 倾斜建筑物可控纠偏施工方法及装置 | |
CN111058539A (zh) | 一种建筑顶升托换装置及方法 | |
CN211690792U (zh) | 一种建筑顶升托换装置 | |
CN111809654A (zh) | 一种装配化压重式塔吊基础结构 | |
CN1165234A (zh) | 一种建筑物断柱顶升纠偏方法 | |
CN2635739Y (zh) | 桩基竖向抗压静载试验装置 | |
CN216586690U (zh) | 一种静载地锚反力装置 | |
CN2310791Y (zh) | 预加反力封桩加荷装置 | |
CN210714048U (zh) | 一种自立式铁塔塔座纠偏装置 | |
CN220150100U (zh) | 一种桁架式双柱两侧悬臂式盖梁支架 | |
JPS62202121A (ja) | 切梁のジャッキアップ方法 | |
CN116733014A (zh) | 一种张弦结构体系的施工方法 | |
CN211621580U (zh) | 一种采用双千斤顶锚杆静压桩的压桩装置 | |
CN221072318U (zh) | 一种适用于圆端形墩柱盖梁施工用牛腿托架 | |
CN212452773U (zh) | 一种钢板桩围堰逆作法施工的内支撑安装装置 | |
CN219527716U (zh) | 一种桩基托换结构 | |
CN219342875U (zh) | 一种中小曲线现浇箱梁新型组合支架结构 | |
US6416254B1 (en) | Method and apparatus for supporting a wall | |
CN220318599U (zh) | 一种大型桩基静载荷试验用锚桩钢筋与反力梁连接装置 | |
CN115420630B (zh) | 现场载荷和直剪试验复合型竖向加载机构及其加载方法 | |
CN212957756U (zh) | 一种托梁拔柱的加固托换装置 | |
US6416255B1 (en) | Method and apparatus for supporting multiple walls | |
CN217174381U (zh) | 一种钢管桩支架顶部平台固定扣件 | |
CN217268057U (zh) | 一种钢筋混凝土无梁楼盖的加固支撑建筑结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C06 | Publication | ||
PB01 | Publication | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |