CN106786705A - 一种协同火电厂深度调峰的电池储能系统实时响应方法 - Google Patents

一种协同火电厂深度调峰的电池储能系统实时响应方法 Download PDF

Info

Publication number
CN106786705A
CN106786705A CN201710082944.1A CN201710082944A CN106786705A CN 106786705 A CN106786705 A CN 106786705A CN 201710082944 A CN201710082944 A CN 201710082944A CN 106786705 A CN106786705 A CN 106786705A
Authority
CN
China
Prior art keywords
energy storage
storage system
peak regulation
battery energy
real
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710082944.1A
Other languages
English (en)
Other versions
CN106786705B (zh
Inventor
魏达
刘平平
刘杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Dewopu Electric Co ltd
Original Assignee
Hunan Province Dworp Energy Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Province Dworp Energy Co Ltd filed Critical Hunan Province Dworp Energy Co Ltd
Priority to CN201710082944.1A priority Critical patent/CN106786705B/zh
Publication of CN106786705A publication Critical patent/CN106786705A/zh
Application granted granted Critical
Publication of CN106786705B publication Critical patent/CN106786705B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/10Flexible AC transmission systems [FACTS]

Abstract

本发明涉及一种协同火电厂深度调峰的电池储能系统实时响应方法。包括如下过程:实时读取电力调度机构的实时数据;计算电池储能协同火电厂参与实时深度调峰功率;计算电池储能系统持续放电时间;计算电池储能系统容量;计算电池储能系统协同火电厂深度调峰的实时响应功率。本发明实现电池储能电站辅助火电厂参与电网实时深度调峰交易,提高火电厂运行效益。

Description

一种协同火电厂深度调峰的电池储能系统实时响应方法
技术领域:
本发明涉及电池储能系统,具体涉及一种协同火电厂深度调峰的电池储能系统实时响应方法。
背景技术:
随着风电装机容量的持续增长,源网荷矛盾日益突出,据最新统计资料显示,2016年,吉林、黑龙江、甘肃、新疆等地风电的利用小时数均明显低于平均利用小时数,弃风率高达43%,尤其是冬季供热期,三北地区火电机组以热电联产机组为主,为满足热负荷需求,火电机组调峰能力有限。为保障东北地区电力系统安全、稳定、经济运行,缓解热、电之间的矛盾,提高风电消纳能力,国家能源局东北监管局印发了《东北电力辅助服务市场运行规则(试行)》,文件中鼓励供热电厂投资建设储能设施,同等条件下优先调用其调峰资源,并对火电厂参与调峰按照不同档位及有偿调峰电量进行补偿。因此,目前急需有关电池储能系统协同火电厂深度调峰的容量及其实时响应的方法。
发明内容:
本发明的目的在于提供一种协同火电厂深度调峰的电池储能系统实时响应方法。技术方案如下:
一种协同火电厂深度调峰的电池储能系统实时响应方法,包括如下过程:
步骤1:实时读取电力调度机构的实时数据;所述电力调度机构的实时数据包括:火电厂计划出力数据、电力调度机构实时调峰指令信号;
步骤2:基于火电厂计划出力数据、电力调度机构实时调峰指令信号、火电厂有偿调峰基准,计算电池储能协同火电厂参与实时深度调峰功率;
步骤3:计算电池储能系统持续放电时间;
步骤4:计算电池储能系统容量;
步骤5:计算电池储能系统协同火电厂深度调峰的实时响应功率。
作为优选方案,所述步骤2的计算过程为:
电力调度机构实时调峰指令信号为1时,电池储能系统响应调峰,储能系统状态计为0;电力调度机构实时调峰指令信号为0时,储能系统状态计为1;
步骤2.1:当t时刻电力调度机构实时调峰指令信号为1时,依据该时刻火电厂计划出力,计算电池储能系统充电功率;
pe(t)=-pjh(t)
其中,pe(t)为t时刻电池储能系统充电功率;pjh(t)表示在t时刻火电机组计划出力;
步骤2.2:依据典型日内火电厂出力数据及调峰指令信号,以M分钟为一个周期进行统计,形成典型日内储能出力:
pe(t)=-pjh(t)t=0,1,...,24*60/M
步骤2.3:计算典型日内电池储能系统功率需求
作为进一步优选方案,所述步骤3的具体过程为:
步骤3.1:依据电力调度机构实时调峰指令信号,形成电池储能系统调峰响应信号时间序列;
步骤3.2:修正该序列,如果该序列起始值为1,去掉起始值为1的连续1;
步骤3.3:计算电池储能系统调峰响应时段序列,依据修正后的调峰响应信号时间序列计算调峰响应时段序列,具体计算方法为,依次统计连续0、连续1的个数,记该序列为t(n);
步骤3.4:计算该序列元素个数N;
步骤3.5:考虑电池储能系统充放电转换效率,校正该序列,形成t'(n),校正方法为:
N为奇数时,
t'(n)=t(1)ηch,t(2)/ηdis,t(3)ηch,…,t(2i-1)ηch,t(2i)/ηdis,…t(N)ηch
N为偶数时,
t'(n)=t(1)ηch,t(2)/ηdis,t(3)ηch,…,t(2i-1)ηch,t(2i)/ηdis,…t(N)/ηdis
其中,ηch为储能系统充电效率;ηdis为储能系统放电效率;
步骤3.6:依据修正后的t'(n)计算电池储能系统持续放电时间,计算步骤如下:
步骤3.6.1:设定电池储能系统持续放电时间Tmax初值,Tmax=t(1)、i=2
步骤3.6.2:判断i是否满足小于等于N,满足转步骤3.6.3,否则结束;
步骤3.6.3:判断|t(i)|是否满足小于Tmax;满足转步骤3.6.4,否则转步骤3.6.5;
步骤3.6.4:Tmax=Tmax-|t(i)|+t(i+1),然后转步骤3.6.5;
步骤3.6.5:i=i+2,然后返回步骤3.6.2。
作为更进一步优选方案,按下式计算电池储能系统容量;
所述步骤4中电池储能系统容量
所述步骤5的具体过程为:
步骤5.1:设定初始时刻t=0、储能系统初始容量Ee(0)=E0
步骤5.2:判断t是否满足小于或等于24*60/M,满足转步骤5.3,否则结束;
步骤5.3:判断是否有调峰指令,有调峰指令转步骤5.4;无调峰指令转步骤5.5;
步骤5.4:计算E1(t)=(pjh(t)-pd1)Δt、E2(t)=(pjh(t)-pd2)Δt,然后转步骤5.6;
步骤5.5:判断Ee(t)>PEΔt是否成立,成立转步骤5.9,否则转步骤5.10;
判断E-Ee(t)是否满足小于E1(t),满足时,转步骤5.10,否则转步骤5.6;
步骤5.6:判断E-Ee(t)是否满足小于E1(t),满足时转步骤5.11,否则转步骤5.7;
步骤5.7:判断是否满足E1(t)<E-Ee(t)<E2(t),满足时转步骤5.12,否则转步骤5.8;
步骤5.8:pe(t)=-PE,然后转步骤5.13;
步骤5.9:储能放电pe(t)=PE,然后转步骤5.14;
步骤5.10:储能放电,然后转步骤5.14;
步骤5.11:储能不调峰pe(t)=0;
步骤5.12:储能调峰,然后转步骤5.13;
步骤5.13:计算Ee(t+1)=Ee(t)-pe(t)Δtηch,然后转步骤5.15;
步骤5.14:计算Ee(t+1)=Ee(t)-pe(t)Δt/ηdis,然后转步骤5.15;
步骤5.15:t=t+1,然后返回步骤5.2;
其中,E0为储能系统初始容量;Ee(0)为时刻0储能系统容量;E1(t)为第一档调峰电量;E2(t)为第二档调峰电量;pd1为第一档功率;pd2为第二档功率;Ee(t)为t时刻储能系统容量状态;pe(t)为t时刻储能系统充放电功率;Ee(t+1)为t+1时刻储能系统容量状态;ηch为储能系统充电效率;ηdis为储能系统放电效率;Δt为调峰单位统计周期。
与现有技术相比,本发明具有以下有益效果:本发明根据火电厂计划出力数据、电力调度机构实时调峰指令信号、火电厂有偿调峰基准等信息,实现电池储能电站辅助火电厂参与电网实时深度调峰交易,提高火电厂运行效益。
附图说明:
图1为实施例中实时响应方法的流程图。
图2为电池储能系统持续放电时间计算方法的流程图。
图3为实施例中电池储能系统参与深度调峰的实时响应功率计算方法的流程图。
具体实施方式:
为了更好地理解本发明,下面结合说明书附图和实例对本发明的内容做进一步的说明。
本实施例中,电池储能系统采用全钒氧化还原液流电池;液流电池储能系统由于深度放电及高频浅充浅放等运行工况下,不会对电池容量或寿命造成显著影响,并且适用寿命长,满足协同火电厂参与电网深度调峰的技术需求。
如图1所示,电池储能系统实时响应方法包括如下步骤:
步骤1:实时读取电力调度机构的实时数据;所述电力调度机构的实时数据包括:火电厂计划出力数据、电力调度机构实时调峰指令信号;
步骤2:基于火电厂计划出力数据、电力调度机构实时调峰指令信号、火电厂有偿调峰基准,计算电池储能协同火电厂参与实时深度调峰功率;具体过程为:
电力调度机构实时调峰指令信号为1时,电池储能系统响应调峰,储能系统状态计为0;电力调度机构实时调峰指令信号为0时,储能系统状态计为1;
步骤2.1:当t时刻电力调度机构实时调峰指令信号为1时,依据该时刻火电厂计划出力,结合国家能源局东北监管局关于《东北电力辅助服务市场运营规则(试行)》中有关电厂投资建设储能参与调峰,抵减电厂出力的相关规定,计算电池储能系统充电功率;
pe(t)=-pjh(t)
其中,pe(t)为t时刻电池储能系统充电功率;pjh(t)表示在t时刻火电机组计划出力;
步骤2.2:依据典型日内火电厂出力数据及调峰指令信号,结合国家能源局东北监管局关于《东北电力辅助服务市场运营规则(试行)》中对调峰辅助服务单位统计周期的规定,以15分钟为一个周期进行统计,形成典型日内储能出力:
pe(t)=-pjh(t)t=0,1,…,96
步骤2.3:计算典型日内电池储能系统功率需求
步骤3:计算电池储能系统持续放电时间;具体过程为:
步骤3.1:依据电力调度机构实时调峰指令信号,形成电池储能系统调峰响应信号时间序列;
步骤3.2:修正该序列,如果该序列起始值为1,去掉起始值为1的连续1;以11100111000...为例,修正后的液流电池储能系统调峰响应信号时间序列为00111000...;
步骤3.3:计算电池储能系统调峰响应时段序列,依据修正后的调峰响应信号时间序列计算调峰响应时段序列,具体计算方法为,依次统计连续0、连续1的个数,步骤3.2中的例子调峰响应时段序列为233...,记该序列为t(n);
步骤3.4:计算该序列元素个数N;
步骤3.5:考虑电池储能系统充放电转换效率,校正该序列,形成t'(n),校正方法为:
N为奇数时,
t'(n)=t(1)ηch,t(2)/ηdis,t(3)ηch,…,t(2i-1)ηch,t(2i)/ηdis,…t(N)ηch
N为偶数时,
t'(n)=t(1)ηch,t(2)/ηdis,t(3)ηch,…,t(2i-1)ηch,t(2i)/ηdis,…t(N)/ηdis
步骤3.6:依据修正后的t'(n)计算电池储能系统持续放电时间,计算步骤如下:
步骤3.6.1:设定电池储能系统持续放电时间Tmax初值,Tmax=t(1)、i=2
步骤3.6.2:判断i是否满足小于等于N,满足转步骤3.6.3,否则结束;
步骤3.6.3:判断|t(i)|是否满足小于Tmax;满足转步骤3.6.4,否则转步骤3.6.5;
步骤3.6.4:Tmax=Tmax-|t(i)|+t(i+1),然后转步骤3.6.5;
步骤3.6.5:i=i+2,然后返回步骤3.6.2。
步骤4:计算电池储能系统容量
步骤5:计算电池储能系统协同火电厂深度调峰的实时响应功率;具体过程为:
步骤5.1:设定初始时刻t=0、储能系统初始容量Ee(0)=E0
步骤5.2:判断t是否满足小于或等于96,满足转步骤5.3,否则结束;
步骤5.3:判断是否有调峰指令,有调峰指令转步骤5.4;无调峰指令转步骤5.5;
步骤5.4:计算E1(t)=(pjh(t)-pd1)Δt、E2(t)=(pjh(t)-pd2)Δt,然后转步骤5.6;
步骤5.5:判断Ee(t)>PEΔt是否成立,成立转步骤5.9,否则转步骤5.10;
判断E-Ee(t)是否满足小于E1(t),满足时,转步骤5.10,否则转步骤5.6;
步骤5.6:判断E-Ee(t)是否满足小于E1(t),满足时转步骤5.11,否则转步骤5.7;
步骤5.7:判断是否满足E1(t)<E-Ee(t)<E2(t),满足时转步骤5.12,否则转步骤5.8;
步骤5.8:pe(t)=-PE,然后转步骤5.13;
步骤5.9:储能放电pe(t)=PE,然后转步骤5.14;
步骤5.10:储能放电,然后转步骤5.14;
步骤5.11:储能不调峰pe(t)=0;
步骤5.12:储能调峰,然后转步骤5.13;
步骤5.13:计算Ee(t+1)=Ee(t)-pe(t)Δtηch,然后转步骤5.15;
步骤5.14:计算Ee(t+1)=Ee(t)-pe(t)Δt/ηdis,然后转步骤5.15;
步骤5.15:t=t+1,然后返回步骤5.2;
其中,E0为储能系统初始容量;Ee(0)为时刻0储能系统容量;根据国家能源局东北监管局关于《东北电力辅助服务市场运营规则(试行)》中对实施深度调峰交易报价方式和价格机制的规定,发电企业采用阶梯式两档浮动报价,E1(t)为第一档调峰电量;E2(t)为第二档调峰电量;pd1为第一档功率;pd2为第二档功率;Ee(t)为t时刻储能系统容量状态;pe(t)为t时刻储能系统充放电功率;Ee(t+1)为t+1时刻储能系统容量状态;ηch为储能系统充电效率;ηdis为储能系统放电效率;Δt为调峰单位统计周期。

Claims (5)

1.一种协同火电厂深度调峰的电池储能系统实时响应方法,其特征在于,包括如下过程:
步骤1:实时读取电力调度机构的实时数据;所述电力调度机构的实时数据包括:火电厂计划出力数据、电力调度机构实时调峰指令信号;
步骤2:基于火电厂计划出力数据、电力调度机构实时调峰指令信号、火电厂有偿调峰基准,计算电池储能协同火电厂参与实时深度调峰功率;
步骤3:计算电池储能系统持续放电时间;
步骤4:计算电池储能系统容量;
步骤5:计算电池储能系统协同火电厂深度调峰的实时响应功率。
2.如权利要求1所述一种协同火电厂深度调峰的电池储能系统实时响应方法,其特征在于,所述步骤2的计算过程为:
电力调度机构实时调峰指令信号为1时,电池储能系统响应调峰,储能系统状态计为0;电力调度机构实时调峰指令信号为0时,储能系统状态计为1;
步骤2.1:当t时刻电力调度机构实时调峰指令信号为1时,依据该时刻火电厂计划出力,计算电池储能系统充电功率;
pe(t)=-pjh(t)
其中,pe(t)为t时刻电池储能系统充电功率;pjh(t)表示在t时刻火电机组计划出力;
步骤2.2:依据典型日内火电厂出力数据及调峰指令信号,以M分钟为一个周期进行统计,形成典型日内储能出力:
pe(t)=-pjh(t)t=0,1,…,24*60/M
步骤2.3:计算典型日内电池储能系统功率需求
3.如权利要求2所述一种协同火电厂深度调峰的电池储能系统实时响应方法,其特征在于,所述步骤3的具体过程为:
步骤3.1:依据电力调度机构实时调峰指令信号,形成电池储能系统调峰响应信号时间序列;
步骤3.2:修正该序列,如果该序列起始值为1,去掉起始值为1的连续1;
步骤3.3:计算电池储能系统调峰响应时段序列,依据修正后的调峰响应信号时间序列计算调峰响应时段序列,具体计算方法为,依次统计连续0、连续1的个数,记该序列为t(n);
步骤3.4:计算该序列元素个数N;
步骤3.5:考虑电池储能系统充放电转换效率,校正该序列,形成t'(n),校正方法为:
N为奇数时,
t'(n)=t(1)ηch,t(2)/ηdis,t(3)ηch,…,t(2i-1)ηch,t(2i)/ηdis,…t(N)ηch
N为偶数时,
t'(n)=t(1)ηch,t(2)/ηdis,t(3)ηch,…,t(2i-1)ηch,t(2i)/ηdis,…t(N)/ηdis
其中,ηch为储能系统充电效率;ηdis为储能系统放电效率;
步骤3.6:依据修正后的t'(n)计算电池储能系统持续放电时间,计算步骤如下:
步骤3.6.1:设定电池储能系统持续放电时间Tmax初值,Tmax=t(1)、i=2
步骤3.6.2:判断i是否满足小于等于N,满足转步骤3.6.3,否则结束;
步骤3.6.3:判断|t(i)|是否满足小于Tmax;满足转步骤3.6.4,否则转步骤3.6.5;
步骤3.6.4:Tmax=Tmax-|t(i)|+t(i+1),然后转步骤3.6.5;
步骤3.6.5:i=i+2,然后返回步骤3.6.2。
4.如权利要求3所述一种协同火电厂深度调峰的电池储能系统实时响应方法,其特征在于,按下式计算电池储能系统容量:
E = P e m a x T m a x .
5.如权利要求1-4任何一项所述一种协同火电厂深度调峰的电池储能系统实时响应方法,其特征在于,所述步骤5的具体过程为:
步骤5.1:设定初始时刻t=0、储能系统初始容量Ee(0)=E0
步骤5.2:判断t是否满足小于或等于24*60/M,满足转步骤5.3,否则结束;
步骤5.3:判断是否有调峰指令,有调峰指令转步骤5.4;无调峰指令转步骤5.5;
步骤5.4:计算E1(t)=(pjh(t)-pd1)Δt、E2(t)=(pjh(t)-pd2)Δt,然后转步骤5.6;
步骤5.5:判断Ee(t)>PEΔt是否成立,成立转步骤5.9,否则转步骤5.10;
步骤5.6:判断E-Ee(t)是否满足小于E1(t),满足时转步骤5.11,否则转步骤5.7;
步骤5.7:判断是否满足E1(t)<E-Ee(t)<E2(t),满足时转步骤5.12,否则转步骤5.8;
步骤5.8:pe(t)=-PE,然后转步骤5.13;
步骤5.9:储能放电pe(t)=PE,然后转步骤5.14;
步骤5.10:储能放电,然后转步骤5.14;
步骤5.11:储能不调峰pe(t)=0;
步骤5.12:储能调峰,然后转步骤5.13;
步骤5.13:计算Ee(t+1)=Ee(t)-pe(t)Δtηch,然后转步骤5.15;
步骤5.14:计算Ee(t+1)=Ee(t)-pe(t)Δt/ηdis,然后转步骤5.15;
步骤5.15:t=t+1,然后返回步骤5.2;
其中,E0为储能系统初始容量;Ee(0)为时刻0储能系统容量;E1(t)为第一档调峰电量;E2(t)为第二档调峰电量;pd1为第一档功率;pd2为第二档功率;Ee(t)为t时刻储能系统容量状态;pe(t)为t时刻储能系统充放电功率;Ee(t+1)为t+1时刻储能系统容量状态;ηch为储能系统充电效率;ηdis为储能系统放电效率;Δt为调峰单位统计周期。
CN201710082944.1A 2017-02-16 2017-02-16 一种协同火电厂深度调峰的电池储能系统实时响应方法 Active CN106786705B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710082944.1A CN106786705B (zh) 2017-02-16 2017-02-16 一种协同火电厂深度调峰的电池储能系统实时响应方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710082944.1A CN106786705B (zh) 2017-02-16 2017-02-16 一种协同火电厂深度调峰的电池储能系统实时响应方法

Publications (2)

Publication Number Publication Date
CN106786705A true CN106786705A (zh) 2017-05-31
CN106786705B CN106786705B (zh) 2019-05-24

Family

ID=58958691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710082944.1A Active CN106786705B (zh) 2017-02-16 2017-02-16 一种协同火电厂深度调峰的电池储能系统实时响应方法

Country Status (1)

Country Link
CN (1) CN106786705B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109066806A (zh) * 2018-07-25 2018-12-21 国电南瑞科技股份有限公司 一种电网调峰控制方法
CN111244989A (zh) * 2020-01-15 2020-06-05 国网内蒙古东部电力有限公司 一种基于电池储能的风电机组与火电机组的协调运行方法
CN111756074A (zh) * 2020-06-29 2020-10-09 中国电力科学研究院有限公司 电池储能辅助火电机组深度调峰的优化方法、系统及设备

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103311942A (zh) * 2013-03-18 2013-09-18 国家电网公司 一种用于配电网削峰填谷的电池储能系统的控制方法
CN104701873A (zh) * 2015-03-27 2015-06-10 国家电网公司 一种用于跟踪风电计划出力的电池储能系统优化控制方法
CN105807633A (zh) * 2016-05-10 2016-07-27 大连理工大学 基于集中供热管网和建筑物储能消纳风电的热电联合系统调度方法
CN106295853A (zh) * 2016-07-28 2017-01-04 华北电力大学(保定) 基于储能调度模式的分布式光伏两阶段多目标就地消纳法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103311942A (zh) * 2013-03-18 2013-09-18 国家电网公司 一种用于配电网削峰填谷的电池储能系统的控制方法
CN104701873A (zh) * 2015-03-27 2015-06-10 国家电网公司 一种用于跟踪风电计划出力的电池储能系统优化控制方法
CN105807633A (zh) * 2016-05-10 2016-07-27 大连理工大学 基于集中供热管网和建筑物储能消纳风电的热电联合系统调度方法
CN106295853A (zh) * 2016-07-28 2017-01-04 华北电力大学(保定) 基于储能调度模式的分布式光伏两阶段多目标就地消纳法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
舒印彪 等: "新能源消纳关键因素分析及解决措施研究", 《中国电机工程学报》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109066806A (zh) * 2018-07-25 2018-12-21 国电南瑞科技股份有限公司 一种电网调峰控制方法
CN111244989A (zh) * 2020-01-15 2020-06-05 国网内蒙古东部电力有限公司 一种基于电池储能的风电机组与火电机组的协调运行方法
CN111244989B (zh) * 2020-01-15 2023-03-24 国网内蒙古东部电力有限公司 一种基于电池储能的风电机组与火电机组的协调运行方法
CN111756074A (zh) * 2020-06-29 2020-10-09 中国电力科学研究院有限公司 电池储能辅助火电机组深度调峰的优化方法、系统及设备

Also Published As

Publication number Publication date
CN106786705B (zh) 2019-05-24

Similar Documents

Publication Publication Date Title
CN103683326B (zh) 一种区域电网风电多点接入最佳接纳能力的计算方法
CN108123492B (zh) 一种考虑火电电蓄热联合调峰的日前发电计划优化方法
CN108229865A (zh) 一种基于碳交易的电热气综合能源系统低碳经济调度方法
Jin et al. Environmental/economic power dispatch with wind power
CN108599206A (zh) 高比例不确定电源场景下的配电网混合储能配置方法
CN104868505B (zh) 大型太阳能光伏发电基地集群出力特性分析方法
CN103972915B (zh) 一种用于负荷削峰填谷的储能系统最优容量计算方法
Weibel et al. Cost-effective design of ringwall storage hybrid power plants: A real options analysis
CN105006844A (zh) 一种间歇式发电并网条件下的电力系统日前鲁棒调度系统
CN106844916A (zh) 一种基于调峰辅助服务市场的发电和用电组织方法及装置
CN105490309A (zh) 一种基于电网调峰能力的风电消纳评估方法
CN104156789B (zh) 计及储能寿命损耗的孤立微电网最优经济运行方法
CN106786705A (zh) 一种协同火电厂深度调峰的电池储能系统实时响应方法
CN103887813B (zh) 基于风功率预测不确定度的风电系统运行的控制方法
CN105162113A (zh) 一种基于灵敏度分析的微电网与配电网互动成本计算方法
Denholm et al. Methods for analyzing the economic value of concentrating solar power with thermal energy storage
CN109378856A (zh) 基于滚动优化的风-储混合电站功率波动平抑策略与模拟方法
CN104362621A (zh) 一种基于反熵权法的光伏电站运行特性评估方法
CN105305488A (zh) 一种考虑新能源并网对输电网利用率影响的评价方法
CN102901890A (zh) 变压器经济运行在线判别方法
CN105262088B (zh) 考虑大规模特高压电源调节能力的机组检修计划优化系统
CN108062606B (zh) 一种基于黎曼积分的虚拟电厂调度优化方法
CN106712064A (zh) 电池储能系统协同火电厂参与电网实时深度调峰的经济配置方法
CN106886835A (zh) 广义联络线模式下网省两级实时交易预测协调优化方法
CN105305463A (zh) 计及光伏发电和谐波污染的基于随机潮流的无功优化方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180122

Address after: 422800 Shaoyang City, Hunan province Shaodong County Lei Zu Lu Jinlihua Hotel

Applicant after: HUNAN DEWOPU NEW ENERGY Co.,Ltd.

Address before: 422800, Shaodong County, Hunan City, Shaoyang Province, Tai Wo Tong, prosperous road and people's Road Interchange

Applicant before: HUNAN DOVOP ENERGY STORAGE CO.,LTD.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190919

Address after: 422899 No. 7 Renmin East Road, Shaodong Eco-Industrial Park, Shaoyang City, Hunan Province

Patentee after: HUNAN DEWOPU ELECTRIC CO.,LTD.

Address before: 422800 Jinlihua Hotel, Leizu Road, Shaodong County, Shaoyang City, Hunan Province

Patentee before: HUNAN DEWOPU NEW ENERGY Co.,Ltd.

TR01 Transfer of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A real-time response method for battery energy storage system in deep peak shaving of collaborative thermal power plants

Effective date of registration: 20231122

Granted publication date: 20190524

Pledgee: China Construction Bank Corporation Shaodong sub branch

Pledgor: HUNAN DEWOPU ELECTRIC CO.,LTD.

Registration number: Y2023980067212

PE01 Entry into force of the registration of the contract for pledge of patent right