CN111244989A - 一种基于电池储能的风电机组与火电机组的协调运行方法 - Google Patents
一种基于电池储能的风电机组与火电机组的协调运行方法 Download PDFInfo
- Publication number
- CN111244989A CN111244989A CN202010040699.XA CN202010040699A CN111244989A CN 111244989 A CN111244989 A CN 111244989A CN 202010040699 A CN202010040699 A CN 202010040699A CN 111244989 A CN111244989 A CN 111244989A
- Authority
- CN
- China
- Prior art keywords
- energy storage
- battery
- power generating
- battery energy
- moment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
- H02J3/32—Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/76—Power conversion electric or electronic aspects
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E70/00—Other energy conversion or management systems reducing GHG emissions
- Y02E70/30—Systems combining energy storage with energy generation of non-fossil origin
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Control Of Eletrric Generators (AREA)
- Wind Motors (AREA)
Abstract
本发明涉及电网技术领域,涉及一种基于电池储能的风电机组与火电机组的协调运行方法。首先采集电池的充放电效率、火电机组的发电功率、风电机组的发电功率、用电负荷及电池储能装置中每个电池的输出功率;然后计算电池储能装置的运行数据及相关参数;接着引入风电机组与电池储能装置的协调运行参数,计算风电并网要求火电机组的最大协调运行能力,并构建火电机组出力约束、电网运行功率平衡约束,再计算电池储能装置的充放电状态判别参数;最后在上述基础上,计算基于电池储能的风电机组与火电机组的协调运行功率。本发明能够提高风电机组与火电机组协调运行的效率与精度。
Description
技术领域
本发明涉及电网技术领域,特别是涉及一种基于电池储能的风电机组与火电机组的协调运行方法。
背景技术
由于风电出力的不确定性和随机性会造成能源间歇式接入占比扩大,需要利用火电机组来进行协调,虽然火电机组总量富余,但是其灵活性却相对较差。近年来随着新能源技术的不断发展,以风电为代表的新能源并网容量不断增加,当风电场的出力较大或较小时,都会对传统常规火电机组带来极大的挑战。电池储能作为电能在时间上的转移手段,可弥补风电出力的波动性,有助于减少火电机组多开和启停次数,从而达到协调运行的目的。现有风电机组与火电机组的协调运行方法的效率低且精度不高。
发明内容
针对现有技术存在的问题,本发明提供一种基于电池储能的风电机组与火电机组的协调运行方法,能够提高风电机组与火电机组协调运行的效率与精度。
本发明的技术方案为:
.一种基于电池储能的风电机组与火电机组的协调运行方法,其特征在于,包括下述步骤:
步骤1:采集数据:获取电池的充电效率η1、放电效率η2,采集第t时刻第i个火电机组的发电功率第j个风电机组的发电功率用电负荷电池储能装置中第k个电池的输出功率其中,t∈{1,2,...,n},n为时刻总数,相邻两个时刻的时间间隔为1h;i∈{1,2,...,I},I为火电机组的总数;j∈{1,2,...,J},J为风电机组的总数;k∈{1,2,...,K},K为电池储能装置中电池的总数;
步骤2:计算电池储能装置的运行数据及相关参数:
计算第t时刻电池储能装置的存储量为
式(4)中,Nt为第t时刻电池储能装置中可参与充放电运行的电池集合,与此前各时段内进行充放电和已完成充放电电池的荷电状态有关;
第t时刻第k个电池的荷电状态为
步骤3:计算第t时刻风电机组与电池储能装置的协调运行参数为
计算风电机组与电池储能装置的协调运行参数γ为{γ1,γ2,...,γt,...,γn}的中位数;
步骤4:计算火电机组与风电机组的运行数据及相关参数:
计算不考虑火电机组的启停时,第t时刻风电并网要求火电机组的最大协调运行能力为
考虑电池储能弥补了风电出力的波动性,得到
构建火电机组出力约束为
式(7)至式(9)中,Phimax、Phimin分别为第i个火电机组的最大出力、最小出力;
构建电网运行功率平衡约束为
步骤5:计算第t时刻电池储能装置的充放电状态判别参数为
若αt<0,则第t时刻电池储能装置进行充电;若αt≥0,则第t时刻电池储能装置进行放电;
步骤6:计算基于电池储能的风电机组与火电机组的协调运行功率分别为
本发明的有益效果为:
本发明引入风电机组与电池储能装置的协调运行参数,来计算火电机组与风电机组的运行数据及相关参数,并计算电池储能装置的充放电状态判别参数,在此基础上计算基于电池储能的风电机组与火电机组的协调运行功率,能够提高风电机组与火电机组协调运行的效率与精度。
附图说明
图1为本发明的基于电池储能的风电机组与火电机组的协调运行方法的流程图。
具体实施方式
下面将结合附图和具体实施方式,对本发明作进一步描述。
如图1所示,本发明的基于电池储能的风电机组与火电机组的协调运行方法,包括下述步骤:
步骤1:采集数据:获取电池的充电效率η1、放电效率η2,采集第t时刻第i个火电机组的发电功率第j个风电机组的发电功率用电负荷电池储能装置中第k个电池的输出功率其中,t∈{1,2,...,n},n为时刻总数,相邻两个时刻的时间间隔为1h;i∈{1,2,...,I},I为火电机组的总数;j∈{1,2,...,J},J为风电机组的总数;k∈{1,2,...,K},K为电池储能装置中电池的总数。
本实施例中,n=24;电池储能装置中共有储能电池K=300个,η1=82.46%,η2=87.51%;风电厂的额定出力为2600MW;风电场配套火电厂的额定出力为4400MW,共有火电机组I=7个;日用电平均负荷为3700MW。
步骤2:计算电池储能装置的运行数据及相关参数:
为保证储能电池不过充过放,需获知在第t时刻参与运行的储能电池数量及随时间变化的充放电功率,结合储能电池的充放电状态系数,可获得储能电池在第t时刻的存储量。
计算第t时刻电池储能装置的存储量为
式(4)中,Nt为第t时刻电池储能装置中可参与充放电运行的电池集合,与此前各时段内进行充放电和已完成充放电电池的荷电状态有关;
第t时刻第k个电池的荷电状态为
步骤3:计算第t时刻风电机组与电池储能装置的协调运行参数为
计算风电机组与电池储能装置的协调运行参数γ为{γ1,γ2,...,γt,...,γn}的中位数。
本实施例中,计算得到{γ1,γ2,...,γt,...,γ24}的中位数为0.67,从而取γ=0.67。
步骤4:计算火电机组与风电机组的运行数据及相关参数:
计算不考虑火电机组的启停时,第t时刻风电并网要求火电机组的最大协调运行能力为
考虑电池储能弥补了风电出力的波动性,得到
构建火电机组出力约束为
式(7)至式(9)中,Phimax、Phimin分别为第i个火电机组的最大出力、最小出力;
构建电网运行功率平衡约束为
本实施例中,7个火电机组的最大出力、最小出力分别为[Phimax]=[570,425,600,550,610,660,540,]、[Phimin]==[310,250,350,300,325,287,235]。
步骤5:计算第t时刻电池储能装置的充放电状态判别参数为
若αt<0,则第t时刻电池储能装置进行充电;若αt≥0,则第t时刻电池储能装置进行放电。
本实施例中,计算得到:当t∈[1,5]∪[20,24]时,αt<0,电池储能装置进行充电;当t∈[8,16]时,αt>0,电池储能装置进行放电;在其他时刻,电池储能装置既不充电也不放电,风电机组与火电机组协调运行满足负荷需求。
步骤6:计算基于电池储能的风电机组与火电机组的协调运行功率分别为
显然,上述实施例仅仅是本发明的一部分实施例,而不是全部的实施例。上述实施例仅用于解释本发明,并不构成对本发明保护范围的限定。基于上述实施例,本领域技术人员在没有做出创造性劳动的前提下所获得的所有其他实施例,也即凡在本申请的精神和原理之内所作的所有修改、等同替换和改进等,均落在本发明要求的保护范围内。
Claims (1)
1.一种基于电池储能的风电机组与火电机组的协调运行方法,其特征在于,包括下述步骤:
步骤1:采集数据:获取电池的充电效率η1、放电效率η2,采集第t时刻第i个火电机组的发电功率第j个风电机组的发电功率用电负荷Pl t、电池储能装置中第k个电池的输出功率其中,t∈{1,2,...,n},n为时刻总数,相邻两个时刻的时间间隔为1h;i∈{1,2,...,I},I为火电机组的总数;j∈{1,2,...,J},J为风电机组的总数;k∈{1,2,...,K},K为电池储能装置中电池的总数;
步骤2:计算电池储能装置的运行数据及相关参数:
计算第t时刻电池储能装置的存储量为
式(4)中,Nt为第t时刻电池储能装置中可参与充放电运行的电池集合,与此前各时段内进行充放电和已完成充放电电池的荷电状态有关;
第t时刻第k个电池的荷电状态为
步骤3:计算第t时刻风电机组与电池储能装置的协调运行参数为
计算风电机组与电池储能装置的协调运行参数γ为{γ1,γ2,...,γt,...,γn}的中位数;
步骤4:计算火电机组与风电机组的运行数据及相关参数:
计算不考虑火电机组的启停时,第t时刻风电并网要求火电机组的最大协调运行能力为
考虑电池储能弥补了风电出力的波动性,得到
构建火电机组出力约束为
式(7)至式(9)中,Phimax、Phimin分别为第i个火电机组的最大出力、最小出力;
构建电网运行功率平衡约束为
步骤5:计算第t时刻电池储能装置的充放电状态判别参数为
若αt<0,则第t时刻电池储能装置进行充电;若αt≥0,则第t时刻电池储能装置进行放电;
步骤6:计算基于电池储能的风电机组与火电机组的协调运行功率分别为
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010040699.XA CN111244989B (zh) | 2020-01-15 | 2020-01-15 | 一种基于电池储能的风电机组与火电机组的协调运行方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010040699.XA CN111244989B (zh) | 2020-01-15 | 2020-01-15 | 一种基于电池储能的风电机组与火电机组的协调运行方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111244989A true CN111244989A (zh) | 2020-06-05 |
CN111244989B CN111244989B (zh) | 2023-03-24 |
Family
ID=70874564
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010040699.XA Active CN111244989B (zh) | 2020-01-15 | 2020-01-15 | 一种基于电池储能的风电机组与火电机组的协调运行方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111244989B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114552614A (zh) * | 2022-01-17 | 2022-05-27 | 东北电力大学 | 一种利用储能电池的海上风电输送方法 |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102820656A (zh) * | 2012-08-25 | 2012-12-12 | 华北电力大学(保定) | 风电机组同火电机组联合调度发电负荷的方法 |
CN103530696A (zh) * | 2013-09-27 | 2014-01-22 | 国家电网公司 | 计入风电不确定度的火电机组中长期时序递进发电协调算法 |
US20140163754A1 (en) * | 2012-12-11 | 2014-06-12 | Chevron Usa Inc. | Systems and methods for regulating an alternative energy source that is decoupled from a power grid |
CN104734170A (zh) * | 2015-03-12 | 2015-06-24 | 国家电网公司 | 用于风力发电系统的储能式电能质量调节器 |
CN106329581A (zh) * | 2016-09-05 | 2017-01-11 | 国家电网公司 | 一种风火电打捆发电系统优化规划方法 |
CN106487038A (zh) * | 2016-11-28 | 2017-03-08 | 北京交通大学 | 一种用于风电‑火电‑储能联合调频系统的控制优化方法 |
CN106786705A (zh) * | 2017-02-16 | 2017-05-31 | 湖南省德沃普储能有限公司 | 一种协同火电厂深度调峰的电池储能系统实时响应方法 |
CN107769274A (zh) * | 2017-11-14 | 2018-03-06 | 国网山东省电力公司电力科学研究院 | 基于风电负荷变化速度的火电机组agc控制方法及系统 |
CN108039736A (zh) * | 2017-11-14 | 2018-05-15 | 国网辽宁省电力有限公司 | 一种提高风电接纳能力的大容量储热储电协调调度方法 |
CN108321804A (zh) * | 2018-02-26 | 2018-07-24 | 清华大学 | 含有电池储能和并网风电场的电力系统双层优化运行方法 |
CN108448574A (zh) * | 2018-03-23 | 2018-08-24 | 河海大学 | 一种风电场与光伏电场并网发电的容量优化配置方法 |
CN109767105A (zh) * | 2018-12-29 | 2019-05-17 | 东北电力大学 | 一种基于风光水火储联合系统的多能互补协调发电调度方法 |
-
2020
- 2020-01-15 CN CN202010040699.XA patent/CN111244989B/zh active Active
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102820656A (zh) * | 2012-08-25 | 2012-12-12 | 华北电力大学(保定) | 风电机组同火电机组联合调度发电负荷的方法 |
US20140163754A1 (en) * | 2012-12-11 | 2014-06-12 | Chevron Usa Inc. | Systems and methods for regulating an alternative energy source that is decoupled from a power grid |
CN103530696A (zh) * | 2013-09-27 | 2014-01-22 | 国家电网公司 | 计入风电不确定度的火电机组中长期时序递进发电协调算法 |
CN104734170A (zh) * | 2015-03-12 | 2015-06-24 | 国家电网公司 | 用于风力发电系统的储能式电能质量调节器 |
CN106329581A (zh) * | 2016-09-05 | 2017-01-11 | 国家电网公司 | 一种风火电打捆发电系统优化规划方法 |
CN106487038A (zh) * | 2016-11-28 | 2017-03-08 | 北京交通大学 | 一种用于风电‑火电‑储能联合调频系统的控制优化方法 |
CN106786705A (zh) * | 2017-02-16 | 2017-05-31 | 湖南省德沃普储能有限公司 | 一种协同火电厂深度调峰的电池储能系统实时响应方法 |
CN107769274A (zh) * | 2017-11-14 | 2018-03-06 | 国网山东省电力公司电力科学研究院 | 基于风电负荷变化速度的火电机组agc控制方法及系统 |
CN108039736A (zh) * | 2017-11-14 | 2018-05-15 | 国网辽宁省电力有限公司 | 一种提高风电接纳能力的大容量储热储电协调调度方法 |
CN108321804A (zh) * | 2018-02-26 | 2018-07-24 | 清华大学 | 含有电池储能和并网风电场的电力系统双层优化运行方法 |
CN108448574A (zh) * | 2018-03-23 | 2018-08-24 | 河海大学 | 一种风电场与光伏电场并网发电的容量优化配置方法 |
CN109767105A (zh) * | 2018-12-29 | 2019-05-17 | 东北电力大学 | 一种基于风光水火储联合系统的多能互补协调发电调度方法 |
Non-Patent Citations (2)
Title |
---|
孙骁强等: "基于多调频资源协调控制的西北送端大电网新能源快速频率响应参数设置方案", 《电网技术》 * |
徐虹卿等: "考虑风电不确定性的风电储能混合系统协调优化计算", 《电器与效能管理技术》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114552614A (zh) * | 2022-01-17 | 2022-05-27 | 东北电力大学 | 一种利用储能电池的海上风电输送方法 |
Also Published As
Publication number | Publication date |
---|---|
CN111244989B (zh) | 2023-03-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108832646A (zh) | 一种适用于可动态重构电池储能系统的管理系统及其方法 | |
CN104410092A (zh) | 一种多元互补新能源发电系统的能量协调优化方法 | |
CN105047966B (zh) | 液流电池多模式运行控制方法及其系统 | |
CN109599881B (zh) | 一种基于锰酸锂电池储能系统的电网调频调压方法 | |
CN111276960A (zh) | 一种光-储直流微电网系统中储能模块预测控制方法 | |
CN111628558B (zh) | 混合储能系统的能量管理和容量配置的优化系统及方法 | |
CN114123280B (zh) | 一种考虑系统效率的电池储能电站能量管理方法 | |
CN111762057B (zh) | 一种区域微网中v2g电动汽车智能充放电管理方法 | |
CN113937750A (zh) | 一种风光储互补的分布式能源发电系统及其控制方法 | |
Kumar et al. | Energy storage options for enhancing the reliability of Power system in the presence of Renewable Energy Sources | |
CN115577929A (zh) | 基于多场景分析的乡村综合能源系统随机优化调度方法 | |
CN110768303A (zh) | 一种海岛型能源系统设备容量的优化配置方法 | |
CN103560533A (zh) | 基于变化率控制储能电站平滑风光发电波动的方法及系统 | |
CN111244989B (zh) | 一种基于电池储能的风电机组与火电机组的协调运行方法 | |
Han et al. | Coordinated optimization of power rating and capacity of battery storage energy system with large-scale renewable energy | |
CN117526435A (zh) | 一种可考虑新能源极端出力特性的多能源外送基地规划方法 | |
Jiao et al. | Analysis of two hybrid energy storage systems in an off-grid photovoltaic microgrid: A case study | |
CN111525597A (zh) | 一种风储联合系统中双电池不平衡状态优化方法 | |
Xu et al. | Multi-objective optimization configuration of wind-solar coupling hydrogen production system | |
CN113471993B (zh) | 一种基于鲁棒优化的用户侧混合储能技术运行优化方法 | |
CN113937796A (zh) | 一种含风、光、储、蓄联合系统多时间尺度优化方法 | |
Saren et al. | An Optimized Control Strategy for Distributed Energy Storage System to Reduce the Peak-valley Difference of Distribution Network | |
Mahrouch et al. | Primary Frequency Control for Wind/Battery Stand-Alone Microgrid | |
CN111952996A (zh) | 一种基于经济效益评估的含储能的分布式光伏调峰控制方法 | |
CN111859608A (zh) | 考虑缓解电力缺口场景的储能选址定容优化方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |