CN106786552A - 一种本地消纳下的电源选择与容量优化算法 - Google Patents
一种本地消纳下的电源选择与容量优化算法 Download PDFInfo
- Publication number
- CN106786552A CN106786552A CN201710031814.5A CN201710031814A CN106786552A CN 106786552 A CN106786552 A CN 106786552A CN 201710031814 A CN201710031814 A CN 201710031814A CN 106786552 A CN106786552 A CN 106786552A
- Authority
- CN
- China
- Prior art keywords
- local
- photovoltaic
- capacity
- hours
- dissolving
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000005611 electricity Effects 0.000 claims abstract description 8
- 230000005540 biological transmission Effects 0.000 claims abstract description 4
- 238000004146 energy storage Methods 0.000 claims description 10
- 238000009434 installation Methods 0.000 claims 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000001172 regenerating effect Effects 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/388—Islanding, i.e. disconnection of local power supply from the network
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Entrepreneurship & Innovation (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
本发明涉及到的是一种本地消纳下的电源选择与容量优化算法,设本地全年分时负荷量为L(t),全年8760小时,Epv(t)为单位装机容量在第t小时内的发电量(kWh),Wpv为光伏的装机容量数,则第t小时的购电量为:En(t)=L(t)‑Wpv*Epv(t),这样,光伏发电与大电网间的功率传输为,当ESUM最小时,光伏发电与大电网的能量交换最小,实现本地消纳下的光伏最优配置。
Description
技术领域
本发明涉及一种本地消纳下的电源选择与容量优化算法。
技术背景
根据用户的年度分时负荷曲线,按本地消纳下的光伏容量优化配置计算出最佳光伏配置容量和投资成本,根据配备储能系统的电池类型、DOD放电深度、电池效率等信息和削峰填谷的充放时间要求计算出蓄电池的最佳容量配置和投资成本。
发明内容
本发明提供一种本地消纳下的电源选择与容量优化算法。
为了实现本地可再生能源的充分利用和本地负荷自维持能力达到最大,减少微电网电源对大电网的影响,要求看我再生能源向大电网传输的电能进可能最少。
设本地全年分时负荷量为L(t),全年8760小时,Epv(t)为单位装机容量在第t小时内的发电量(kWh),Wpv为光伏的装机容量数,则第t小时的购电量为
En(t)=L(t)-Wpv*Epv(t)
这样,光伏发电与大电网间的功率传输为
当ESUM最小时,光伏发电与大电网的能量交换最小,实现本地消纳下的光伏最优配置。
对于储能系统,设储能的效率为μ,放电深度为DOD%,本地全年分时负荷量为L(t),一般峰值电价时间为白天有光伏发电的时段,则储能的容量配置为
EBESS=((L(t)-Epv(t))*n)/η*DOD%
具体实施方式:
一种本地消纳下的电源选择与容量优化算法。
设本地全年分时负荷量为L(t),全年8760小时,Epv(t)为单位装机容量在第t小时内的发电量(kWh),Wpv为光伏的装机容量数,则第t小时的购电量为
En(t)=L(t)-Wpv*Epv(t)
这样,光伏发电与大电网间的功率传输为
当ESUM最小时,光伏发电与大电网的能量交换最小,实现本地消纳下的光伏最优配置。
对于储能系统,设储能的效率为μ,放电深度为DOD%,本地全年分时负荷量为L(t),一般峰值电价时间为白天有光伏发电的时段,则储能的容量配置为
EBESS=((L(t)-Epv(t))*n)/η*DOD%。
Claims (1)
1.一种本地消纳下的电源选择与容量优化算法,其特征为:设本地全年分时负荷量为L(t),全年8760小时,Epv(t)为单位装机容量在第t小时内的发电量(kWh),Wpv为光伏的装机容量数,则第t小时的购电量为:
En(t)=L(t)-Wpv*Epv(t),
这样,光伏发电与大电网间的功率传输为,
当ESUM最小时,光伏发电与大电网的能量交换最小,实现本地消纳下的光伏最优配置;
对于储能系统,设储能的效率为μ,放电深度为DOD%,本地全年分时负荷量为L(t),一般峰值电价时间为白天有光伏发电的时段,则储能的容量配置为,
EBESS=((L(t)-Epv(t))*n)/η*DOD%。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710031814.5A CN106786552A (zh) | 2017-01-17 | 2017-01-17 | 一种本地消纳下的电源选择与容量优化算法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710031814.5A CN106786552A (zh) | 2017-01-17 | 2017-01-17 | 一种本地消纳下的电源选择与容量优化算法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106786552A true CN106786552A (zh) | 2017-05-31 |
Family
ID=58945874
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710031814.5A Pending CN106786552A (zh) | 2017-01-17 | 2017-01-17 | 一种本地消纳下的电源选择与容量优化算法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106786552A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110390482A (zh) * | 2019-07-23 | 2019-10-29 | 廊坊新奥泛能网络科技服务有限公司 | 共建供能设备的选型方法及系统 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2642633A1 (en) * | 2010-11-19 | 2013-09-25 | Hitachi, Ltd. | Control device for electrical storage device, electrical storage device, and method for charging/discharging electrical storage device |
CN104466997A (zh) * | 2014-11-28 | 2015-03-25 | 广东易事特电源股份有限公司 | 分层分布式微电网储能电池配置方法 |
CN105005872A (zh) * | 2015-08-06 | 2015-10-28 | 北京交通大学 | 一种移峰填谷的储能系统的容量配置方法 |
CN105515058A (zh) * | 2015-12-24 | 2016-04-20 | 东南大学 | 一种光伏发电参与的功率就地消纳方法 |
-
2017
- 2017-01-17 CN CN201710031814.5A patent/CN106786552A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2642633A1 (en) * | 2010-11-19 | 2013-09-25 | Hitachi, Ltd. | Control device for electrical storage device, electrical storage device, and method for charging/discharging electrical storage device |
CN104466997A (zh) * | 2014-11-28 | 2015-03-25 | 广东易事特电源股份有限公司 | 分层分布式微电网储能电池配置方法 |
CN105005872A (zh) * | 2015-08-06 | 2015-10-28 | 北京交通大学 | 一种移峰填谷的储能系统的容量配置方法 |
CN105515058A (zh) * | 2015-12-24 | 2016-04-20 | 东南大学 | 一种光伏发电参与的功率就地消纳方法 |
Non-Patent Citations (1)
Title |
---|
郑凌蔚 等: "并网型可再生能源发电系统容量配置与优化", 《电力系统保护与控制》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110390482A (zh) * | 2019-07-23 | 2019-10-29 | 廊坊新奥泛能网络科技服务有限公司 | 共建供能设备的选型方法及系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ghenai et al. | Grid-tied and stand-alone hybrid solar power system for desalination plant | |
Díaz et al. | FAR from the grid: A rural electrification field study | |
Oghogho | Solar energy potential and its development fortainable energy generation in Nigeria: a road map to achieving this feat | |
Johann et al. | Profitability of energy storage for raising self-consumption of solar power: Analysis of different household types in Germany | |
CN102347620A (zh) | 一种微电网的控制方法 | |
Castello et al. | Control strategies for electric vehicle (EV) charging using renewables and local storage | |
Hu et al. | Capacity configuration optimization for island microgrid with wind/solar/pumped storage considering demand response | |
Murthy et al. | Parametric studies on a stand-alone polygeneration microgrid with battery storage | |
KR20130117566A (ko) | 주택용 지능형 전력 제어 시스템 및 방법 | |
CN106786552A (zh) | 一种本地消纳下的电源选择与容量优化算法 | |
Arefin et al. | Power resilience enhancement of a PV-battery-diesel microgrid | |
Solanki et al. | Distributed generation to reduce carbon dioxide emissions: a case study for residential sector in Oman | |
Tebibel et al. | Impact of the battery depth of discharge on the performance of photovoltaic hydrogen production unit with energy management strategy | |
CN106786700A (zh) | 用户侧光储一体化系统离网运行容量配置软件算法 | |
Sameti et al. | Simulation of a ZEB electrical balance with aHybrid small wind/PV | |
Nwabuokei et al. | Design of A Stand-Alone Photovoltaic Power System: Case Study of A Residence in Ogwashi-Ukwu, Delta State | |
Eshtabvi et al. | Rooftop PV systems as a solution to the electrical power shortage in Libya | |
CN202206331U (zh) | 太阳能发电系统 | |
CN106875289A (zh) | 用户侧光储一体化系统削峰填谷容量配置优化软件算法 | |
Gawronska et al. | A test bench for microgrids powered by concentrator photovoltaic systems | |
JP2019221062A (ja) | 電力を発生させ供給するシステム | |
Kusakana | Peer-to-peer energy sharing model between grid-connected residential wind and commercial photovoltaic prosumers | |
Vineetha et al. | Optimal unidirectional grid tied hybrid power system for peak demand management | |
US11932130B2 (en) | Mission-critical microgrid | |
Sameti | Low-cost building integrated renewables through general algebraic modelling system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170531 |