CN106786221A - A kind of submarine cable joint for offshore platform makes purification room change system - Google Patents

A kind of submarine cable joint for offshore platform makes purification room change system Download PDF

Info

Publication number
CN106786221A
CN106786221A CN201710025597.9A CN201710025597A CN106786221A CN 106786221 A CN106786221 A CN 106786221A CN 201710025597 A CN201710025597 A CN 201710025597A CN 106786221 A CN106786221 A CN 106786221A
Authority
CN
China
Prior art keywords
cable
extra large
purification
hull
room
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710025597.9A
Other languages
Chinese (zh)
Other versions
CN106786221B (en
Inventor
张志刚
宣耀伟
包善军
董益军
丁兆冈
郑新龙
胡文侃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hailan Engineering Company Zhejiang Zhoushan Qiming Power Group Co Ltd
Open-Minded Electric Power Design Institute Co Ltd In Zhoushan
State Grid Corp of China SGCC
Zhoushan Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
Hailan Engineering Company Zhejiang Zhoushan Qiming Power Group Co Ltd
Open-Minded Electric Power Design Institute Co Ltd In Zhoushan
State Grid Corp of China SGCC
Zhoushan Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hailan Engineering Company Zhejiang Zhoushan Qiming Power Group Co Ltd, Open-Minded Electric Power Design Institute Co Ltd In Zhoushan, State Grid Corp of China SGCC, Zhoushan Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical Hailan Engineering Company Zhejiang Zhoushan Qiming Power Group Co Ltd
Priority to CN201710025597.9A priority Critical patent/CN106786221B/en
Publication of CN106786221A publication Critical patent/CN106786221A/en
Application granted granted Critical
Publication of CN106786221B publication Critical patent/CN106786221B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/14Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for joining or terminating cables
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G9/00Installations of electric cables or lines in or on the ground or water
    • H02G9/02Installations of electric cables or lines in or on the ground or water laid directly in or on the ground, river-bed or sea-bottom; Coverings therefor, e.g. tile

Abstract

A kind of submarine cable joint for offshore platform makes purification room change system, is related to a kind of cable laying ship.The purification room for carrying out extra large cable joint making typically all arranges on the axis of hull that such extra large cable is turned more in cloth cable distraction procedure, there is hidden danger of quality.The present invention includes hull, located at the central control chamber of fore-body, located at midship shipping reel and lead cable frame, cable laying machine located at hull postmedian, the purification room for making extra large cable joint and enter tank, it is described to lead cable frame, cable laying machine, purification room and enter tank located at the side of hull fore-and-aft direction axis.The technical program reduces extra large cable and repeatedly turns situation, reduces the quantity of the transfer required for being turned because of extra large cable, reduces the extra large cable probability of malfunction occurred because extra large cable is turned, and improves the operation convenience of cloth cable, accelerates cloth cable speed.

Description

A kind of submarine cable joint for offshore platform makes purification room change system
Technical field
Purification room dress is made the present invention relates to a kind of cable laying ship, especially a kind of submarine cable joint for offshore platform Standby system.
Background technology
At present, the purification room for carrying out extra large cable joint making typically all arranges on the axis of hull that such extra large cable is in cloth cable In distraction procedure, turn more, internal bending easily occurs because turning traction, there is hidden danger of quality, in addition, purification room is most The field fabrication case dress on cable laying ship, installs manufacturing speed slowly, easily receives to make ambient influnence.
The content of the invention
The technical problem to be solved in the present invention and the technical assignment for proposing are prior art to be improved and is improved, A kind of submarine cable joint for offshore platform is provided and makes purification room change system, with purpose.Therefore, the present invention take with Lower technical scheme.
A kind of submarine cable joint for offshore platform makes purification room change system, including hull, before hull The central control chamber in portion, located at midship shipping reel and lead cable frame, cable laying machine located at hull postmedian, for making sea The purification room of cable joint is located in hull fore-and-aft direction with tank, described leading cable frame, cable laying machine, purification room and enter tank is entered The side of axis.By leading cable frame, cable laying machine, purification room and entering side of the tank located at hull fore-and-aft direction axis, making Straight line of the extra large cable after laterally cable is gone out along the longitudinal direction is transmitted, joint makes and cloth cable enters water, is reduced because of traditional cloth The extra large cable that cable machine, purification room cloth occur on the axis of hull is repeatedly turned situation, is reduced required for being turned because of extra large cable Transfer quantity, reduce the extra large cable probability of malfunction that occurs because extra large cable is turned, improve the operation convenience of cloth cable, Accelerate cloth cable speed.
As further improving and supplementing to above-mentioned technical proposal, present invention additionally comprises following additional technical feature.
Described purification room includes being detachably fastened room body in deck in ship structure, consolidates for the extra large cable that extra large cable joint makes Determine double end die holder, be easy to extra large cable move support extra large cable bracket, for purification room taken a breath purification ventilating system, be used for People and article to entering purification room carry out the Airshower chamber of dust removing, the temperature control for controlling purification room temperature and humidity Equipment, the air purity detecting system for being monitored to the air quality for purifying room.The detachable fixation of room body is just In room body, integral hoisting is installed on hull after making elsewhere;A whole set of perfect purification room equipment, being capable of high-quality Completion extra large cable joint making.
Described room body includes the office adjacent with purification junction chamber of the purification junction chamber warehouse adjacent with office, Described room body is all steel mount structure, including wallboard and the ceiling of wallboard encapsulation process with the deck encapsulation process of hull are done Public room offers towards the side of hull axis and pushes, and office, warehouse offer shifting towards the side of hull axis Window, purification junction chamber is provided with fixed window towards the side of hull axis, and purification junction chamber is provided with instrument rest area.By reasonable Segmentation office, warehouse and purification junction chamber region, article access when being easy to work and handle official business, carried by setting window The room brilliancy in purification junction chamber, office and warehouse high, reduces the application of illuminator in room body.
In nearly hull central axis framed side wallboard concordantly, purification junction chamber is near in described purification junction chamber, office, warehouse , more than more than 0.5 meter of the width in office and warehouse, purification junction chamber is in nearly hull board for the transverse width of hull board Front and rear wallboard be provided with opening for extra large cable turnover, the purification junction chamber side wallboard adjacent with ship side and be provided with lateral opening Mouthful, described opening is provided with the sealing protection window that can be closed up and down, and described sealing protection window is opened by cylinder push-and-pull.By handle It is easy to set front and back in the width more than 0.5 meter of the width more than office and warehouse of nearly hull board in purification junction chamber To opening, lateral opening contribute to extra large cable enter purification junction chamber after operation, easy access, sealing protection window lead to Cross cylinder push-and-pull and open and be easy to sealing.
Described office is provided with purifying door and the warehouse gate into warehouse into purification junction chamber, and Airshower chamber is located at net Change the purification junction chamber side of door, the office side of purifying door is provided with the dressing cubicle adjacent with Airshower chamber.Entered by office Enter to purify junction chamber and warehouse, be easy to carry out purification room overall management, and facilitate warehouse item and personnel to enter purification Junction chamber.
Described extra large cable fixes double end die holder includes base, the upper and lower 2 sets of split cavities for closing up opening on base Mouthful, 2 sets of described split die orifices are movably arranged on the screw mandrel back and forth of base top.Joint location according to extra large cable can be with Mobile die orifice closes up fixed extra large cable by die orifice up and down to relevant position, is easy to make joint.
Totally 2, described extra large cable bracket, the rear and front end in the turnover cable direction of double end die holder is fixed located at extra large cable, described Extra large cable bracket is included using the underframe and the multiple evenly distributed horizontal rolling wheel on underframe of rectangular square tube welding, every 2 The both sides vertical array of position has vertical scroll wheel between individual scroll wheel.It is easy to support extra large cable to exist using the extra large cable bracket of scroll wheel Slip thereon, reduces extra large cable movement frictional resistance, and vertical vertical scroll wheel can prevent extra large cable from being displaced sideways.
Described extra large cable fixes double end die holder and the bottom of extra large cable bracket is provided with 4 groups of movable pulleies and positioning lock.By 4 groups Movable pulley and positioning lock are easy to mobile and are locked.
Totally 2 sets of described cable laying machine, is respectively arranged in the deck in ship structure of the rear and front end in purification room.It is easy to make joint The tethered sliding of front and rear extra large cable, positioning when facilitating joint to make.
4 liftings suspension ring and 4 lifting ropes are provided with the top of room body.It is easy to the handling of room body.
Video monitoring system is equipped with the purification junction chamber and office in purification room, video monitoring system passes through cable laying ship On network system be connected on the control and monitor console of central control chamber, shown by display screen, be easy to purify room integral monitoring and Scheduling.
Beneficial effect:The quantity of the transfer required for being turned because of extra large cable is reduced, cost is reduced, reduced because of sea The extra large cable probability of malfunction that cable turning is excessive and is likely to occur, improves the operation convenience of cloth cable, accelerates cloth cable speed, Fang Ti Integral hoisting and be detachably fixed mode and simplify installation, fix double end die holder bottom and install in extra large cable bracket and extra large cable and slide Wheel and positioning lock are easy to positioning and the fixation of position, make equipment solid after it directly can aboard ship be moved after outside completes It is fixed, movement is easily installed, reduce work working strength.
Brief description of the drawings
Fig. 1 is topology layout schematic diagram of the present invention.
Fig. 2 is present invention purification room topology layout schematic diagram.
Fig. 3 is present invention purification room topology layout schematic side view.
In figure:1- hulls;2- central control chambers;3- shipping reels;4- leads cable frame;5- cable laying machines;6- purifies room;7- enters water Groove;8- extra large cables;601- purifies junction chamber;602- offices;603- warehouses;604- extra large cables fix double end die holder;605- extra large cable supports Frame;606- Airshower chambers;607- instruments rest area;608- sealing protection windows;609- dressing cubicles;60401- bases;60402- is split Die orifice;60403- screw mandrels back and forth;60501- underframe;60502- horizontal rolling wheels;The vertical scroll wheels of 60503-.
Specific embodiment
Technical scheme is described in further detail below in conjunction with Figure of description.
As Figure 1-3, a kind of submarine cable joint for offshore platform makes purification room change system, including hull 1, located at the central control chamber 2 of the front portion of hull 1, located at the middle part of hull 1 shipping reel 3 and lead cable frame 4, located at the postmedian of hull 1 Cable laying machine 5, the purification room 6 for making the joint of extra large cable 8 and enter tank 7, lead cable frame 4, cable laying machine 5, purification room 6 and enter tank 7 located at the side of the fore-and-aft direction axis of hull 1.
For the ease of the installation for purifying room 6 and the high-quality joint of making extra large cable 8, purification room 6 includes being detachably fastened Room body in the deck of hull 1, double end die holder 604 is fixed for the extra large cable that the joint of extra large cable 8 makes, is easy to extra large cable 8 to move support Extra large cable bracket 605, for purification room 6 taken a breath purification ventilating system, for enter purify room 6 people and article enter The Airshower chamber 606 that row dust is removed, the Temperature-controlled appliance for controlling purification room 6 temperature and humidity, for purification room 6 The air purity detecting system that air quality is monitored.The detachable fixation of room body is easy to room body to be made elsewhere Integral hoisting afterwards is installed on hull 1;A whole set of perfect equipment of purification room 6, being capable of the high-quality system for completing the joint of extra large cable 8 Make.
In order to reasonably set the purification space of room 6 and the preferable daylighting effect that takes, room body include purification junction chamber 601, The office 602 adjacent with purification junction chamber 601 warehouse 603 adjacent with office 602, room body is all steel mount structure, including With the wallboard and the ceiling of wallboard encapsulation process of the deck encapsulation process of hull 1, office 602 towards the axis of hull 1 one Side offers and pushes, and office 602, warehouse 603 offer shifting window towards the side of the axis of hull 1, purify junction chamber 601 Fixed window is provided with towards the side of the axis of hull 1, purification junction chamber 601 is provided with instrument rest area 607.By rational segmentation The region of office 602, warehouse 603 and purification junction chamber 601, is easy to article access and office during work, by setting window Family improves purification junction chamber 601, the room brilliancy in office 602 and warehouse 603, and reduce illuminator in room body should With.
For the ease of the access operation of extra large cable 8 and maintenance, purification junction chamber 601, office 602, warehouse 603 are in nearly hull 1 Central axis framed side wallboard is concordant, and purification junction chamber 601 is more than office 602 and warehouse in the transverse width of the board of nearly hull 1 More than 0.5 meter of 603 width, the purification wallboard before and after the board of nearly hull 1 of junction chamber 601 is provided with for the turnover of extra large cable 8 Opening, purification junction chamber 601 the side wallboard adjacent with ship side are provided with lateral opening, and opening is provided with the sealing that can be closed up and down and prevents Shield window 608, sealing protection window 608 is opened by cylinder push-and-pull.By purification junction chamber 601 the board of nearly hull 1 width Degree is easy to set the opening of fore-and-aft direction more than more than 0.5 meter of the width in office 602 and warehouse 603, and lateral opening helps In the operation entered after purifying junction chamber 601 to extra large cable 8, easy access, sealing protection window 608 is opened just by cylinder push-and-pull In sealing.
It is easy to management to lift operating efficiency and closing, office 602 is provided with into the purifying door for purifying junction chamber 601 and enters Enter 603, the warehouse in warehouse 603, Airshower chamber 606 is located at the side of purification junction chamber 601 of purifying door, the office 602 of purifying door Side is provided with the dressing cubicle 609 adjacent with Airshower chamber 606.Purification junction chamber 601 and warehouse 603 are entered by office 602, just In carrying out overall management to purification room 6, and the article of warehouse 603 and personnel are facilitated to enter purification junction chamber 601.
For the ease of making the joint of extra large cable 8, extra large cable fixes double end die holder 604 including base 60401, located at base 60401 On upper and lower 2 sets of split die orifices, 60402,2 sets of split die orifices 60402 for closing up opening be movably arranged in base 60401 On the screw mandrel back and forth 60403 at top.Joint location according to extra large cable 8 can move die orifice to relevant position, upper and lower by die orifice Close up fixed extra large cable 8, be easy to make joint.
In order to provide extra large cable 8 support, reducing friction and prevent sideslip, totally 2, extra large cable bracket 605 is fixed located at extra large cable The rear and front end in the turnover cable direction of double end die holder 604, extra large cable bracket 605 includes the underframe 60501 using rectangular square tube welding With the multiple evenly distributed horizontal rolling wheel 60502 on underframe 60501, the both sides of position are erected between every 2 scroll wheels To being arranged with vertical scroll wheel 60503.It is easy to support the slip thereon of extra large cable 8 using the extra large cable bracket 605 of scroll wheel, reduces Extra large cable 8 moves frictional resistance, and vertical vertical scroll wheel 60503 can prevent extra large cable 8 from being displaced sideways.
Mobile and fixed in order to realize, extra large cable fixes double end die holder 604 and the bottom of extra large cable bracket 605 is provided with 4 groups of cunnings Driving wheel and positioning lock.It is easy to mobile by 4 groups of movable pulleies and positioning lock and locks.
The position adjustment of extra large cable 8 movement when joint makes for convenience, enhancing extra large cable 8 goes out tractive force during cable, cable laying machine 5 Totally 2 sets, it is respectively arranged on the deck of hull 1 of the rear and front end in purification room 6.It is easy to the traction of the front and rear extra large cable 8 for making joint to move It is dynamic, positioning when facilitating joint to make.
For the ease of handling, 4 liftings suspension ring and 4 lifting ropes are provided with the top of room body.It is easy to the handling of room body.
In order to realize the monitoring to purifying room 6, video is equipped with the purification junction chamber 601 and office 602 in purification room 6 Monitoring system, video monitoring system is connected on the control and monitor console of central control chamber 2 by the network system on cable laying ship, by aobvious Display screen shows, is easy to purify the integral monitoring and scheduling in room 6.
When the joint of extra large cable 8 makes, double end die holder is fixed in the end of leading portion extra large cable 8 with the front end of back segment extra large cable 8 by extra large cable 604 fix, and carry out joint making, after completing, cloth cable are drawn by 2 sets of cable laying machines 5.
The field joint of the main extra large cable 8 to 500KV and above of this equipment makes, in joint manufacturing process, The limiting condition swing angle for adapting to offshore platform is ± 15 °.
In this example, wallboard uses the high-quality double-side color steel plate of thickness 0.5mm, and the sandwich rock wool of color steel is hydrophobic rock Cotton, color steel is two-sided to cover plastic sheeting, corrosion-resistant, easy to clean.
In this example, purifying door is using the liner aluminium honeycomb light color steel plate door flushed with surfaces of wall, doorframe Aluminium alloy, sets observation window on door, door lock is locked using stainless steel L-type, and Men Yusuo has consolidation process, dead bolt hole and doorframe on doorframe Junction should have the reliability seal approach such as sealing joint strip under answering encapsulation process, door, and door lock uses column type handle lock.
In this example, purification ventilating system is thousand grades of cleaning systems, using a high-effective automatic-purifying device, to purification room Pressure air blowing is carried out in 6, rate of ventilation reaches 50-52 times per hour, pure air delivers to purification room 6, room by air supply duct Interior malleation, it is ensured that malleation > 10Pa;Non- purification air-conditioning room and outdoor guarantee malleation > 5Pa;The purification noise of junction chamber 601≤ 65dB(A)。
The purification ground of room 6 uses anti-static PVC floor.
In this example, Airshower chamber 606 is through the clean gas flow after high efficiency particulate air filter filtering by rotatable nozzle from all directions On injection to the person, so as to efficiently and rapidly remove dust particle, the dust particle after removing is again via first, high efficiency particulate air filter It is re-circulated in wind drenches region after filtering;System auto-controll operation, two-door electronic interlocking, and it is provided with photoelectric sensor;Wind Drench room 606 to be made using overall cold-rolled steel sheet, the treatment of outer surface electrostatic plastic spraying.Door, base plate, nozzle use stainless steel making, Modularization assembling, the wind that can be according to actual needs assembled into various length drenches size, assembling transport extremely convenient.Drench the time 0- 99 seconds adjustable.Using first, efficient two-stage filtration system.Pouring effect most preferably is blown in order to reach, tuyere air outlet wind speed is up to 25m/s More than, more than wind speed 18m/s on human body is blown to, the initial drench the time dispatched from the factory is set to
15 seconds, using EVA encapsulants, airtight performance was high.
In this example, it is the air conditioner of 10Kw that temperature control system uses refrigerating capacity, and air-conditioner set is provided with isolation measure, empty Adjust airduct and the equipment junction of unit to use hose adapter, the airduct of air-conditioner set, the branch of water pipe, hang or bracket is arranged at insulation Layer is outside, and hangs bracket with pipeline enclosure edge with chock, the same insulation layer thickness of thickness of chock in branch.
Purification junction chamber 601 and the illuminator of office 602 use the glimmering lamp of ceiling type purifying.
It is this hair that a kind of submarine cable joint for offshore platform shown in figure 1 above -3 makes purification room change system Bright specific embodiment, has embodied substantive distinguishing features of the present invention and progress, can be according to actual use needs, in the present invention Enlightenment under, carry out the equivalent modifications of the aspects such as shape, structure to it, this programme protection domain row.

Claims (10)

1. a kind of submarine cable joint for offshore platform makes purification room change system, including hull(1), located at hull (1)Anterior central control chamber(2), located at hull(1)The shipping reel at middle part(3)With lead cable frame(4), located at hull(1)In after The cable laying machine in portion(5), for making extra large cable(8)The purification room of joint(6)With enter tank(7), it is characterised in that:Described leads cable Frame(4), cable laying machine(5), purification room(6)With enter tank(7)It is located at hull(1)The side of fore-and-aft direction axis.
2. a kind of submarine cable joint for offshore platform according to claim 1 makes purification room change system, its It is characterised by:Described purification room(6)Including being detachably fastened in hull(1)The room body on deck, for extra large cable(8)Joint system The extra large cable of work fixes double end die holder(604), be easy to extra large cable(8)The extra large cable bracket of mobile support(605), for purification room(6) The purification ventilating system taken a breath, for entering purification room(6)People and article carry out the Airshower chamber of dust removing (606), for control purification room(6)The Temperature-controlled appliance of temperature and humidity, for purification room(6)Air quality carry out The air purity detecting system of monitoring.
3. a kind of submarine cable joint for offshore platform according to claim 2 makes purification room change system, its It is characterised by:Described room body includes purification junction chamber(601)With purification junction chamber(601)Adjacent office(602)With Office(602)Adjacent warehouse(603), described room body is all steel mount structure, including with hull(1)Deck encapsulation process Wallboard and wallboard encapsulation process ceiling, office(602)Towards hull(1)The side of axis offers and pushes, office Room(602), warehouse(603)Towards hull(1)The side of axis offers shifting window, purifies junction chamber(601)Towards hull (1)The side of axis is provided with fixed window, purifies junction chamber(601)It is provided with instrument rest area(607).
4. a kind of submarine cable joint for offshore platform according to claim 2 makes purification room change system, its It is characterised by:Described purification junction chamber(601), office(602), warehouse(603)In nearly hull(1)Central axis framed side wallboard Concordantly, junction chamber is purified(601)In nearly hull(1)The transverse width of board is more than office(602)0.5 meter of width with On, purify junction chamber(601)In nearly hull(1)The front and rear wallboard of board is provided with for extra large cable(8)The opening of turnover, purification receiving Head-room(601)The side wallboard adjacent with ship side is provided with lateral opening, and described opening is provided with the sealing protection that can be closed up and down Window(608), described sealing protection window(608)Opened by cylinder push-and-pull.
5. a kind of submarine cable joint for offshore platform according to claim 3 makes purification room change system, its It is characterised by:Described office(602)It is provided with into purification junction chamber(601)Purifying door and enter warehouse(603)Storehouse Storehouse(603)Door, Airshower chamber(606)Located at the purification junction chamber of purifying door(601)Side, the office of purifying door(602)Side It is provided with and Airshower chamber(606)Adjacent dressing cubicle(609).
6. a kind of submarine cable joint for offshore platform according to claim 2 makes purification room change system, its It is characterised by:Described extra large cable fixes double end die holder(604)Including base(60401), located at base(60401)On it is upper and lower can Close up 2 sets of split die orifices of opening(60402), described 2 sets of split die orifices(60402)It is movably arranged in base (60401)The screw mandrel back and forth at top(60403)On.
7. a kind of submarine cable joint for offshore platform according to claim 2 makes purification room change system, its It is characterised by:Described extra large cable bracket(605)Totally 2, double end die holder is fixed located at extra large cable(604)Turnover cable direction before and after two End, described extra large cable bracket(605)Including the underframe using rectangular square tube welding(60501)With located at underframe(60501)On Multiple evenly distributed horizontal rolling wheels(60502), the both sides vertical array of position has vertical scroll wheel between every 2 scroll wheels (60503).
8. a kind of submarine cable joint for offshore platform according to claim 2 makes purification room change system, its It is characterised by:Described extra large cable fixes double end die holder(604)With extra large cable bracket(605)Bottom be provided with 4 groups of movable pulleies and fixed Position lock.
9. a kind of submarine cable joint for offshore platform according to claim 1 makes purification room change system, its It is characterised by:Described cable laying machine(5)Totally 2 sets, it is respectively arranged on purification room(6)Rear and front end hull(1)On deck.
10. a kind of submarine cable joint for offshore platform according to claim 3 makes purification room change system, its It is characterised by:4 liftings suspension ring and 4 lifting ropes are provided with the top of room body.
CN201710025597.9A 2017-01-13 2017-01-13 A kind of submarine cable connector for offshore platform makes purification room change system Active CN106786221B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710025597.9A CN106786221B (en) 2017-01-13 2017-01-13 A kind of submarine cable connector for offshore platform makes purification room change system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710025597.9A CN106786221B (en) 2017-01-13 2017-01-13 A kind of submarine cable connector for offshore platform makes purification room change system

Publications (2)

Publication Number Publication Date
CN106786221A true CN106786221A (en) 2017-05-31
CN106786221B CN106786221B (en) 2018-09-21

Family

ID=58945475

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710025597.9A Active CN106786221B (en) 2017-01-13 2017-01-13 A kind of submarine cable connector for offshore platform makes purification room change system

Country Status (1)

Country Link
CN (1) CN106786221B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108493854A (en) * 2018-04-18 2018-09-04 国家电网公司 A kind of manufacturing cable head platform
CN108561982A (en) * 2018-02-07 2018-09-21 国网浙江省电力有限公司电力科学研究院 A kind of hundred grades of mobile purification house systems made for 500kV extra large cable connectors

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108561982A (en) * 2018-02-07 2018-09-21 国网浙江省电力有限公司电力科学研究院 A kind of hundred grades of mobile purification house systems made for 500kV extra large cable connectors
CN108493854A (en) * 2018-04-18 2018-09-04 国家电网公司 A kind of manufacturing cable head platform
CN108493854B (en) * 2018-04-18 2023-11-21 国家电网公司 Cable head manufacturing platform

Also Published As

Publication number Publication date
CN106786221B (en) 2018-09-21

Similar Documents

Publication Publication Date Title
CN104759382B (en) Dry type spray room of double-chamber double-pressure structure
US9810440B2 (en) Ventilation system for bathroom
CN106786221B (en) A kind of submarine cable connector for offshore platform makes purification room change system
CN206191842U (en) Air supply arrangement of application skirting line air supply and new trend conveying system thereof
CN206332387U (en) A kind of submarine cable joint for offshore platform makes purification room change system
CN206676621U (en) A kind of air zoning moves dry spray booth
CN205673110U (en) Automobile door plate automatic glue-spraying system
CN208502371U (en) A kind of auxiliary fire-fighting structure carrying out auxiliary fire-fighting in stereo garage transport mechanism
JP3692894B2 (en) How to introduce outside air into tunnel tunnels
CN207035404U (en) A kind of VMC
CN209706288U (en) The integrated vertical ventilation module of assembled
CN208243946U (en) A kind of auxiliary fire-fighting structure carrying out auxiliary fire-fighting on stereo garage parking stall
CN210845690U (en) Curtain removes haze system
CN208321512U (en) A kind of goods leaching room
CN201250498Y (en) Dirty clothing collector
CN203347634U (en) Novel air shower delivery window
CN205957419U (en) Air film building position new trend system
KR20210012228A (en) Clean Booth For Public Transit Platform
CN216467500U (en) Vehicle-mounted PCR laboratory
CN219817312U (en) All-round clean wind of goods drenches room
CN111515212B (en) Online cleaning maintenance device and method for side-hung laser
CN215797819U (en) Air shower elevator used for entering dust-free room
CN209409557U (en) A kind of cooling equipment of overlay film for waterproof roll
CN208423597U (en) A kind of container type silent noise reduction case apparatus
CN211548251U (en) Curtain wall system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant