CN106774275A - Visualize the test system and method for the control function of train operation monitoring device - Google Patents

Visualize the test system and method for the control function of train operation monitoring device Download PDF

Info

Publication number
CN106774275A
CN106774275A CN201710030334.7A CN201710030334A CN106774275A CN 106774275 A CN106774275 A CN 106774275A CN 201710030334 A CN201710030334 A CN 201710030334A CN 106774275 A CN106774275 A CN 106774275A
Authority
CN
China
Prior art keywords
test
train
module
data
tested
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710030334.7A
Other languages
Chinese (zh)
Other versions
CN106774275B (en
Inventor
王志伟
苏军贵
朱明�
付强
范旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan CRRC Times Signal and Communication Co Ltd
Original Assignee
Hunan CRRC Times Signal and Communication Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan CRRC Times Signal and Communication Co Ltd filed Critical Hunan CRRC Times Signal and Communication Co Ltd
Priority to CN201710030334.7A priority Critical patent/CN106774275B/en
Publication of CN106774275A publication Critical patent/CN106774275A/en
Application granted granted Critical
Publication of CN106774275B publication Critical patent/CN106774275B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0208Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the configuration of the monitoring system
    • G05B23/0213Modular or universal configuration of the monitoring system, e.g. monitoring system having modules that may be combined to build monitoring program; monitoring system that can be applied to legacy systems; adaptable monitoring system; using different communication protocols
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B17/00Systems involving the use of models or simulators of said systems
    • G05B17/02Systems involving the use of models or simulators of said systems electric

Abstract

The invention discloses a kind of test system and method for the control function for visualizing train operation monitoring device, the emulation testing such as circuit, train Run-time scenario is combined with half object signal analog machine, form the control function test environment of the train operation monitoring device for completing, realize the automatic test based on scene and manual intervention test, and be easy to build, make test process more directly perceived and efficient.Its technical scheme is:Test subsystem realizes that test man-machine interface, ground line and device data loading, virtual train Kinematic Model, the computing of train operation position, train simulation Run-time scenario graphical representation, the control of test and excitation signal generation apparatus and collection, dot-mode transponder message send, equipment under test feedback information shows and network service;Equipment condition monitoring subsystem realizes that the collection of tested supervising device CAN operation information, operation information content frame show and analysis, running state information network service forwarding.

Description

Visualize the test system and method for the control function of train operation monitoring device
Technical field
The present invention relates to the measuring technology of the control function to train operation monitoring device, more particularly to emulation testing is transported The visual control function for train operation monitoring device that row scene and half object signal analog machine are combined is carried out The system and method for test.
Background technology
LKJ2000 train operation monitoring devices in functional test and verification process, it is necessary to its send speed, pressure, Operating mode, track signal, communication equal excitation signal, and observe and detect its output order and feedback information, to judge tested monitoring The functional completeness of device, and carry out its security control performance evaluation.
At present in the functional test and experiment of supervising device, the Laboratory Function checking of supervising device is only relied on simply Simulating test device, with manually operate test device, manual observation test result and record based on, test environment is simple and crude, effect Rate is low.
This testing scheme can specifically be embodied in entitled " the supervising device signal hair of Publication No. CN101334668A The patent application of raw device " and a kind of entitled " train operation monitoring device integration test side of Publication No. CN101021451A In the patent application of method and combined test stand ".For the former, its scheme is that equipment is generated for monitoring dress by signal modulation circuit Put and test the analog signal for using, it is necessary to artificial button operation.For the latter, its scheme is to simulate the generation of locomotive conditions signal Equipment is main body, increase supervising device do equipment under test output signal detection, for realize the whole machine of equipment under test and it is single insert The electric interfaces performance detection of part.
These existing testing schemes have the shortcomings that as follows:
1st, track signal, speed pulse signal, reservoir pressure voltage are provided only according to running environment needed for supervising device The single test and excitations such as signal, operating mode digital quantity signal, it is impossible to combined with test parameter with test scene and complete work(is provided Can test environment;
2nd, it is main to send unidirectional test and excitation to tested supervising device, lack the test response to being tested supervising device output Correction judgement, be only capable of realizing open-loop test function;
3rd, tester when functional test is carried out using simulating test device, it is necessary to carry out it is relatively complicated it is artificial by Key operation, test process and result need manual observation and record, and test experience is not good, and workload is big.
The content of the invention
The brief overview of one or more aspects given below is providing to the basic comprehension in terms of these.This general introduction is not The extensive overview of all aspects for contemplating, and it is also non-to be both not intended to identify the key or decisive key element of all aspects Attempt to define the scope in terms of any or all.Its unique purpose is to provide the one of one or more aspects in simplified form A little concepts think the sequence of more detailed description given later.
It is an object of the invention to solve the above problems, there is provided a kind of control work(for visualizing train operation monitoring device The test system and method for energy, the emulation testing such as circuit, train Run-time scenario is combined with half object signal analog machine, is formed The control function test environment of the train operation monitoring device of completion, realizes that the automatic test based on scene and manual intervention are surveyed Examination, and be easy to build, make test process more directly perceived and efficient.
The technical scheme is that:Present invention is disclosed a kind of control function for visualizing train operation monitoring device Test system, including test subsystem and equipment condition monitoring subsystem, wherein:
Test subsystem realizes test man-machine interface, ground line and device data loading, virtual train kinematics Modeling, the computing of train operation position, train simulation Run-time scenario graphical representation, the control of test and excitation signal generation apparatus with Collection, dot-mode transponder message are sent, equipment under test feedback information shows, test process is recorded and network service;
Equipment condition monitoring subsystem realizes the collection of tested supervising device CAN operation information, operation information content frame Display and analysis, running state information network service forwarding.
One embodiment of the test system of the control function of visualization train operation monitoring device of the invention, test Subsystem includes:
Test human-computer interface module, there is provided test man-machine interface;
Train simulation Run-time scenario MBM, Load Line characteristic calculates virtual train and is closed with ground signal The position relationship of key point, graphical representation train simulation Run-time scenario;
Train traction/braking characteristic MBM, sets up train traction/braking and kinetic model, calculates equipment under test Required cab signal environmental data and controlled output;
Test and excitation signal generation apparatus are controlled and detection module, and control exciting signal source sends actual sharp to equipment under test Encourage signal, detection equipment under test output feedback and form closed loop;
Dot-mode transponder message transmissions control module, simulates vehicle-mounted transponder information receiving module and tested supervising device Connection and message transmissions;
The operation letter that tested supervising device running state information display module, display and the tested supervising device of analysis send Breath;
Test process logging modle, records the situation of test execution;
Network communication module, the operation information of the equipment under test of receiving device status monitoring subsystem forwarding.
One embodiment of the test system of the control function of visualization train operation monitoring device of the invention, equipment Status monitoring subsystem includes:
Detection human-computer interface module, there is provided the man-machine interface of monitoring and data analysis;
CAN operation information acquisition module, CAN communication, the operation in collection CAN are set up with tested supervising device Information;
Operation information content frame shows and analysis module, the CAN operation information that display and analysis get;
Running state information network service forwarding module, the running state information of tested device is sent by network;
Network connection state monitoring module, display and the network service connection status for testing subsystem.
Present invention is disclosed a kind of method of testing of the control function for visualizing train operation monitoring device, arranged in visualization Test is completed in the test system of the control function of car running monitor device, test system includes test subsystem and equipment Status monitoring subsystem, test subsystem includes test human-computer interface module, train simulation Run-time scenario MBM, row Car traction/brake MBM, the control of test and excitation signal generation apparatus and detection module, dot-mode transponder message transmissions Control module, tested supervising device running state information display module, test process logging modle, network communication module, equipment Status monitoring subsystem includes that detection human-computer interface module, CAN operation information acquisition module, operation information content frame show With analysis module, running state information network service forwarding module, network connection state monitoring module, method of testing includes:
Train simulation Run-time scenario MBM Load Line and trackside equipment data simultaneously set up Run-time scenario digitlization mould Type;
Train traction/braking characteristic MBM loading Train Parameters simultaneously set up train traction/Brake Dynamics model;
The traction of test human-computer interface module input/braking level driving train traction/braking characteristic MBM is carried out Train dynamics is calculated in real time, and result of calculation is controlled by test and excitation signal generation apparatus to be occurred with detection module control signal Device sends vehicle-mounted pumping signal;
Train simulation Run-time scenario MBM calculates train present position according to current virtual train running speed And judge ground signal key point position relationship and spend the key point moment, such as ground signal is semaphore, then by test and excitation Signal generation apparatus are controlled to drive exciting signal source to send corresponding cab signal with detection module, and such as ground signal is answered for point type Device is answered, then transponder message signals is directly sent to tested device by dot-mode transponder message transmissions control module;
Running state information when the tested supervising device of CAN operation information acquisition module detection runs, and transfer to fortune Row information content frame to show and carry out the display and analysis of detailed running state data with analysis module, while transferring to running status to believe Breath network service forwarding module group bag is sent to network communication module;
Network communication module parses running state data bag, sends to tested supervising device running state information display module Shown in real time, send to test process logging modle and recorded;
Test process logging modle records DCO process and tested supervising device the operation shape in whole test process State information, and write file preservation.
One embodiment of the method for testing of the control function of visualization train operation monitoring device of the invention, train The circuit and trackside equipment data of simulation run scene modeling module loading include:Circuit ramp data, curve data, road junction/ Bridge/tunneling data, circuit speed limit data, split-phase point data, track section data, station data, station side track data, signal Machine data, dot-mode transponder data.
One embodiment of the method for testing of the control function of visualization train operation monitoring device of the invention, train The Train Parameters of traction/brake MBM loading include:Locomotive tractive characteristic curve, locomotive brake characteristic curve, car Braking characteristic curve, level controlling curve, train marshalling list parameter.
Present invention contrast prior art has following beneficial effect:It is characteristic of the invention that Load Line characteristic parameter, shape Into virtual circuit and trackside equipment (including track circuit, dot-mode transponder etc.) model, with reference to real-time train kinematic calculation Train simulation Run-time scenario is constituted, using information such as visual picture Dynamic Announce train operation position, operating conditions, and forms outer Portion signal key point position trigger condition, it is automatic to drive half object signal analog machine to send excitation letter to tested supervising device Number, while showing and recording the test information that tested supervising device feeds back, it is capable of achieving the closed loop test of supervising device, therefore this hair The method and system of bright offer is easier to build typical test scene, makes test process more directly perceived, efficient.
Specifically, first, the present invention is pre-configured with by loading ground line data, trackside equipment data, train The parameter such as grouping information and traction braking characteristic, builds circuit model and train kinematics model, and simulation train is in tested monitoring Running status under device control, and drive dependence test pumping signal that equipment occurs, provide function to tested supervising device With the complete test scene needed for control model test.
Secondly, the present invention by loading be pre-configured with ground line data, trackside equipment data, train marshalling list information and The parameters such as traction braking characteristic, build circuit model and train kinematics model, and simulation train is under the control of tested supervising device Running status, and drive dependence test pumping signal that equipment occurs, provide function and control model to tested supervising device Complete test scene needed for test.
Finally, the present invention provides integrated man-machine interface, easy to operate, friendly interface, abundant information, and possesses record work( Can, test process is directly perceived, can improve test job efficiency.
Brief description of the drawings
Fig. 1 shows the embodiment of the test system of the control function of visualization train operation monitoring device of the invention General principles figure.
Fig. 2 shows the schematic diagram of test subsystem of the invention.
Fig. 3 shows the schematic diagram of equipment condition monitoring subsystem of the invention.
Fig. 4 shows the embodiment of the method for testing of the control function of visualization train operation monitoring device of the invention Flow chart.
Fig. 5 shows the operational flow diagram of test subsystem.
Fig. 6 shows the operational flow diagram of equipment condition monitoring subsystem.
Specific embodiment
After the detailed description for reading embodiment of the disclosure in conjunction with the following drawings, better understood when of the invention Features described above and advantage.In the accompanying drawings, each component is not necessarily drawn to scale, and with similar correlation properties or feature Component may have same or like reference.
Visualize the embodiment of the test system of the control function of train operation monitoring device
Fig. 1 shows the embodiment of the test system of the control function of visualization train operation monitoring device of the invention General principles, refer to Fig. 1, and the test system of the present embodiment includes:Test subsystem 1 and equipment condition monitoring subsystem 2, using industrial computer, and connected by Ethernet between the two.
Test subsystem 1 realizes test man-machine interface, ground line and device data loading, virtual train kinematics Modeling, the computing of train operation position, train simulation Run-time scenario graphical representation, the control of test and excitation signal generation apparatus with Collection, dot-mode transponder message send, equipment under test feedback information shows and network service.
Equipment condition monitoring subsystem 2 realizes the collection of tested supervising device CAN operation information, operation information content frame Display and analysis, running state information network service forwarding.
Fig. 2 shows the principle of test subsystem of the invention, and Fig. 5 shows the operation stream of test subsystem Journey, refers to Fig. 2 and Fig. 5, and test subsystem 1 includes:Test human-computer interface module 11, the modeling of train simulation Run-time scenario Module 12, train traction/braking characteristic MBM 13, the control of test and excitation signal generation apparatus and detection module 14, point type Transponder message transmissions control module 15, tested supervising device running state information display module 16, test process logging modle 17th, network communication module 18.
Test human-computer interface module 11 provides test man-machine interface.Test man-machine interface is by simulation driver controller area, machine Turner condition viewing area, ground rail cue field, transponder list display area, train operation circuit vertical section viewing area, row Car operation top plan view shape viewing area, tested supervising device output information viewing area, Heibei provincial opera testing and control area, network state prison Vision area is constituted.
The Load Line characteristic of train simulation Run-time scenario MBM 12, calculates virtual train and is closed with ground signal The position relationship of key point, graphical representation train simulation Run-time scenario.Loading LKJ basic datas source file and trackside equipment number According to according to track data feature construction circuit model;Place virtual train in the service position set according to task;According to dummy column Vehicle speed and operation pathway are set, and carry out train kinematic calculation and real time line operation information data operation, calculate train and work as Preceding position, obtains present position mean inclination, and ground trackside equipment key point was judged according to current location, and directly Connect or test signal is sent to tested supervising device by precise control test signal exciting bank.
In the process of running, real-time rendering train operation scene skiagraph and top plan view, intuitively show and reflect Whether train position, speed, speed limit, braking output control effect (advance rashly, emerge semaphore and hypervelocity), ground signal become The Run-time scenarios such as change, yard side line route.
Train traction/braking characteristic MBM 13 sets up train traction/braking and kinetic model, calculates equipment under test Required cab signal environmental data and controlled output.Set according to Train Parameters and marshalling, set up motor-car/train traction braking meter Model is calculated, according to the simulation driver controller handle position, control button, tested supervising device output brake signal for obtaining, virtually The information such as the current mean inclination of train, calculate train stressing conditions, and calculate the information such as acceleration, speed, reservoir pressure, pass through Serial ports control test signal exciting bank sends test signal to tested supervising device.
Test and excitation signal generation apparatus control to send reality to equipment under test with the control exciting signal source of detection module 14 Pumping signal, detection equipment under test output feedback form closed loop.Primary control program is tested by RS232 serial communication controllings and detection Pumping signal generating means.
After primary control program is connected with test and excitation signal generation apparatus, computing and train traction system are modeled according to Run-time scenario Dynamic computing, control test and excitation signal generation apparatus send speed square-wave signal, velocity phase, machine to tested LKJ supervising devices Car signal, excessively insulation joint, locomotive power condition switch amount, reservoir pressure, primary side signal, bavin speed signal, anti-slip stimulus, Heibei provincial opera examination Test signal, GYK (vehicle track running supervising device) axle temperature signal equal excitation signal;Primary control program is filled from test and excitation signal Put the signals below of the tested supervising device output of detection:Unloader signal, depression signal, close wind number, emergency brake signal, standby Brake signal.
Dot-mode transponder message transmissions control module 15 simulates vehicle-mounted transponder information receiving module and tested supervising device Connection and message transmissions.Primary control program connects tested LKJ supervising devices and realizes dot-mode transponder message transmissions control by RS422 System.
After setting up connection, (Balise Transmission Module, transponder information is received primary control program simulation BTM Module) claim frame that tested LKJ supervising devices send is received, when virtual train computing is not yet by transponder, to LKJ responses Idle frame, when by transponder, retrieves corresponding transponder message, and to LKJ response message frames.
Tested supervising device running state information display module 16 shows and analyzes the operation letter that tested supervising device sends Breath.Primary control program connects equipment condition monitoring subsystem program, the tested supervising device reality that reception is forwarded by it by Ethernet When running state information, and shown, display content mainly includes:Real speed, speed limit, operating mode, pipe pressure, signal, mileage, when Clock, braking output, equipment state, device fault information etc..
Test process logging modle 17 records the situation of test execution.Primary control program records the detailed of each test assignment execution Details condition, mainly includes:Time, test and excitation signal type, pumping signal parameter, train status, tested LKJ states, failure Information, braking output control car exception etc., preserve in text form, are commented as the comprehensive function and performance to equipment under test Valency.
The operation information of the equipment under test of the receiving device status monitoring subsystem of network communication module 18 forwarding.Primary control program Equipment condition monitoring subsystem program is connected by ethernet communication.Using TCP/IP network communication protocols, primary control program is visitor Family end, equipment condition monitoring subsystem program is server end, and the packet of network interaction includes:Equipment real-time traffic information Bag, detection information bag, operational factor bag, equipment state bag.Major control data receives packet and carries out resolve packet, for display And record.Equipment real-time traffic information bag content mainly includes:Real speed, speed limit, clock, operating mode, colored lights, semaphore, braking are defeated Go out, mileage etc..Detection information bag content includes:Reservoir pressure, primary side information, speed channels information etc..Operational factor bag content Including:Circuit number, grouping information, Bus Schedules, system control information etc..Equipment state bag content includes:Display state, Rom state, CPU RAM states, communications status, software version information etc..
Fig. 3 shows the principle of equipment condition monitoring subsystem of the invention, and Fig. 6 shows equipment condition monitoring subsystem Operational process, refer to Fig. 3 and Fig. 6, equipment condition monitoring subsystem 2 includes:Detection human-computer interface module 21, CAN Operation information acquisition module 22, operation information content frame show and analysis module 23, running state information network service forwarding mould Block 24, network connection state monitoring module 25.
Detection human-computer interface module 21, there is provided the man-machine interface of monitoring and data analysis.Detection man-machine interface is by CAN data Frame viewing area, device type selection area, networking client list display area are constituted.
CAN operation information acquisition module 22, CAN communication, the fortune in collection CAN are set up with tested supervising device Row information.Equipment condition monitoring subsystem computer is connected by USB-CAN with tested LKJ supervising devices, opens CAN communication Afterwards, the module sends all data frame write-in buffer areas in CAN for showing and organizing bag to primary control program.
Operation information content frame shows the CAN operation information got with analysis module 23, display and analysis.The mould The all supervising device service data frames obtained from CAN are carried out list display by block in CAN data frames viewing area, are shown Content includes the frame data of frame ID, priority, frame number and 8 bytes of each frame;By selecting assigned priority and frame number to aobvious The frame data for showing carry out filtering and show, for being analysed in depth to the running status for being tested supervising device.
Running state information network service forwarding module 24, the running state information of tested device is sent by network.If Standby status monitoring subsystem connects primary control program by ethernet communication, using TCP/IP network communication protocols, equipment state prison Survey subsystem is server end, and primary control program is client.When the Programmable detection to current CAN frame data is identical with caching When the data of priority and frame number have different, just by related content group bag, send to client.The program is by tested supervising device Running status sends to all and has set up the successful client that connects and shake hands.
Network connection state monitoring module 25, display and the network service connection status for testing subsystem.The module The web socket of connection is set up by real-time query, the client communication state being connected is set up in monitoring with the module, and with visitor Family end IP address and connection status information of shaking hands show in networking client list.
Visualize the embodiment of the method for testing of the control function of train operation monitoring device
Fig. 4 shows the embodiment of the method for testing of the control function of visualization train operation monitoring device of the invention Flow.Fig. 4 is referred to, the method for the present embodiment is realized in the embodiment of above-mentioned test system, its specific step realized It is rapid as follows.
Step S1:Train simulation Run-time scenario MBM Load Line and trackside equipment data simultaneously set up Run-time scenario number Word model.The circuit and trackside equipment data of train simulation Run-time scenario MBM loading include:Circuit ramp data, song Line number evidence, road junction/bridge/tunneling data, circuit speed limit data, split-phase point data, track section data, station data, station Side line data, semaphore data, dot-mode transponder data.
Step S2:Train traction/braking characteristic MBM loading Train Parameters simultaneously set up train traction/Brake Dynamics Model.The Train Parameters of train traction/braking characteristic MBM loading include:Locomotive tractive characteristic curve, locomotive brake are special Linearity curve, vehicle braking characteristic curve, level controlling curve, train marshalling list parameter.
Step S3:Traction/braking the level of test human-computer interface module input drives train traction/braking characteristic modeling mould Block carries out train dynamics and calculates in real time, and result of calculation controls to control letter with detection module by test and excitation signal generation apparatus Number generating means sends vehicle-mounted pumping signal.
Step S4:Train simulation Run-time scenario MBM calculates train current according to current virtual train running speed Position simultaneously judges ground signal key point position relationship and spends the key point moment, and such as ground signal is semaphore, then pass through Test and excitation signal generation apparatus control to drive exciting signal source to send corresponding cab signal, such as ground signal with detection module Be dot-mode transponder (being used for point type equipment of the ground to train information transfer in rail traffic signal system), then should by point type Answer device message transmissions control module and directly send transponder message signals to tested device.
Step S5:Running state information when the tested supervising device of CAN operation information acquisition module detection runs, and Transferring to operation information content frame to show with analysis module carries out the display and analysis of detailed running state data, while transferring to operation Status information network service forwarding module group bag is sent to network communication module.
Step S6:Network communication module parses running state data bag, sends to tested supervising device running state information Display module is shown, sends to test process logging modle and recorded in real time.
Step S7:Test process logging modle records DCO process and tested supervising device in whole test process Running state information, and write file preservation.
Although for make explanation simplify the above method is illustrated and is described as a series of actions, it should be understood that and understand, The order that these methods are not acted is limited, because according to one or more embodiments, some actions can occur in different order And/or with from it is depicted and described herein or herein it is not shown and describe but it will be appreciated by those skilled in the art that other Action concomitantly occurs.
Those skilled in the art will further appreciate that, the various illustratives described with reference to the embodiments described herein Logic plate, module, circuit and algorithm steps can realize being electronic hardware, computer software or combination of the two.For clear Chu ground explains this interchangeability of hardware and software, various illustrative components, frame, module, circuit and step be above with Its functional form makees vague generalization description.Such feature be implemented as hardware or software depend on concrete application and Put on the design constraint of total system.Technical staff can be realized described for every kind of application-specific with different modes Feature, but such realize that decision-making should not be interpreted to cause departing from the scope of the present invention.
Various illustrative logic plates, module and the circuit described with reference to presently disclosed embodiment can use general place Reason device, digital signal processor (DSP), application specific integrated circuit (ASIC), field programmable gate array (FPGA) or other can compile Journey logical device, discrete door or transistor logic, discrete nextport hardware component NextPort or its be designed to carry out function described herein Any combinations are realized or performed.General processor can be microprocessor, but in alternative, the processor can be appointed What conventional processor, controller, microcontroller or state machine.Processor is also implemented as the combination of computing device, example One or more microprocessors that combination, multi-microprocessor such as DSP and microprocessor cooperate with DSP core or it is any its His such configuration.
The step of method or algorithm for being described with reference to embodiment disclosed herein, can be embodied directly in hardware, in by processor Embodied in the software module of execution or in combination of the two.Software module can reside in RAM memory, flash memory, ROM and deposit Reservoir, eprom memory, eeprom memory, register, hard disk, removable disk, CD-ROM or known in the art appoint In the storage medium of what other forms.Exemplary storage medium is coupled to processor to enable the processor from/to the storage Medium reads and write-in information.In alternative, storage medium can be integrated into processor.Processor and storage medium can In residing in ASIC.ASIC can reside in user terminal.In alternative, processor and storage medium can be used as discrete sets Part is resident in the user terminal.
In one or more exemplary embodiments, described function can be in hardware, software, firmware or its any combinations Middle realization.If being embodied as computer program product in software, each function can be as the instruction of one or more bars or generation Code storage is transmitted on a computer-readable medium or by it.Computer-readable medium includes computer-readable storage medium and communication Both media, it includes any medium for facilitating computer program to shift from one place to another.Storage medium can be can quilt Any usable medium that computer is accessed.It is non-limiting as an example, such computer-readable medium may include RAM, ROM, EEPROM, CD-ROM or other optical disc storages, disk storage or other magnetic storage apparatus can be used to carry or store instruction Or the desirable program code and any other medium that can be accessed by a computer of data structure form.Any connection is also by by rights Referred to as computer-readable medium.If for example, software is to use coaxial cable, fiber optic cables, twisted-pair feeder, digital subscriber line Or the wireless technology of such as infrared, radio and microwave etc is passed from web site, server or other remote sources (DSL) Send, then the coaxial cable, fiber optic cables, twisted-pair feeder, DSL or such as infrared, radio and microwave etc is wireless Technology is just included among the definition of medium.Disk (disk) as used herein and dish (disc) include compact disc (CD), laser disc, laser disc, digital versatile disc (DVD), floppy disk and blu-ray disc, which disk (disk) are often reproduced in the way of magnetic Data, and dish (disc) laser reproduce data optically.Combinations of the above should also be included in computer-readable medium In the range of.
It is for so that any person skilled in the art can all make or use this public affairs to provide of this disclosure being previously described Open.Various modifications of this disclosure all will be apparent for a person skilled in the art, and as defined herein general Suitable principle can be applied to spirit or scope of other variants without departing from the disclosure.Thus, the disclosure is not intended to be limited Due to example described herein and design, but should be awarded and principle disclosed herein and novel features phase one The widest scope of cause.

Claims (6)

1. it is a kind of visualize train operation monitoring device control function test system, it is characterised in that including test master control Subsystem and equipment condition monitoring subsystem, wherein:
Test subsystem realize test man-machine interface, ground line and device data loading, virtual train Kinematic Model, The computing of train operation position, train simulation Run-time scenario graphical representation, the control of test and excitation signal generation apparatus and collection, Dot-mode transponder message is sent, equipment under test feedback information shows, test process is recorded and network service;
Equipment condition monitoring subsystem realizes that the collection of tested supervising device CAN operation information, operation information content frame show Forwarded with analysis, running state information network service.
2. the test system of the control function of visualization train operation monitoring device according to claim 1, its feature exists In test subsystem includes:
Test human-computer interface module, there is provided test man-machine interface;
Train simulation Run-time scenario MBM, Load Line characteristic calculates virtual train and ground signal key point Position relationship, graphical representation train simulation Run-time scenario;
Train traction/braking characteristic MBM, sets up train traction/braking and kinetic model, needed for calculating equipment under test Cab signal environmental data and controlled output;
Test and excitation signal generation apparatus are controlled and detection module, and control exciting signal source sends actual excitation to equipment under test to be believed Number, detection equipment under test output feedback form closed loop;
Dot-mode transponder message transmissions control module, simulates the connection of vehicle-mounted transponder information receiving module and tested supervising device And message transmissions;
The operation information that tested supervising device running state information display module, display and the tested supervising device of analysis send;
Test process logging modle, records the situation of test execution;
Network communication module, the operation information of the equipment under test of receiving device status monitoring subsystem forwarding.
3. the test system of the control function of visualization train operation monitoring device according to claim 1, its feature exists In equipment condition monitoring subsystem includes:
Detection human-computer interface module, there is provided the man-machine interface of monitoring and data analysis;
CAN operation information acquisition module, CAN communication is set up with tested supervising device, the operation letter in collection CAN Breath;
Operation information content frame shows and analysis module, the CAN operation information that display and analysis get;
Running state information network service forwarding module, the running state information of tested device is sent by network;
Network connection state monitoring module, display and the network service connection status for testing subsystem.
4. it is a kind of visualize train operation monitoring device control function method of testing, it is characterised in that visualization train Test is completed in the test system of the control function of running monitor device, test system includes test subsystem and equipment shape State monitoring subsystem, test subsystem includes test human-computer interface module, train simulation Run-time scenario MBM, train Traction/brake MBM, the control of test and excitation signal generation apparatus and detection module, dot-mode transponder message transmissions control Molding block, tested supervising device running state information display module, test process logging modle, network communication module, equipment shape State monitoring subsystem include detection human-computer interface module, CAN operation information acquisition module, operation information content frame show and Analysis module, running state information network service forwarding module, network connection state monitoring module, method of testing include:
Train simulation Run-time scenario MBM Load Line and trackside equipment data simultaneously set up Run-time scenario digital model;
Train traction/braking characteristic MBM loading Train Parameters simultaneously set up train traction/Brake Dynamics model;
The traction of test human-computer interface module input/braking level driving train traction/braking characteristic MBM carries out train Dynamics is calculated in real time, and result of calculation is controlled and detection module control signal generating means by test and excitation signal generation apparatus Send vehicle-mounted pumping signal;
Train simulation Run-time scenario MBM calculates train present position and sentences according to current virtual train running speed Disconnected ground signal key point position relationship and excessively key point moment, such as ground signal are semaphore, then by test and excitation signal Generating means controls to drive exciting signal source to send corresponding cab signal with detection module, and such as ground signal is point type response Device, then directly send transponder message signals by dot-mode transponder message transmissions control module to tested device;
Running state information when the tested supervising device of CAN operation information acquisition module detection runs, and transfer to operation to believe Breath content frame to show and carry out the display and analysis of detailed running state data with analysis module, while transferring to running state information net Network communication forwarding module group bag is sent to network communication module;
Network communication module parses running state data bag, and sending to tested supervising device running state information display module is carried out Display in real time, sends to test process logging modle and is recorded;
Test process logging modle records DCO process and tested supervising device the running status letter in whole test process Breath, and write file preservation.
5. the method for testing of the control function of visualization train operation monitoring device according to claim 4, its feature exists In the circuit and trackside equipment data of the loading of train simulation Run-time scenario MBM include:Circuit ramp data, curve number According to, road junction/bridge/tunneling data, circuit speed limit data, split-phase point data, track section data, station data, station side track Data, semaphore data, dot-mode transponder data.
6. the method for testing of the control function of visualization train operation monitoring device according to claim 4, its feature exists In the Train Parameters of train traction/braking characteristic MBM loading include:Locomotive tractive characteristic curve, locomotive brake characteristic Curve, vehicle braking characteristic curve, level controlling curve, train marshalling list parameter.
CN201710030334.7A 2017-01-16 2017-01-16 Visualize the test macro and method of the control function of train operation monitoring device Active CN106774275B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710030334.7A CN106774275B (en) 2017-01-16 2017-01-16 Visualize the test macro and method of the control function of train operation monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710030334.7A CN106774275B (en) 2017-01-16 2017-01-16 Visualize the test macro and method of the control function of train operation monitoring device

Publications (2)

Publication Number Publication Date
CN106774275A true CN106774275A (en) 2017-05-31
CN106774275B CN106774275B (en) 2019-11-19

Family

ID=58945846

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710030334.7A Active CN106774275B (en) 2017-01-16 2017-01-16 Visualize the test macro and method of the control function of train operation monitoring device

Country Status (1)

Country Link
CN (1) CN106774275B (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108508867A (en) * 2018-03-23 2018-09-07 卡斯柯信号有限公司 Behavior-based control drives the Vehicle Controller software testing system and method for script
CN109484430A (en) * 2018-10-10 2019-03-19 同济大学 The data framing method and device of high-speed magnetic floating onboard wireless electric control unit
CN111061258A (en) * 2019-12-31 2020-04-24 卡斯柯信号(北京)有限公司 Function testing method and device based on train control system
CN111077877A (en) * 2019-12-12 2020-04-28 联合汽车电子有限公司 Test and monitored control system
CN111123739A (en) * 2019-12-14 2020-05-08 中车大连电力牵引研发中心有限公司 Network control system semi-physical simulation experiment platform used in full-automatic unmanned driving mode
CN111736557A (en) * 2020-06-29 2020-10-02 中车长春轨道客车股份有限公司 Integrated control system and control method for rail vehicle collision test
CN113126554A (en) * 2019-12-30 2021-07-16 中国科学院长春光学精密机械与物理研究所 Optical equipment monitoring system
CN113468031A (en) * 2021-07-29 2021-10-01 湖南中车时代通信信号有限公司 Monitoring method, system and device for magnetic levitation vehicle-mounted operation control system
CN114006922A (en) * 2021-10-19 2022-02-01 中车青岛四方机车车辆股份有限公司 Train communication network safety detection system and detection method
CN114124992A (en) * 2021-10-18 2022-03-01 华人运通(江苏)技术有限公司 Method, device, equipment and system for monitoring running state of whole vehicle domain controller
CN114348073A (en) * 2022-01-06 2022-04-15 北京全路通信信号研究设计院集团有限公司 Point type train control system testing method and device
CN108874493B (en) * 2018-06-20 2022-04-22 青岛海信网络科技股份有限公司 ATS interface display method and device based on comprehensive monitoring platform
CN114460860A (en) * 2021-12-29 2022-05-10 中车永济电机有限公司 Comprehensive control and management platform and method for train-level semi-physical simulation system
CN114954568A (en) * 2022-07-01 2022-08-30 河南思维轨道交通技术研究院有限公司 Locomotive with train operation monitoring device
WO2022205175A1 (en) * 2021-03-31 2022-10-06 西门子股份公司 Method and device for train operation optimization
CN115963740A (en) * 2023-01-30 2023-04-14 中南大学 Energy storage type high-speed heavy-load train and rolling test system thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102427372A (en) * 2011-04-19 2012-04-25 北京锦鸿希电信息技术股份有限公司 China train control system (CTCS) point type transponder demodulating device and implementation method thereof
CN102567205A (en) * 2012-01-05 2012-07-11 铁道部运输局 Simulation test system and simulation test device of train network control software
CN102692921A (en) * 2012-06-19 2012-09-26 株洲南车时代电气股份有限公司 Line control vehicle-mounted integrated testing system and method based on object signal
CN104699069A (en) * 2015-01-09 2015-06-10 中国铁路总公司 Train control system vehicular device simulation testing system
CN205725863U (en) * 2016-06-29 2016-11-23 河南蓝信软件有限公司 EMUs information of vehicles dynamic monitoring system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102427372A (en) * 2011-04-19 2012-04-25 北京锦鸿希电信息技术股份有限公司 China train control system (CTCS) point type transponder demodulating device and implementation method thereof
CN102567205A (en) * 2012-01-05 2012-07-11 铁道部运输局 Simulation test system and simulation test device of train network control software
CN102692921A (en) * 2012-06-19 2012-09-26 株洲南车时代电气股份有限公司 Line control vehicle-mounted integrated testing system and method based on object signal
CN104699069A (en) * 2015-01-09 2015-06-10 中国铁路总公司 Train control system vehicular device simulation testing system
CN205725863U (en) * 2016-06-29 2016-11-23 河南蓝信软件有限公司 EMUs information of vehicles dynamic monitoring system

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108508867B (en) * 2018-03-23 2020-09-01 卡斯柯信号有限公司 Vehicle-mounted controller software testing system and method based on behavior driving script
CN108508867A (en) * 2018-03-23 2018-09-07 卡斯柯信号有限公司 Behavior-based control drives the Vehicle Controller software testing system and method for script
CN108874493B (en) * 2018-06-20 2022-04-22 青岛海信网络科技股份有限公司 ATS interface display method and device based on comprehensive monitoring platform
CN109484430A (en) * 2018-10-10 2019-03-19 同济大学 The data framing method and device of high-speed magnetic floating onboard wireless electric control unit
CN109484430B (en) * 2018-10-10 2020-04-28 同济大学 Data framing method and device for high-speed magnetic levitation vehicle-mounted radio control unit
CN111077877A (en) * 2019-12-12 2020-04-28 联合汽车电子有限公司 Test and monitored control system
CN111123739A (en) * 2019-12-14 2020-05-08 中车大连电力牵引研发中心有限公司 Network control system semi-physical simulation experiment platform used in full-automatic unmanned driving mode
CN111123739B (en) * 2019-12-14 2024-02-23 中车大连电力牵引研发中心有限公司 Network control system semi-physical simulation experiment platform used in full-automatic unmanned mode
CN113126554A (en) * 2019-12-30 2021-07-16 中国科学院长春光学精密机械与物理研究所 Optical equipment monitoring system
CN111061258A (en) * 2019-12-31 2020-04-24 卡斯柯信号(北京)有限公司 Function testing method and device based on train control system
CN111736557A (en) * 2020-06-29 2020-10-02 中车长春轨道客车股份有限公司 Integrated control system and control method for rail vehicle collision test
WO2022205175A1 (en) * 2021-03-31 2022-10-06 西门子股份公司 Method and device for train operation optimization
CN113468031A (en) * 2021-07-29 2021-10-01 湖南中车时代通信信号有限公司 Monitoring method, system and device for magnetic levitation vehicle-mounted operation control system
CN114124992A (en) * 2021-10-18 2022-03-01 华人运通(江苏)技术有限公司 Method, device, equipment and system for monitoring running state of whole vehicle domain controller
CN114124992B (en) * 2021-10-18 2023-12-26 华人运通(江苏)技术有限公司 Method, device, equipment and system for monitoring running state of whole vehicle domain controller
CN114006922A (en) * 2021-10-19 2022-02-01 中车青岛四方机车车辆股份有限公司 Train communication network safety detection system and detection method
CN114460860B (en) * 2021-12-29 2023-10-13 中车永济电机有限公司 Comprehensive control and management platform and method for train-level semi-physical simulation system
CN114460860A (en) * 2021-12-29 2022-05-10 中车永济电机有限公司 Comprehensive control and management platform and method for train-level semi-physical simulation system
CN114348073B (en) * 2022-01-06 2023-10-13 北京全路通信信号研究设计院集团有限公司 Point type train control system testing method and device
CN114348073A (en) * 2022-01-06 2022-04-15 北京全路通信信号研究设计院集团有限公司 Point type train control system testing method and device
CN114954568A (en) * 2022-07-01 2022-08-30 河南思维轨道交通技术研究院有限公司 Locomotive with train operation monitoring device
CN115963740A (en) * 2023-01-30 2023-04-14 中南大学 Energy storage type high-speed heavy-load train and rolling test system thereof
CN115963740B (en) * 2023-01-30 2024-01-30 中南大学 Energy-storage type high-speed and heavy-load train and rolling test system thereof

Also Published As

Publication number Publication date
CN106774275B (en) 2019-11-19

Similar Documents

Publication Publication Date Title
CN106774275B (en) Visualize the test macro and method of the control function of train operation monitoring device
CN104596770B (en) A kind of power train in vehicle application assembly comprehensive performance testing system
CN107600110B (en) A kind of vehicle-mounted train groups prognostic and health management system
CN108154743A (en) A kind of train travelling simulation system
CN107479532A (en) The domain controller test system and method for a kind of intelligent automobile
CN101482894A (en) Simulation system and method for combined train operation control
CN112164272B (en) Signal simulation system and simulation method of tramcar signal system
CN109358599A (en) A kind of Auto-Test System of train operation monitoring device, method and device
CN103647684A (en) System and method for testing urban rail train security detection sensing network
CN113219855B (en) Simulation verification method and device for TACS (terminal-to-terminal Security System)
CN105469665A (en) High-speed railway onboard signal simulation training system and method
CN112874588B (en) Test system of rail transit interconnection intercommunication signal system
CN109491267A (en) Hump automation semi-physical simulation experiment system and its algorithm based on data-driven
CN107450354B (en) Interface simulation system of train control vehicle-mounted equipment and train control data testing method
CN104913942A (en) Detection system for automatic train operation system
CN106993307A (en) Train-ground communication analogue system and method
CN110346155A (en) A kind of system and method for power car weight translocation examination
CN104102776A (en) Automatic identification method for urban railway trains
CN109194544A (en) A kind of bus or train route communication test platform and test method based on EUHT technology
CN106428125B (en) Navigation-type operation pathway data organization method based on GIS map and system
CN114089719A (en) Vehicle signal interface simulation verification method and device for TACS (train operation control System)
CN110553864B (en) Tramcar simulation operation monitoring system
CN111366374B (en) Vehicle testing method and device, electronic equipment and storage medium
CN112781888A (en) System and method for testing vehicle
CN108257444A (en) A kind of train operation simulation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant