CN106774131A - A kind of urban track traffic energy consumption measurement control system and evaluation method - Google Patents

A kind of urban track traffic energy consumption measurement control system and evaluation method Download PDF

Info

Publication number
CN106774131A
CN106774131A CN201710008071.XA CN201710008071A CN106774131A CN 106774131 A CN106774131 A CN 106774131A CN 201710008071 A CN201710008071 A CN 201710008071A CN 106774131 A CN106774131 A CN 106774131A
Authority
CN
China
Prior art keywords
energy consumption
energy
vehicle
module
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710008071.XA
Other languages
Chinese (zh)
Inventor
王晓侃
董海荣
孙绪彬
姚秀明
王琼
郭三刺
魏鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Mechanical and Electrical Vocational College
Original Assignee
Henan Mechanical and Electrical Vocational College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Mechanical and Electrical Vocational College filed Critical Henan Mechanical and Electrical Vocational College
Priority to CN201710008071.XA priority Critical patent/CN106774131A/en
Publication of CN106774131A publication Critical patent/CN106774131A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/05Programmable logic controllers, e.g. simulating logic interconnections of signals according to ladder diagrams or function charts
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. electricity meters

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Power Engineering (AREA)
  • Automation & Control Theory (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention discloses a kind of urban track traffic energy consumption measurement control system and evaluation method, including vehicle-mounted energy consumption control unit, Data Management Unit, ground energy consumption control unit.The beneficial effects of the invention are as follows:System of the invention is a kind of energy consumption metering system of multi-channel sampling, control is driven using permanent magnet synchronous DC motor, setting up dual energy control module using super capacitor and lithium battery carries out vehicle-mounted energy conversion control, train force analysis and modeling need not be carried out, a large amount of nonlinear analyses need not be carried out and intelligent optimization is calculated, directly traction energy consumption can be carried out using the voltage and current data of collection, the measurement and monitoring of regenerating braking energy and auxiliary energy consumption, possess energy consumption data real-time storage and display function, energy consumption data can be uploaded to by ground managing power consumption unit by Data Management Unit, save labour turnover, with fault detection capability, when system breaks down, can accurately report.

Description

A kind of urban track traffic energy consumption measurement control system and evaluation method
Technical field
The present invention relates to a kind of urban track traffic control system and evaluation method, specially a kind of urban track traffic energy Consumption Measurement and Control System and evaluation method, belong to urban track traffic applied technical field.
Background technology
Urban track traffic is city important infrastructure and great people's livelihood engineering, for lifting urban public transport service Ability, guiding Optimizing City space layout, realize urban sustainable development and it is steady increase, Huimin life it is significant.In recent years, Urban track traffic simplify administrative procedures and delegate powers to the lower levels are progressed into " fast traffic lane ".
Mainly by consumption electric energy, the consumption of its electric energy is quite huge for the operation of urban track traffic.Chinese city The statistics of track traffic association shows, by year ends 2015, city rail traffic fortune is opened in totally 26 cities for CONTINENTAL AREA OF CHINA Seek, altogether 116 circuits, operating line total length is up to 3618 kilometers.By taking Beijing Rail Transit as an example, Beijing Metro 2015 Mileage number reaches 554 kilometers, adds up 28.21 hundred million person-times of passenger flow.It is that 0.07 kilowatt hour is calculated according to average every passenger-kilometer energy consumption, Energy consumption is 1093.99 hundred million degree within 2015.The mileage number of national track traffic is more long, and energy input is bigger, and energy input would is that One surprising numeral.If can be by the application of low-carbon energy-saving technology by the energy consumption reduction of urban track traffic, this will be Metro operation department saves substantial amounts of energy consumption.
Current energy-saving control system is mainly from the analysis and application for being mainly biased into theoretical energy saving optimizing.On the one hand Dynamical system for train carries out setting up mechanical model, kinetic model, Mathematical Modeling etc., and then carries out nonlinear analysis With linear intelligent optimization;On the other hand the steerable system to train uses structure model, is divided using various optimized algorithms Analyse the change of energy consumption.Also there is the power save mode for using resistive braking, regenerative braking, energy storage device in dynamical system, but be all Single energy consumption control, it is impossible to realize the interconnection of ground energy consumption and vehicle-mounted energy consumption, effective storage and the energy of energy can not be carried out Amount conversion, largely wastes the energy.Simultaneously traditional energy statisticses and way to manage can not enter to the situation of energy consumption Row is evaluated and assessed, and realizes energy-optimised, the consumption of the reduction energy, realizes green traffic, green city.Therefore, for above-mentioned Problem proposes a kind of urban track traffic energy consumption measurement control system and evaluation method.
The content of the invention
The purpose of the present invention is that and provide a kind of urban track traffic energy consumption measurement control in order to solve the above problems System and evaluation method, analyze the energy consumption of city rail traffic, are convenient for administration of energy conservation and optimization.
The present invention is achieved through the following technical solutions above-mentioned purpose, a kind of urban track traffic energy consumption measurement control system System, including vehicle-mounted energy consumption control unit, Data Management Unit, ground energy consumption control unit, the vehicle-mounted energy consumption control unit connect Connect Data Management Unit, and Data Management Unit connection ground energy consumption control unit;
The vehicle-mounted energy consumption control unit includes vehicle-mounted PLC control modules and is connected with the vehicle-mounted PLC control modules , dual energy memory module, voltage acquisition module, current acquisition module, vehicle-mounted energy consumption calculation module, RFID module out of the station, Basic display module and power supply module;
Energy consumption control unit in ground includes that ground PLC control module, lighting energy consumption module, elevator energy consumption module, air-conditioning lead to Wind energy consumes module and other energy consumption modules;
Data Management Unit includes data communication module, data memory module, data dispatch module and data processing module.
Preferably, the voltage acquisition module passes through voltage sensor module and A/D modular converters the voltage for collecting Data transfer is to vehicle-mounted PLC control modules;The current acquisition module is adopted by current sensor module and A/D modular converters handle The voltage data for collecting is transferred to vehicle-mounted PLC control modules.
Preferably, the vehicle-mounted energy consumption control unit is by the sensor collection voltages and electric current number installed in diverse location According to, the analysis and calculating of energy consumption are carried out, its computing formula is:
W=∫ UIdt/3.6 × 105
In formula, W is energy input (kWh), and U is voltage (V), and I is voltage (A).
Preferably, the power supply module connects vehicle-mounted PLC control modules and other modules, for it provides the various electricity for needing Source;
The basic display module carry out train master data, speed-displacement curve, energy consumption curve, speed-power curve, The display of train operation curve and other DAS (Driver Assistant System)s;
The dual energy memory module realizes the power supply of vehicle-mounted motor and the recovery of regenerating braking energy and utilization, Ke Yishi Now regenerate energy stores and conversion.By using the heavy current impact of transient change on ultracapacitor absorption circuit, lithium is protected Battery pack;Expand the memory capacity of energy-storage system using lithium battery, make up the small shortcoming of super capacitor energy density, lifting storage Cost of investment is reduced while energy system lifetim is with dynamic response performance, energy storage economy is improved.
The vehicle-mounted energy consumption measure module is by using the sensor collection voltages and current data installed in diverse location To calculate vehicle energy consumption, lighting energy consumption, air conditioner ventilation energy consumption, regenerative braking energy consumption, feedback fraction energy consumption and other parts energy Consumption;
The RFID module out of the station enters the label of out position by being arranged on platform and determines the inbound/outbound process state of vehicle And differentiate the accuracy of train stopping position.
Preferably, the vehicle-mounted energy consumption measurement system includes sensor assembly, smoothing reactor, filter circuit, VVVF electricity Road, vehicle-mounted lighting circuit, on-board air conditioner ventilating circuit, vehicle-mounted other circuits, dual energy module and motor.
Preferably, the dual energy module includes regenerative braking circuit, lithium battery, super capacitor, DC/DC converters, DC/ AC inverters and controller.
Preferably, the sensor assembly is by sensor circuit 1, sensor circuit 2, sensor circuit 3, sensor circuit 4th, sensor circuit 5, sensor circuit 6, the circuit of sensor circuit 7 composition, by A/D converter voltage sensor and electric current The vehicle-mounted PLC control modules of voltage and current signal transmission that sensor is collected.
Preferably, vehicle-mounted Calculation Method of Energy Consumption is:
W1=∫ U1I1dt
W1=W2+Wot=W3+W5-W4+Wot=W3+W5-(W6+W7)+Wot
=∫ U3I3dt+∫U5I5dt-(∫U6I6dt+∫U7I7dt)+Wot
∫U1I1Dt=∫ U3I3dt+∫U5I5dt-(∫U6I6dt+∫U7I7dt)+Wot
W2=W3++W5-W4
W4=Wfk+Wnh
Wfk=W6+W7
In formula, W1It is vehicle-mounted total energy consumption, W2It is the main energy consumption of train;W3It is the energy consumption of traction electric machine;W4It is regenerative braking energy Consumption, W5It is vehicle-mounted illumination, air conditioner ventilation and other energy consumptions, WotIt is the attached energy consumption of onboard system, WfkIt is feedback energy consumption, W6For Feed back to the energy consumption on motor, W7To feed back to the energy consumption of vehicle electronic circuit part, WnhIt is the energy consumption of interior dual energy modular circuit.
Preferably, the Data Management Unit realizes the interconnection and the communication of various pieces of vehicle-mounted data and ground data, Vehicle-mounted energy consumption control unit is connected with ground energy consumption control unit, data communication module by GPRS, TCP/IP, MVB, A kind of communication and transmission for carrying out data in RS232/RS485, Profibus, Profinet;Data memory module be used for into Driving carries the storage with ground data, and cloud platform or cloud space are stored the data to by Internet of Things;Data dispatch module reality The scheduling of existing vehicle-mounted and ground data, is sent to municipal rail train control centre display module for display speed-distance Curve, energy Consumption curve, speed-displacement curve;Data processing module is used for processing the various data and some unfavorable or number of faults of storage According to the form of the various data of generation, while also having active tolerant control function.
Preferably, the ground energy consumption element is calculated and is analyzed energy consumption using electric energy meter, and ground energy consumption data passes through To data center, wherein air-conditioning is according to weather and scene temperature adjust automatically, it is ensured that scene temperature for Data Management Unit storage The comfortableness of suitable and crowd;Elevator is adjusted operation according to passenger flow, and appropriate time control is shunted using elevator, station Lighting apparatus uses intelligent illumination system, and the mode according to number and acousto-optic control is realized automatically controlling fluorescent tube brightness and opened Close.
Preferably, the ground energy consumption measurement system is measured using kilowatt-hour meter, by being arranged on the total of main circuit Electric energy meter carries out the overall measurement of ground energy consumption, the electric energy meter for installing each circuit in main distribution cabinet measure respectively lighting energy consumption, Elevator energy consumption, air conditioner ventilation energy consumption and other energy consumptions, energy consumption measurement schematic diagram and computing formula are as follows:
Wd=Wkf+Wzm+Wdt+Wqt
In formula, WdIt is ground energy consumption summation, WzmIt is territory lighting energy consumption;WkfIt is ground air conditioner ventilation energy consumption, WdtIt is elevator Energy consumption, WqtIt is other energy consumptions of ground.
A kind of evaluation method of urban track traffic energy consumption measurement control system,
System energy consumption system is evaluated:
(1) passenger person-kilometres energy consumption index:
In formula, K1- kilometer power consumption (kWh/ kilometers), W-total power consumption (kWh), the n-volume of the flow of passengers, in S-operation per capita Journey (km), n × S is passenger person-kilometres, is its corresponding transport distance product of passenger trip that rail line is transported;
(2) the traction energy consumption index based on operation mileage:
The factor that index reflection time, class of vehicle and circuit economical grade are used, different operation phase energy consumptions performances Significantly different, the circuit using economical grade is helpful to saving energy consumption, and the different then energy consumptions of vehicle are different, and the index can then embody not With the comparing of vehicle energy consumption;
(3) the power consumption index based on operation mileage:
In formula:It is the power consumption based on operation mileage, is total output power consumption, is car operation total kilometrage, the index Reflect the producing level of whole piece circuit power electricity consumption, power electricity consumption also for the operating service of whole piece circuit, therefore from fortune From the point of view of battalion's mileage, also the characteristics of embodiment power power consumption;
(4) regenerative braking utilizes ratio:
Regenerative braking energy consumption utilization rate:
Wherein, regenerating braking energy ratio reflects institute accounting of the utilization of train regeneration energy during train operation Example, with reference to regenerative braking energy consumption utilization rate, embodies the utilizing status of regeneration energy well;Regenerative braking energy consumption utilization rate reflects The utilization power of regenerating braking energy, utilization rate is higher, and explanation systematic function is better;
(5) accurate parking evaluation index is:Ks=| Sr-Si|
In formula, SrIt is the stopping distance of actual measurement, SiIt is preferable stopping distance, the index reflection Train Stopping precision, for protecting Card passenger safety and train operating safety, index are the smaller the better;
(6) operation Comfort Evaluation index is:
In formula, v is the speed of service, and S is range ability, by the rate of acceleration change of train, weighs Comfortability of Train, plus Percentage speed variation is bigger, and comfort level is poorer, and the index is smaller, shows that ride quality is better;
Run punctuality rate evaluation index be:
In formula, tpIt is plan run time, trIt is actual run time, the index reflection punctuality of train operation is protected Card train each website of reaching on the time and is dispatched a car on time within scheduling time, and the index is smaller, illustrates that punctuality rate is higher.
The beneficial effects of the invention are as follows:
(1) system of the invention is a kind of energy consumption metering system of multi-channel sampling, it is not necessary to carry out train force analysis and Modeling, can directly carry out the survey of traction energy consumption, regenerating braking energy and auxiliary energy consumption using the voltage and current data of collection Amount and monitoring, possess energy consumption data real-time storage and display function, can be uploaded to energy consumption data by Data Management Unit Ground managing power consumption unit, saves labour turnover, and with fault detection capability, when system breaks down, can accurately report.
(2) the dual energy module that system is used, realizes the optimization of energy-storage system operation reserve, improves the energy of system Utilization ratio, it is ensured that regenerate making full use of and changing for energy;And then can also be optimization system control parameters, exploitation track Corresponding intelligent grid of traffic etc. contributes.
(3) system can show the drafting of the detailed power consumption and operation curve of each traffic coverage by segmentation, have Effect prevents the generation of improper electricity consumption, and influence to driver control situation and its to energy-conservation is analyzed and evaluated, and propulsion is saved Energy, optimized handling technology have extraordinary directive significance.
(4) by setting up energy consumption multi-targets appraisement system, the assessment of energy consumption can be directly carried out to existing line, is section The formulation of energy measure provides theoretical foundation, in government decision, layout of roads, basic facilities construction, selection of equipment, operation management etc. Aspect has directive function.
(5) motor of the system uses permanent magnet synchronous DC motor, can improve power quality, energy consumption and the control of train Characteristic, lifts economy, comfortableness and the reliability of train.
Brief description of the drawings
Fig. 1 is track traffic energy consumption control system structure chart of the invention;
Fig. 2 is car of the invention in energy consumption measurement system schematic;
Fig. 3 is energy consumption measurement system schematic in ground of the invention;
Fig. 4 is train energy consumption indicator evaluation system Constructed wetlands schematic diagram of the invention.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Embodiment one:
As Figure 1-4, a kind of urban track traffic energy consumption measurement control system, including vehicle-mounted energy consumption control unit, number According to administrative unit, ground energy consumption control unit, the vehicle-mounted energy consumption control unit connection Data Management Unit, and the data pipe Reason unit connection ground energy consumption control unit;
The vehicle-mounted energy consumption control unit includes vehicle-mounted PLC control modules and is connected with the vehicle-mounted PLC control modules , dual energy memory module, voltage acquisition module, current acquisition module, vehicle-mounted energy consumption calculation module, RFID module out of the station, Basic display module and power supply module;
Energy consumption control unit in ground includes that ground PLC control module, lighting energy consumption module, elevator energy consumption module, air-conditioning lead to Wind energy consumes module and other energy consumption modules;
Data Management Unit includes data communication module, data memory module, data dispatch module and data processing module.
Wherein, the voltage acquisition module passes through voltage sensor module and A/D modular converters the voltage number for collecting According to being transferred to vehicle-mounted PLC control modules;The current acquisition module is by current sensor module and A/D modular converters collection To voltage data be transferred to vehicle-mounted PLC control modules.
Wherein, the vehicle-mounted energy consumption control unit is by the sensor collection voltages and electric current number installed in diverse location According to, the analysis and calculating of energy consumption are carried out, its computing formula is:
W=UIdt/3.6 × 105
In formula, W is energy input (kWh), and U is voltage (V), and I is voltage (A).
Wherein, the power supply module connects vehicle-mounted PLC control modules and other modules, for it provides the various electricity for needing Source;
The basic display module carry out train master data, speed-displacement curve, energy consumption curve, speed-power curve, The display of train operation curve and other DAS (Driver Assistant System)s;
The dual energy memory module realizes the power supply of vehicle-mounted motor and the recovery of regenerating braking energy and utilization;
The vehicle-mounted energy consumption measure module is by using the sensor collection voltages and current data installed in diverse location To calculate vehicle energy consumption, lighting energy consumption, air conditioner ventilation energy consumption, regenerative braking energy consumption, feedback fraction energy consumption and other parts energy Consumption;
The RFID module out of the station enters the label of out position by being arranged on platform and determines the inbound/outbound process state of vehicle And differentiate the accuracy of train stopping position.
Wherein, the vehicle-mounted energy consumption measurement system include sensor assembly, smoothing reactor, filter circuit, VVVF circuits, Vehicle-mounted lighting circuit, on-board air conditioner ventilating circuit, vehicle-mounted other circuits, dual energy module and motor.
Wherein, the dual energy module includes regenerative braking circuit, lithium battery, super capacitor, DC/DC converters, DC/AC Inverter and controller.
Wherein, the sensor assembly by sensor circuit 1, sensor circuit 2, sensor circuit 3, sensor circuit 4, Sensor circuit 5, sensor circuit 6, the circuit of sensor circuit 7 composition, pass voltage sensor and electric current by A/D converter The vehicle-mounted PLC control modules of voltage and current signal transmission that sensor is collected.
Wherein, vehicle-mounted Calculation Method of Energy Consumption is:
W1=∫ U1I1dt
W1=W2+Wot=W3+W5-W4+Wot=W3+W5-(W6+W7)+Wot
=∫ U3I3dt+∫U5I5dt-(∫U6I6dt+∫U7I7dt)+Wot
∫U1I1Dt=∫ U3I3dt+∫U5I5dt-(∫U6I6dt+∫U7I7dt)+Wot
W2=W3++W5-W4
W4=Wfk+Wnh
Wfk=W6+W7
In formula, W1It is vehicle-mounted total energy consumption, W2It is the main energy consumption of train;W3It is the energy consumption of traction electric machine;W4It is regenerative braking energy Consumption, W5It is vehicle-mounted illumination, air conditioner ventilation and other energy consumptions, WotIt is the attached energy consumption of onboard system, WfkIt is feedback energy consumption, W6For Feed back to the energy consumption on motor, W7To feed back to the energy consumption of vehicle electronic circuit part, WnhIt is the energy consumption of interior dual energy modular circuit.
Wherein, the Data Management Unit realizes the interconnection and the communication of various pieces of vehicle-mounted data and ground data, Vehicle-mounted energy consumption control unit is connected with ground energy consumption control unit, and data communication module carries out the logical of data by TCP/IP News and transmission;Data memory module is used for carrying out vehicle-mounted and ground data storage, and storing the data to cloud by Internet of Things puts down Platform or cloud space;Data dispatch module realizes vehicle-mounted and ground data scheduling, is sent to municipal rail train control centre and shows Module is used for display speed-distance Curve, energy consumption curve, speed-displacement curve;Data processing module is used for processing each of storage Data and some unfavorable or fault datas are planted, the form of various data is generated, while also having active tolerant control function.
Wherein, the ground energy consumption element is calculated and is analyzed energy consumption using electric energy meter, and ground energy consumption data is by number According to administrative unit storage to data center, wherein air-conditioning is according to weather and scene temperature adjust automatically, it is ensured that scene temperature it is suitable The comfortableness of suitable and crowd;Elevator is adjusted operation according to passenger flow, and appropriate time control is shunted using elevator, and station is shone Bright equipment uses intelligent illumination system, and the mode according to number and acousto-optic control is realized automatically controlling fluorescent tube brightness and switch.
Wherein, the ground energy consumption measurement system is measured using kilowatt-hour meter, by the total electricity for being arranged on main circuit Energy table carries out the overall measurement of ground energy consumption, and the electric energy meter for installing each circuit in main distribution cabinet measures lighting energy consumption, electricity respectively Terraced energy consumption, air conditioner ventilation energy consumption and other energy consumptions, energy consumption measurement schematic diagram and computing formula are as follows:
Wd=Wkf+Wzm+Wdt+Wqt
In formula, WdIt is ground energy consumption summation, WzmIt is territory lighting energy consumption;WkfIt is ground air conditioner ventilation energy consumption, WdtIt is elevator Energy consumption, WqtIt is other energy consumptions of ground.
A kind of evaluation method of urban track traffic energy consumption measurement control system,
System energy consumption system is evaluated:
(1) passenger person-kilometres energy consumption index:
In formula, K1- kilometer power consumption (kWh/ kilometers), W-total power consumption (kWh), the n-volume of the flow of passengers, in S-operation per capita Journey (km), n × S is passenger person-kilometres, is its corresponding transport distance product of passenger trip that rail line is transported;
(2) the traction energy consumption index based on operation mileage:
The factor that index reflection time, class of vehicle and circuit economical grade are used, different operation phase energy consumptions performances Significantly different, the circuit using economical grade is helpful to saving energy consumption, and the different then energy consumptions of vehicle are different, and the index can then embody not With the comparing of vehicle energy consumption;
(3) the power consumption index based on operation mileage:
In formula:It is the power consumption based on operation mileage, is total output power consumption, is car operation total kilometrage, the index Reflect the producing level of whole piece circuit power electricity consumption, power electricity consumption also for the operating service of whole piece circuit, therefore from fortune From the point of view of battalion's mileage, also the characteristics of embodiment power power consumption;
(4) regenerative braking utilizes ratio:
Regenerative braking energy consumption utilization rate:
Wherein, regenerating braking energy ratio reflects institute accounting of the utilization of train regeneration energy during train operation Example, with reference to regenerative braking energy consumption utilization rate, embodies the utilizing status of regeneration energy well;Regenerative braking energy consumption utilization rate reflects The utilization power of regenerating braking energy, utilization rate is higher, and explanation systematic function is better;
(5) accurate parking evaluation index is:Ks=| Sr-Si|
In formula, SrIt is the stopping distance of actual measurement, SiIt is preferable stopping distance, the index reflection Train Stopping precision, for protecting Card passenger safety and train operating safety, index are the smaller the better;
(7) operation Comfort Evaluation index is:
In formula, v is the speed of service, and S is range ability, by the rate of acceleration change of train, weighs Comfortability of Train, plus Percentage speed variation is bigger, and comfort level is poorer, and the index is smaller, shows that ride quality is better;
Run punctuality rate evaluation index be:
In formula, tpIt is plan run time, trIt is actual run time, the index reflection punctuality of train operation is protected Card train each website of reaching on the time and is dispatched a car on time within scheduling time, and the index is smaller, illustrates that punctuality rate is higher.
Embodiment two:
As Figure 1-4, a kind of urban track traffic energy consumption measurement control system, including vehicle-mounted energy consumption control unit, number According to administrative unit, ground energy consumption control unit, the vehicle-mounted energy consumption control unit connection Data Management Unit, and the data pipe Reason unit connection ground energy consumption control unit;
The vehicle-mounted energy consumption control unit includes vehicle-mounted PLC control modules and is connected with the vehicle-mounted PLC control modules , dual energy memory module, voltage acquisition module, current acquisition module, vehicle-mounted energy consumption calculation module, RFID module out of the station, Basic display module and power supply module;
Energy consumption control unit in ground includes that ground PLC control module, lighting energy consumption module, elevator energy consumption module, air-conditioning lead to Wind energy consumes module and other energy consumption modules;
Data Management Unit includes data communication module, data memory module, data dispatch module and data processing module.
Wherein, the voltage acquisition module passes through voltage sensor module and A/D modular converters the voltage number for collecting According to being transferred to vehicle-mounted PLC control modules;The current acquisition module is by current sensor module and A/D modular converters collection To voltage data be transferred to vehicle-mounted PLC control modules.
Wherein, the vehicle-mounted energy consumption control unit is by the sensor collection voltages and electric current number installed in diverse location According to, the analysis and calculating of energy consumption are carried out, its computing formula is:
W=∫ UIdt/3.6 × 105
In formula, W is energy input (kWh), and U is voltage (V), and I is voltage (A).
Wherein, the power supply module connects vehicle-mounted PLC control modules and other modules, for it provides the various electricity for needing Source;
The basic display module carry out train master data, speed-displacement curve, energy consumption curve, speed-power curve, The display of train operation curve and other DAS (Driver Assistant System)s;
The dual energy memory module realizes the power supply of vehicle-mounted motor and the recovery of regenerating braking energy and utilization;
The vehicle-mounted energy consumption measure module is by using the sensor collection voltages and current data installed in diverse location To calculate vehicle energy consumption, lighting energy consumption, air conditioner ventilation energy consumption, regenerative braking energy consumption, feedback fraction energy consumption and other parts energy Consumption;
The RFID module out of the station enters the label of out position by being arranged on platform and determines the inbound/outbound process state of vehicle And differentiate the accuracy of train stopping position.
Wherein, the vehicle-mounted energy consumption measurement system include sensor assembly, smoothing reactor, filter circuit, VVVF circuits, Vehicle-mounted lighting circuit, on-board air conditioner ventilating circuit, vehicle-mounted other circuits, dual energy module and motor.
Wherein, the dual energy module includes regenerative braking circuit, lithium battery, super capacitor, DC/DC converters, DC/AC Inverter and controller.
Wherein, the sensor assembly by sensor circuit 1, sensor circuit 2, sensor circuit 3, sensor circuit 4, Sensor circuit 5, sensor circuit 6, the circuit of sensor circuit 7 composition, pass voltage sensor and electric current by A/D converter The vehicle-mounted PLC control modules of voltage and current signal transmission that sensor is collected.
Wherein, vehicle-mounted Calculation Method of Energy Consumption is:
W1=∫ U1I1dt
W1=W2+Wot=W3+W5-W4+Wot=W3+W5-(W6+W7)+Wot
=∫ U3I3dt+∫U5I5dt-(∫U6I6dt+∫U7I7dt)+Wot
∫U1I1Dt=∫ U3I3dt+∫U5I5dt-(∫U6I6dt+∫U7I7dt)+Wot
W2=W3++W5-W4
W4=Wfk+Wnh
Wfk=W6+W7
In formula, W1It is vehicle-mounted total energy consumption, W2It is the main energy consumption of train;W3It is the energy consumption of traction electric machine;W4It is regenerative braking energy Consumption, W5It is vehicle-mounted illumination, air conditioner ventilation and other energy consumptions, WotIt is the attached energy consumption of onboard system, WfkIt is feedback energy consumption, W6For Feed back to the energy consumption on motor, W7To feed back to the energy consumption of vehicle electronic circuit part, WnhIt is the energy consumption of interior dual energy modular circuit.
Wherein, the Data Management Unit realizes the interconnection and the communication of various pieces of vehicle-mounted data and ground data, Vehicle-mounted energy consumption control unit is connected with ground energy consumption control unit, and data communication module carries out the communication of data by GPRS And transmission;Data memory module is used for carrying out vehicle-mounted and ground data storage, and cloud platform is stored the data to by Internet of Things Or cloud space;Data dispatch module realizes vehicle-mounted and ground data scheduling, is sent to municipal rail train control centre display mould Block is used for display speed-distance Curve, energy consumption curve, speed-displacement curve;Data processing module is used for processing the various of storage Data and some unfavorable or fault datas, generate the form of various data, while also having active tolerant control function.
Wherein, the ground energy consumption element is calculated and is analyzed energy consumption using electric energy meter, and ground energy consumption data is by number According to administrative unit storage to data center, wherein air-conditioning is according to weather and scene temperature adjust automatically, it is ensured that scene temperature it is suitable The comfortableness of suitable and crowd;Elevator is adjusted operation according to passenger flow, and appropriate time control is shunted using elevator, and station is shone Bright equipment uses intelligent illumination system, and the mode according to number and acousto-optic control is realized automatically controlling fluorescent tube brightness and switch.
Wherein, the ground energy consumption measurement system is measured using kilowatt-hour meter, by the total electricity for being arranged on main circuit Energy table carries out the overall measurement of ground energy consumption, and the electric energy meter for installing each circuit in main distribution cabinet measures lighting energy consumption, electricity respectively Terraced energy consumption, air conditioner ventilation energy consumption and other energy consumptions, energy consumption measurement schematic diagram and computing formula are as follows:
Wd=Wkf+Wzm+Wdt+Wqt
In formula, WdIt is ground energy consumption summation, WzmIt is territory lighting energy consumption;WkfIt is ground air conditioner ventilation energy consumption, WdtIt is elevator Energy consumption, WqtIt is other energy consumptions of ground.
A kind of evaluation method of urban track traffic energy consumption measurement control system,
System energy consumption system is evaluated:
(1) passenger person-kilometres energy consumption index:
In formula, K1- kilometer power consumption (kWh/ kilometers), W-total power consumption (kWh), the n-volume of the flow of passengers, in S-operation per capita Journey (km), n × S is passenger person-kilometres, is its corresponding transport distance product of passenger trip that rail line is transported;
(2) the traction energy consumption index based on operation mileage:
The factor that index reflection time, class of vehicle and circuit economical grade are used, different operation phase energy consumptions performances Significantly different, the circuit using economical grade is helpful to saving energy consumption, and the different then energy consumptions of vehicle are different, and the index can then embody not With the comparing of vehicle energy consumption;
(3) the power consumption index based on operation mileage:
In formula:It is the power consumption based on operation mileage, is total output power consumption, is car operation total kilometrage, the index Reflect the producing level of whole piece circuit power electricity consumption, power electricity consumption also for the operating service of whole piece circuit, therefore from fortune From the point of view of battalion's mileage, also the characteristics of embodiment power power consumption;
(4) regenerative braking utilizes ratio:
Regenerative braking energy consumption utilization rate:
Wherein, regenerating braking energy ratio reflects institute accounting of the utilization of train regeneration energy during train operation Example, with reference to regenerative braking energy consumption utilization rate, embodies the utilizing status of regeneration energy well;Regenerative braking energy consumption utilization rate reflects The utilization power of regenerating braking energy, utilization rate is higher, and explanation systematic function is better;
(5) accurate parking evaluation index is:Ks=| Sr-Si|
In formula, SrIt is the stopping distance of actual measurement, SiIt is preferable stopping distance, the index reflection Train Stopping precision, for protecting Card passenger safety and train operating safety, index are the smaller the better;
(8) operation Comfort Evaluation index is:
In formula, v is the speed of service, and S is range ability, by the rate of acceleration change of train, weighs Comfortability of Train, plus Percentage speed variation is bigger, and comfort level is poorer, and the index is smaller, shows that ride quality is better;
Run punctuality rate evaluation index be:
In formula, tpIt is plan run time, trIt is actual run time, the index reflection punctuality of train operation is protected Card train each website of reaching on the time and is dispatched a car on time within scheduling time, and the index is smaller, illustrates that punctuality rate is higher.
The system is different from traditional various machineries and power consumption model, it is not necessary to carry out a large amount of nonlinear analyses and intelligence Can optimize and calculate, and vehicle-mounted energy consumption element realizes record and the calculating of energy by the vehicle-mounted voltage and current of direct measurement, can To analyze the energy consumption situation of change of train in real time, so that the various operations of the energy to train in the process of running are optimized;Ground Face energy consumption element directly calculates the energy consumption of various illuminations, elevator, air conditioner ventilation and affiliated facility using electric energy meter, convenient to calculate With the change of analysis energy consumption.The upload and storage of vehicle-mounted energy consumption can be realized by data transmission unit simultaneously, it is possible to achieve car Carry the real time record of energy consumption.
It is not high for regenerating braking energy utilization rate, it is necessary to lay special circuit, so devise dual energy memory module, Carry out stopping brake energy regenerating, ramp and protect fast Brake energy recovery and other situation energy regeneratings and utilization.The system Dual energy module mainly has lithium battery, super capacitor, regenerative braking circuit, DC/AC inverters, DC/DC converters, controller etc. Composition, it is possible to achieve regeneration energy stores and conversion.By using the high current of transient change on ultracapacitor absorption circuit Impact, protects lithium battery group;Expand the memory capacity of energy-storage system using lithium battery, make up super capacitor energy density small Shortcoming, cost of investment is reduced while lifting the life-span of energy-storage system with dynamic response performance, improves energy storage economy.
The motor of the system uses permanent magnet synchronous DC motor, and power quality, energy consumption and the control that can improve train are special Property, lift economy, comfortableness and the reliability of train.Startup noise decrease 5% can just be made using direct current, energy consumption is reduced 10-20%, just current cost increase by 15%, life cycle cost reduces 45%, safeguards easier.To before and after the year two thousand twenty, the whole nation will Build about 100 city rail traffic routes.If newly-built circuit 60% use permanent magnetism trailer system, it is contemplated that the output value be up to 10000000000 yuan, the annual new line operation energy consumption in the whole nation will save 2.4 hundred million yuan.
The system is provided with Data Management Unit, it is possible to achieve the interconnection of vehicle-mounted data and ground data, can be by each Plant communication module and memory module realizes the preservation and treatment of data.Intelligent things technology can be utilized simultaneously, realize energy consumption number According to cloud platform storage, in order to realize real-time calling and checking, the change of accurate analysis train energy consumption and ground energy consumption is convenient Track traffic managing power consumption and realize energy saving optimizing.
Passenger person-kilometres energy consumption index, traction energy consumption index, base based on operation mileage are set up by using surveyed data Power consumption index, regenerative braking in operation mileage are referred to using ratio, regenerative braking energy consumption utilization rate, accurate parking evaluation The Energy Consumption Evaluation standards such as the evaluation index of mark, operation Comfort Evaluation index and operation punctuality rate, form Energy Consumption Evaluation report.No Circuit energy consumption can only be evaluated, equipment energy consumption, management energy consumption etc. can also be evaluated and studied, be conducive to strengthening Energy-saving consumes, and makes great efforts to build economizing type transportation industry;It is also beneficial to study and define the Industry Policy of guiding energy saving, makes great efforts section About construction cost, energy saving and resource, promote Sustainable transportation development.
From the angle of whole Rail Transit System, theoretical foundation, evaluation method to Rail Transit System energy-conservation, control Method processed and corresponding Standardization System carry out theory analysis and research, can be Rail Transit System power-saving technology research and Development provides the guidance of methodology and Systems Theory.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be in other specific forms realized.Therefore, no matter From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power Profit requires to be limited rather than described above, it is intended that all in the implication and scope of the equivalency of claim by falling Change is included in the present invention.Any reference in claim should not be considered as the claim involved by limitation.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each implementation method is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that for clarity, those skilled in the art should Specification an as entirety, the technical scheme in each embodiment can also be formed into those skilled in the art through appropriately combined May be appreciated other embodiment.

Claims (10)

1. a kind of urban track traffic energy consumption measurement control system, including vehicle-mounted energy consumption control unit, Data Management Unit, ground Energy consumption control unit, it is characterised in that:The vehicle-mounted energy consumption control unit connection Data Management Unit, and the data management list Unit's connection ground energy consumption control unit;
The vehicle-mounted energy consumption control unit include vehicle-mounted PLC control modules and be connected with the vehicle-mounted PLC control modules, it is double Energy storage module, voltage acquisition module, current acquisition module, vehicle-mounted energy consumption calculation module, RFID module out of the station, basis are aobvious Show module and power supply module;
Energy consumption control unit in ground includes ground PLC control module, lighting energy consumption module, elevator energy consumption module, air conditioner ventilation energy Consumption module and other energy consumption modules;
Data Management Unit includes data communication module, data memory module, data dispatch module and data processing module.
2. a kind of urban track traffic energy consumption measurement control system according to claim 1, it is characterised in that:The voltage The voltage data for collecting is transferred to vehicle-mounted PLC and controls mould by acquisition module by voltage sensor module and A/D modular converters Block;The voltage data for collecting is transferred to car by the current acquisition module by current sensor module and A/D modular converters Carry PLC control modules.
3. a kind of urban track traffic energy consumption measurement control system according to claim 1 and 2, it is characterised in that:It is described Vehicle-mounted energy consumption control unit by the sensor collection voltages and current data installed in diverse location, carry out energy consumption analysis and Calculate, its computing formula is:
W=∫ UIdt/3.6 × 105
In formula, W is energy input (kWh), and U is voltage (V), and I is voltage (A).
4. a kind of urban track traffic energy consumption measurement control system according to claim 1, it is characterised in that:The power supply Module connects vehicle-mounted PLC control modules and other modules, for it provides the various power supplys for needing;
The basic display module carries out train master data, speed-displacement curve, energy consumption curve, speed-power curve, train The display of operation curve and other DAS (Driver Assistant System)s;
The dual energy memory module realizes the power supply of vehicle-mounted motor and the recovery of regenerating braking energy and utilization, it is possible to achieve again Raw energy stores and conversion;By using the heavy current impact of transient change on ultracapacitor absorption circuit, lithium battery is protected Group;Expand the memory capacity of energy-storage system using lithium battery, make up the small shortcoming of super capacitor energy density, lifting energy storage system Cost of investment is reduced while the life-span of system is with dynamic response performance, energy storage economy is improved;
The vehicle-mounted energy consumption measure module is counted by using installed in the sensor collection voltages and current data of diverse location Calculate vehicle energy consumption, lighting energy consumption, air conditioner ventilation energy consumption, regenerative braking energy consumption, feedback fraction energy consumption and other parts energy consumption;
The RFID module out of the station by be arranged on platform enter the label of out position determine vehicle inbound/outbound process state and Differentiate the accuracy of train stopping position.
5. a kind of urban track traffic energy consumption measurement control system according to claim 1, it is characterised in that:It is described vehicle-mounted Energy consumption measurement system includes sensor assembly, smoothing reactor, filter circuit, VVVF circuits, vehicle-mounted lighting circuit, on-board air conditioner Ventilating circuit, vehicle-mounted other circuits, dual energy module and motor;The dual energy module include regenerative braking circuit, lithium battery, Super capacitor, DC/DC converters, DC/AC inverters and controller.
6. a kind of urban track traffic energy consumption measurement control system according to claim 5, it is characterised in that:The sensing Device module is by sensor circuit 1, sensor circuit 2, sensor circuit 3, sensor circuit 4, sensor circuit 5, sensor electricity Road 6, the circuit of sensor circuit 7 composition, voltage sensor and current sensor are collected voltage and electricity by A/D converter The stream vehicle-mounted PLC control modules of signal transmission.
7. a kind of urban track traffic energy consumption measurement control system according to claim 1, it is characterised in that:Vehicle-mounted energy consumption Computational methods are:
W1=∫ U1I1dt
W1=W2+Wot=W3+W5-W4+Wot=W3+W5-(W6+W7)+Wot
=∫ U3I3dt+∫U5I5dt-(∫U6I6dt+∫U7I7dt)+Wot
∫U1I1Dt=∫ U3I3dt+∫U5I5dt-(∫U6I6dt+∫U7I7dt)+Wot
W2=W3++W5-W4
W4=Wfk+Wnh
Wfk=W6+W7
In formula, W1It is vehicle-mounted total energy consumption, W2It is the main energy consumption of train;W3It is the energy consumption of traction electric machine;W4It is regenerative braking energy consumption, W5 It is vehicle-mounted illumination, air conditioner ventilation and other energy consumptions, WotIt is the attached energy consumption of onboard system, WfkIt is feedback energy consumption, W6It is feedback Energy consumption on to motor, W7To feed back to the energy consumption of vehicle electronic circuit part, WnhIt is the energy consumption of interior dual energy modular circuit.
8. a kind of urban track traffic energy consumption measurement control system according to claim 1, it is characterised in that:The data Administrative unit realizes the interconnection and the communication of various pieces of vehicle-mounted data and ground data, vehicle-mounted energy consumption control unit and ground Energy consumption control unit connection get up, data communication module by GPRS, TCP/IP, MVB, RS232/RS485, Profibus, A kind of communication and transmission for carrying out data in Profinet;Data memory module is used for carrying out depositing for vehicle-mounted and ground data Storage, cloud platform or cloud space are stored the data to by Internet of Things;Data dispatch module realizes vehicle-mounted and ground data tune Degree, is sent to municipal rail train control centre display module bent for display speed-distance Curve, energy consumption curve, speed-displacement Line;Data processing module is used for processing the various data and some unfavorable or fault datas of storage, generates various data Form, while also having active tolerant control function;
The ground energy consumption element is calculated and is analyzed energy consumption using electric energy meter, and ground energy consumption data passes through Data Management Unit Store data center, wherein air-conditioning is according to weather and scene temperature adjust automatically, it is ensured that scene temperature it is suitable and crowd Comfortableness;Elevator is adjusted operation according to passenger flow, and appropriate time control is shunted using elevator, and illuminating station equipment is used Intelligent illumination system, the mode according to number and acousto-optic control is realized automatically controlling fluorescent tube brightness and switch.
9. a kind of urban track traffic energy consumption measurement control system according to claim 1, it is characterised in that:The ground Energy consumption measurement system is measured using kilowatt-hour meter, and the totality of ground energy consumption is carried out by the total electric energy meter for being arranged on main circuit Measurement, the electric energy meter for installing each circuit in main distribution cabinet measure respectively lighting energy consumption, elevator energy consumption, air conditioner ventilation energy consumption and its Its energy consumption, energy consumption measurement schematic diagram and computing formula are as follows:
Wd=Wkf+Wzm+Wdt+Wqt
In formula, WdIt is ground energy consumption summation, WzmIt is territory lighting energy consumption;WkfIt is ground air conditioner ventilation energy consumption, WdtIt is elevator energy consumption, WqtIt is other energy consumptions of ground.
10. the evaluation side of a kind of urban track traffic energy consumption measurement control system according to any one of claim 1-19 Method, it is characterised in that:
System energy consumption system is evaluated:
(1) passenger person-kilometres energy consumption index:
K 1 = W n × S = W 1 + W d n × S
In formula, K1- kilometer power consumption (kWh/ kilometers), W-total power consumption (kWh), the n-volume of the flow of passengers, S-operation mileage per capita (km), n × S is passenger person-kilometres, is its corresponding transport distance product of passenger trip that rail line is transported;
(2) the traction energy consumption index based on operation mileage:
K 2 = W 2 S
The factor that index reflection time, class of vehicle and circuit economical grade are used, different operation phase energy consumptions performance is obvious Difference, the circuit using economical grade is helpful to saving energy consumption, and the different then energy consumptions of vehicle are different, and the index can then embody different cars The comparing of type energy consumption;
(3) the power consumption index based on operation mileage:
K 3 = W 1 S
In formula:It is the power consumption based on operation mileage, is total output power consumption, is car operation total kilometrage, the index reflection The producing level of whole piece circuit power electricity consumption, power electricity consumption also for the operating service of whole piece circuit, therefore from operation From the point of view of journey, also the characteristics of embodiment power power consumption;
(4) regenerative braking utilizes ratio:
Regenerative braking energy consumption utilization rate:
Wherein, regenerating braking energy ratio reflects proportion of the utilization of train regeneration energy during train operation, With reference to regenerative braking energy consumption utilization rate, the utilizing status of regeneration energy are embodied well;Regenerative braking energy consumption utilization rate reflects again The utilization power of raw braking energy, utilization rate is higher, and explanation systematic function is better;
(5) accurate parking evaluation index is:Ks=| Sr-Si|
In formula, SrIt is the stopping distance of actual measurement, SiIt is preferable stopping distance, the index reflection Train Stopping precision, for ensureing to multiply Objective safety and train operating safety, index are the smaller the better;
(6) operation Comfort Evaluation index is:
In formula, v is the speed of service, and S is range ability, by the rate of acceleration change of train, weighs Comfortability of Train, acceleration Rate of change is bigger, and comfort level is poorer, and the index is smaller, shows that ride quality is better;
Run punctuality rate evaluation index be:
In formula, tpIt is plan run time, trIt is actual run time, the index reflection punctuality of train operation, it is ensured that row Car each website of reaching on the time and is dispatched a car on time within scheduling time, and the index is smaller, illustrates that punctuality rate is higher.
CN201710008071.XA 2017-01-05 2017-01-05 A kind of urban track traffic energy consumption measurement control system and evaluation method Pending CN106774131A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710008071.XA CN106774131A (en) 2017-01-05 2017-01-05 A kind of urban track traffic energy consumption measurement control system and evaluation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710008071.XA CN106774131A (en) 2017-01-05 2017-01-05 A kind of urban track traffic energy consumption measurement control system and evaluation method

Publications (1)

Publication Number Publication Date
CN106774131A true CN106774131A (en) 2017-05-31

Family

ID=58950497

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710008071.XA Pending CN106774131A (en) 2017-01-05 2017-01-05 A kind of urban track traffic energy consumption measurement control system and evaluation method

Country Status (1)

Country Link
CN (1) CN106774131A (en)

Cited By (43)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107606745A (en) * 2017-09-27 2018-01-19 南京中灿科技有限公司 Metro Air conditioner season by when ring control energy consumption Forecasting Methodology
CN107832865A (en) * 2017-09-05 2018-03-23 北京交通大学 A kind of subway train energy saving in running computational methods based on ground placed type energy storage device
CN108759904A (en) * 2018-04-03 2018-11-06 北京千驷驭电气有限公司 Urban rail information comprehensive analysis method and apparatus based on big data
CN108801324A (en) * 2018-04-04 2018-11-13 河南机电职业学院 A kind of urban track traffic energy consumption measuring device
CN109118052A (en) * 2018-07-17 2019-01-01 西南交通大学 Energy efficiency evaluation method
CN109165866A (en) * 2018-09-11 2019-01-08 河南机电职业学院 A kind of municipal rail train heat-supplied system based on deep learning
CN109658541A (en) * 2017-10-11 2019-04-19 株洲中车时代电气股份有限公司 A kind of locomotive free time energy consumption monitoring method and device
CN110126854A (en) * 2019-04-25 2019-08-16 西南交通大学 A kind of train energy consumption evaluation method based on GPS
CN110197012A (en) * 2019-05-13 2019-09-03 西南交通大学 Consider the Support Capacitor lifetime estimation method that traction drive failure influences
CN110618313A (en) * 2019-09-09 2019-12-27 中车唐山机车车辆有限公司 Online energy consumption detection and prediction device and method for train power system
CN110852636A (en) * 2019-11-14 2020-02-28 北京交通大学 Rail transit system traction energy consumption optimization limit detection method based on operation plan
CN110962610A (en) * 2019-12-18 2020-04-07 安徽天健环保车辆部件有限公司 New energy bus electric quantity analysis system and method
CN110989556A (en) * 2019-12-12 2020-04-10 交控科技股份有限公司 Fault diagnosis method and system for vehicle-mounted equipment
CN111612314A (en) * 2020-04-30 2020-09-01 汉腾新能源汽车科技有限公司 Method for evaluating automobile energy consumption
CN111695815A (en) * 2020-06-15 2020-09-22 中车青岛四方车辆研究所有限公司 Urban rail transit energy consumption testing and evaluating method
US10870333B2 (en) 2018-10-31 2020-12-22 Thermo King Corporation Reconfigurable utility power input with passive voltage booster
US10875497B2 (en) 2018-10-31 2020-12-29 Thermo King Corporation Drive off protection system and method for preventing drive off
US10926610B2 (en) 2018-10-31 2021-02-23 Thermo King Corporation Methods and systems for controlling a mild hybrid system that powers a transport climate control system
US10985511B2 (en) 2019-09-09 2021-04-20 Thermo King Corporation Optimized power cord for transferring power to a transport climate control system
CN112782468A (en) * 2020-12-18 2021-05-11 福州轨道交通电气科技有限公司 Train operation energy consumption metering method
US11022451B2 (en) 2018-11-01 2021-06-01 Thermo King Corporation Methods and systems for generation and utilization of supplemental stored energy for use in transport climate control
CN112937537A (en) * 2021-03-30 2021-06-11 中车青岛四方机车车辆股份有限公司 Rail vehicle brake adjusting method and device
US11034213B2 (en) 2018-09-29 2021-06-15 Thermo King Corporation Methods and systems for monitoring and displaying energy use and energy cost of a transport vehicle climate control system or a fleet of transport vehicle climate control systems
US11059352B2 (en) 2018-10-31 2021-07-13 Thermo King Corporation Methods and systems for augmenting a vehicle powered transport climate control system
US11072321B2 (en) 2018-12-31 2021-07-27 Thermo King Corporation Systems and methods for smart load shedding of a transport vehicle while in transit
CN113361792A (en) * 2021-06-21 2021-09-07 吉林大学 Urban electric bus travel energy consumption estimation method based on multivariate nonlinear regression
CN113379289A (en) * 2021-06-25 2021-09-10 吉林大学 Opportunity constraint planning-based air conditioner use planning method for electric bus
CN113450057A (en) * 2020-03-25 2021-09-28 南京理工大学 Rail transit energy management system based on mobile terminal
US11135894B2 (en) 2019-09-09 2021-10-05 Thermo King Corporation System and method for managing power and efficiently sourcing a variable voltage for a transport climate control system
US11192451B2 (en) 2018-09-19 2021-12-07 Thermo King Corporation Methods and systems for energy management of a transport climate control system
US11203262B2 (en) 2019-09-09 2021-12-21 Thermo King Corporation Transport climate control system with an accessory power distribution unit for managing transport climate control loads
US11214118B2 (en) 2019-09-09 2022-01-04 Thermo King Corporation Demand-side power distribution management for a plurality of transport climate control systems
US11260723B2 (en) 2018-09-19 2022-03-01 Thermo King Corporation Methods and systems for power and load management of a transport climate control system
US11273684B2 (en) 2018-09-29 2022-03-15 Thermo King Corporation Methods and systems for autonomous climate control optimization of a transport vehicle
US11376922B2 (en) 2019-09-09 2022-07-05 Thermo King Corporation Transport climate control system with a self-configuring matrix power converter
US11420495B2 (en) 2019-09-09 2022-08-23 Thermo King Corporation Interface system for connecting a vehicle and a transport climate control system
US11458802B2 (en) 2019-09-09 2022-10-04 Thermo King Corporation Optimized power management for a transport climate control energy source
US11489431B2 (en) 2019-12-30 2022-11-01 Thermo King Corporation Transport climate control system power architecture
US11554638B2 (en) 2018-12-28 2023-01-17 Thermo King Llc Methods and systems for preserving autonomous operation of a transport climate control system
CN115860339A (en) * 2023-02-17 2023-03-28 天津津轨汇海科技发展有限公司 Big data analysis-based rail transit energy consumption management method and related components
US11695275B2 (en) 2019-09-09 2023-07-04 Thermo King Llc Prioritized power delivery for facilitating transport climate control
US11772496B2 (en) 2020-08-26 2023-10-03 Anusheel Nahar Regenerative braking system of an automobile and a method to operate
US11794551B2 (en) 2019-09-09 2023-10-24 Thermo King Llc Optimized power distribution to transport climate control systems amongst one or more electric supply equipment stations

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102890858A (en) * 2012-09-13 2013-01-23 南京交通职业技术学院 Remote monitoring system for bus energy consumption
CN102951165A (en) * 2012-11-05 2013-03-06 北京交通大学 Rail train electric energy saving operation control method
CN103105779A (en) * 2011-11-09 2013-05-15 北京南车时代信息技术有限公司 Train motion simulation system
CN103236165A (en) * 2013-05-06 2013-08-07 无锡乾煜信息技术有限公司 Method for detecting comfort level of passengers in passenger vehicle
CN103287359A (en) * 2013-04-25 2013-09-11 华南农业大学 Energy consumption detecting method for BEV (Blade Electric Vehicle)
CN104260759A (en) * 2014-10-08 2015-01-07 北京交通大学 Method and system for optimizing energy conservation of urban rail transit

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103105779A (en) * 2011-11-09 2013-05-15 北京南车时代信息技术有限公司 Train motion simulation system
CN102890858A (en) * 2012-09-13 2013-01-23 南京交通职业技术学院 Remote monitoring system for bus energy consumption
CN102951165A (en) * 2012-11-05 2013-03-06 北京交通大学 Rail train electric energy saving operation control method
CN103287359A (en) * 2013-04-25 2013-09-11 华南农业大学 Energy consumption detecting method for BEV (Blade Electric Vehicle)
CN103236165A (en) * 2013-05-06 2013-08-07 无锡乾煜信息技术有限公司 Method for detecting comfort level of passengers in passenger vehicle
CN104260759A (en) * 2014-10-08 2015-01-07 北京交通大学 Method and system for optimizing energy conservation of urban rail transit

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张燕燕: "城市轨道交通系统牵引及车站能耗研究", 《中国优秀硕士学位论文全文数据库》 *
石雅静: "关于上海城市轨道交通能耗指标体系的建立与分析", 《万方数据库》 *

Cited By (60)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107832865A (en) * 2017-09-05 2018-03-23 北京交通大学 A kind of subway train energy saving in running computational methods based on ground placed type energy storage device
CN107832865B (en) * 2017-09-05 2021-10-08 北京交通大学 Subway train operation energy-saving calculation method based on ground-positioned energy storage device
CN107606745A (en) * 2017-09-27 2018-01-19 南京中灿科技有限公司 Metro Air conditioner season by when ring control energy consumption Forecasting Methodology
CN107606745B (en) * 2017-09-27 2019-09-27 南京中灿科技有限公司 Metro Air conditioner season by when ring control energy consumption prediction technique
CN109658541A (en) * 2017-10-11 2019-04-19 株洲中车时代电气股份有限公司 A kind of locomotive free time energy consumption monitoring method and device
CN109658541B (en) * 2017-10-11 2021-11-12 株洲中车时代电气股份有限公司 Method and device for monitoring idle energy consumption of locomotive
CN108759904B (en) * 2018-04-03 2021-02-09 北京千驷驭电气有限公司 Urban rail information comprehensive analysis method and device based on big data
CN108759904A (en) * 2018-04-03 2018-11-06 北京千驷驭电气有限公司 Urban rail information comprehensive analysis method and apparatus based on big data
CN108801324B (en) * 2018-04-04 2020-09-11 河南机电职业学院 Urban rail transit energy consumption measuring device
CN108801324A (en) * 2018-04-04 2018-11-13 河南机电职业学院 A kind of urban track traffic energy consumption measuring device
CN109118052A (en) * 2018-07-17 2019-01-01 西南交通大学 Energy efficiency evaluation method
CN109118052B (en) * 2018-07-17 2021-11-05 西南交通大学 Energy-saving evaluation method
CN109165866A (en) * 2018-09-11 2019-01-08 河南机电职业学院 A kind of municipal rail train heat-supplied system based on deep learning
US11260723B2 (en) 2018-09-19 2022-03-01 Thermo King Corporation Methods and systems for power and load management of a transport climate control system
US11192451B2 (en) 2018-09-19 2021-12-07 Thermo King Corporation Methods and systems for energy management of a transport climate control system
US11273684B2 (en) 2018-09-29 2022-03-15 Thermo King Corporation Methods and systems for autonomous climate control optimization of a transport vehicle
US11034213B2 (en) 2018-09-29 2021-06-15 Thermo King Corporation Methods and systems for monitoring and displaying energy use and energy cost of a transport vehicle climate control system or a fleet of transport vehicle climate control systems
US10870333B2 (en) 2018-10-31 2020-12-22 Thermo King Corporation Reconfigurable utility power input with passive voltage booster
US10875497B2 (en) 2018-10-31 2020-12-29 Thermo King Corporation Drive off protection system and method for preventing drive off
US10926610B2 (en) 2018-10-31 2021-02-23 Thermo King Corporation Methods and systems for controlling a mild hybrid system that powers a transport climate control system
US11059352B2 (en) 2018-10-31 2021-07-13 Thermo King Corporation Methods and systems for augmenting a vehicle powered transport climate control system
US11703341B2 (en) 2018-11-01 2023-07-18 Thermo King Llc Methods and systems for generation and utilization of supplemental stored energy for use in transport climate control
US11022451B2 (en) 2018-11-01 2021-06-01 Thermo King Corporation Methods and systems for generation and utilization of supplemental stored energy for use in transport climate control
US11554638B2 (en) 2018-12-28 2023-01-17 Thermo King Llc Methods and systems for preserving autonomous operation of a transport climate control system
US11884258B2 (en) 2018-12-31 2024-01-30 Thermo King Llc Systems and methods for smart load shedding of a transport vehicle while in transit
US11072321B2 (en) 2018-12-31 2021-07-27 Thermo King Corporation Systems and methods for smart load shedding of a transport vehicle while in transit
CN110126854A (en) * 2019-04-25 2019-08-16 西南交通大学 A kind of train energy consumption evaluation method based on GPS
CN110197012B (en) * 2019-05-13 2022-07-19 西南交通大学 Support capacitor life evaluation method considering fault influence of traction transmission system
CN110197012A (en) * 2019-05-13 2019-09-03 西南交通大学 Consider the Support Capacitor lifetime estimation method that traction drive failure influences
US11827106B2 (en) 2019-09-09 2023-11-28 Thermo King Llc Transport climate control system with an accessory power distribution unit for managing transport climate control loads
US11376922B2 (en) 2019-09-09 2022-07-05 Thermo King Corporation Transport climate control system with a self-configuring matrix power converter
US11135894B2 (en) 2019-09-09 2021-10-05 Thermo King Corporation System and method for managing power and efficiently sourcing a variable voltage for a transport climate control system
US11794551B2 (en) 2019-09-09 2023-10-24 Thermo King Llc Optimized power distribution to transport climate control systems amongst one or more electric supply equipment stations
CN110618313A (en) * 2019-09-09 2019-12-27 中车唐山机车车辆有限公司 Online energy consumption detection and prediction device and method for train power system
US10985511B2 (en) 2019-09-09 2021-04-20 Thermo King Corporation Optimized power cord for transferring power to a transport climate control system
US11458802B2 (en) 2019-09-09 2022-10-04 Thermo King Corporation Optimized power management for a transport climate control energy source
US11203262B2 (en) 2019-09-09 2021-12-21 Thermo King Corporation Transport climate control system with an accessory power distribution unit for managing transport climate control loads
US11214118B2 (en) 2019-09-09 2022-01-04 Thermo King Corporation Demand-side power distribution management for a plurality of transport climate control systems
US11420495B2 (en) 2019-09-09 2022-08-23 Thermo King Corporation Interface system for connecting a vehicle and a transport climate control system
US11712943B2 (en) 2019-09-09 2023-08-01 Thermo King Llc System and method for managing power and efficiently sourcing a variable voltage for a transport climate control system
US11695275B2 (en) 2019-09-09 2023-07-04 Thermo King Llc Prioritized power delivery for facilitating transport climate control
CN110852636B (en) * 2019-11-14 2022-04-29 北京交通大学 Rail transit system traction energy consumption optimization limit detection method based on operation plan
CN110852636A (en) * 2019-11-14 2020-02-28 北京交通大学 Rail transit system traction energy consumption optimization limit detection method based on operation plan
CN110989556A (en) * 2019-12-12 2020-04-10 交控科技股份有限公司 Fault diagnosis method and system for vehicle-mounted equipment
CN110962610A (en) * 2019-12-18 2020-04-07 安徽天健环保车辆部件有限公司 New energy bus electric quantity analysis system and method
US11843303B2 (en) 2019-12-30 2023-12-12 Thermo King Llc Transport climate control system power architecture
US11489431B2 (en) 2019-12-30 2022-11-01 Thermo King Corporation Transport climate control system power architecture
CN113450057A (en) * 2020-03-25 2021-09-28 南京理工大学 Rail transit energy management system based on mobile terminal
CN111612314A (en) * 2020-04-30 2020-09-01 汉腾新能源汽车科技有限公司 Method for evaluating automobile energy consumption
CN111695815B (en) * 2020-06-15 2023-06-06 中车青岛四方车辆研究所有限公司 Urban rail transit energy consumption testing and evaluating method
CN111695815A (en) * 2020-06-15 2020-09-22 中车青岛四方车辆研究所有限公司 Urban rail transit energy consumption testing and evaluating method
US11772496B2 (en) 2020-08-26 2023-10-03 Anusheel Nahar Regenerative braking system of an automobile and a method to operate
CN112782468A (en) * 2020-12-18 2021-05-11 福州轨道交通电气科技有限公司 Train operation energy consumption metering method
CN112937537B (en) * 2021-03-30 2022-03-22 中车青岛四方机车车辆股份有限公司 Rail vehicle brake adjusting method and device
CN112937537A (en) * 2021-03-30 2021-06-11 中车青岛四方机车车辆股份有限公司 Rail vehicle brake adjusting method and device
CN113361792A (en) * 2021-06-21 2021-09-07 吉林大学 Urban electric bus travel energy consumption estimation method based on multivariate nonlinear regression
CN113379289B (en) * 2021-06-25 2022-10-25 吉林大学 Opportunity constraint planning-based air conditioner use planning method for electric bus
CN113379289A (en) * 2021-06-25 2021-09-10 吉林大学 Opportunity constraint planning-based air conditioner use planning method for electric bus
CN115860339A (en) * 2023-02-17 2023-03-28 天津津轨汇海科技发展有限公司 Big data analysis-based rail transit energy consumption management method and related components
CN115860339B (en) * 2023-02-17 2023-05-05 天津津轨汇海科技发展有限公司 Rail transit energy consumption management method and device based on big data analysis

Similar Documents

Publication Publication Date Title
CN106774131A (en) A kind of urban track traffic energy consumption measurement control system and evaluation method
Wang et al. Electric train energy consumption modeling
CN104260724B (en) Vehicle intelligent predictive control system and method
CN102360401B (en) Method for designing urban rail transit energy-saving run chart based on genetic algorithm
Saxe et al. Energy system analysis of the fuel cell buses operated in the project: Clean Urban Transport for Europe
CN106530180A (en) High-cold region charging service network planning method
CN107704950A (en) A kind of city rail train figure optimization method based on trip requirements and energy saving of system
CN106991492A (en) A kind of boreal climate fills pure electric bus transit operation optimization method soon
Fischer et al. Detection process of energy loss in electric railway vehicles
Feng et al. Study on the maximum operation speeds of metro trains for energy saving as well as transport efficiency improvement
CN109060015A (en) A kind of detection of EV Energy Consumption, evaluation and the device and its working method that reduce energy consumption
CN109733443A (en) A kind of hybrid power tramcar braking optimization method and system
CN104504902B (en) Vehicle uses right of way, right of way computational methods and the road charging method based on right of way
Zhang et al. Increasing urban tram system efficiency, with battery storage and electric vehicle charging
CN104594147A (en) Novel bus rapid transit system for annular express road net
Yu et al. Charging infrastructure construction from the perspective of new infrastructure
Szilassy et al. Consumption estimation method for battery-electric buses using general line characteristics and temperature
CN104300881A (en) Expressway power supply device, system and method based on solar energy
CN117401001A (en) Urban rail multi-train driving scheduling comprehensive energy-saving control method and device under complex working conditions
Leska et al. Comparative Calculation of the Fuel–Optimal Operating Strategy for Diesel Hybrid Railway Vehicles
Sun et al. A prediction-evaluation method for road network energy consumption: Fusion of vehicle energy flow principle and Two-Fluid theory
CN106467116B (en) Solar energy and hydrodynamic aerial rapid transit system (RTS)
Sengor et al. Smart railway station energy management considering regenerative braking and ESS
CN108599150A (en) Power distribution network Cost/Benefit Analysis for extensive electric vehicle access area
Jing et al. Modeling for electric taxi load and optimization model for charging/swapping facilities of electric taxi

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531