CN106761442B - 充填式高强度纤维橡胶外层组合套管 - Google Patents

充填式高强度纤维橡胶外层组合套管 Download PDF

Info

Publication number
CN106761442B
CN106761442B CN201611183332.3A CN201611183332A CN106761442B CN 106761442 B CN106761442 B CN 106761442B CN 201611183332 A CN201611183332 A CN 201611183332A CN 106761442 B CN106761442 B CN 106761442B
Authority
CN
China
Prior art keywords
casing
high strength
fill
strength fibre
type high
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611183332.3A
Other languages
English (en)
Other versions
CN106761442A (zh
Inventor
项德贵
陈朝伟
王倩
杨恒林
王鹏飞
王思敏
赵亦朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Engineering Technology R&D Co Ltd
Beijing Petroleum Machinery Co Ltd
Original Assignee
China National Petroleum Corp
CNPC Drilling Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, CNPC Drilling Research Institute Co Ltd filed Critical China National Petroleum Corp
Priority to CN201611183332.3A priority Critical patent/CN106761442B/zh
Publication of CN106761442A publication Critical patent/CN106761442A/zh
Application granted granted Critical
Publication of CN106761442B publication Critical patent/CN106761442B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/02Couplings; joints
    • E21B17/08Casing joints

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

本发明提供了一种充填式高强度纤维橡胶外层组合套管,所述充填式高强度纤维橡胶外层组合套管包括:至少一节套管单元,每节套管单元包括:钢制的内层套管,所述内层套管具有上接头和下接头;外层橡胶套管,套设在所述内层套管之外;填充高强度纤维的填充层,设置在所述内层套管与所述外层橡胶套管之间,并且所述填充层设置在所述上接头和下接头之间;其中,所述高强度纤维的抗拉强度是P110钢级石油钢管抗拉强度的10倍以上。本发明中,充填的高强度纤维抗拉强度较高,能够消耗因地层错动所产生的拉伸力,从而保护内层套管不受损伤。

Description

充填式高强度纤维橡胶外层组合套管
技术领域
本发明涉及石油、天然气钻完井领域,具体涉及油田所用的钻井套管,尤其是一种充填式高强度纤维橡胶外层组合套管。
背景技术
随着页岩气资源开发的深入以及水力压裂技术的广泛应用,页岩气区块在水力压裂时套管出现了不同程度的损坏,对页岩气资源的开发带来很大的危害。目前大部分页岩气井的套管都是采用具有高强度的单层套管,但现有的套管容易发生塑性变形甚至发生破坏,最终导致页岩气储层水力压裂改造工作无法继续进行,降低了页岩气储层水力压裂段数和井生产生命周期。
综上所述,现有技术中存在以下问题:页岩气井使用的套管水力压裂的过程中容易发生塑性变形甚至发生破坏。
发明内容
本发明提供一种充填式高强度纤维橡胶外层组合套管,以解决页岩气井使用的套管水力压裂过程中容易发生塑性变形甚至发生破坏的问题。
为此,本发明提出一种充填式高强度纤维橡胶外层组合套管,所述充填式高强度纤维橡胶外层组合套管包括:至少一节套管单元,每节套管单元包括:
钢制的内层套管,所述内层套管具有上接头和下接头;
外层橡胶套管,套设在所述内层套管之外;
填充高强度纤维的填充层,设置在所述内层套管与所述外层橡胶套管之间,并且所述填充层设置在所述上接头和下接头之间;
其中,所述高强度纤维的抗拉强度是P110钢级石油钢管抗拉强度的10倍以上。
进一步地,所述外层橡胶套管的外壁与环空的水泥环相交接。
进一步地,所述充填式高强度纤维橡胶外层组合套管包括:多节串联的所述套管单元。
进一步地,相邻的两节所述套管单元中,上方的内层套管的下接头连接下方的内层套管的上接头。
进一步地,每节所述套管单元中,所述内层套管的长度为9.0米至11.0米,所述外层橡胶套管的长度为8.5米至10.5米。
进一步地,所述套管单元的数目为几十节至几百节。
进一步地,所述内层套管的外径为5英寸到9.625英寸。
进一步地,所述高强度纤维为芳纶纤维或高强度碳纤维。
本发明具有如下有益效果:将充填式高强度纤维橡胶外层组合套管下入页岩气储层层理、裂缝和断层发育井段中。当水力压裂时,若层理、裂缝和断层发育地层发生错动,所产生的剪切力作用于充填式高强度纤维橡胶外层套管上,该剪切力可以分解为一对力偶及一对相反的拉伸力,拉伸力作用在充填式高强度纤维橡胶外层套管上,充填的高强度纤维抗拉强度较高,消耗因地层错动所产生的拉伸力,从而保护内层套管不受损伤。该组合套管结构简单,采用充填式高强度纤维橡胶外层套管,对内层套管保护效果更明显。
附图说明
图1为本发明的充填式高强度纤维橡胶外层套管的结构示意图。
附图标号说明:
1-外层橡胶套管,2-(高强度纤维)填充层,3-内层套管
具体实施方式
为了对本发明的技术特征、目的和效果有更加清楚的理解,现对照附图说明本发明。
申请人在页岩气井水力压裂施工过程中发现:由于页岩气储层层理、裂缝和断层发育,在水力压裂施工过程中会引发页岩气储层微地震事件,地层发生一定尺度的错动。地层错动所引起的剪切力通过水泥环间接作用在套管上,该剪切力可以分解为一对力偶及一对相反的拉伸力,在该拉伸力的作用下,套管发生塑性变形甚至发生破坏,最终导致页岩气储层水力压裂改造工作无法继续进行,降低了页岩气储层水力压裂段数和井生产生命周期。
为此,申请人提出了一种充填式高强度纤维外层组合套管,以解决页岩气井筒水力压裂时保护套管不受损害。
如图1所示,本发明提出一种充填式高强度纤维橡胶外层组合套管,所述充填式高强度纤维橡胶外层组合套管包括:至少一节套管单元,每节套管单元包括:
钢制的内层套管3,例如为钢质的固井套管,所述内层套管具有上接头和下接头;
外层橡胶套管1,套设在所述内层套管3之外,外层橡胶套管1可以通过过盈配合与内层套管3相连;
填充高强度纤维的填充层2,设置在所述内层套管3与所述外层橡胶套管1之间,并且所述填充层2设置在所述上接头和下接头之间;其中,所述高强度纤维的抗拉强度是P110钢级石油钢管抗拉强度的10倍以上,高强度纤维可以选用具有上述较高抗拉强度的各种合适纤维。
进一步地,所述高强度纤维的抗拉强度是P110钢级石油钢管抗拉强度的10倍以上,能够更好的适应井下环境,消耗因地层错动所产生的拉伸力。
进一步地,所述高强度纤维为芳纶纤维或高强度碳纤维,芳纶纤维或高强度碳纤维为制作防弹衣的材质,抗拉强度较高,使用稳定。
进一步地,所述外层橡胶套管的外壁与环空的水泥环相交接。外层橡胶套管1得以固定,从而以保护内层套管3。
进一步地,所述充填式高强度纤维橡胶外层组合套管包括:多节串联的所述套管单元这样,井下的整个套管都能得到有效保护。
进一步地,相邻的两节所述套管单元中,上方的内层套管的下接头连接下方的内层套管的上接头。相邻的下接头和上接头通过螺纹连接,这样能形成连续稳定的连接。
进一步地,每节所述套管单元中,所述内层套管的长度为9.0米至11.0米,例如为9米,所述外层橡胶套管的长度为8.0米至8.5米,这样,便于单节套管单元的制作。进一步地,每节所述套管单元中,所述内层套管的长度为9米,所述外层橡胶套管的长度为8.0米至8.5米,这样,能够做成与现有的钢质套管长度适应的套管单元。
进一步地,所述套管单元的数目为几十节至几百节这样,能够连接成整个井下套管。
进一步地,所述内层套管的外径为5英寸到9.625英寸,即在现有的各种规格的钢质套管外都可以设置外层橡胶套管1,从而应用广泛。进一步地,所述内层套管的外径为5英寸到9.625英寸,这样,对于这个范围的固井套管,都可以设置外层橡胶套管1,从而保护了内层的固井套管。
将充填式高强度纤维橡胶外层组合套管下入页岩气储层层理、裂缝和断层发育井段中。如图1所示,在固井以后,该组合套管的外层橡胶套管1外壁与水泥环相交接。当水力压裂时,若层理、裂缝和断层发育地层发生错动,所产生的剪切力作用于充填式高强度纤维橡胶外层套管1上,该剪切力可以分解为一对力偶及一对相反的拉伸力,拉伸力作用在充填式高强度纤维橡胶外层套管1上,充填的高强度纤维填充层2抗拉强度是P110钢级石油钢管抗拉强度的10倍以上,消耗因地层错动所产生的拉伸力,从而保护了内层套管3。该组合套管结构简单,采用纤维橡胶作为外层套管,因此对内层套管保护效果更明显。
以上所述仅为本发明示意性的具体实施方式,并非用以限定本发明的范围。为本发明的各组成部分在不冲突的条件下可以相互组合,任何本领域的技术人员,在不脱离本发明的构思和原则的前提下所作出的等同变化与修改,均应属于本发明保护的范围。

Claims (7)

1.一种充填式高强度纤维橡胶外层组合套管,用于页岩气储层层理、裂缝和断层发育井段,其特征在于,所述充填式高强度纤维橡胶外层组合套管包括:至少一节套管单元,每节套管单元包括:
钢制的内层套管,所述内层套管具有上接头和下接头;
外层橡胶套管,套设在所述内层套管之外,所述外层橡胶套管的外壁与环空的水泥环相交接,当水力压裂时,若所述页岩气储层层理、裂缝和断层发育地层发生错动,所产生的剪切力作用于所述外层橡胶套管上;
填充高强度纤维的填充层,设置在所述内层套管与所述外层橡胶套管之间,并且所述填充层设置在所述上接头和下接头之间;
其中,所述高强度纤维的抗拉强度是P110钢级石油钢管抗拉强度的10倍以上。
2.如权利要求1所述的充填式高强度纤维橡胶外层组合套管,其特征在于,所述充填式高强度纤维橡胶外层组合套管包括:多节串联的所述套管单元。
3.如权利要求2所述的充填式高强度纤维橡胶外层组合套管,其特征在于,相邻的两节所述套管单元中,上方的内层套管的下接头连接下方的内层套管的上接头。
4.如权利要求1所述的充填式高强度纤维橡胶外层组合套管,其特征在于,每节所述套管单元中,所述内层套管的长度为9.0米至11.0米,所述外层橡胶套管的长度为8.5米至10.5米。
5.如权利要求1所述的充填式高强度纤维橡胶外层组合套管,其特征在于,所述套管单元的数目为几十节至几百节。
6.如权利要求1所述的充填式高强度纤维橡胶外层组合套管,其特征在于,所述内层套管的外径为5英寸到9.625英寸。
7.如权利要求1所述的充填式高强度纤维橡胶外层组合套管,其特征在于,所述高强度纤维为芳纶纤维或碳纤维。
CN201611183332.3A 2016-12-20 2016-12-20 充填式高强度纤维橡胶外层组合套管 Active CN106761442B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611183332.3A CN106761442B (zh) 2016-12-20 2016-12-20 充填式高强度纤维橡胶外层组合套管

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611183332.3A CN106761442B (zh) 2016-12-20 2016-12-20 充填式高强度纤维橡胶外层组合套管

Publications (2)

Publication Number Publication Date
CN106761442A CN106761442A (zh) 2017-05-31
CN106761442B true CN106761442B (zh) 2019-06-11

Family

ID=58891289

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611183332.3A Active CN106761442B (zh) 2016-12-20 2016-12-20 充填式高强度纤维橡胶外层组合套管

Country Status (1)

Country Link
CN (1) CN106761442B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108798543A (zh) * 2018-06-07 2018-11-13 贵州中钻机械设备有限公司 潜孔钻管改进结构

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86208448U (zh) * 1986-10-25 1987-09-23 河南省新乡市第一机床厂 管式抽油泵的缸套与套筒结构
CN87107859A (zh) * 1986-11-14 1988-08-10 滑铁卢大学 钻孔的隔封装置
CN2739353Y (zh) * 2004-10-12 2005-11-09 铁岭市铁南橡胶制品厂 具有钢丝绳骨架的油井封隔胶筒
CN201050310Y (zh) * 2007-05-30 2008-04-23 孟庆义 柔性复合高压立管
CN103124831A (zh) * 2010-07-05 2013-05-29 普拉德研究及开发股份有限公司 在井下环境中使用的感应耦合器
CN207177748U (zh) * 2016-12-20 2018-04-03 中国石油天然气集团公司 充填式高强度纤维橡胶外层组合套管

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1560420A (zh) * 2004-03-10 2005-01-05 孟庆义 超强轻型管汇
DE602007007726D1 (de) * 2007-04-06 2010-08-26 Schlumberger Services Petrol Verfahren und Zusammensetzung zur Zonenisolierung eines Bohrlochs
BR112016007450B1 (pt) * 2013-11-08 2021-08-03 Halliburton Energy Services, Inc. Método para criar um furo de poço lateral em uma formação subterrânea

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86208448U (zh) * 1986-10-25 1987-09-23 河南省新乡市第一机床厂 管式抽油泵的缸套与套筒结构
CN87107859A (zh) * 1986-11-14 1988-08-10 滑铁卢大学 钻孔的隔封装置
CN2739353Y (zh) * 2004-10-12 2005-11-09 铁岭市铁南橡胶制品厂 具有钢丝绳骨架的油井封隔胶筒
CN201050310Y (zh) * 2007-05-30 2008-04-23 孟庆义 柔性复合高压立管
CN103124831A (zh) * 2010-07-05 2013-05-29 普拉德研究及开发股份有限公司 在井下环境中使用的感应耦合器
CN207177748U (zh) * 2016-12-20 2018-04-03 中国石油天然气集团公司 充填式高强度纤维橡胶外层组合套管

Also Published As

Publication number Publication date
CN106761442A (zh) 2017-05-31

Similar Documents

Publication Publication Date Title
Liu et al. Analysis on integrity of cement sheath in the vertical section of wells during hydraulic fracturing
CN201757686U (zh) 一种水压致裂测量地应力装置
CN108729913B (zh) 可控冲击波预裂页岩储层方法
WO2017121112A1 (zh) 一种多级水力喷射压裂管柱性能评价方法
CN106639971B (zh) 一种射孔炮眼高承压封堵方法
CN106761443B (zh) 防止页岩气井压裂时套管变形的组合套管
CN212671582U (zh) 用于油气储层压裂的组合套管
CN106321001A (zh) 一种用于监测底板围岩裂隙的钻孔锚固结构及其施工方法
CN106761442B (zh) 充填式高强度纤维橡胶外层组合套管
CN207177748U (zh) 充填式高强度纤维橡胶外层组合套管
CN200940768Y (zh) 双管地下天然气高压储气井
Liu et al. Analysis of sealing mechanical properties of fracturing packer under complex conditions
CN206144498U (zh) 用于监测底板围岩裂隙的钻孔锚固结构
Dou et al. Experimental and theoretical study on the mechanical characteristics of perforated casings
CN204082151U (zh) 自收纳式液压劈裂设备
Kuanhai et al. Experimental study on the influence of axial length on collapse properties of N80 casings under non-uniform load
CN208830947U (zh) 油管堵塞器
CN101539010A (zh) 用于稠油热采工艺的热-预应力融合套管及其使用方法
CN206458331U (zh) 防止页岩气井压裂时套管变形的组合套管
CN108222880A (zh) 一种高温高压井预应力固井施工新工艺
Kuanhai et al. Experimental investigation of the failure mechanism of P110SS casing under opposed line load
CN103670326A (zh) 裸眼封隔器
CN204457782U (zh) 解除断裂滑移型岩爆风险的高压注水装置
CN206458332U (zh) 防止套管变形的组合套管
CN209145536U (zh) 一种套损井同步扶正套铣工具

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen

Patentee after: China National Petroleum Corp.

Patentee after: CNPC Drilling Engineering Technology Research Institute Co.,Ltd.

Address before: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen

Patentee before: China National Petroleum Corp.

Patentee before: DRILLING RESEARCH INSTITUTE OF CHINA NATIONAL PETROLEUM Co.

Address after: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC ENGINEERING TECHNOLOGY R & D Co.,Ltd.

Address before: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen

Patentee before: China National Petroleum Corp.

Patentee before: CNPC Drilling Engineering Technology Research Institute Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20221222

Address after: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC ENGINEERING TECHNOLOGY R & D Co.,Ltd.

Patentee after: BEIJING PETROLEUM MACHINERY Co.,Ltd.

Address before: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen

Patentee before: CHINA NATIONAL PETROLEUM Corp.

Patentee before: CNPC ENGINEERING TECHNOLOGY R & D Co.,Ltd.

TR01 Transfer of patent right