CN106760049A - The attachment structure and its casting method of shear wall and after-pouring concrete secondary beam - Google Patents

The attachment structure and its casting method of shear wall and after-pouring concrete secondary beam Download PDF

Info

Publication number
CN106760049A
CN106760049A CN201611052119.9A CN201611052119A CN106760049A CN 106760049 A CN106760049 A CN 106760049A CN 201611052119 A CN201611052119 A CN 201611052119A CN 106760049 A CN106760049 A CN 106760049A
Authority
CN
China
Prior art keywords
shear wall
secondary beam
concrete
concrete secondary
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611052119.9A
Other languages
Chinese (zh)
Inventor
胡凌华
龚铭
包风
赵亮亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Elephant Architectural Design Co Ltd
Original Assignee
Elephant Architectural Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Elephant Architectural Design Co Ltd filed Critical Elephant Architectural Design Co Ltd
Priority to CN201611052119.9A priority Critical patent/CN106760049A/en
Publication of CN106760049A publication Critical patent/CN106760049A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention provides a kind of shear wall and the attachment structure of after-pouring concrete secondary beam, it connects shear wall and after-pouring concrete secondary beam, vertical reinforcement and horizontal reinforcement are set in wall, pouring basin after secondary beam is reserved in attachment structure, shear wall sets connecting parts in the concrete secondary beam longitudinal reinforcement correspondence position of after-pouring concrete secondary beam, the collar extension of connecting parts is flushed exposed to shear wall body surface and with metope, and the horizontal reinforcement and vertical reinforcement in wall expose to pour in the rear and stay rooved face.Present invention also offers a kind of casting method.The present invention is connected using concrete secondary beam longitudinal reinforcement by pre-buried connecting parts, will not the concrete shear force wall that pour completion be caused to damage.Pour afterwards and stay shear wall horizontal reinforcement and shear wall vertical reinforcement in groove to expose, improve the reliability of the contact surface cohesive force of new-old concrete, pour afterwards stay groove presence make after pour secondary beam and be embedded into inside shear wall, the construction quality of node structure is easily controlled, and with comparatively ideal outward appearance.

Description

The attachment structure and its casting method of shear wall and after-pouring concrete secondary beam
Technical field
The present invention relates to a kind of shear wall, more particularly to attachment structure of the shear wall with concrete secondary beam and its side of pouring Method.
Background technology
Shear wall is to be primarily subjected to horizontal loading and the vertical lotus that wind load or geological process cause in house or structures The wall of load, prevents structure shear from destroying, and is typically made by armored concrete.In following kind of engineering, it is desirable to shear wall Poured prior to floor beam:
1st, the building of high-rise frame core wall structure, when building, is accelerating construction progress, the concrete core cylinder shearing of high building Wall is generally using the arrangement and method for construction of creeping formwork so that 3 ~ 5 layers of the contignation of the advanced flooring of construction speed of Core Walls Structure shear wall.
2nd, the clear-water concrete structural wall of multilayer structure, to strengthen the airtight performance of template, is prevented in construction Spillage, it is ensured that wall associative perception, it is desirable to after completing the overall pouring construction of dry concrete wall, then the building for carrying out outside functional areas The construction of face beam slab.
In said structure, floor beam need could be constructed after shear wall concrete reaches preset strength, shear wall with it is rear The node of casting concrete floor beam is a difficult point, and generally for this difficult point is avoided, floor beam generally selects girder steel, uses The pre-embedded steel slab in shear wall, girder steel and pre-buried plate weld or bolted method, between such shear wall and floor beam Connecting node is easier to treatment.But the cost of steel structure floor is higher.
When flooring secondary beam uses reinforced concrete structure, the connection of the shear wall and the secondary beam of after-pouring that first pour at present The processing method of node is:
First pouring reinforcement concrete shear wall, after shear wall concrete reaches preset strength, by concrete secondary beam longitudinal reinforcement Concrete shear is planted in the way of bar planting within the walls, afterwards by shear wall surface and the contact surface dabbing of concrete secondary beam, and Contact surface after dabbing is cleared up.Colligation concrete time beam steel simultaneously sets up template, and last casting concrete secondary beam is simultaneously supported Shield.
Shortcoming is stated in the presence of shear wall and the connecting node of the secondary beam of after-pouring:
1st, concrete secondary beam longitudinal reinforcement is that concrete shear is planted in the way of bar planting within the walls, is needed in coagulation during bar planting Bar planting hole is opened up on native shear wall.Reinforcing bar in shear wall is easy to be destroyed when bar planting hole is opened up, especially the position of secondary beam Put and be exactly in when on shear wall sleeper position, the missing of reinforcing bar will bring hidden danger to the security of structure in sleeper.
2nd, bar planting is a kind of technology being bonded in reinforcing bar by chemical constitution glue in bar planting hole, to the quality of structure glue with And the operating technology requirement of operator is higher, the quality control at scene is more difficult.
3rd, the vertical force of concrete secondary beam is to bond to pass to shear wall by the contact surface of secondary beam and shear wall, although Dabbing treatment has been carried out to contact surface, but the reliability of the cohesive force of the contact surface of new-old concrete is also to be studied, secondary beam Root easily becomes the weak spot of structure, when especially the larger load of secondary beam span is heavier, the safety stock of this connecting node It is not enough.
4th, this node easily produces crack in stress at the contact surface of concrete secondary beam and shear wall, and influence is outer See effect.
The content of the invention
Present invention technical problem to be solved first is to provide the shearing that a kind of power transmission is direct, possess reliable stress performance The attachment structure of wall and after-pouring concrete secondary beam.Therefore, the present invention uses following technical scheme:
The attachment structure connects and vertical reinforcement and horizontal steel is set in shear wall and after-pouring concrete secondary beam, the wall Muscle, reserves pouring basin after secondary beam in the attachment structure, the shear wall is indulged in the concrete secondary beam of after-pouring concrete secondary beam Connecting parts are set to reinforcing bar correspondence position, the collar extension of the connecting parts is exposed to shear wall body surface and is flushed with metope, wall Internal horizontal reinforcement and vertical reinforcement exposes to pour in the rear and stays rooved face.
Further, the after-pouring concrete secondary beam is provided with concrete secondary beam longitudinal reinforcement, and the concrete secondary beam is indulged Mechanically connected with the collar extension of the connecting parts to reinforcing bar, the after-pouring concrete secondary beam is provided with the vertical muscle of anchoring, the anchoring is indulged Muscle is mechanically connected with the internal orifice of the connecting parts, and in shear wall inner bending anchoring.
Further, being poured after described stays the width of groove fewer 50-100 millimeters than the width of after-pouring concrete secondary beam, after pour Stay the height of groove fewer 150-200 millimeters than after-pouring concrete time depth of beam, after pour that to stay the depth of groove be 30 millimeters.
, in colligation, concrete cover to reinforcement thickness takes 30 for the shear wall horizontal reinforcement and shear wall vertical reinforcement Millimeter.
Poured after described and stay groove to be located at secondary beam installation node middle part.
The present invention also needs the technical problem for solving to be to provide a kind of above-mentioned shear wall with after-pouring concrete secondary beam Casting method, the described method comprises the following steps:
S101 colligation shear force wall reinforcing steel bar structures, reserve in shear wall link position corresponding with concrete secondary beam longitudinal reinforcement and plug into Part;
S102 sets up shear wall formwork, and template is correspondingly provided with the center that shear wall is connected with after-pouring concrete secondary beam One hole, and the embedded plugging device in the hole, the plugging device are identical with dimension of opening, the plugging device appearance Face is beyond template outer surface and template flush with outer surface;
S103 pours shear wall concrete, after shear wall concrete reaches preset strength, removes shear wall formwork and removes plate Bar, taking-up plugging device, now connecting parts collar extension exposed to shear wall surface, after being formed pour and stay groove by plugging device position;By after Pour and stay rooved face dabbing and clear up inner surface so that after pour outside the shear wall horizontal reinforcement and shear wall vertical reinforcement stayed in groove Dew;
With the longitudinal reinforcement of concrete secondary beam be connected connecting parts collar extension by S104, and colligation secondary beam bar construction, erection time beam form Plate, completes pouring for concrete secondary beam.
Further, in step S101, collar extension and the shear wall crust of the connecting parts are put down, and the internal orifice of the connecting parts connects Connect the vertical muscle of an anchoring;The vertical muscle of anchoring is in bending anchoring within the walls.
Further, in step S102, the width at the hole is smaller than the width of concrete secondary beam 50-100 millimeters;It is described The height at hole is smaller 150-200 millimeters than concrete time depth of beam.
Meanwhile, in step S102, the thickness of the plugging device is 30 millimeters more than template thickness.
Meanwhile, in step S102, the plate object that the plugging device is made for styrofoam, during closure, plugging device outside Fixed with shear wall using lath and steel nail.
As a result of technical scheme, the present invention is plugged into using concrete secondary beam longitudinal reinforcement by pre-buried Part is connected, and is anchored directly to concrete shear within the walls, will not the concrete shear force wall that pour completion be caused to damage.After pour Stay shear wall horizontal reinforcement and shear wall vertical reinforcement in groove to expose, improve new-old concrete contact surface cohesive force can By property, after pour stay groove presence make after pour secondary beam and be embedded into inside shear wall, it is ensured that between the root of secondary beam and shear wall Globality, this node is especially suitable for being used in the connecting node of the heavier shear wall of the larger load of span and after-pouring secondary beam In, the construction quality of node structure is easily controlled, and with comparatively ideal outward appearance.
Brief description of the drawings
Fig. 1 is the schematic diagram of shear wall of the present invention and after-pouring concrete secondary beam.
Fig. 2 is the schematic diagram of reinforcing bar and connecting parts in shear wall of the present invention.
Fig. 3 is the profile of shear wall closing template of the present invention and embedded plugging device.
Fig. 4 is the front view of shear wall closing template of the present invention and embedded plugging device.
Fig. 5 is that shear wall of the present invention completes concreting, the profile after form removal and plugging device.
Fig. 6 shear wall of the present invention completes the schematic diagram after secondary beam is poured.
In figure, 1:Shear wall, 2:After-pouring concrete secondary beam, 3:Shear wall vertical reinforcement, 4:Shear wall horizontal reinforcement, 5: After pour and stay groove, 6:Secondary beam longitudinal reinforcement, 7:Connecting parts, 8:The vertical muscle of anchoring, 9:Shear wall formwork, 10:Plugging device, 11:Lath, 12:Steel nail, 21:Concrete time beam stirrup, 81:Bending part.
Specific embodiment
Below in conjunction with accompanying drawing, the present invention is further elaborated.
Embodiment one:
As shown in figure 1, the shear wall 1 that the present invention is provided, including shear wall horizontal reinforcement 4, shear wall vertical reinforcement 3, it is described to cut Power wall 1 is connected with after-pouring concrete secondary beam 2 in the middle part of shear wall as depicted, and the tie point is the secondary beam that shear wall is reserved 2 pour node, and the secondary beam is poured for the later stage.Shear wall 1 is provided with connecting parts 7 in the link position of concrete secondary beam, described to connect The correspondence position that part 7 is arranged on secondary beam longitudinal reinforcement 6 is refuted, collar extension is exposed to the exterior surface of wall of shear wall 1, the coagulation with after-pouring The longitudinal reinforcement 6 of native secondary beam is connected, and internal orifice is connected with the vertical muscle 8 of anchoring, and the vertical muscle 8 of anchoring is in the inner bending anchor of the shear wall 1 Gu.Poured after reserved secondary beam in shear wall 1 and stay groove 5, the horizontal reinforcement 4 and vertical reinforcement 3 in wall to expose pour in the rear and stay groove 5 Surface.
The shear wall 1 sets connecting parts 7, and rear pouring concrete secondary beam longitudinal reinforcement 6 is connected by pre-buried connecting parts 7, It is anchored directly to concrete shear within the walls, will not the concrete shear force wall that pour completion is caused to damage.As a kind of machine Tool connected mode, the operating technology to operator is less demanding, and the quality at scene is easily ensured.
Poured after described and stay shear wall horizontal reinforcement 4 and shear wall vertical reinforcement 3 in groove 5 to expose, improve after-pouring and mix The reliability of solidifying soil secondary beam and first casting concrete shear wall contact surface cohesive force.Pour afterwards and stay the presence of groove 5 to make after-pouring coagulation Native secondary beam 2 is embedded into inside shear wall 1, it is ensured that the globality between the root of secondary beam and shear wall, due to new-old concrete Contact surface cohesive force reliability and globality greatly enhance, this attachment structure is not easy in concrete secondary beam and shear wall Contact surface produce crack, appearance is good.
Embodiment two:
As shown in Fig. 2-Fig. 6.
Shear wall of the present invention is comprised the following steps with the casting method of after-pouring concrete secondary beam:
1st, as shown in Fig. 2 colligation shear wall vertical reinforcement 3 and shear wall horizontal reinforcement 4, thickness of protection tier is according to 30 millimeters Control, in the link position with concrete secondary beam, according to the position of secondary beam longitudinal reinforcement 6, reserves in shear wall 1 and plugs into 7, connects Refute the colligation of part 7 to fix on nigh shear force wall reinforcing steel bar, the collar extension of connecting parts 7 is flushed with shearing metope;The internal orifice of connecting parts 7 and anchor Admittedly vertical muscle 8 is connected, the vertical muscle 8 of anchoring is anchored in shear wall inner bending, and the bending part 81 is close to the wall-body energy saving of shear wall 1.
2nd, as shown in Figure 3 and Figure 4, shear wall formwork 9, the center being connected with concrete secondary beam 2, shear wall mould are set up Plate 9 reserves hole, 50 ~ 100 millimeters fewer than the width of concrete secondary beam of the width at hole, and the height at hole is than concrete secondary beam Highly lack 150 ~ 200 millimeters;Embedded plugging device 10, the size and dimension of opening of plugging device 10 in shear wall formwork hole Identical, thickness is+30 millimeters of template thickness;Plugging device is made of styrofoam, and plugging device outside uses lath 11 and steel Nail 12 is fixed with shear wall formwork 9.
3rd, as shown in figure 5, pouring the concrete of shear wall 1, after the concrete of shear wall 1 reaches preset strength, dismounting is cut When power wall form 9, taking-up plugging device 10,7 mouthfuls of connecting parts are exposed to the outer surface of shear wall 1, are formed in the position of plugging device 10 Reserved groove, the reserved groove is poured after being and stays groove 5, reserves width 50 ~ 100 milli fewer than the width of concrete secondary beam of groove Rice, reserves the height of groove than few 150 ~ 200 millimeters of depth of beam of concrete time, and the depth for reserving groove is 30 millimeters;Dabbing And the inner surface for reserving groove is cleared up, the shear wall horizontal reinforcement 4 and shear wall vertical reinforcement 3 in reserved groove are exposed.
4th, as shown in fig. 6, concrete secondary beam longitudinal reinforcement 6 is connected with connecting parts 7, and colligation concrete time beam stirrup 21, time beam forms is set up, complete the concreting of secondary beam.
By casting method of the invention, the vertical force of concrete secondary beam stays groove 5 to transmit by pouring after in shear wall To shear wall, shear wall, power transmission reliability are embedded in equivalent to secondary beam.Pour afterwards and stay shear wall horizontal reinforcement and shear wall in groove 5 to erect To reinforcing steel bars exposed, improve the reliability of the contact surface cohesive force of new-old concrete, it is ensured that the root of secondary beam and shear wall it Between globality, this attachment structure is especially suitable for being used in the heavier after-pouring concrete secondary beam of the larger load of span with shearing In the connecting node of wall.

Claims (10)

1. the attachment structure of shear wall and after-pouring concrete secondary beam, the attachment structure connects shear wall(1)It is mixed with after-pouring Solidifying soil secondary beam(2), the shear wall(1)Vertical reinforcement is set in wall(3)And horizontal reinforcement(4), it is characterised in that the company Poured after reserved secondary beam in binding structure and stay groove(5), the shear wall(1)In after-pouring concrete secondary beam(2)Concrete secondary beam indulge To reinforcing bar(6)Correspondence position sets connecting parts(7), the connecting parts(7)Collar extension be exposed to shear wall(1)Surface of wall and with Metope is flushed, the horizontal reinforcement in wall(4)And vertical reinforcement(3)Expose to pour in the rear and stay groove(5)Surface.
2. the attachment structure of shear wall according to claim 1 and after-pouring concrete secondary beam, it is characterised in that after described Casting concrete secondary beam(2)It is provided with concrete secondary beam longitudinal reinforcement(6), the concrete secondary beam longitudinal reinforcement(6)Connect with described Refute part(7)Collar extension mechanically connect, the after-pouring concrete secondary beam(2)It is provided with the vertical muscle of anchoring(8), the vertical muscle of anchoring(8) With the connecting parts(7)Internal orifice mechanically connect, and in the shear wall(1)Inner bending is anchored.
3. the attachment structure of shear wall according to claim 1 and after-pouring concrete secondary beam, it is characterised in that after described Pour and stay groove(5)Width than after-pouring concrete secondary beam(2)Few 50-100 millimeters of width, after pour and stay groove(5)Height ratio after Casting concrete secondary beam(2)Few 150-200 millimeters of height, after pour and stay groove(5)Depth be 30 millimeters.
4. the attachment structure of shear wall according to claim 1 and after-pouring concrete secondary beam, it is characterised in that described to cut Power wall horizontal reinforcement(4)With shear wall vertical reinforcement(3)In colligation, concrete cover to reinforcement thickness takes 30 millimeters.
5. the attachment structure of shear wall according to claim 1 and after-pouring concrete secondary beam, it is characterised in that after described Pour and stay groove(5)Node middle part is installed positioned at secondary beam.
6. the casting method of the attachment structure of the shear wall as described in claim 1-5 is any and after-pouring concrete secondary beam, its It is characterised by the described method comprises the following steps:
S101 colligation shear force wall reinforcing steel bar structures, in shear wall(1)With concrete secondary beam longitudinal reinforcement(6)Corresponding link position is pre- Stay connecting parts(7);
S102 sets up shear wall formwork(9), template is in shear wall(1)With after-pouring concrete secondary beam(2)The center of connection It is correspondingly provided with a hole, and the embedded plugging device in the hole(10), the plugging device(10)It is identical with dimension of opening, The plugging device(10)Outer surface and template flush with outer surface;
S103 pours shear wall concrete, after shear wall concrete reaches preset strength, removes shear wall formwork(9)And remove Lath, taking-up plugging device(10), now connecting parts(7)Collar extension is exposed to shear wall(1)Surface, plugging device(10)Position shape Poured after and stay groove(5);Poured by after and stay groove(5)Surface dabbing simultaneously clears up inner surface so that after pour and stay groove(5)Interior shear wall level Reinforcing bar(4)And shear wall vertical reinforcement(3)Expose;
S104 is by connecting parts(7)Collar extension and concrete secondary beam longitudinal reinforcement(6)Connection, and colligation concrete time beam stirrup(21)And Other secondary beam bar constructions, erection time beam forms, complete pouring for concrete secondary beam.
7. casting method according to claim 6, it is characterised in that in step S101, the connecting parts(7)Collar extension with Shear wall (1) crust is put down, the vertical muscle (8) of anchoring of internal orifice connection one of the connecting parts (7);The vertical muscle (8) of anchoring is curved within the walls Folding anchoring.
8. casting method according to claim 6, it is characterised in that in step S102, the width at the hole compares concrete The width of secondary beam is small 50-100 millimeters;The height at the hole is smaller 150-200 millimeters than concrete time depth of beam.
9. casting method according to claim 6, it is characterised in that in step S102, the plugging device(10)Thickness Compare shear wall formwork(9)Thickness is more 30 millimeters.
10. casting method according to claim 6, it is characterised in that in step S102, the plugging device(10)It is poly- The plate object that benzene plate is made, during closure, plugging device outside utilizes lath and steel nail and shear wall(1)It is fixed.
CN201611052119.9A 2016-11-24 2016-11-24 The attachment structure and its casting method of shear wall and after-pouring concrete secondary beam Pending CN106760049A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611052119.9A CN106760049A (en) 2016-11-24 2016-11-24 The attachment structure and its casting method of shear wall and after-pouring concrete secondary beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611052119.9A CN106760049A (en) 2016-11-24 2016-11-24 The attachment structure and its casting method of shear wall and after-pouring concrete secondary beam

Publications (1)

Publication Number Publication Date
CN106760049A true CN106760049A (en) 2017-05-31

Family

ID=58912273

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611052119.9A Pending CN106760049A (en) 2016-11-24 2016-11-24 The attachment structure and its casting method of shear wall and after-pouring concrete secondary beam

Country Status (1)

Country Link
CN (1) CN106760049A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108518084A (en) * 2018-04-28 2018-09-11 上海建工二建集团有限公司 The additional structure and method that shear wall is removed in frame-shear-wall structure
CN109653443A (en) * 2019-01-30 2019-04-19 山西三建集团有限公司 Concrete structure stage construction is reserved to connect batch steel bar connecting machine structure and a connection method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2489811A (en) * 2011-04-05 2012-10-10 Ian Kelly A method of erecting a multi-storey building using multi-storey panels
CN102995613A (en) * 2012-12-17 2013-03-27 中国水电顾问集团贵阳勘测设计研究院 Connection method and structure for casting wall body and plate girder of powerhouse of hydropower station by stages
CN103195193A (en) * 2013-04-24 2013-07-10 石家庄晶达建筑体系有限公司 Structure and construction method of cast-in-site style welded steel frame composite concrete shear wall
CN103556821A (en) * 2013-10-08 2014-02-05 沈阳建筑大学 Tooth-form connecting method for prefabricated half shear wall and beam
CN103866866A (en) * 2014-03-07 2014-06-18 江苏中南建筑产业集团有限责任公司 Ultra-high layer core tube and outer framework beam post-cast joint
CN103883034A (en) * 2014-03-14 2014-06-25 东南大学 Assembled shear wall and wall-beam connecting structure with edge restraining component
CN106088649A (en) * 2016-07-15 2016-11-09 厦门特房建设工程集团有限公司 The method of Sandwich insulation wallboard reinforced steel concrete damaged frame and manufacture method
CN206233404U (en) * 2016-11-24 2017-06-09 大象建筑设计有限公司 The attachment structure of shear wall and after-pouring concrete secondary beam

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2489811A (en) * 2011-04-05 2012-10-10 Ian Kelly A method of erecting a multi-storey building using multi-storey panels
CN102995613A (en) * 2012-12-17 2013-03-27 中国水电顾问集团贵阳勘测设计研究院 Connection method and structure for casting wall body and plate girder of powerhouse of hydropower station by stages
CN103195193A (en) * 2013-04-24 2013-07-10 石家庄晶达建筑体系有限公司 Structure and construction method of cast-in-site style welded steel frame composite concrete shear wall
CN103556821A (en) * 2013-10-08 2014-02-05 沈阳建筑大学 Tooth-form connecting method for prefabricated half shear wall and beam
CN103866866A (en) * 2014-03-07 2014-06-18 江苏中南建筑产业集团有限责任公司 Ultra-high layer core tube and outer framework beam post-cast joint
CN103883034A (en) * 2014-03-14 2014-06-25 东南大学 Assembled shear wall and wall-beam connecting structure with edge restraining component
CN106088649A (en) * 2016-07-15 2016-11-09 厦门特房建设工程集团有限公司 The method of Sandwich insulation wallboard reinforced steel concrete damaged frame and manufacture method
CN206233404U (en) * 2016-11-24 2017-06-09 大象建筑设计有限公司 The attachment structure of shear wall and after-pouring concrete secondary beam

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108518084A (en) * 2018-04-28 2018-09-11 上海建工二建集团有限公司 The additional structure and method that shear wall is removed in frame-shear-wall structure
CN109653443A (en) * 2019-01-30 2019-04-19 山西三建集团有限公司 Concrete structure stage construction is reserved to connect batch steel bar connecting machine structure and a connection method

Similar Documents

Publication Publication Date Title
CN106223360B (en) Using the open cut cast in place and precast construction subway station construction method of stake supporting system
CN104532997B (en) A kind of precast assemble floor system and its construction method
CN105714962B (en) The cast-in-place external wall system and construction method for building prefabricated overall assembling insulation exterior sheathing free of demolition
CN205954921U (en) Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area
CN106545109A (en) Overlaid plate type concrete shear wall longitudinal connection structure and method of attachment
CN106245931A (en) The underpinning device of load bearing wall and construction method in brick mix structure
CN107119901A (en) The cast-in-place system of formwork structure and shear wall and construction method of shear wall angle node
CN106284655A (en) Precast concrete beam stud connects node and method of attachment in succession
CN204983662U (en) To drawing screw rod and steel pipe framed bent combination unilateral formwork device
CN209457194U (en) Steel ribs dislocation dock shear wall vertical connection structure
CN106760050A (en) The attachment structure and through processing method of shear wall and after-pouring concrete frame beam
CN206888506U (en) The cast-in-place system of formwork structure and shear wall of shear wall angle node
CN108104284B (en) Wallboard connecting structure of shear wall steel arm embedded floor slab and assembly method
CN109267673A (en) Steel ribs dislocation dock shear wall vertical connection structure and assembly method
CN107090908A (en) A kind of new vertical prefabricated components joint connecting method
CN111502080A (en) Steel-concrete composite structure frame-cast-in-place concrete shear wall structure system
CN206233404U (en) The attachment structure of shear wall and after-pouring concrete secondary beam
CN105275087B (en) The attachment structure of prefabricated assembled concrete beam column
CN106760049A (en) The attachment structure and its casting method of shear wall and after-pouring concrete secondary beam
CN205712204U (en) A kind of multiple waterstop and waterproof construction thereof
CN105821908A (en) Multiple water stop belt, waterproof structure and construction method of waterproof structure
CN212534652U (en) Steel-concrete composite structure frame-cast-in-place concrete shear wall structure system
CN106337530B (en) A kind of construction of frame beam seams stifled construction method
CN110670717B (en) Connecting structure and construction method of prefabricated beam type balcony
CN208152311U (en) A kind of two-sided folded type steel shear wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531

RJ01 Rejection of invention patent application after publication