CN106759440A - Foundation of iron tower screw bolt reinforcing method - Google Patents

Foundation of iron tower screw bolt reinforcing method Download PDF

Info

Publication number
CN106759440A
CN106759440A CN201611222784.8A CN201611222784A CN106759440A CN 106759440 A CN106759440 A CN 106759440A CN 201611222784 A CN201611222784 A CN 201611222784A CN 106759440 A CN106759440 A CN 106759440A
Authority
CN
China
Prior art keywords
bar
rinforcement bar
rinforcement
foundation
iron tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611222784.8A
Other languages
Chinese (zh)
Other versions
CN106759440B (en
Inventor
沈文
宋鑫
梁茂华
彭明瑞
金�一
蔡卫军
李磊
祁小钰
马翼飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yancheng Branch China Tower Co Ltd
Original Assignee
Yancheng Branch China Tower Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yancheng Branch China Tower Co Ltd filed Critical Yancheng Branch China Tower Co Ltd
Priority to CN201611222784.8A priority Critical patent/CN106759440B/en
Publication of CN106759440A publication Critical patent/CN106759440A/en
Application granted granted Critical
Publication of CN106759440B publication Critical patent/CN106759440B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Reinforcement Elements For Buildings (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a kind of foundation of iron tower screw bolt reinforcing method, belong to communications infrastructure area of maintenance.Determine the quantity and diameter of rinforcement bar;The floating rust on original place foot bolt surface is removed, protective coating is coated, and support block is encased inside below the flange of bottom;Bar planting hole corresponding with the quantity of rinforcement bar is drilled through in the top surface of original basis concrete, bar planting hole is uniformly distributed along the external circumferential of original place foot bolt;Anchor adhesive is simultaneously injected in cleaning bar planting hole, is inserted into rinforcement bar;Contact surface to original basis concrete carries out dabbing treatment, and reinforcing bar colligation then will be carried out between rinforcement bar, forms steel reinforcement cage;Branching standing template and casting concrete on the outside of steel reinforcement cage.Cost decline more than 90% of the reconstruction model compared to reinforcement means of the present invention is removed with traditional, communication operation cost is greatlyd save, and is capable of the demand for services of seamless connection operator, do not had any impact to communicating.

Description

Foundation of iron tower screw bolt reinforcing method
Technical field
It is especially a kind of foundation of iron tower screw bolt reinforcing method the present invention relates to a kind of communication tower reinforcement means, belongs to logical Letter infrastructure area of maintenance.
Background technology
, due to being erected at outdoor, the foundation bolt of its bottom is by natural environment during long-term use for communication iron tower Easily there is corrosion in burn into weathering, part steel tower safeguards inadequate to foundation bolt in addition, cause the operation of steel tower to be subject to tight safely Threaten again.The corrosion of foundation bolt will bring serious harm to whole iron tower structure, can not only influence the unimpeded of communication, and Economic loss can be caused, in some instances it may even be possible to cause casualties.
At present, it is most of because safety problem causes far smaller than its design of its service life to use year in existing steel tower Limit, it usually needs remove reconstruction and set, it not only causes the wasting of resources, increases communication operation cost, but also to influence normal Communication overlay, made troubles to terminal user.
The content of the invention
The technical problems to be solved by the invention are to overcome prior art defect, there is provided one kind can be quickly to foundation of iron tower Bolt is reinforced, effectively save communication operation cost, it is ensured that the foundation of iron tower screw bolt reinforcing side of safety and proper communication efficiency Method.
In order to solve the above-mentioned technical problem, the foundation of iron tower screw bolt reinforcing method that the present invention is provided, comprises the following steps:
1), the design load according to steel tower uplift force determines the quantity and diameter of rinforcement bar;
2) the floating rust on original place foot bolt surface, is removed, protective coating is coated, and support block is encased inside below the flange of bottom;
3), the top surface in original basis concrete drills through bar planting hole corresponding with the quantity of rinforcement bar, and bar planting hole is along original place pin The external circumferential of bolt is uniformly distributed;
4), clean bar planting hole and inject anchor adhesive, inserted in bar planting hole after then the surface of rinforcement bar is cleaned with water and fixed simultaneously Maintenance;
5) dabbing treatment, is carried out with the contact surface for intending casting concrete to original basis concrete, then by between rinforcement bar Reinforcing bar colligation is carried out, steel reinforcement cage is formed;
6), the branching standing template on the outside of steel reinforcement cage, then with concreting, then protected close over casting concrete Support.
In the present invention, the step 1) in the quantity of rinforcement bar determine that method isD is reinforcing in formula The theoretical diameter of muscle, a is the quantity of rinforcement bar, and b is the tensile strength of rinforcement bar;
The diameter of rinforcement bar is at least 1.2 times of d.
In the present invention, the step 3) in bar planting hole depth be at least 480MM.
In the present invention, the step 4) in detailed process be:
41), the bar planting hole inwall cleaned with water with hard brush, and dust in the bar planting of hole is all removed;
42) bottom that bar planting hole is stretched into after, extracting anchor adhesive with syringe is injected, and marginal not enters syringe side and carries upwards Rise, the injection rate of anchor adhesive is the 2/3 of pore volume;
43) bar planting hole is inserted and to bottom hole in the slow rand rotation side of rinforcement bar after, cleaning with water, conserves more than 7 days.
In the present invention, the step 5) in detailed process be:
51), along rinforcement bar between the upper and lower every colligation multi-turn circular stirrups;
52), will be fixedly connected between bottom flanged plate muscle and the rinforcement bar of correspondence position;
53), the racking seizing reinforcing bar between each rinforcement bar, forms multiple zone well shape steel reinforcement cage.
Or be:
51), along rinforcement bar between the upper and lower every colligation multi-turn circular stirrups;
52), the racking seizing reinforcing bar between each rinforcement bar;
53), racking seizing reinforcing bar between levels circular stirrups, forms multiple zone well shape steel reinforcement cage.
In the present invention, be additionally included in bottom flange to original basis concrete outside set many drainpipes the step of.
In the present invention, to inner side bending, bending degree is 90 ° -145 ° at the top of the rinforcement bar.
In the present invention, the anchor adhesive uses modified epoxy class or modified vinyl esters material, and its curing agent is not Including ethylenediamine.
The beneficial effects of the present invention are:(1), with it is traditional remove reconstruction model compared with reinforcement means of the present invention cost Expense decline more than 90%, significantly energy-conservation communication operation cost, and it is capable of the demand for services of seamless connection operator, to communication not Have any impact;(2), compared with reconstruction model is removed, reinforcement means holding time of the present invention is short, and speed is fast, and it is only right Its column foot carries out consolidation process, and the normal of the tower can't be influenceed to use during consolidation process;(3), the corrosion of foundation bolt Be steel tower safeguard in common problem, and steel tower in itself really substantially it is intact meet design use requirement, removed reconstruction The serious waste of resource is necessarily caused, steel tower normal work in design service life can be met by reinforcement means of the present invention Make, so that the cost-effective waste for avoiding resource so that resource it is effective using reaching maximization;(4), bar planting hole depth is at least It is 480MM, with the stability for ensureing to reinforce;(5) the slow injecting glue of bottom up, using syringe from bar planting hole, the injection of glue It is the 2/3 of pore volume to measure, and by the way of rinforcement bar is rotatably inserted into, can improve rinforcement bar steady with what original basis concrete was connected It is fixed, reduce the waste of glue so that more firm Nian Jie with bar planting hole of rinforcement bar;(6), bottom flange to original basis concrete outside Many drainpipes are set, the ponding inside king-post can be in time excluded, slow down corrosion, extend the service life of its steel tower;(7)、 The top of rinforcement bar to 90 ° -145 ° of inner side bending, to improve the stability of reinforcing.
Brief description of the drawings
Fig. 1 is steel tower schematic diagram after present invention reinforcing;
Fig. 2 is steel tower top view after present invention reinforcing;
Fig. 3 is that the embodiment of the present invention one reinforces schematic diagram;
Fig. 4 is reinforcing position sectional view;
Fig. 5 is rinforcement bar structural representation;
Fig. 6 reinforces schematic diagram for the present invention implements two;
Fig. 7 is implementation Er Zhi Zhu and formwork schematic diagram.
Specific embodiment
Below in conjunction with the accompanying drawings and embodiment is described in further detail to the present invention.
As illustrated in fig. 1 and 2, now technical scheme is described in detail by taking three common pipe towers as an example.The length of three pipe towers During the use of phase, foundation bolt on its bottom flange causes diameter progressively to diminish because of corrosion, it is impossible to undertakes column foot and should bear Pulling force, directly affect three pipe towers stabilization, it is impossible to ensure normal communication operation.The present invention is directed to the original stress of column foot Complicated and changeable the characteristics of, by way of changing the Path of Force Transfer of original column foot, the principle of strong replacement such as take, i.e., on original Bar planting and casting concrete on the basis of column foot, to reach the purpose of enhancing column foot bearing capacity, so that column foot stress meets Design safety use requirement.
Embodiment one
As shown in Fig. 3,4 and 5, the pipe tower foundation bolt of Yancheng City area of Jiangsu Province three is reinforced, it is comprised the following steps that:
Step 1, the offer tower figure according to producer, consider load, with reference to current art rule according to+2 layers of support of three layers of platform Model calculates gained column foot internal force:Uplift force design load is 981.049KN, and lower pressure design load is 1042.23KN.By column foot Uplift force design load 981.049KN, original 6 crab-bolts of column foot are uniformly distributed in column foot surrounding, and the present embodiment is intended adding using 12 Gu the uniform annular spread of muscle 6, and the diameter of rinforcement bar 6 is determined according to following formula:
In formula, d is the theoretical diameter of rinforcement bar, and 12 is the quantity of rinforcement bar, and 360 is the tensile strength of rinforcement bar, and π is circle Frequency;
Calculate d>17MM, it is considered to which safety factor is multiplied by 1.2 safe amplification coefficient, then take rinforcement bar 6 straight Footpath d=20MM.I.e. each column foot is reinforced using 12 rinforcement bars of a diameter of 20MM 6.
Step 2, outside symmetrical laying two drainings of a diameter of 30MM of setting in bottom flange 3 to original basis concrete 1 Pipe 9, for excluding the ponding inside king-post 2, extends the service life of its steel tower.
The floating rust in the surface of original place foot bolt 5 is removed with wire brush, paints epoxy glue, and bloom is encased inside below bottom flange 3 (not shown), prevents from causing column foot to destroy because of the stripped thread of corrosion foundation bolt 5.Then, in bottom flange 3 and original basis concrete In reserved hole between 1, poured with microdilatancy pea gravel concreten closely knit, use bottom flange 3 connects into whole with original basis concrete 1 Body.
Step 3, by detail of design, drill through 12 bar planting holes, 12 plants in the top surface electric impact drill of original basis concrete 1 Muscle hole is uniformly distributed along the external circumferential of original place foot bolt 5, and bar planting hole aperture is 25MM, and depth is 480MM.When drilling through bar planting hole It should be noted that avoiding the reinforcing bar in original basis concrete 1.
Step 4, first, the inwall in bar planting hole is cleared up with hard plastic hairbrush, then with hair-dryer that the dust in bar planting hole is complete Portion blows out, and so on three to four times, untill finger is touched less than hole wall dust.
Secondly, organic adhesion agent (i.e. anchor adhesive) is extracted with syringe, the mixing tube of syringe is stretched into the hole in bar planting hole Bottom, pushing syringe injecting glue by the way of marginal not penetrates side lifting.The injection rate of injecting glue amount should have a little to insert after rinforcement bar 6 Organic adhesion agent overflows and is defined, generally the 2/3 of bar planting pore volume.Organic adhesion agent should use modified epoxy in the present invention Class or modified vinyl esters material, its curing agent should not use ethylenediamine, to protect rinforcement bar 6, reduce corrosion.The present embodiment Middle use, the SAMSON boards of Xi Meng departments (Shanghai) architecture engineering material Co., Ltd production, the anchoring adhesive of model EP90.
Finally, with steel brush by the surface of rinforcement bar 6 clean with water it is clean after, inserted rinforcement bar 6 is slow in rotation successively In bar planting hole, it is necessary to assure every rinforcement bar 6 is inserted to the bottom hole in bar planting hole, rinforcement bar 6 uses traditional screw-thread steel, rinforcement bar To inner side (i.e. to king-post 2) bending, bending degree is 90 ° -145 °, as shown in Figure 5 at 6 tops.The insertion bar planting of rinforcement bar 6 is conserved in hole After 7 days, pull-out test is carried out to it by professional testing agency, next link is carried out after pass the test;
Bar planting pull-out test process:Every pile randomly selects 2 to be taken root in carries out anti-pulling test (using Non-Destructive Testing side into muscle Formula), its test pulling capacity minimum value take 84.8kN, maximum takes 100.53kN, use continuous load mode (prior art) with Uniform rate is loaded onto the inspection payload values of setting within the 2min-3min times, and continues 2min.The original basis in test process Also the sign without other local damages the free from flaw of concrete 1 occurs, as qualified.
After bar planting pull-out test terminates, original basis concrete 1 and the contact surface for intending existing casting concrete 10 are dug Hair treatment, raising pours stability.
Step 5, first, along rinforcement bar 6 between the upper and lower every colligation multi-turn circular stirrups 7, a diameter of 8MM of circular stirrups 7, The lap of splice of circular stirrups 7 is more than 50 times of diameter itself, and 135 ° of crotch and straight length are more than 10 times of diameter itself, crotch Hook rinforcement bar 6.
Then, will be welded between the plate muscle 4 of each bottom flange 3 and the rinforcement bar 6 of correspondence position, the present embodiment midsole flange Plate muscle 4 on 3 has 6 pieces, circumferentially distributed along king-post 2, because rinforcement bar 6 has 12, using at interval of 1 rinforcement bar 6 and bottom method Plate muscle 4 on blue 3 is welded.Weld spacing base material concrete surface should be greater than 15d, and d is the diameter of rinforcement bar, is used during welding The root of the exposed parts of wet towel multilayer wrapped strengthening muscle 6 of frozen water dipping, it is to avoid the high temperature produced during welding is to organic gluing Agent causes to damage, and influences the stability of bar planting.
Finally, many transverse steels 8 of racking seizing between each rinforcement bar 6, a diameter of 8MM of transverse steel 8 is formed many The well shape steel reinforcement cage of Rotating fields, steel reinforcement cage must meet following requirements:Spacing tolerance ± the 10MM of rinforcement bar 6, length ± 100MM, the spacing ± 10MM between circular stirrups 7.
Step 6, first, the vertical punching block of steel reinforcement cage lateral branch on original basis concrete 1, after finished product, punching block inner side is away from steel Muscle cage at least 50MM, punching block is highly 600MM, a diameter of 600MM of punching block.Before punching block supporting need in template surface brushing machine oil, Template should must not smooth out spillage.
Then, to C30 commerical ready-mixed concretes are poured in punching block, concreting should be carried out continuously, and use poker vibrator Should soon be inserted during jolt ramming and pulled out slowly, slotting point is evenly distributed, pointwise movement is sequentially carried out, and must not be omitted, and accomplishes uniform jolt ramming.
After step 7, the construction of newly-laid concrete 10 terminate, responsible measures should be taken to conserve more than one week.The concrete curing phase Between, answer emphasis to strengthen the humidity and temperature control of concrete, the open-assembly time of surface concrete is reduced as far as possible, in time to concrete Exposure carries out, close over (can be covered using paulin, plastic cloth etc.), preventing surface moisture from evaporating, it is ensured that concrete table Face moistens all the time.During newly-laid concrete 10 is conserved, must not be watered when daily mean temperature is less than 5 DEG C.
Embodiment two
As shown in Figures 6 and 7, to the reinforcing of the pipe tower foundation bolt of Yancheng City county of Jiangsu Province three, its specific steps and implementation Example is basically identical, and its is specific as follows:
Step 1 is with embodiment 1.
Step 2 is substantially the same manner as Example 1, and difference is in the outer of bottom flange 3 to original basis concrete 1 in embodiment two Side symmetrical laying sets a drainpipe of a diameter of 30MM 9, for excluding the ponding inside king-post 2.
Step 3 is with embodiment 1.
Step 4 is with embodiment 1.
Step 5, first, along rinforcement bar 6 between the upper and lower every colligation multi-turn circular stirrups 7, a diameter of 8MM of circular stirrups 7, The lap of splice of circular stirrups 7 is more than 50 times of diameter itself, and 135 ° of crotch and straight length are more than 10 times of diameter itself, crotch Hook rinforcement bar 6.
Then, being intersected between each rinforcement bar with reinforcing bar against king-post 2 is carried out between colligation, and levels circular stirrups 7 Racking seizing reinforcing bar forms steel reinforcement cage into the structure of multiple zone well font reinforcing bar piece 11.Steel reinforcement cage must meet following requirements:Rinforcement bar 6 Spacing tolerance ± 10MM, length ± 100MM, the spacing ± 10MM between circular stirrups 7.
Step 6, first, the vertical punching block of steel reinforcement cage lateral branch on original basis concrete 1, after finished product, punching block inner side is away from steel Muscle cage at least 50MM, punching block is highly 800MM, a diameter of 800MM of punching block.Before punching block supporting need in template surface brushing machine oil, Template should must not smooth out spillage.
Then, to C30 commerical ready-mixed concretes are poured in punching block, concreting should be carried out continuously, and use poker vibrator Should soon be inserted during jolt ramming and pulled out slowly, slotting point is evenly distributed, pointwise movement is sequentially carried out, and must not be omitted, and accomplishes uniform jolt ramming.
Step 7 is with embodiment 1.
Concrete application approach of the present invention is a lot, and the above is only the preferred embodiment of the present invention, it is noted that for For those skilled in the art, under the premise without departing from the principles of the invention, some improvement can also be made, this A little improvement also should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of foundation of iron tower screw bolt reinforcing method, it is characterised in that comprise the following steps:
1), the design load according to steel tower uplift force determines the quantity and diameter of rinforcement bar;
2) the floating rust on original place foot bolt surface, is removed, protective coating is coated, and support block is encased inside below the flange of bottom;
3), the top surface in original basis concrete drills through bar planting hole corresponding with the quantity of rinforcement bar, and bar planting hole is along original place foot bolt External circumferential be uniformly distributed;
4), clean bar planting hole and inject anchor adhesive, inserted in bar planting hole after then the surface of rinforcement bar is cleaned with water and fix and conserve;
5) dabbing treatment, is carried out with the contact surface for intending casting concrete to original basis concrete, then will be carried out between rinforcement bar Reinforcing bar colligation, forms steel reinforcement cage;
6), branching standing template and casting concrete on the outside of steel reinforcement cage.
2. foundation of iron tower screw bolt reinforcing method according to claim 1, it is characterised in that the step 1) in rinforcement bar Quantity determines that method isD is the theoretical diameter of rinforcement bar in formula, and a is the quantity of rinforcement bar, and b is rinforcement bar Tensile strength, π is pi;
The diameter of rinforcement bar is at least 1.2 times of d.
3. foundation of iron tower screw bolt reinforcing method according to claim 2, it is characterised in that:The step 3) in bar planting hole Depth is at least 480MM.
4. the foundation of iron tower screw bolt reinforcing method according to any one of claims 1 to 3, it is characterised in that the step 4) in Detailed process be:
41), the bar planting hole inwall cleaned with water with hard brush, and dust in the bar planting of hole is all removed;
42) bottom that bar planting hole is stretched into after, extracting anchor adhesive with syringe is injected, and marginal not enters syringe side and is lifted up, The injection rate of anchor adhesive is the 2/3 of pore volume;
43) the slow rand rotation side insertion bar planting hole of rinforcement bar after, cleaning with water simultaneously to bottom hole and conserves.
5. foundation of iron tower screw bolt reinforcing method according to claim 4, it is characterised in that the step 5) in specific mistake Cheng Wei:
51), along rinforcement bar between the upper and lower every colligation multi-turn circular stirrups;
52), will be fixedly connected between bottom flanged plate muscle and the rinforcement bar of correspondence position;
53), the racking seizing reinforcing bar between each rinforcement bar, forms multiple zone well shape steel reinforcement cage.
Cage.
6. foundation of iron tower screw bolt reinforcing method according to claim 5, it is characterised in that:It is additionally included in bottom flange to former base The step of plinth concrete outside sets many drainpipes.
7. foundation of iron tower screw bolt reinforcing method according to claim 6, it is characterised in that:The top of the rinforcement bar is inside Side bending, bending degree is 90 ° -145 °.
8. foundation of iron tower screw bolt reinforcing method according to claim 7, it is characterised in that:The anchor adhesive is using modified ring Oxygen tree lipid or modified vinyl esters material, its curing agent do not include ethylenediamine.
9. foundation of iron tower screw bolt reinforcing method according to claim 4, it is characterised in that the step 5) in specific mistake Cheng Wei:
51), along rinforcement bar between the upper and lower every colligation multi-turn circular stirrups;
52), the racking seizing reinforcing bar between each rinforcement bar;
53), racking seizing reinforcing bar between levels circular stirrups, forms multiple zone well shape steel reinforcement cage.
10. the foundation of iron tower screw bolt reinforcing method according to any one of claims 1 to 3, it is characterised in that the step 5) In detailed process be:
51), along rinforcement bar between the upper and lower every colligation multi-turn circular stirrups;
52), will be fixedly connected between bottom flanged plate muscle and the rinforcement bar of correspondence position;
53), the racking seizing reinforcing bar between each rinforcement bar, forms multiple zone well shape steel reinforcement cage.
CN201611222784.8A 2016-12-27 2016-12-27 Foundation of iron tower screw bolt reinforcing method Active CN106759440B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611222784.8A CN106759440B (en) 2016-12-27 2016-12-27 Foundation of iron tower screw bolt reinforcing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611222784.8A CN106759440B (en) 2016-12-27 2016-12-27 Foundation of iron tower screw bolt reinforcing method

Publications (2)

Publication Number Publication Date
CN106759440A true CN106759440A (en) 2017-05-31
CN106759440B CN106759440B (en) 2019-07-09

Family

ID=58924695

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611222784.8A Active CN106759440B (en) 2016-12-27 2016-12-27 Foundation of iron tower screw bolt reinforcing method

Country Status (1)

Country Link
CN (1) CN106759440B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108999207A (en) * 2018-07-27 2018-12-14 江苏国华管塔制造有限公司 A kind of strengthening of foundation device and its application method
CN110306830A (en) * 2019-07-22 2019-10-08 江苏苏南建筑安装工程有限公司 A kind of implantation bar construction and pore reinforced construction method
CN110397074A (en) * 2019-07-31 2019-11-01 福建省邮电规划设计院有限公司 A kind of communication shaft tower earth anchor ruggedized construction and its construction method
CN110616733A (en) * 2019-10-25 2019-12-27 中国电建集团贵州电力设计研究院有限公司 Integral reinforcing device and method for foundation and component of power transmission tower
CN110629785A (en) * 2019-10-25 2019-12-31 中国电建集团贵州电力设计研究院有限公司 Anchor pier type power transmission iron tower foundation reinforcing structure and method
CN110685307A (en) * 2019-08-30 2020-01-14 中交武汉港湾工程设计研究院有限公司 Method for repairing base of lower hinge point of mast crane arm frame
CN111894031A (en) * 2020-08-10 2020-11-06 中国建筑第八工程局有限公司 Tower crane foundation and construction method thereof
CN112411605A (en) * 2020-11-30 2021-02-26 国网四川省电力公司电力科学研究院 Reinforcement reinforcing method and system for foundation anchor bolt of power transmission tower
CN116145716A (en) * 2023-02-14 2023-05-23 中国铁塔股份有限公司 Iron tower base reinforcing method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011094385A (en) * 2009-10-29 2011-05-12 Nippon Steel Corp Method for replacing foundation bolt
CN103821142A (en) * 2014-03-17 2014-05-28 太原理工大学 Steel structure of pre-stress high-strength concrete pipe pile body
CN103938664A (en) * 2014-05-09 2014-07-23 南通庞源机械工程有限公司 Processing method for subsequent reinforcement of tower crane foundation
CN103967289A (en) * 2014-04-23 2014-08-06 江苏建研建设工程质量安全鉴定有限公司 Steel bar planting method and steel bar planting structure suitable for improving plain concrete post-installed fastening bearing capacity
CN104878773A (en) * 2015-04-01 2015-09-02 中船重工中南装备有限责任公司 Construction method of ground wave radar antenna mounting base on reef base
CN106121264A (en) * 2016-06-23 2016-11-16 青岛海川建设集团有限公司 Postinstalled chemically rebar construction technology

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011094385A (en) * 2009-10-29 2011-05-12 Nippon Steel Corp Method for replacing foundation bolt
CN103821142A (en) * 2014-03-17 2014-05-28 太原理工大学 Steel structure of pre-stress high-strength concrete pipe pile body
CN103967289A (en) * 2014-04-23 2014-08-06 江苏建研建设工程质量安全鉴定有限公司 Steel bar planting method and steel bar planting structure suitable for improving plain concrete post-installed fastening bearing capacity
CN103938664A (en) * 2014-05-09 2014-07-23 南通庞源机械工程有限公司 Processing method for subsequent reinforcement of tower crane foundation
CN104878773A (en) * 2015-04-01 2015-09-02 中船重工中南装备有限责任公司 Construction method of ground wave radar antenna mounting base on reef base
CN106121264A (en) * 2016-06-23 2016-11-16 青岛海川建设集团有限公司 Postinstalled chemically rebar construction technology

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
国家电网公司基建部: "《输电线路全过程机械化施工技术设计分册》", 30 April 2015 *
金立虎: "《混凝土复合保温填充砌块及装饰保温贴面砌块生产与应用技术问答》", 31 May 2015 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108999207B (en) * 2018-07-27 2023-12-19 江苏国华管塔制造有限公司 Foundation reinforcement device and application method thereof
CN108999207A (en) * 2018-07-27 2018-12-14 江苏国华管塔制造有限公司 A kind of strengthening of foundation device and its application method
CN110306830A (en) * 2019-07-22 2019-10-08 江苏苏南建筑安装工程有限公司 A kind of implantation bar construction and pore reinforced construction method
CN110397074A (en) * 2019-07-31 2019-11-01 福建省邮电规划设计院有限公司 A kind of communication shaft tower earth anchor ruggedized construction and its construction method
CN110397074B (en) * 2019-07-31 2024-04-12 福建省邮电规划设计院有限公司 Communication pole tower ground anchor reinforcing structure and construction method thereof
CN110685307A (en) * 2019-08-30 2020-01-14 中交武汉港湾工程设计研究院有限公司 Method for repairing base of lower hinge point of mast crane arm frame
CN110685307B (en) * 2019-08-30 2021-04-23 中交武汉港湾工程设计研究院有限公司 Method for repairing base of lower hinge point of mast crane arm frame
CN110616733A (en) * 2019-10-25 2019-12-27 中国电建集团贵州电力设计研究院有限公司 Integral reinforcing device and method for foundation and component of power transmission tower
CN110629785A (en) * 2019-10-25 2019-12-31 中国电建集团贵州电力设计研究院有限公司 Anchor pier type power transmission iron tower foundation reinforcing structure and method
CN111894031A (en) * 2020-08-10 2020-11-06 中国建筑第八工程局有限公司 Tower crane foundation and construction method thereof
CN112411605A (en) * 2020-11-30 2021-02-26 国网四川省电力公司电力科学研究院 Reinforcement reinforcing method and system for foundation anchor bolt of power transmission tower
CN116145716A (en) * 2023-02-14 2023-05-23 中国铁塔股份有限公司 Iron tower base reinforcing method
CN116145716B (en) * 2023-02-14 2024-02-23 中国铁塔股份有限公司 Iron tower base reinforcing method

Also Published As

Publication number Publication date
CN106759440B (en) 2019-07-09

Similar Documents

Publication Publication Date Title
CN106759440B (en) Foundation of iron tower screw bolt reinforcing method
CN100476082C (en) Post-grouting construction method for long helical bore grouting pile and grouting device thereof
CN109457993A (en) A kind of concrete column restoring and fastening method
CN106759843A (en) A kind of outer wall of basement waterproof construction and its construction method
CN204060020U (en) A kind of Reinforced Concrete Reinforcement structure
CN109208631A (en) A kind of gravity retaining wall inclination deviation rectification and reinforcement means
CN104295112B (en) A kind of reinforced concrete post connects steel core concrete column syndeton and construction method
CN206419039U (en) A kind of tunnel-liner is seriously come to nothing rhegma Defects Treatment structure
CN205804367U (en) A kind of construction prefabricated components assembling structure
CN209741844U (en) Pile pulling device for hydraulic engineering
CN209195363U (en) Changeable deep well, secondary deep well anode device
CN204174955U (en) Reinforced concrete post connects steel core concrete column syndeton
CN206635750U (en) Manually digging hole pile enlarged foot dado structure
CN205502020U (en) Sloping underground structure is put to stagnant water
CN205314372U (en) Steel reinforcement cage protective layer cushion
CN107964975A (en) The PBL shear connectors connection structure and its construction method of steel pipe composite pile and cushion cap
CN208949893U (en) A kind of oblique suspension device of the auxiliary of foundation pit
CN204780892U (en) Tubular pile crack reinforcement structure of high strength
CN204898645U (en) Construction waste regeneration drainage CFG pile foundation
CN104652426B (en) A kind of saline soil area waterglass anticorrosion pile foundation construction method
CN207079643U (en) It is easy to the Strengthening of Bridge Pile Foundation structure of construction
CN207739247U (en) A kind of bored concrete pile grouting behind shaft or drift lining structure
CN208072414U (en) A kind of deep foundation pit support bar planting linked network fixing device
CN207453121U (en) A kind of hydraulic structure flow-passing surface pre-embedded anchoring bolts
CN206784438U (en) A kind of well week steel reinforcement cage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant