Prior art keywords
steel
reinforcement cage
steel reinforcement
taper pile
conduit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611149739.4A
Other languages
Chinese (zh)
Other versions
CN106759278B (en
Inventor
金玲玲
宋文利
谢兰敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201611149739.4A priority Critical patent/CN106759278B/en
Publication of CN106759278A publication Critical patent/CN106759278A/en
Application granted granted Critical
Publication of CN106759278B publication Critical patent/CN106759278B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

Preamble the invention discloses a kind of construction method of high inclination-angle taper pile steel reinforcement cage decentralization, including perforate, laying bar-mat reinforcement, erection steel arch-shelf and gunite concrete works, also including making steel reinforcement cage semi-finished product;Conduit is laid in taper pile aperture, and is cleared up on steel arch-shelf concrete surface and is exposed reserved pad;A kind of steel reinforcement cage semi-finished product made of step are hoisted to taper pile aperture with lifting machine, after pre-determined tilt of slinging angle, whole steel reinforcement cage bottom hole is snapped down to along conduit;Steel reinforcement cage semi-finished product are welded in by temporary weld steel bar welding pad is reserved on steel arch-shelf;The longitudinal reinforcement and transverse steel of banding steel cage, laying density is increased to the construction procedure of predetermined density.Steel reinforcement cage of the invention is first fabricated to semi-finished product and is aided in decentralization to hole by conduit again, on the one hand improves installation effectiveness and quality compared with being laid in hole completely and installing steel reinforcement cage;On the other hand installation quality and safety are improve compared with being transferred again after steel reinforcement cage integral manufacturing is good.

Description

A kind of construction method of high inclination-angle taper pile steel reinforcement cage decentralization
Technical field
The invention belongs to taper pile construction field in architectural engineering, more particularly to a kind of high inclination-angle taper pile steel reinforcement cage decentralization is applied Work method.
Background technology
With developing rapidly for domestic and abroad bridge technology, multiarch bridge, Deck Arch Bridges, steel arch bridge etc. possess have landscape, The bridge structure form for meeting landform requirement is arisen at the historic moment, and not only embodies the design level of designer, is also to different types of rridges A kind of checking of construction method.It is related to the Engineering Projects of taper pile more in Arch Bridge Construction, taper pile is also relatively universal under water, it is mostly big straight The taper pile in footpath, is designed as full face inclined steel-pipe pile more, using tunneling boring impact holing, impact holing equipment also at home and abroad compared with Maturation, but for the taper pile design of minor radius, High angle, both at home and abroad without ripe construction technology and equipment, more using excavated by manual work The construction method in hole ensures the quality and safety of construction, but there is the disadvantage of many quality controls in work progress, because The special construction principle of taper pile, and influenceed by geographical environment and geological condition, collapse hole is also easy to produce during manually digging hole And water burst phenomenon.Therefore the generation of these hidden danger how is avoided in work progress at the scene, in addition to carrying out advance support measure, also Needs avoid the generation of some quality, security incident using effective construction method.
In High angle taper pile work progress, after stake holes pore-forming, after indices meet the requirements on inspection, that is, steel is installed How muscle cage, because of the stake holes of High angle, ensure the installation effectiveness and quality of steel reinforcement cage, while ensuring that the thickness of protective layer is uniform simultaneously Ensure the safety problem of work progress, be the practical problem that technical staff faces at the scene.
The content of the invention
The technical problems to be solved by the invention are:A kind of construction method of high inclination-angle taper pile steel reinforcement cage decentralization is provided, is carried The efficiency of work progress high, quality and safety.
In order to solve the above-mentioned technical problem, the invention discloses a kind of construction method of high inclination-angle taper pile steel reinforcement cage decentralization, Preamble work including perforate, laying bar-mat reinforcement, erection steel arch-shelf and gunite concrete, it is further comprising the steps of:
Step one:Make steel reinforcement cage semi-finished product, steel reinforcement cage includes longitudinal reinforcement and transverse steel, steel reinforcement cage semi-finished product it is vertical It is the 1/2~3/4 of predetermined density to the laying density of reinforcing bar and transverse steel;
Step 2:Conduit is laid in taper pile aperture, and is cleared up on steel arch-shelf concrete surface and is exposed reserved pad;
Step 3:A kind of steel reinforcement cage semi-finished product made of step are hoisted to taper pile aperture with lifting machine, are sling predetermined Behind angle of inclination, whole steel reinforcement cage is snapped down to bottom hole along conduit;
Step 4:Steel reinforcement cage semi-finished product are welded in by temporary weld steel bar welding pad is reserved on steel arch-shelf;
Step 5:The longitudinal reinforcement and transverse steel of banding steel cage, predetermined density is increased to by laying density.
Further, conduit is hollow steel pipe in the step 2, and its external diameter is identical with the thickness of steel bar cage protecting layer, institute It is steel reinforcement cage outward flange to the default spacing between steel arch-shelf inward flange to state steel bar cage protecting layer.
Further, conduit has 2~5 in the step 2.
Further, root is gone back after the longitudinal reinforcement and transverse steel to predetermined density of banding steel cage in the step 5 Need to increase laterally fixed reinforcing bar according to scene, the laterally fixed reinforcing bar colligation is located at longitudinal reinforcement end in bottom hole.
Further, check on the quality it is qualified after, extract out conduit.
Further, end of conduit is provided with symmetrical perforation in the step 2, and the perforation is suitable to cable wire and passes through.
Compared with prior art, the present invention can obtain following technique effect:
1) steel reinforcement cage is first fabricated to semi-finished product again by the way that in conduit auxiliary decentralization to hole, the program need not be complete in the present invention Steel reinforcement cage is simultaneously installed in laying in Quan Kong, nor by steel reinforcement cage integral manufacturing it is good after transfer again, the program is on the one hand, and complete Steel reinforcement cage is laid and installed in hole compared to improve installation effectiveness and quality;On the other hand with by steel reinforcement cage integral manufacturing it is good after Transfer again compared to improve installation quality and safety because the good steel reinforcement cage overall weight of integral manufacturing is too heavy, loop wheel machine handling and There is very big potential safety hazard in decentralization process, there is recessive danger to operating personnel and other construction equipments;And first by steel reinforcement cage Be fabricated to semi-finished product aids in decentralization to the method in hole by conduit again, and conduit has ensured installation effectiveness, while ensure that protection The thickness of layer is uniform, and greatly improves construction safety and total quality.
2) steel reinforcement cage is first fabricated to semi-finished product again by conduit auxiliary decentralization to hole in the present invention, afterwards again by horizontal steel The laying density of muscle and longitudinal reinforcement increases to predetermined density, further, longitudinal steel of banding steel cage in the step 5 After muscle and transverse steel to predetermined density, need to increase laterally fixed reinforcing bar, the laterally fixed reinforcing bar colligation always according to scene Longitudinal reinforcement end is located in bottom hole.The program can in time adjust distributing position and the installation of reinforcing bar according to site operation state Sequentially, be increased compared with being transferred again after steel reinforcement cage integral manufacturing is good and carry high-quality space so that steel reinforcement cage is more consolidated, Improve construction quality.
3) end of conduit is provided with symmetrical perforation in heretofore described step 2, and the perforation is suitable to cable wire and passes through.Should Scheme is conducive to extracting conduit out in construction follow-up work, has further ensured construction quality and safety.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, come for those of ordinary skill in the art Say, on the premise of not paying creative work, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is high inclination-angle taper pile stake mouth reinforcing bar section layout drawing.
Fig. 2 is another high inclination-angle taper pile stake mouth reinforcing bar section layout drawing.
Wherein:1. steel arch-shelf, 2. steel reinforcement cage, 21. longitudinal reinforcements, 22. transverse steels, 3. conduit, 4. temporary weld reinforcing bar.
Specific embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to embodiments, to the present invention It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to Limit the present invention.
Below in conjunction with the accompanying drawings and specific embodiment is further described to application principle of the invention.
Embodiment one
As shown in figure 1, a kind of construction method of high inclination-angle taper pile steel reinforcement cage decentralization, including perforate, laying bar-mat reinforcement, erection The preamble work of steel arch-shelf 1 and gunite concrete, it is further comprising the steps of:
Step one:The semi-finished product of steel reinforcement cage 2 are made, steel reinforcement cage 2 includes longitudinal reinforcement 21 and transverse steel 22, steel reinforcement cage 2 half The longitudinal reinforcement 21 of finished product and the laying density of transverse steel 22 are the 1/2 of predetermined density;
Step 2:Conduit 3 is laid in taper pile aperture, and is cleared up on steel arch-shelf 1 concrete surface and is exposed reserved pad;
Step 3:A kind of semi-finished product of steel reinforcement cage 2 made of step are hoisted to taper pile aperture with lifting machine, are sling predetermined Behind angle of inclination, whole steel reinforcement cage 2 is snapped down to bottom hole along conduit 3;
Step 4:The semi-finished product of steel reinforcement cage 2 are welded in by temporary weld reinforcing bar 4 pad is reserved on steel arch-shelf 1;
Step 5:The longitudinal reinforcement 21 and transverse steel 22 of banding steel cage 2, predetermined density is increased to by laying density.
Wherein:Conduit 3 is hollow steel pipe in the step 2, and its external diameter is identical with the thickness of the protective layer of steel reinforcement cage 2, described The protective layer of steel reinforcement cage 2 is the outward flange of steel reinforcement cage 2 to the default spacing between the inward flange of steel arch-shelf 1;There is conduit 3 in the step 2 2;In the step 5 after the longitudinal reinforcement 21 and transverse steel 22 to predetermined density of banding steel cage 2, needed always according to scene Increase laterally fixed reinforcing bar, the laterally fixed reinforcing bar colligation is located at the end of longitudinal reinforcement 21 in bottom hole;In the step 2 The end of conduit 3 is provided with symmetrical perforation, and the perforation is suitable to cable wire and passes through.
Embodiment two
As shown in Fig. 2 a kind of construction method of high inclination-angle taper pile steel reinforcement cage decentralization, the construction method with embodiment one is basic Identical, its difference is:The longitudinal reinforcement 21 of the semi-finished product of steel reinforcement cage 2 and the laying density of transverse steel 22 are in step one The 3/4 of predetermined density.
Embodiment three
As shown in Fig. 2 a kind of construction method of high inclination-angle taper pile steel reinforcement cage decentralization, the construction method with embodiment one is basic Identical, its difference is:The longitudinal reinforcement 21 of the semi-finished product of steel reinforcement cage 2 and the laying density of transverse steel 22 are in step one The 3/4 of predetermined density;Conduit 3 has 5 in the step 2.
The technique effect of above scheme is realized in the present invention:
1) steel reinforcement cage is first fabricated to semi-finished product again by the way that in conduit auxiliary decentralization to hole, the program need not be complete in the present invention Steel reinforcement cage is simultaneously installed in laying in Quan Kong, nor by steel reinforcement cage integral manufacturing it is good after transfer again, the program is on the one hand, and complete Steel reinforcement cage is laid and installed in hole compared to improve installation effectiveness and quality;On the other hand with by steel reinforcement cage integral manufacturing it is good after Transfer again compared to improve installation quality and safety because the good steel reinforcement cage overall weight of integral manufacturing is too heavy, loop wheel machine handling and There is very big potential safety hazard in decentralization process, there is recessive danger to operating personnel and other construction equipments;And first by steel reinforcement cage Be fabricated to semi-finished product aids in decentralization to the method in hole by conduit again, and conduit has ensured installation effectiveness, while ensure that protection The thickness of layer is uniform, and greatly improves construction safety and total quality.
2) steel reinforcement cage is first fabricated to semi-finished product again by conduit auxiliary decentralization to hole in the present invention, afterwards again by horizontal steel The laying density of muscle and longitudinal reinforcement increases to predetermined density, further, longitudinal steel of banding steel cage in the step 5 After muscle and transverse steel to predetermined density, need to increase laterally fixed reinforcing bar, the laterally fixed reinforcing bar colligation always according to scene Longitudinal reinforcement end is located in bottom hole.The program can in time adjust distributing position and the installation of reinforcing bar according to site operation state Sequentially, be increased compared with being transferred again after steel reinforcement cage integral manufacturing is good and carry high-quality space so that steel reinforcement cage is more consolidated, Improve construction quality.
3) end of conduit is provided with symmetrical perforation in heretofore described step 2, and the perforation is suitable to cable wire and passes through.Should Scheme is conducive to extracting conduit out in construction follow-up work, has further ensured construction quality and safety.

Claims (5)

1. a kind of construction method of high inclination-angle taper pile steel reinforcement cage decentralization, including perforate, laying bar-mat reinforcement, set up steel arch-shelf (1) and The preamble work of gunite concrete, it is characterised in that further comprising the steps of:
Step one:Steel reinforcement cage (2) semi-finished product are made, steel reinforcement cage (2) includes longitudinal reinforcement (21) and transverse steel (22), steel reinforcement cage (2) laying density of the longitudinal reinforcement (21) of semi-finished product and transverse steel (22) is the 1/2~3/4 of predetermined density;
Step 2:Conduit (3) is laid in taper pile aperture, and is cleared up on steel arch-shelf (1) concrete surface and is exposed reserved pad;
Step 3:A kind of steel reinforcement cage (2) semi-finished product made of step are hoisted to taper pile aperture with lifting machine, pre- constant inclination of slinging After rake angle, whole steel reinforcement cage (2) is snapped down to bottom hole along conduit (3);
Step 4:Steel reinforcement cage (2) semi-finished product are welded in by temporary weld reinforcing bar (4) pad is reserved on steel arch-shelf (1);
Step 5:The longitudinal reinforcement (21) and transverse steel (22) of banding steel cage (2), laying density are increased to predetermined close Degree.
Step 6:Check on the quality it is qualified after, extract out conduit (3).
2. the construction method that a kind of high inclination-angle taper pile steel reinforcement cage according to claim 1 is transferred, it is characterised in that:The step Conduit (3) is hollow steel pipe in rapid two, and its external diameter is identical with the thickness of steel reinforcement cage (2) protective layer, steel reinforcement cage (2) protective layer It is steel reinforcement cage (2) outward flange to the default spacing between steel arch-shelf (1) inward flange.
3. the construction method that a kind of high inclination-angle taper pile steel reinforcement cage according to claim 1 and 2 is transferred, it is characterised in that:Institute Conduit (3) has 2~5 in stating step 2.
4. the construction method that a kind of high inclination-angle taper pile steel reinforcement cage according to claim 1 and 2 is transferred, it is characterised in that:Institute After stating the longitudinal reinforcement (21) and transverse steel (22) to predetermined density of banding steel cage (2) in step 5, needed always according to scene Increase laterally fixed reinforcing bar, the laterally fixed reinforcing bar colligation is located at longitudinal reinforcement (21) end in bottom hole.
5. the construction method that a kind of high inclination-angle taper pile steel reinforcement cage according to any one of claim 1 to 4 is transferred, its feature It is:Conduit (3) end is provided with symmetrical perforation in the step 2, and the perforation is suitable to cable wire and passes through.
CN201611149739.4A 2016-12-14 2016-12-14 A kind of construction method of high inclination-angle taper pile steel reinforcement cage decentralization Active CN106759278B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611149739.4A CN106759278B (en) 2016-12-14 2016-12-14 A kind of construction method of high inclination-angle taper pile steel reinforcement cage decentralization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611149739.4A CN106759278B (en) 2016-12-14 2016-12-14 A kind of construction method of high inclination-angle taper pile steel reinforcement cage decentralization

Publications (2)

Publication Number Publication Date
CN106759278A true CN106759278A (en) 2017-05-31
CN106759278B CN106759278B (en) 2019-02-26

Family

ID=58876813

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611149739.4A Active CN106759278B (en) 2016-12-14 2016-12-14 A kind of construction method of high inclination-angle taper pile steel reinforcement cage decentralization

Country Status (1)

Country Link
CN (1) CN106759278B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109881700A (en) * 2018-12-03 2019-06-14 中铁上海工程局集团有限公司 The installation method of super-big and overweight pile foundation steel bar cage under a kind of MODEL OVER COMPLEX TOPOGRAPHY

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005282212A (en) * 2004-03-30 2005-10-13 Kumagai Gumi Co Ltd Construction method of cast-in-place concrete pile
CN102191773A (en) * 2010-03-18 2011-09-21 中交第三航务工程局有限公司 Big-diameter oblique socketed pile construction method
CN203475419U (en) * 2013-09-27 2014-03-12 国家电网公司 Connection structure for placing reinforcing cage into steel tube batter pile
CN105369802A (en) * 2015-12-05 2016-03-02 中交通力建设股份有限公司 Supporting and bar-arranging structure for arch bridge raking pile hole forming construction
CN205475204U (en) * 2016-02-23 2016-08-17 宏润建设集团股份有限公司 Locator for steel reinforcement cage is transferred to drilling bored concrete pile
CN105937218A (en) * 2016-04-27 2016-09-14 中国建筑第五工程局有限公司 Construction method of underground diaphragm wall

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005282212A (en) * 2004-03-30 2005-10-13 Kumagai Gumi Co Ltd Construction method of cast-in-place concrete pile
CN102191773A (en) * 2010-03-18 2011-09-21 中交第三航务工程局有限公司 Big-diameter oblique socketed pile construction method
CN203475419U (en) * 2013-09-27 2014-03-12 国家电网公司 Connection structure for placing reinforcing cage into steel tube batter pile
CN105369802A (en) * 2015-12-05 2016-03-02 中交通力建设股份有限公司 Supporting and bar-arranging structure for arch bridge raking pile hole forming construction
CN205475204U (en) * 2016-02-23 2016-08-17 宏润建设集团股份有限公司 Locator for steel reinforcement cage is transferred to drilling bored concrete pile
CN105937218A (en) * 2016-04-27 2016-09-14 中国建筑第五工程局有限公司 Construction method of underground diaphragm wall

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
谢东辉等: "大跨径悬浇施工箱型拱桥大截面斜桩施工技术", 《攀枝花科技与信息》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109881700A (en) * 2018-12-03 2019-06-14 中铁上海工程局集团有限公司 The installation method of super-big and overweight pile foundation steel bar cage under a kind of MODEL OVER COMPLEX TOPOGRAPHY

Also Published As

Publication number Publication date
CN106759278B (en) 2019-02-26

Similar Documents

Publication Publication Date Title
LU102302B1 (en) Steel reinforcement cage for use in ventilation shaft diaphragm wall, and usage method
CN102031784B (en) Slope protection pile pouring and cable bolting construction method for deep foundation pit
CN106120839B (en) A kind of construction technology of off-lying sea blower foundation embedded rock pile
CN101289862B (en) Foundation ditch construction method in water for supporting circuit purlin
CN107313435A (en) Deep Water Ultra-long steel sheet pile cofferdam construction method
CN105239775B (en) A kind of reinforcement installation penetration quality dynamic control method for silo slip form construction
CN110303265B (en) Low-temperature storage tank inner tank top plate construction process and low-temperature storage tank construction process
CN108678751B (en) Assembly type construction method of shield cutter head manhole by jacking and excavating firstly
CN106760841A (en) A kind of construction method of buckling restrained brace structure
CN111894204A (en) Steel pipe concrete composite column construction method
CN108708284B (en) A kind of steel trestle construction method for resisting flood discharge bed scour
CN105040830A (en) Construction method of beam longitudinal bar anchorage for stiffened steel structural column-beam column joints
CN104184097B (en) Non-migration suspension protection system and method for communication pipes and cables
CN114134928B (en) Construction method of steel pipe column tower crane foundation
WO2020103351A1 (en) Bailey support system applied to crossed protection of complicated pipe cable and construction method therefor
CN106759278A (en) A kind of construction method of high inclination-angle taper pile steel reinforcement cage decentralization
CN208235578U (en) A kind of reserved bridge zone assembled barricade for reinforcing hole slot
CN111997043A (en) Segmented reinforcement cage and diaphragm wall construction method under low-clearance high-voltage line
CN105239573B (en) The interplantation tube anchor rock construction method of shaped steel trestle
CN208717918U (en) The enclosure structure of foundation pit of subway station of high-voltage line or overpass is worn under a kind of
CN207469303U (en) A kind of removable assembled template peace tears operating system open
CN203531010U (en) Supporting platform of heat pipe trench and for crossing reserved subway station
CN206219080U (en) A kind of tower crane
CN108331014A (en) A kind of reserved bridge zone assembled barricade for reinforcing hole slot
CN113235970B (en) Structure for separating periphery of ancient coffin chamber and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant