CN106759247B - A method of slope reinforcement is carried out using macromolecule double focusing material - Google Patents
A method of slope reinforcement is carried out using macromolecule double focusing material Download PDFInfo
- Publication number
- CN106759247B CN106759247B CN201611068318.9A CN201611068318A CN106759247B CN 106759247 B CN106759247 B CN 106759247B CN 201611068318 A CN201611068318 A CN 201611068318A CN 106759247 B CN106759247 B CN 106759247B
- Authority
- CN
- China
- Prior art keywords
- side slope
- slope
- double focusing
- kilograms
- earth material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/12—Consolidating by placing solidifying or pore-filling substances in the soil
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K17/00—Soil-conditioning materials or soil-stabilising materials
- C09K17/14—Soil-conditioning materials or soil-stabilising materials containing organic compounds only
- C09K17/18—Prepolymers; Macromolecular compounds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K2105/00—Erosion prevention
Abstract
The invention discloses a kind of method for carrying out slope reinforcement using macromolecule double focusing material, construction procedure is as follows: 1, slope and sloping surface arrangement;2, the proportion of water, soil and double focusing material etc. is selected and is calculated: being gravelly soil quality for side slope, 0.06-0.09 kilograms of double focusing material and 5-6 kilograms of water is taken to carry out dissolution proportion, it is salinized soil quality for side slope, it takes 0.08-0.108 kilograms of double focusing material and 4-5 kilograms of water to carry out dissolution proportion, double focusing material and double centner earth material, 8-9 kilograms of Wheat Straw that the weight has dissolved is stirred uniformly;3, side slope laying sequence: according to on-site actual situations, divide side slope to level Four bench excavation, totally three platforms, every level-one side slope is segmented the reinforced material in the step 2 that paves, it from second level side slope to fourth stage side slope, successively reinforces from bottom to top, finally handles first order side slope;4, earth material conveys;5, reinforcing layer conserves: earth material surface being renovated smooth, smooth, then overlays covering with ground sheeting, film, reinforced material molding are taken off in maintenance after seven days.
Description
Technical field
The present invention relates to a kind of methods for carrying out slope reinforcement using macromolecule double focusing material.
Background technique
With continuously emerging every soil solidification new material, it is suitble to reinforcement material-macromolecule double focusing material of arid region in northwest China
Material just comes into being.Double focusing material is mainly used for slope reinforcement by Xinjiang, forms dent after preventing rain drop erosion.But for mixing
There are laying method and the process of the earth material of double focusing material not yet unified, and Xinjiang drought, sunshine is strong, and dust storm is big, soil
Body is loose, and moisture evaporation is fast.The excessive drying shrinkage seam easy to form of soil body upper and lower level moisture content difference, influences the service life of side slope.
Summary of the invention
The purpose of the present invention is to provide a kind of method for carrying out slope reinforcement using macromolecule double focusing material, side slope tables
Layer is solidified, and can either guarantee the long service life of side slope, and can give full play to the effect of double focusing material, is prevented further
Collapse, reduce damage to ecological environment, it is ensured that roadbed is firm.
The object of the present invention is achieved like this, a method of slope reinforcement is carried out using macromolecule double focusing material,
Construction procedure is as follows:
1, slope and sloping surface arrangement: the selected slope that will be reinforced is cleared up and is arranged, according to the gradient of 1:1.5
Point three-level carries out slope or cuts slope;
2, the proportion selection and calculating of water, soil and double focusing material etc.: macromolecule double focusing material is filled into the water
Divide uniform stirring, is gravelly soil quality for side slope, 0.06-0.09 kilograms of double focusing material is taken to be dissolved with 5-6 kilograms of water
Double focusing material and double centner earth material that the weight has dissolved are stirred uniformly, wherein vegetation kind can be added by proportion
Son;It is salinized soil quality for side slope, 0.08-0.108 kilograms of double focusing material and 4-5 kilograms of water is taken to carry out dissolution proportion, it will
The double focusing material and double centner earth material, 8-9 kilograms of Wheat Straw that the weight has dissolved are stirred uniformly, wherein can add
Vegetation seed;
3, side slope laying sequence: according to on-site actual situations, divide side slope to level Four bench excavation, totally three platforms, each
Grade side slope segmentation paves double focusing material aqueous solution and earth material, Wheat Straw, grass seeds mixing post-reinforcing material in step 2, from second level side
Slope successively reinforces from bottom to top to fourth stage side slope, finally handles first order side slope;
4, earth material conveys: first carrying out sprinkler operation in the side slope trimmed, keeps side slope wet, be then laid in side slope
Iron sheet is conveyed, the above-mentioned earth material being stirred is installed with dump truck to be transported on side slope top is applied on conveying iron sheet, from top to bottom,
Brush slope operation is carried out from left to right, and the earth material being stirred moves down covering side slope, manual compaction's earth material under self gravitation effect;By
Step covers entire side slope, and the earth material average thickness covered in side slope is 13cm;
5, reinforcing layer conserves: earth material surface to be renovated smooth, smooth, then overlays covering with ground sheeting, maintenance took off film after seven days,
Reinforced material molding.
The method of the present invention needs to sprinkle water before earth material laying, and earth material and double focusing material are added grass-seed when stirring, and when construction reinforces
Layer troweling surface as far as possible is simultaneously conserved using covering with ground sheeting, some side slopes are steeper, is easy to collapse, is needed appropriate slope.Using macromolecule
The method construction that double focusing material carries out slope reinforcement can achieve vegetative coverage --- the double action of environmental protection and Gu Po, to protect
The effect of card double focusing material can perform to maximization.The method of the present invention specification is easy, is consolidated with this method side slope surface layer
Change, can either guarantee the long service life of side slope, and the effect of double focusing material can be given full play to, prevent from further collapsing,
Reduce the damage to ecological environment, it is ensured that roadbed is firm.
Detailed description of the invention
Fig. 1 is slope construction arragement construction schematic diagram involved in the method for the present invention.
Specific embodiment
A method of slope reinforcement is carried out using macromolecule double focusing material, side slope arrangement finishing is carried out referring to Fig.1, applies
Steps are as follows for work:
1, slope and sloping surface arrangement: the selected slope that will be reinforced is cleared up and is arranged, according to the gradient of 1:1.5
Point three-level carries out slope or cuts slope;
2, the proportion selection and calculating of water, soil and double focusing material etc.: macromolecule double focusing material is filled into the water
Divide uniform stirring, is gravelly soil quality for side slope, 0.07 kilogram of double focusing material and 6 kilograms of water is taken to carry out dissolution proportion, it will
The double focusing material and double centner earth material that the weight has dissolved are stirred uniformly, wherein vegetation seed can be added;For side
Slope is salinized soil quality, and 0.1 kilogram of double focusing material and 4 kilograms of water is taken to carry out dissolution proportion, the weight has been dissolved double
Poly- material and double centner earth material, 9 kilograms of Wheat Straws are stirred uniformly, wherein vegetation seed can be added;
3, side slope laying sequence: according to on-site actual situations, divide side slope to level Four bench excavation, totally three platforms, each
Grade side slope segmentation paves double focusing material aqueous solution and earth material, Wheat Straw, grass seeds mixing post-reinforcing material in step 2, from second level side
Slope successively reinforces from bottom to top to fourth stage side slope, finally handles first order side slope;
4, earth material conveys: first carrying out sprinkler operation in the side slope trimmed, keeps side slope wet, be then laid in side slope
Iron sheet is conveyed, the above-mentioned earth material being stirred is installed with dump truck to be transported on side slope top is applied on conveying iron sheet, from top to bottom,
Brush slope operation is carried out from left to right, and the earth material being stirred moves down covering side slope, manual compaction's earth material under self gravitation effect;By
Step covers entire side slope, and the earth material average thickness covered in side slope is 13cm;
5, reinforcing layer conserves: earth material surface to be renovated smooth, smooth, then overlays covering with ground sheeting, maintenance took off film after seven days,
Reinforced material molding.
Claims (1)
1. a kind of method for carrying out slope reinforcement using macromolecule double focusing material, it is characterised in that its construction procedure is as follows: 1, putting
Slope and sloping surface arrangement: the selected slope that will be reinforced is cleared up and is arranged, and is put according to the gradient point three-level of 1:1.5
Slope is cut on slope;2, the proportion selection and calculating of water, soil and double focusing material: macromolecule double focusing material is carried out into the water sufficiently
Uniform stirring is gravelly soil quality for side slope, takes 0.06-0.09 kilograms of double focusing material to carry out dissolution with 5-6 kilograms of water and matches
Than double focusing material and double centner earth material that the weight has dissolved being stirred uniformly, wherein adding vegetation seed;For
Side slope is salinized soil quality, takes 0.08-0.108 kilograms of double focusing material and 4-5 kilograms of water to carry out dissolution proportion, by the weight
The double focusing material and double centner earth material, 8-9 kilograms of Wheat Straw dissolved is stirred uniformly, wherein adding vegetation seed;3, side
Slope laying sequence: according to on-site actual situations, dividing side slope to level Four bench excavation, totally three platforms, every level-one side slope segmentation booth
Double focusing material aqueous solution and earth material, Wheat Straw, grass seeds mixing post-reinforcing material in step 2 are spread, from second level side slope to fourth stage side
Slope successively reinforces from bottom to top, finally handles first order side slope;4, earth material conveys: first sprinkling water in the side slope trimmed
Operation keeps side slope wet, and conveying iron sheet is then laid in side slope, the above-mentioned earth material being stirred is installed with dump truck and is transported to side
It is applied in top of the slope on conveying iron sheet, carries out brush slope operation from top to bottom, from left to right, the earth material being stirred is made in self gravity
Covering side slope, manual compaction's earth material are moved down under;Entire side slope is gradually covered, the earth material average thickness covered in side slope is
13cm;5, reinforcing layer conserves: earth material surface being renovated smooth, smooth, then overlays covering with ground sheeting, maintenance is taken off film after seven days, added
Gu material molding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611068318.9A CN106759247B (en) | 2016-11-29 | 2016-11-29 | A method of slope reinforcement is carried out using macromolecule double focusing material |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611068318.9A CN106759247B (en) | 2016-11-29 | 2016-11-29 | A method of slope reinforcement is carried out using macromolecule double focusing material |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106759247A CN106759247A (en) | 2017-05-31 |
CN106759247B true CN106759247B (en) | 2019-04-16 |
Family
ID=58904871
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611068318.9A Active CN106759247B (en) | 2016-11-29 | 2016-11-29 | A method of slope reinforcement is carried out using macromolecule double focusing material |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106759247B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101037598A (en) * | 2007-03-30 | 2007-09-19 | 成都理工大学 | Ecological slope protection substrate |
CN104310905A (en) * | 2014-10-11 | 2015-01-28 | 江苏鼎泰工程材料有限公司 | Road slope silt curing agent and preparation method thereof |
KR20150049373A (en) * | 2013-10-30 | 2015-05-08 | 우영환경개발 주식회사 | Planting material having erosion preventive function and greening method of natural ground using the same |
CN105862889A (en) * | 2016-05-19 | 2016-08-17 | 成都理工大学 | Soil slope protection method |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004194608A (en) * | 2002-12-20 | 2004-07-15 | Takenaka Komuten Co Ltd | Greened wall surface and construction method for greening wall surface |
-
2016
- 2016-11-29 CN CN201611068318.9A patent/CN106759247B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101037598A (en) * | 2007-03-30 | 2007-09-19 | 成都理工大学 | Ecological slope protection substrate |
KR20150049373A (en) * | 2013-10-30 | 2015-05-08 | 우영환경개발 주식회사 | Planting material having erosion preventive function and greening method of natural ground using the same |
CN104310905A (en) * | 2014-10-11 | 2015-01-28 | 江苏鼎泰工程材料有限公司 | Road slope silt curing agent and preparation method thereof |
CN105862889A (en) * | 2016-05-19 | 2016-08-17 | 成都理工大学 | Soil slope protection method |
Also Published As
Publication number | Publication date |
---|---|
CN106759247A (en) | 2017-05-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102652480B (en) | Vegetation recovery method for acid metal mine solid waste stock dump | |
CN105862889B (en) | A kind of soil-slope bank protecting method | |
CN102296511A (en) | Cellular permeable concrete ground structure for grass growing and production method thereof | |
CN105409725B (en) | Soakaway trench, revegetation area water-saving irrigation system and its construction method | |
CN104652360A (en) | Vegetation bag ecological slope protection construction method and vegetation bag rainwater treatment system | |
CN106522244B (en) | A kind of embankment combination binding structure and its construction method | |
CN106759247B (en) | A method of slope reinforcement is carried out using macromolecule double focusing material | |
CN109005722B (en) | Comprehensive reclamation method for land reclamation of iron ore waste stone yard | |
CN207228298U (en) | A kind of landscape drought small stream structure | |
CN207376761U (en) | concrete prefabricated rainwater seepage well | |
EP4190972A1 (en) | Vegetation maintenance system | |
CN206267161U (en) | A kind of three-dimension vegetative net slope protection construction structure suitable for soil-slope | |
CN109989474B (en) | Construction method of rainwater collection system | |
CN108775169A (en) | A kind of open air arenas and its method of construction | |
CN106342433B (en) | A kind of curtain fragrant plant combination slope vegetation restoration method | |
CN202064260U (en) | Environmental-friendly, permeable and exhausting man-made stadium used as green building | |
CN205756051U (en) | The shovel soil rupture of membranes film rolling device of cigarette ground rib skinning in a kind of tobacco planting | |
CN214301792U (en) | Soft rock side slope ecological slope protection structure based on waste recycling | |
CN113914265A (en) | Waste ditch ecological restoration and treatment method based on coal gangue filling technology | |
CN113216224A (en) | Gravel soil slope greening technology for open-pit mining of green mine | |
CN111945512A (en) | Vegetation maintenance system | |
CN106812151A (en) | A kind of construction method on wind tower basis | |
CN202181492U (en) | Planted grass vestibule type permeable concrete ground structure | |
CN113832994B (en) | Method for repairing top slope of tuff slope | |
CN219604075U (en) | Improved permeable pavement structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |