CN106759205A - A kind of jack up octagon spud leg section and use its offshore work platform - Google Patents

A kind of jack up octagon spud leg section and use its offshore work platform Download PDF

Info

Publication number
CN106759205A
CN106759205A CN201710024405.2A CN201710024405A CN106759205A CN 106759205 A CN106759205 A CN 106759205A CN 201710024405 A CN201710024405 A CN 201710024405A CN 106759205 A CN106759205 A CN 106759205A
Authority
CN
China
Prior art keywords
floating platform
leg section
spud leg
coaming plate
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710024405.2A
Other languages
Chinese (zh)
Other versions
CN106759205B (en
Inventor
李光远
吴平平
陆军
张静波
马振军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG HUA YUN OFFSHORE ENGINEERING & TECHNOLOGY SERVICE Co.,Ltd.
Guangdong Jing Yin Ocean Engineering Co Ltd
Original Assignee
Guangdong Jing Yin Ocean Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Jing Yin Ocean Engineering Co Ltd filed Critical Guangdong Jing Yin Ocean Engineering Co Ltd
Priority to CN201710024405.2A priority Critical patent/CN106759205B/en
Publication of CN106759205A publication Critical patent/CN106759205A/en
Application granted granted Critical
Publication of CN106759205B publication Critical patent/CN106759205B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/0017Means for protecting offshore constructions
    • E02B17/003Fenders
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/0017Means for protecting offshore constructions
    • E02B17/0021Means for protecting offshore constructions against ice-loads

Abstract

The invention discloses a kind of jack up octagon spud leg section and its offshore work platform is used, including platform dividing plate, coaming plate and guide plate, the housing of the coaming plate and guide plate assembling combination pile leg section;The platform dividing plate is arranged at the inside of the housing of spud leg section.Jack up octagon spud leg section is easy to assembling, and space availability ratio is higher;Platform dividing plate is provided with landing slab main rib and multiple landing slab time ribs, increases the bulk strength of platform dividing plate, and is effectively prevented from the problem of the middle part stress concentration of platform dividing plate, makes platform dividing plate even intensity everywhere.Heater is used to heat the housing of spud leg section to reach deicing effect, eliminates load of the ice sheet to the housing of spud leg section, greatly improves service life of the jack up octagon spud leg section in severe cold area.Floating platform is installed to be locked on the housing of spud leg section by floating platform locking device, abrasion collision occurs to avoid being installed between floating platform and the housing of spud leg section because of wind wave action, improve safety in utilization.

Description

A kind of jack up octagon spud leg section and use its offshore work platform
Technical field
The present invention relates to field of ocean engineering, more particularly to a kind of jack up octagon spud leg section and its sea of use Upper job platform.
Background technology
Spud leg is the important component of offshore work platform, for support upper hull weight and bear wind, wave, The environmental loads such as stream, its structure type is mainly cylindrical leg and truss framed leg, and the lifting system of spud leg mainly has hydraulic pressure Bolt-type and pinion and-rack.In bolt-type offshore work platform, cylindrical leg and hydraulic bolt formula lifting system are used The lifting for cooperating to realize spud leg.Existing cylindrical leg be not easy assembling, low space utilization, bulk strength compared with It is low, there is problem of stress concentration, there is cracking or breaking potential safety hazard during use.And under the relatively low environment of temperature, Spud leg freezes serious, and ice sheet brings very big load to spud leg, spud leg is fractureed or is damaged.
The content of the invention
It is an object of the invention to propose that one kind is easy to assembling, space availability ratio is higher, and bulk strength is high, and being prevented effectively from should Power concentration problem, improves spud leg in the jack up octagon spud leg section of the service life of severe cold area and uses its operation on the sea Platform.
It is that, up to this purpose, the present invention uses following technical scheme:
A kind of jack up octagon spud leg section, including platform dividing plate, coaming plate and guide plate, the coaming plate and guide plate are assembled It is combined into the housing of spud leg section;
The platform dividing plate is arranged at the inside of the housing of spud leg section;
The platform dividing plate also includes landing slab, landing slab main rib and multiple landing slab time ribs, the side of the landing slab It is octagon, pipeline receiving opening is provided with the middle part of the landing slab;The landing slab main rib is arranged at pipeline receiving opening Edge;Side of multiple landing slab time ribs in dispersion shape from pipeline receiving opening to landing slab extends, and landing slab One end of rib and landing slab main rib are connected;
The landing slab includes multiple coaming plate position level edges and multiple guide plate positioning bevelled edge edges, and the coaming plate is determined Position horizontal edge and guide plate positioning bevelled edge edge are spaced apart in the side of the platform dividing plate;
The inner side of the coaming plate and coaming plate position level edge are welded, and the inner side of the guide plate and guide plate positioning chamfer Weld at edge;The guide plate includes multiple pin-and-holes, and the pin-and-hole is longitudinally disposed on the guide plate evenly and at intervals;
Also include heater and floating platform is installed, the heater is installed on installation floating platform, the installation floating platform socket In the outside of the housing of spud leg section, the installation floating platform includes floating platform locking device, and the installation floating platform is locked by floating platform and filled Put and connected with the housing of spud leg section.
Preferably, the coaming plate includes coaming plate fixing rib, and the coaming plate fixing rib is longitudinally disposed in the inner side of coaming plate;
Accordingly, the landing slab also includes that coaming plate installs groove, and the coaming plate installs groove and is arranged at coaming plate positioning water Flat edge, the coaming plate fixing rib is connected in coaming plate and installs groove.
Preferably, the coaming plate fixing rib is bar shaped rib, and it is bar-shaped trough that accordingly the coaming plate installs groove;
Or, the coaming plate fixing rib is T-shaped rib, and it is T-slot that accordingly the coaming plate installs groove.
Preferably, the pipeline receiving opening is square opening, and accordingly, the landing slab main rib is square rib.
Preferably, also including overcoat, the overcoat includes water barrier, the freeze proof layer of anti-corrosion and lubricating layer, the coaming plate Outside and the outside of guide plate set gradually the freeze proof layer of water barrier, anti-corrosion and lubricating layer inside-out;
The thickness of the water barrier is 0.4mm~1.5mm, and the thickness of the freeze proof layer of anti-corrosion is 3.5mm~6mm, lubrication The thickness of layer is 0.4mm~2mm.
Preferably, the installation floating platform also includes that floating platform body, floating platform water injection pipe, floating platform outlet pipe, floating platform water filling are automatically controlled Valve and floating platform water outlet electrically-controlled valve;
The cross section of the floating platform body is octagon, and the floating platform body is socketed on the outside of the housing of spud leg section, institute The inside for stating floating platform body is hollow;
The floating platform water injection pipe is connected with the side of floating platform body, and the opposite side of the floating platform outlet pipe and floating platform body connects It is logical;
The floating platform water filling electrically-controlled valve is installed on floating platform water injection pipe, and the floating platform water outlet electrically-controlled valve is installed on floating platform water outlet Pipe.
Preferably, the floating platform locking device is arranged at the side towards guide plate of floating platform body;
The floating platform locking device includes floating platform stop pin and stop pin actuator, the floating platform stop pin and the locking Pin actuator connection, the stop pin actuator drives floating platform stop pin to insert the pin-and-hole of guide plate.
Preferably, the heater includes that air inlet pipe, escaping pipe, heat exchanger tube, air inlet are oriented to connecting tube, outlet and are oriented to company Adapter, air inlet electrically-controlled valve and gas outlet electrically-controlled valve;
The air inlet is oriented to connecting tube and is connected by heat exchanger tube with outlet guiding connecting tube, and the air inlet pipe and air inlet are oriented to Connecting tube is connected, and the escaping pipe is oriented to connecting tube and connects with outlet;
The air inlet electrically-controlled valve is installed on air inlet pipe, and the gas outlet electrically-controlled valve is installed on escaping pipe.
Preferably, also including cleaning device, the cleaning device is installed on the top of heater;
The cleaning device includes cleaning jet pipe, water inlet pipe, current deflecting connecting tube and water inlet electrically-controlled valve, the cleaning spray Pipe is connected with the top of current deflecting connecting tube, and the water inlet pipe is connected with the side of current deflecting connecting tube;
The water inlet electrically-controlled valve is installed on water inlet pipe, housing of the cleaning jet pipe towards spud leg section;
Also include anticollision cushion pad, the inner side of the housing towards spud leg section of the current deflecting connecting tube sets described anti- Hit cushion pad.
Preferably, a kind of offshore work platform including the jack up octagon spud leg section.
The jack up octagon spud leg section is easy to assembling, and space availability ratio is higher;The platform dividing plate is provided with landing slab Main rib and multiple landing slab time ribs, increase the bulk strength of platform dividing plate, and be effectively prevented from the middle part stress collection of platform dividing plate In problem, make platform dividing plate even intensity everywhere.The coaming plate fixing rib is connected in coaming plate and installs groove, so as to increase enclose Contact area between plate and platform dividing plate, is easy to welding, coaming plate is more securely mounted at platform dividing plate, it is to avoid coaming plate should Power is concentrated at one, and stress is more uniformly distributed.The heater is used to heat the housing of spud leg section to reach deicing effect Really, ice sheet is eliminated to the load of the housing of spud leg section, greatly improves the jack up octagon spud leg section in severe cold area Service life.The installation floating platform is locked on the housing of spud leg section by floating platform locking device, to avoid pacifying because of wind wave action There is abrasion collision between dress floating platform and the housing of spud leg section, improve safety in utilization.
Brief description of the drawings
The present invention will be further described for accompanying drawing, but content in accompanying drawing does not constitute any limitation of the invention.
Fig. 1 is the octagon pile leg structure schematic diagram of one of embodiment of the invention;
Fig. 2 is the housing interior structure schematic diagram of the spud leg section of one of embodiment of the invention;
Fig. 3 is the platform diaphragm structure schematic diagram of one of embodiment of the invention;
Fig. 4 is the housing horizontal profile structure schematic diagram of the spud leg section of one of embodiment of the invention;
Fig. 5 is the coaming plate structural representation of one of embodiment of the invention;
Fig. 6 is the protective layer structure schematic diagram of one of embodiment of the invention;
Fig. 7 is the installation floating platform structural representation of one of embodiment of the invention.
Wherein:Platform dividing plate 1;Coaming plate 2;Guide plate 3;Coaming plate position level edge 11;Guide plate positions bevelled edge along 12; Pin-and-hole 31;Heater 6;Floating platform 7 is installed;Floating platform locking device 73;Coaming plate fixing rib 21;Coaming plate installs groove 14;Pipeline holds Receive through hole 13;Landing slab 101;Overcoat 4;Water barrier 41;The freeze proof layer 42 of anti-corrosion;Lubricating layer 43;Floating platform body 71;Floating platform water filling Pipe 72;Floating platform outlet pipe 74;Floating platform water filling electrically-controlled valve 75;Floating platform water outlet electrically-controlled valve 76;Air inlet pipe 61;Escaping pipe 62;Heat exchanger tube 63;Air inlet is oriented to connecting tube 64;Outlet is oriented to connecting tube 65;Air inlet electrically-controlled valve 66;Gas outlet electrically-controlled valve 67;Cleaning device 5;Cleaning Jet pipe 51;Water inlet pipe 52;Current deflecting connecting tube 53;Water inlet electrically-controlled valve 54;Anticollision cushion pad 8;Landing slab main rib 15;Landing slab Secondary rib 16.
Specific embodiment
Further illustrate technical scheme below in conjunction with the accompanying drawings and by specific embodiment.
The jack up octagon spud leg section of the present embodiment, as shown in figure 1, including platform dividing plate 1, coaming plate 2 and guide plate 3, The housing of the coaming plate 2 and the assembling combination pile leg section of guide plate 3;
The platform dividing plate 1 is arranged at the inside of the housing of spud leg section;
The platform dividing plate 1 includes landing slab 101, landing slab main rib 15 and multiple landing slab time ribs 16, such as Fig. 3, Fig. 4 institute Show, the side of the landing slab 101 is octagon, and the middle part of the landing slab 101 is provided with pipeline receiving opening 13;The platform Plate main rib 15 is arranged at the edge of pipeline receiving opening 13;Multiple landing slab time ribs 16 are in dispersion shape from pipeline receiving opening 13 extend to the side of landing slab 101, and landing slab time rib 16 one end and landing slab main rib 15 connect;
The landing slab 101 also includes that multiple coaming plate position level edges 11 and multiple guide plates position bevelled edge along 12, The coaming plate position level edge 11 and guide plate positioning bevelled edge are spaced apart in the side of the platform dividing plate 1 along 12;
The inner side and coaming plate position level edge 11 of the coaming plate 2 are welded, and the inner side of the guide plate 3 and guide plate are positioned Bevelled edge is along 12 welding;The guide plate 3 includes multiple pin-and-holes 31, and the pin-and-hole 31 is longitudinally disposed at described leading evenly and at intervals To on plate 3;
Also include heater 6 and floating platform 7 is installed, as shown in fig. 7, the heater 6 is installed on installation floating platform 7, institute The outside for installing the housing that floating platform 7 is socketed on spud leg section is stated, the installation floating platform 7 includes floating platform locking device 73, the installation Floating platform 7 is connected by the housing of floating platform locking device 73 and spud leg section.
The cross section of the jack up octagon spud leg section is octagon, and multiple high intensity octagon spud leg sections close up High intensity octagon spud leg is assembled into, compared with existing cylindrical leg, the high intensity octagon spud leg section is easy to assembling, Space availability ratio is higher.The high intensity octagon spud leg section is formed by platform dividing plate 1, coaming plate 2 and the assembling combination of guide plate 3, The side of the landing slab 101 is octagon, and four coaming plate position level edges 11 and four are provided with the side of landing slab 101 Guide plate positions bevelled edge along 12, a guide plate is set between two coaming plate position level edges 11 and positions bevelled edge along 12, I.e. four coaming plate position level edges 11 are relative two-by-two, and four guide plate positioning bevelled edges are relative two-by-two along 12.Multiple can be provided with The coaming plate position level edge 11 of platform dividing plate 1, the inner side of the coaming plate 2 and multiple platform dividing plates 1 is connected, the guide plate 3 Inner side and multiple platform dividing plates 1 guide plate positioning bevelled edge along 12 connections, the platform dividing plate 1 plays a support and is coupled Effect, in order to assemble the housing of spud leg section;And staff can be movable on platform dividing plate 1, to realize that staff arrives The inside of the housing of spud leg section carries out operation and maintenance.Guide plate 3 with pin-and-hole 31 is arranged at four bevelings of platform dividing plate 1 On angle, so as to avoid stress concentration in the housing lifting process of spud leg section, stress is more uniformly distributed, the reliable essence of spud leg lifting It is accurate.
The middle part of the landing slab 101 is provided with pipeline receiving opening 13, and the pipeline receiving opening 13 is inside spud leg Pipeline is set space to be provided and is easy to staff to go deep into carrying out operation and maintenance inside spud leg.Also, pipeline receiving opening 13 The circumferentially disposed landing slab main rib 15 in edge, with the intensity at the edge of reinforced pipe road receiving opening 13, reduce pipeline and accommodate Gouging abrasion of through hole 13 etc.;And landing slab main rib 15 is protruded upward, baffle effect can be played, when stopping staff's operation Instrument falls to the bottom of the housing of spud leg section from pipeline receiving opening 13.Multiple landing slab time ribs 16 are set in dispersion shape In landing slab 101, increase the bulk strength of landing slab 101, and be effectively prevented from asking for the middle part stress concentration of landing slab 101 Topic, makes the even intensity everywhere of landing slab 101.
It is described that the outside that floating platform 7 is socketed on the housing of spud leg section is installed, for carrying heater 6, the heater 6 Heated to reach deicing effect for the housing to spud leg section.Under the relatively low environment of temperature, the housing of spud leg section freezes Seriously, ice sheet brings very big load to the housing of spud leg section, the housing of spud leg section is fractureed or is damaged, therefore sets institute Heater 6 is stated, the heater 6 can be added using the waste heat of offshore work platform diesel engine unit to the housing of spud leg section Hot ice-melt, eliminates load of the ice sheet to the housing of spud leg section, greatly improves the jack up octagon spud leg section on severe cold ground The service life in area.The installation floating platform 7 is provided with floating platform locking device 73, so as to larger in off working state or marine stormy waves When, the installation floating platform 7 is locked on the housing of spud leg section by floating platform locking device 73, to avoid installing floating because of wind wave action There is abrasion collision between the housing of platform 7 and spud leg section, improve safety in utilization.
Preferably, as shown in Fig. 2, Fig. 5, the coaming plate 2 includes coaming plate fixing rib 21, and the coaming plate fixing rib 21 is longitudinally It is arranged at the inner side of coaming plate 2;Accordingly, as shown in Figure 3, Figure 4, the platform dividing plate 1 also includes that coaming plate installs groove 14, described Coaming plate installs groove 14 and is arranged at coaming plate position level edge 11, and the coaming plate fixing rib 21 is connected in coaming plate and installs groove 14. Settable multiple coaming plate fixing rib 21, and longitudinally interval is uniformly distributed in the inner side of the coaming plate 2, the coaming plate fixing rib 21 Play a part of to strengthen the intensity of coaming plate 2.Accordingly, multiple coaming plate can be set groove 14, the coaming plate fixing rib 21 clamping is installed Groove 14 is installed in coaming plate, so as to increase the contact area between coaming plate 2 and platform dividing plate 1, is easy to welding, make coaming plate 2 more It is securely mounted at platform dividing plate 1, it is to avoid at one, stress is more uniformly distributed the stress concentration of coaming plate 2.
Preferably, the coaming plate fixing rib 21 is bar shaped rib, and it is bar-shaped trough that accordingly the coaming plate installs groove 14, is both risen To the effect of the enhancing intensity of coaming plate 2, assembled welding is easy to again.Or, the coaming plate fixing rib 21 is T-shaped rib, accordingly described It is T-slot that coaming plate installs groove 14, and T-type structure can increase the contact area between coaming plate 2 and platform dividing plate 1, greatly improve The intensity of coaming plate 2.
Preferably, as shown in figure 3, the pipeline receiving opening 13 is square opening, accordingly, the landing slab main rib 15 is Square rib.The pipeline receiving opening 13 is square opening, is compared with circular port, and the pipeline receiving opening 13 being square can be greatly Improve receiving space;Accordingly, the landing slab main rib 15 is square rib, makes landing slab main rib 15 and pipeline receiving opening 13 more It is laminating, the intensity at the edge of reinforced pipe road receiving opening 13.
Preferably, the other end of the landing slab time rib 16 is in hook-shaped shape, as shown in figure 3, due to actually used middle coaming plate 2 The impact such as high wind, sea laps can be subject to, the stress that the stress ratio platform dividing plate 1 that coaming plate 2 is subject to is subject to is much greater, therefore flat The secondary rib 16 of platen is in hook-shaped shape with the other end of the connection of coaming plate fixing rib 21 so that the other end of landing slab time rib 16 is with it certainly One end of body, to increase lifting surface area of the landing slab time between rib 16 and coaming plate fixing rib 21, is effectively divided compared to higher Stress herein is dissipated, structural strength is improved, extends the service life of coaming plate 2.
Preferably, as shown in figure 4, two neighboring landing slab time rib 16 is big in the spacing towards one end of landing slab main rib 15 In the spacing of the other end that groove 14 is installed towards coaming plate.Groove 14 is installed due to the coaming plate at coaming plate position level edge 11 to be distributed The length of the corresponding sides of landing slab main rib 15 is smaller than, in order that uniform intensity distribution, the two neighboring landing slab time rib 16 In spacing of the spacing towards one end of landing slab main rib 15 more than the other end that groove 14 is installed towards coaming plate, so as to avoid answering Power concentration problem;The coaming plate of the end of coaming plate position level edge 11 described in each of which installs groove 14 by landing slab time rib 16 and the connection of the corresponding corner side of landing slab main rib 15, landing slab time rib 16 herein is inclined, can strengthen buckling strength.
Preferably, as shown in figure 4, the thickness of the guide plate 3 is more than the thickness of coaming plate 2.Due to the stake of jack up octagon Leg section is connected by the pin-and-hole 31 of guide plate 3 and the hydraulic bolt formula lifting system of ocean platform, to complete the lifting of spud leg, Therefore guide plate 3 is stress maximum in whole jack up octagon spud leg section, and the thickness for setting the guide plate 3 is more than coaming plate 2 thickness, to improve the rigidity and intensity of guide plate 3, it is ensured that the security reliability of guide plate 3.Existing cylindrical leg is By monoblock steel plate press process, therefore to improve the intensity and rigidity of cylindrical leg, the thickness of whole cylindrical leg Degree is larger, but this steel material for needing is big, increases production cost, waste of resource.And the jack up octagon spud leg section is then Only described guide plate 3 needs thickness big, and rigidity strong steel plate is made, and greatly reduces production cost, economizes on resources;And The guide plate 3 is strip, compared to cylindrical leg, it is easier to which processing is installed, and improves manufacture efficiency.
Preferably, as shown in figure 4, the edge of the guide plate 3 outwardly.The outer surface light of existing cylindrical leg It is sliding, without any prominent structure, it is susceptible to rotate in the presence of stormy waves and rocks, easily collided with main hull, there is pole Big potential safety hazard.And in the jack up octagon spud leg section, the edge of the guide plate 3 outwardly, the jack up Octagon spud leg section can be by guide plate 3 and main hull clamping, it is to avoid the jack up octagon spud leg in the presence of stormy waves Section rotates and rocks, and improves safety in utilization.
Preferably, as shown in fig. 6, also including overcoat 4, the overcoat 4 includes the freeze proof and of layer 42 of water barrier 41, anti-corrosion Lubricating layer 43, the outside of the coaming plate 2 and the outside of guide plate 3 set gradually the freeze proof layer of water barrier 41, anti-corrosion inside-out 42 and lubricating layer 43.The water barrier 41 is arranged at innermost layer, with impermeable role, so as to prevent seawater from penetrating into the shell of spud leg section The inside of body, the thickness of the water barrier 41 is 0.4mm~1.5mm, preferably 0.8mm;The freeze proof layer 42 of anti-corrosion plays anti- Rotten freeze proof effect, prevents corrosion of the seawater to coaming plate 2 and guide plate 3, and influence of the low temperature environment to coaming plate 2 and guide plate 3, The thickness of the freeze proof layer 42 of anti-corrosion is 3.5mm~6mm, preferably 4.5mm;The lubricating layer 43 is arranged at outermost layer, plays Lubrication, is effectively reduced the attachment of marine organisms, and the thickness of lubricating layer 43 is 0.4mm~2mm, preferably 1.6mm;Protection Layer 4 sets the combination of this thickness range, has both ensured the protective effect of the housing to spud leg section, reduces 4 pairs of stakes of overcoat as far as possible again The load of the housing of leg section, saves input cost.The freeze proof layer 42 of the water barrier 41, anti-corrosion and lubricating layer 43 can for apply oil reservoir or Colloid layer, lighter in weight reduces load.
Preferably, as shown in fig. 7, the installation floating platform 7 also includes floating platform body 71, floating platform water injection pipe 72, floating platform water outlet Pipe 74, floating platform water filling electrically-controlled valve 75 and floating platform water outlet electrically-controlled valve 76;The cross section of the floating platform body 71 is octagon, described floating Playscript with stage directions body 71 is socketed on the outside of the housing of spud leg section, and the inside of the floating platform body 71 is hollow;The floating platform water injection pipe 72 Side with floating platform body 71 is connected, and the floating platform outlet pipe 74 is connected with the opposite side of floating platform body 71;The floating platform water filling Electrically-controlled valve 75 is installed on floating platform water injection pipe 72, and the floating platform water outlet electrically-controlled valve 76 is installed on floating platform outlet pipe 74.
, by internal water flooding of the floating platform water injection pipe 72 to floating platform body 71, floating platform body 71 is by floating for the installation floating platform 7 The water outlet of platform outlet pipe 74, the water storage of floating platform body 71 is controlled by the floating platform water filling electrically-controlled valve 75 and floating platform water outlet electrically-controlled valve 76 Amount, then controls the buoyancy size and fording depth of floating platform body 71.The cross section of the floating platform body 71 is octagon, more preferably Ground is fitted with the housing of spud leg section in eight side bar shapes, effectively prevents floating platform body 71 from being rotated in the case where wave is acted on shifting Position.It is package unit that the buoyancy of floating platform body 71 can be controlled by floating platform water filling electrically-controlled valve 75 and floating platform water outlet electrically-controlled valve 76 1.5 times of weight, make the heat exchanger tube 63 of heater 6 just be contacted with ice face, increase deicing effect.
Preferably, as shown in fig. 7, the floating platform locking device 73 be arranged at floating platform body 71 towards the one of guide plate 3 Side, the floating platform locking device 73 includes floating platform stop pin and stop pin actuator, the floating platform stop pin and the stop pin Actuator is connected, and the stop pin actuator drives floating platform stop pin to insert the pin-and-hole 31 of guide plate 3.The floating platform locking device 73 drive floating platform stop pin to insert the pin-and-hole 31 of guide plate 3 by stop pin actuator, to realize making the locking for installing floating platform 7 With.The stop pin actuator can be hydraulic jack, and the stop pin actuator drive floating platform stop pin carries out stretching motion, also Stop pin position sensor can be set towards one end of pin-and-hole 31 in floating platform stop pin, position for detecting pin-and-hole 31, with Ensure that the floating platform stop pin is properly inserted corresponding pin-and-hole 31, prevent because aligning that improper to cause floating platform stop pin to insert right The pin-and-hole 31 answered and the housing of floating platform stop pin and spud leg section is caused to damage.Settable multiple floating platform locking device 73, distribution In four angles of chamfer of floating platform body 71, with each guide plate 3 of the housing of correspondence spud leg section, so as to ensure uniform point of load Cloth.
Preferably, as shown in fig. 7, the heater 6 includes that air inlet pipe 61, escaping pipe 62, heat exchanger tube 63, air inlet are oriented to Connecting tube 64, outlet is oriented to connecting tube 65, air inlet electrically-controlled valve 66 and gas outlet electrically-controlled valve 67;The air inlet is oriented to connecting tube 64 and goes out Conductance is connected to connecting tube 65 by heat exchanger tube 63, and the air inlet pipe 61 is oriented to connecting tube 64 and connects with air inlet, the escaping pipe 62 are oriented to connecting tube 65 with outlet connects;The air inlet electrically-controlled valve 66 is installed on air inlet pipe 61, and the gas outlet electrically-controlled valve 67 is installed In escaping pipe 62.
The heater 6 connects the offgas duct of diesel engine unit by air inlet pipe 61, and used heat tail gas enters as added through air inlet pipe 61 Air inlet is sequentially passed through after thermal 6 and is oriented to connecting tube 64, heat exchanger tube 63, outlet guiding connecting tube 65, most afterwards through the row of escaping pipe 62 Go out, used heat tail gas carries out heat exchange in heat exchanger tube 63 and external environment during this, so as to the housing to spud leg section is heated Ice-melt.The air inlet electrically-controlled valve 66 and gas outlet electrically-controlled valve 67 are respectively used to control the input quantity and output quantity of used heat tail gas, to control The degree of heat of refrigerating/heating apparatus 6.The air inlet is oriented to connecting tube 64 and outlet is oriented to connecting tube 65 and may be configured as loop pipe, ring It is around in the surrounding of the housing of spud leg section;Accordingly, many heat exchanger tubes 63 can be set, many heat exchanger tubes 63 are surrounded on the shell of spud leg section The surrounding of body, so as to expand deicing scope, strengthens deicing quality.
Preferably, as shown in fig. 7, also including cleaning device 5, the cleaning device 5 is installed on the top of heater 6; The cleaning device 5 includes cleaning jet pipe 51, water inlet pipe 52, current deflecting connecting tube 53 and water inlet electrically-controlled valve 54, the cleaning Jet pipe 51 is connected with the top of current deflecting connecting tube 53, and the water inlet pipe 52 is connected with the side of current deflecting connecting tube 53; The water inlet electrically-controlled valve 54 is installed on water inlet pipe 52, the cleaning housing of the jet pipe 51 towards spud leg section;Also buffered including anticollision Pad 8, the inner side of the housing towards spud leg section of the current deflecting connecting tube 53 sets the anticollision cushion pad 8.
The housing that the cleaning device 5 is used for when stake is received to the spud leg section is cleaned, big due to containing in seawater Amount salinity, the housing to the spud leg section under the collective effect of sunlight and air produces corrosiveness, therefore sets described clear Cleaning device 5 avoids seawater to the corrosiveness of the housing of the spud leg section, extends the service life of the housing of the spud leg section.Institute State cleaning device 5 and the hot water that clear water or diesel engine are discharged is poured into current deflecting connecting tube 53 by water inlet pipe 52, then current The water for being oriented to connecting tube 53 sprays from cleaning jet pipe 51, the cleaning housing of the jet pipe 51 towards spud leg section, sprays current to stake The housing of leg section is cleaned.The water inlet electrically-controlled valve 54 is used to control the inflow of water inlet pipe 52, to control to spray current Pressure, i.e. cleaning dynamics.The current deflecting connecting tube 53 may be configured as loop pipe, be surrounded on the surrounding of the housing of spud leg section; Accordingly, multiple cleaning jet pipes 51 can be set, multiple cleaning jet pipes 51 are surrounded on the surrounding of the housing of spud leg section, so as to expand Great purge scope, strengthens cleaning quality.The side of the housing towards spud leg section of the current deflecting connecting tube 53 sets described Anticollision cushion pad 8, the anticollision cushion pad 8 plays cushioning effect, can reduce because of the shell of wind wave action cleaning device 5 and spud leg section The gouging abrasion that body occurs.
Preferably, a kind of offshore work platform including the jack up octagon spud leg section.The offshore work platform Including main hull and the jack up octagon spud leg section, the main hull correspondence jack up octagon spud leg section is provided with liquid Pressure bolt-type lifting system, by hydraulic bolt formula lifting system and the jack up octagon spud leg section with the use of causing The jack up octagon spud leg section and main hull can realize relative oscilaltion, and the jack up octagon spud leg section is easy to Assembling, space availability ratio is higher, and bulk strength is high, is prevented effectively from problem of stress concentration, and load capacity is big and reliable and stable, uses the longevity Life length.
The jack up octagon spud leg section of the present embodiment has the advantages that:1. high intensity octagon spud leg section described in It is provided with the housing that cross section is octagonal spud leg section, multiple high intensity octagon spud leg sections close up and are assembled into high intensity eight Side shape spud leg, compared with existing cylindrical leg, the high intensity octagon spud leg section is easy to assembling, and space availability ratio is more It is high;2. the landing slab main rib 15 and multiple landing slab time ribs 16 are set, increase the bulk strength of landing slab 101, and effectively The problem of the middle part stress concentration of landing slab 101 is avoided, makes the even intensity everywhere of landing slab 101;3. heater 6 can described in Heating ice-melt is carried out to the housing of spud leg section using the waste heat of offshore work platform diesel engine unit, shell of the ice sheet to spud leg section is eliminated The load of body, greatly improves service life of the spud leg section in severe cold area;4. off working state or marine stormy waves compared with When big, the installation floating platform 7 is locked on the housing of spud leg section by floating platform locking device 73, to avoid being installed because of wind wave action There is abrasion collision between the housing of floating platform 7 and spud leg section, improve safety in utilization.
Know-why of the invention is described above in association with specific embodiment.These descriptions are intended merely to explain of the invention Principle, and can not by any way be construed to limiting the scope of the invention.Based on explanation herein, the technology of this area Personnel associate other specific embodiments of the invention by would not require any inventive effort, these modes fall within Within protection scope of the present invention.

Claims (10)

1. a kind of jack up octagon spud leg section, it is characterised in that:Including platform dividing plate, coaming plate and guide plate, the coaming plate and The housing of guide plate assembling combination pile leg section;
The platform dividing plate is arranged at the inside of the housing of spud leg section;
The platform dividing plate includes landing slab, landing slab main rib and multiple landing slab time ribs, and the side of the landing slab is eight sides Shape, is provided with pipeline receiving opening in the middle part of the landing slab;The landing slab main rib is arranged at the edge of pipeline receiving opening;It is many Side of the individual landing slab time rib in dispersion shape from pipeline receiving opening to landing slab extends, and landing slab time rib one end Connected with landing slab main rib;
The landing slab also includes multiple coaming plate position level edges and multiple guide plate positioning bevelled edge edges, the coaming plate positioning Horizontal edge and guide plate positioning bevelled edge edge are spaced apart in the side of the platform dividing plate;
The inner side of the coaming plate and coaming plate position level edge are welded, and the inner side of the guide plate and guide plate position bevelled edge edge Welding;The guide plate includes multiple pin-and-holes, and the pin-and-hole is longitudinally disposed on the guide plate evenly and at intervals;
Also include heater and floating platform is installed, the heater is installed on installation floating platform, and the installation floating platform is socketed on stake The outside of the housing of leg section, the installation floating platform includes floating platform locking device, the installation floating platform by floating platform locking device and The housing connection of spud leg section.
2. jack up octagon spud leg section according to claim 1, it is characterised in that:The coaming plate is fixed including coaming plate Rib, the coaming plate fixing rib is longitudinally disposed in the inner side of coaming plate;
Accordingly, the landing slab also includes that coaming plate installs groove, and the coaming plate installs groove and is arranged at coaming plate position level side Edge, the coaming plate fixing rib is connected in coaming plate and installs groove.
3. jack up octagon spud leg section according to claim 2, it is characterised in that:The coaming plate fixing rib is bar shaped Rib, it is bar-shaped trough that accordingly the coaming plate installs groove;
Or, the coaming plate fixing rib is T-shaped rib, and it is T-slot that accordingly the coaming plate installs groove.
4. jack up octagon spud leg section according to claim 1, it is characterised in that:The pipeline receiving opening is square Hole, accordingly, the landing slab main rib is square rib.
5. jack up octagon spud leg section according to claim 1, it is characterised in that:Also include overcoat, the protection Layer includes water barrier, the freeze proof layer of anti-corrosion and lubricating layer, and the outside of the coaming plate and the outside of guide plate set successively inside-out Put the freeze proof layer of water barrier, anti-corrosion and lubricating layer;
The thickness of the water barrier is 0.4mm~1.5mm, and the thickness of the freeze proof layer of anti-corrosion is 3.5mm~6mm, lubricating layer Thickness is 0.4mm~2mm.
6. jack up octagon spud leg section according to claim 1, it is characterised in that:The installation floating platform also includes floating platform Body, floating platform water injection pipe, floating platform outlet pipe, floating platform water filling electrically-controlled valve and floating platform water outlet electrically-controlled valve;
The cross section of the floating platform body is octagon, and the floating platform body is socketed on the outside of the housing of spud leg section, described floating The inside of playscript with stage directions body is hollow;
The floating platform water injection pipe is connected with the side of floating platform body, and the floating platform outlet pipe is connected with the opposite side of floating platform body;
The floating platform water filling electrically-controlled valve is installed on floating platform water injection pipe, and the floating platform water outlet electrically-controlled valve is installed on floating platform outlet pipe.
7. jack up octagon spud leg section according to claim 6, it is characterised in that:The floating platform locking device is arranged at The side towards guide plate of floating platform body;
The floating platform locking device includes floating platform stop pin and stop pin actuator, and the floating platform stop pin and the stop pin drive Moving part is connected, and the stop pin actuator drives floating platform stop pin to insert the pin-and-hole of guide plate.
8. jack up octagon spud leg section according to claim 1, it is characterised in that:The heater includes air inlet Pipe, escaping pipe, heat exchanger tube, air inlet are oriented to connecting tube, outlet and are oriented to connecting tube, air inlet electrically-controlled valve and gas outlet electrically-controlled valve;
The air inlet is oriented to connecting tube and is connected by heat exchanger tube with outlet guiding connecting tube, and the air inlet pipe and air inlet are oriented to connection Pipe is connected, and the escaping pipe is oriented to connecting tube and connects with outlet;
The air inlet electrically-controlled valve is installed on air inlet pipe, and the gas outlet electrically-controlled valve is installed on escaping pipe.
9. jack up octagon spud leg section according to claim 1, it is characterised in that:Also include cleaning device, it is described clear Cleaning device is installed on the top of heater;
The cleaning device include cleaning jet pipe, water inlet pipe, current deflecting connecting tube and water inlet electrically-controlled valve, the cleaning jet pipe and The top connection of current deflecting connecting tube, the water inlet pipe is connected with the side of current deflecting connecting tube;
The water inlet electrically-controlled valve is installed on water inlet pipe, housing of the cleaning jet pipe towards spud leg section;
Also include anticollision cushion pad, the inner side of the housing towards spud leg section of the current deflecting connecting tube sets the anticollision and delays Punching pad.
10. a kind of offshore work platform of the jack up octagon spud leg section including described in claim 1 to 9 any one.
CN201710024405.2A 2017-01-13 2017-01-13 A kind of jack up octagon spud leg section and the offshore work platform using it Active CN106759205B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710024405.2A CN106759205B (en) 2017-01-13 2017-01-13 A kind of jack up octagon spud leg section and the offshore work platform using it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710024405.2A CN106759205B (en) 2017-01-13 2017-01-13 A kind of jack up octagon spud leg section and the offshore work platform using it

Publications (2)

Publication Number Publication Date
CN106759205A true CN106759205A (en) 2017-05-31
CN106759205B CN106759205B (en) 2018-12-18

Family

ID=58948469

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710024405.2A Active CN106759205B (en) 2017-01-13 2017-01-13 A kind of jack up octagon spud leg section and the offshore work platform using it

Country Status (1)

Country Link
CN (1) CN106759205B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114198269A (en) * 2021-12-20 2022-03-18 中国石油大学(北京) Anti-ice damping device of offshore wind turbine

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3495806A (en) * 1967-10-26 1970-02-17 John R Sutton Apparatus for raising and lowering an off-shore platform
CN101827979A (en) * 2007-07-30 2010-09-08 荷兰格斯特公司 Jacking system
CN202400264U (en) * 2011-12-15 2012-08-29 广东精铟机械有限公司 Ring beam type continuous lifting system for multifunctional wind generation set mounting ship
CN102728980A (en) * 2012-07-05 2012-10-17 南通中远船务工程有限公司 Method for limiting and positioning octagonal spud leg in folding process
CN105862699A (en) * 2016-06-13 2016-08-17 广东精铟海洋工程股份有限公司 Pin type continuous lifting system for offshore platform and lifting method thereof
CN105967089A (en) * 2016-06-13 2016-09-28 广东精铟海洋工程股份有限公司 Double-acting continuous lifting system for offshore platform and lifting method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3495806A (en) * 1967-10-26 1970-02-17 John R Sutton Apparatus for raising and lowering an off-shore platform
CN101827979A (en) * 2007-07-30 2010-09-08 荷兰格斯特公司 Jacking system
CN202400264U (en) * 2011-12-15 2012-08-29 广东精铟机械有限公司 Ring beam type continuous lifting system for multifunctional wind generation set mounting ship
CN102728980A (en) * 2012-07-05 2012-10-17 南通中远船务工程有限公司 Method for limiting and positioning octagonal spud leg in folding process
CN105862699A (en) * 2016-06-13 2016-08-17 广东精铟海洋工程股份有限公司 Pin type continuous lifting system for offshore platform and lifting method thereof
CN105967089A (en) * 2016-06-13 2016-09-28 广东精铟海洋工程股份有限公司 Double-acting continuous lifting system for offshore platform and lifting method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114198269A (en) * 2021-12-20 2022-03-18 中国石油大学(北京) Anti-ice damping device of offshore wind turbine
CN114198269B (en) * 2021-12-20 2023-09-15 中国石油大学(北京) Anti-icing damping device of offshore wind turbine

Also Published As

Publication number Publication date
CN106759205B (en) 2018-12-18

Similar Documents

Publication Publication Date Title
US9533738B2 (en) Floating body structure
CN106592556B (en) A kind of high intensity octagon spud leg section and use its offshore work platform
US20090178722A1 (en) Otec cold water pipe system
CN102182203B (en) A kind of steel row's formula anemometer tower foundation and anemometer tower structure
CN210592333U (en) Prevent that living beings adhere to ocean buoy
CN106759205B (en) A kind of jack up octagon spud leg section and the offshore work platform using it
CN203294609U (en) Modular fully-connected liquid honeycomb floating plate
CN106677149B (en) A kind of hydraulic continuous jacking system with octagon spud leg
CN109356096A (en) The floated anti-ship of one kind hits multilayer energy-consuming device
CN202936793U (en) Water cooling drum-type diesel pile hammer
CN111119223A (en) Oval multi-cylinder jacket foundation structure
CN201801883U (en) Steel bar type wind measurement tower foundation and wind measurement tower structure
US9786394B2 (en) Component cooling water system for nuclear power plant
CN203797624U (en) Intensively heated tube bundle fixing device suitable for waste heat recovery of supercharged boiler
CN102797258B (en) Cylindrical diesel pile hammer with forced cooling function
CN109305303B (en) Liquid cargo tank containment system with liquid collecting function
CN203612173U (en) Ship fuel oil bunker air head
CN103727520A (en) Intensive heated tube bundle fixing device suitable for supercharged boiler waste heat recovery
CN212294531U (en) Quick water filling type floating breakwater
CN102155284A (en) Cooling water supplying device of diesel engine for wind and electric hoisting and transporting working ship
CN112796368A (en) Method for repairing large-diameter water intake head top cover
CN102030087A (en) Semi-submersible platform for offshore drilling
CN219524193U (en) Wave-resistant type offshore floating type photovoltaic floating body structure in ice area
CN215907959U (en) High-quality corrosion-resistant cylinder cover
CN209069061U (en) Two tube side floating head heat exchangers

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20181226

Address after: 311121 213, room 4, 20 Longtan Road, Cang Qian street, Yuhang District, Hangzhou, Zhejiang.

Patentee after: ZHEJIANG RICH MARINE ENGINEERING TECHNOLOGY SERVICE CO., LTD.

Address before: 528244 the southern side of Jin Feng Road, Fung Chung Village, Lishui Town, Nanhai District, Foshan, Guangdong, China

Patentee before: Guangdong Jing Yin ocean engineering limited company

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210929

Address after: 528244 the southern side of Jin Feng Road, Fung Chung Village, Lishui Town, Nanhai District, Foshan, Guangdong, China

Patentee after: KEEN OFFSHORE ENGINEERING Co.,Ltd.

Patentee after: ZHEJIANG HUA YUN OFFSHORE ENGINEERING & TECHNOLOGY SERVICE Co.,Ltd.

Address before: 311121 213, room 4, 20 Longtan Road, Cang Qian street, Yuhang District, Hangzhou, Zhejiang.

Patentee before: ZHEJIANG HUA YUN OFFSHORE ENGINEERING & TECHNOLOGY SERVICE Co.,Ltd.

TR01 Transfer of patent right