A kind of ring beam formula free of discontinuities jacking system that is used for multi-functional wind-powered electricity generation unit installation ship
Technical field
The utility model relates to the technical field of boats and ships accessory equipment, refers in particular to a kind of ring beam formula free of discontinuities jacking system that multi-functional wind-powered electricity generation unit is installed ship that is used for.
Background technology
Convention in the industry, traditional jacking system that is used for multi-functional wind-powered electricity generation unit installation ship is confined to structure design own, and it promotes with the reduction function and is difficult to realize continuous continuing, and work-hours is long, and energy resource consumption simultaneously is big, is difficult to satisfy the actual condition demand.
Summary of the invention
The purpose of the utility model is to improve the concentration of hydraulic mixture of existing cutter suction dredger, and the ring beam formula free of discontinuities jacking system that multi-functional wind-powered electricity generation unit is installed ship that is used for of a kind of reliable, stable action reasonable in design, energy savings, saving work-hours is provided.
For realizing above-mentioned purpose; The technical scheme that the utility model provided is: a kind of ring beam formula free of discontinuities jacking system that is used for multi-functional wind-powered electricity generation unit installation ship; It includes spud leg, install frame, lifting tower, ring fine strain of millet, shoe, master cylinder, auxiliary cylinder, master cylinder transmission yoke, auxiliary cylinder transmission yoke; Wherein, describedly install upper end and the bottom that frame and ring fine strain of millet correspondence are installed in spud leg, this installs frame and fixes through lifting tower and hull with ring fine strain of millet simultaneously; The shoe correspondence is installed in the bottom, lower end of spud leg; The back earrings of master cylinder and auxiliary cylinder is connected with ring fine strain of millet through the ear pin; Its preceding earrings is connected with the auxiliary cylinder transmission yoke with each self-corresponding master cylinder transmission yoke respectively through the ear pin, is equipped with the set pin that can insert or extract the spud leg pin-and-hole in master cylinder transmission yoke and the auxiliary cylinder transmission yoke simultaneously.
Described master cylinder transmission yoke includes set pin, yoke body, ear pin and drives the hydraulic actuating cylinder that this set pin inserted or extracted the spud leg pin-and-hole; Wherein, Described set pin interts in the middle part of yoke body; While ear pin symmetry is interted at the opposite end of this yoke body, matches with the preceding earrings of each self-corresponding master cylinder respectively.
Described auxiliary cylinder transmission yoke includes set pin, yoke body, ear pin and drives the hydraulic actuating cylinder that this set pin inserted or extracted the spud leg pin-and-hole; Wherein, Described set pin interts in the middle part of yoke body; While ear pin symmetry is interted at the opposite end of this yoke body, matches with the preceding earrings of each self-corresponding auxiliary cylinder respectively.
Described each master cylinder transmission yoke is connected with two master cylinders.
Described each auxiliary cylinder transmission yoke is connected with two auxiliary cylinders.
Described yoke body assumes diamond in shape.
Described yoke body assumes diamond in shape.
The utility model is after having adopted such scheme, and its great advantage is that lifting of the utility model and reduction can realize that all free of discontinuities continues, and practices thrift work-hours; The utility model reduced spud leg, promotes the hull action and promoted spud leg, reduction hull motion flow is identical for energy savings while, but system pressure is different.
Description of drawings
Fig. 1 is the integral structure scheme drawing of the utility model.
Fig. 2 is the birds-eye view of the utility model.
Partial schematic diagram when Fig. 3 reduces spud leg for the utility model.
Partial schematic diagram when Fig. 4 promotes spud leg for the utility model.
Fig. 5 is the birds-eye view of the utility model master cylinder transmission yoke or auxiliary cylinder transmission yoke.
Fig. 6 is the front view of the utility model master cylinder transmission yoke or auxiliary cylinder transmission yoke.
The specific embodiment
Below in conjunction with specific embodiment the utility model is described further.
Shown in accompanying drawing 1 to accompanying drawing 6; The described ring beam formula free of discontinuities jacking system that is used for multi-functional wind-powered electricity generation unit installation ship of present embodiment; It includes spud leg 1, install frame 2, lifting tower 3, ring fine strain of millet 4, shoe 5, master cylinder 6, auxiliary cylinder 7, master cylinder transmission yoke 8, auxiliary cylinder transmission yoke 9; Wherein, describedly install upper end and the bottom that frame 2 and ring fine strain of millet 4 correspondences are installed in spud leg 1, this installs frame 2 and fixes through lifting tower 3 and hull with ring fine strain of millet 4 simultaneously; Shoe 5 correspondences are installed in the bottom, lower end of spud leg 1; The back earrings 6-1 of master cylinder 6 and auxiliary cylinder 7,7-1 are connected with ring fine strain of millet 4 through the ear pin; Its preceding earrings 6-2,7-2 are connected with auxiliary cylinder transmission yoke 9 with each self-corresponding master cylinder transmission yoke 8 respectively through the ear pin; Master cylinder transmission yoke 8 includes set pin 8-1, rhombus yoke body 8-2, ear pin 8-3 and drives the hydraulic actuating cylinder 8-4 that this set pin 8-1 inserted or extracted spud leg 1 pin-and-hole simultaneously; Wherein, described set pin 8-1 interts in the middle part of rhombus yoke body 8-2, and while ear pin 8-3 symmetry is interted at the opposite end of this rhombus yoke body 8-2; And be on the same horizontal surface (make stressed evenly) with set pin 8-1, match with the preceding earrings 6-2 of each self-corresponding master cylinder 6 respectively.And auxiliary cylinder transmission yoke 9 includes set pin 9-1, rhombus yoke body 9-2, ear pin 9-3 and drive the hydraulic actuating cylinder 9-4 that this set pin 9-1 inserted or extracted spud leg 1 pin-and-hole; Wherein, Described set pin 9-1 interts in the middle part of rhombus yoke body 9-2; Simultaneously ear pin 9-3 symmetry is interted the opposite end at this rhombus yoke body 9-2, and is on the same horizontal surface (make stressed evenly) with set pin 9-1, matches with the preceding earrings 7-2 of each self-corresponding auxiliary cylinder 7 respectively.In addition; Master cylinder transmission yoke 8 described in the present embodiment all has two with auxiliary cylinder transmission yoke 9; They are circular layout around the outside face of spud leg 1; And auxiliary cylinder transmission yoke 9 of corresponding clip between two master cylinder transmission yokes 8, each master cylinder transmission yoke 8 is connected with two master cylinders 6 simultaneously, and each auxiliary cylinder transmission yoke 9 is connected with two auxiliary cylinders 7.During work; After multi-functional wind-powered electricity generation unit installation ship moves to the work area; Reduce spud leg 1 through this ring beam formula free of discontinuities jacking system, shoe 5 is contacted and compacting with the seabed, promote hull or reduce hull through this ring beam formula free of discontinuities jacking system according to need of work again; And when multi-functional wind-powered electricity generation unit is installed ship and need be moved to other work areas, promote spud leg through this ring beam formula free of discontinuities jacking system earlier, make and ship is installed is moved again after aweigh.
The detailed process of the action of the utility model reduction spud leg 1, the action that promotes hull and lifting spud leg 1, reduction hull is following:
One, reduce the action of spud leg 1, lifting hull: master cylinder 6 piston rods stretch out, and the set pin 8-1 of master cylinder transmission yoke 8 inserts in spud leg 1 pin-and-hole, and the set pin 9-1 of auxiliary cylinder transmission yoke 9 extracts.Master cylinder 6 rod chamber oil-feeds; The set pin 9-1 that reduces spud leg 1 or lifting hull to auxiliary cylinder transmission yoke 9 inserts in spud leg 1 pin-and-hole; The set pin 8-1 of master cylinder transmission yoke 8 is extracted; Master cylinder 6 rodless cavity oil-feed piston rods extend out to next pin-and-hole and the set pin 8-1 of master cylinder transmission yoke 8 are inserted in spud leg 1 pin-and-hole again, so move in circles.
Two, promote the action of spud leg 1, reduction hull: the withdrawal of master cylinder 6 piston rods, the set pin 8-1 of master cylinder transmission yoke 8 inserts in spud leg 1 pin-and-hole, and the set pin 9-1 of auxiliary cylinder transmission yoke 9 extracts.Master cylinder 6 rodless cavity oil-feeds; The set pin 9-1 that promotes spud leg 1 or reduction hull to auxiliary cylinder transmission yoke 9 inserts in spud leg 1 pin-and-hole; The set pin 8-1 of master cylinder transmission yoke 8 is extracted; Master cylinder 6 rod chamber oil-feed piston rods are retracted to next pin-and-hole and the set pin 8-1 of master cylinder transmission yoke 8 are inserted in spud leg 1 pin-and-hole again, so move in circles.
After adopting above design, the utility model is applicable to multi-functional wind-powered electricity generation unit installation ship, drives through hydraulic efficiency pressure system, can realize the free of discontinuities lifting action, practices thrift work-hours; The utility model reduced spud leg, promotes the hull action and promoted spud leg, reduction hull motion flow is identical for energy savings while, but system pressure is different.
The embodiment of the above is the preferred embodiment of the utility model only, is not the practical range that limits the utility model with this, so the variation that all shapes according to the utility model, principle are done all should be encompassed in the protection domain of the utility model.