CN106758863B - A kind of overall fan-shaped across the width method for traversing of mobile formwork girder - Google Patents

A kind of overall fan-shaped across the width method for traversing of mobile formwork girder Download PDF

Info

Publication number
CN106758863B
CN106758863B CN201611009922.4A CN201611009922A CN106758863B CN 106758863 B CN106758863 B CN 106758863B CN 201611009922 A CN201611009922 A CN 201611009922A CN 106758863 B CN106758863 B CN 106758863B
Authority
CN
China
Prior art keywords
girder
flat car
traversing
width
mould bases
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611009922.4A
Other languages
Chinese (zh)
Other versions
CN106758863A (en
Inventor
应虹
党权交
刘让群
杨军宏
张铮
周继军
胡逢辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Road and Bridge East China Engineering Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Road and Bridge East China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, Road and Bridge East China Engineering Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN201611009922.4A priority Critical patent/CN106758863B/en
Publication of CN106758863A publication Critical patent/CN106758863A/en
Application granted granted Critical
Publication of CN106758863B publication Critical patent/CN106758863B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/06Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a kind of overall fan-shaped across the width method for traversing of mobile formwork girder.Widen using original assembled place and suitably, realize mobile formwork girder sector across traversing using hydraulic flat car.This method accelerates construction progress while construction machinery cost is saved, and can greatly improve construction efficiency.It avoids the secondary spelling of mobile formwork girder from tearing open, secondary precompressed, reduces mechanical equipment and personnel's input, saves construction cost, accelerate construction progress.

Description

A kind of overall fan-shaped across the width method for traversing of mobile formwork girder
Technical field
The present invention relates to mobile formwork ground to turn width traversing construction, and particularly a kind of overall sector of mobile formwork girder is across width Method for traversing.
Background technology
Standard Span Continuous cast-in-situ box girder part uses Construction Through Form on Traveler on highway at present, in order to reduce the throwing of construction Enter, typically first constructed a width using a set of mobile formwork, Dismantling of Movable Shuttering Form is gone into another width weight after single width of having constructed It is new to carry out assembly, then utilize assembled mobile formwork to carry out another width construction of cast-in-situ box-beam.Such a method there are mobile formwork Girder needs the shortcomings of secondary spelling is torn open, time-consuming for secondary precompressed, and how costly mechanical equipment input is.
The content of the invention
It is an object of the invention to provide a kind of overall fan-shaped across the width method for traversing of mobile formwork girder, mainly solve above-mentioned Technical problem present in the prior art, it avoids the secondary spelling of mobile formwork girder from tearing open, secondary precompressed, reduces mechanical equipment and people Member's input, saves construction cost, accelerates construction progress.
To achieve the above object, the technical scheme is that:
A kind of overall fan-shaped across the width method for traversing of mobile formwork girder, it is characterised in that:
This method implement condition be:
A, cast-in-situ box girder uses Construction Through Form on Traveler, and double width only puts into a set of mould bases;
B, there is the traversing construction place of larger area, and place foundation bearing capacity is preferable;
C, hydraulic flat car 1;
The construction process of this method:
A, original assembled place is carried out smooth and widened, digging machine crawler belt rolls repeatedly on traversing place, to ensure field The bearing capacity on ground;
Temporary rest pier at 4 is set per Pin girders position, below casting concrete Extended chemotherapy B,;
C, dropped down onto when right width mould bases is transferred to ground from bridge on temporary rest pier;
D, jack is set near front end and rearmost end temporary rest pier, need to stagger hydraulic flat car entrucking position Put, hydraulic flat car is moved to girder treats holding position;
E, hydraulic flat car turntable is highly adjusted, and the jacking of mould bases girder is left temporary rest pier, hydraulic pressure wooden handcart headstock can be certainly Row is in place, and the tailstock is in place by loading machine;Headstock is located in girder termination, and the tailstock is located in away from girder other end neighbouring position;
F, jack oil return makes girder drop down onto on hydraulic flat car turntable, removes temporary rest pier, in hydraulic flat car Recruitment steel welded limiting prevents transverse shifting on turntable, and girder is fixed on hydraulic flat car to drawing with chain block prevents from inclining Cover;
G, mould bases girder is gone to left width by hydraulic flat car with fan-shaped circuit by right width, is set in Extended chemotherapy position interim Buttress, leaves flat car turntable, flat car is opened from below mould bases girder by jack by girder jacking;
H, jack oil return, mould bases girder are dropped down onto on left width temporary rest pier, and mould bases list Pin girders complete sector across width It is traversing;
I, repeat the above steps D-H, completes across the width traversing construction of another Pin girders;
J, overall fan-shaped across the width traversing construction of mould bases girder is completed.
The invention has the advantages that:
Secondary inventive process avoids girder tears spelling and secondary precompressed open, substantial saving in tear open and spells needed for mould bases girder It is manually and mechanical, and without largely preparing prepressing materials again, construction efficiency is substantially increased, it is with good economic efficiency.
Brief description of the drawings
Fig. 1 is the structure diagram of temporary rest pier in the present invention.
Fig. 2 is the structure diagram for removing temporary rest pier in the present invention by jack.
Fig. 3 is traversing situation schematic diagram one in the method for the present invention.
Fig. 4 is traversing situation schematic diagram two in the method for the present invention.
Fig. 5 is traversing situation schematic diagram three in the method for the present invention.
Embodiment
The invention discloses a kind of overall fan-shaped across the width method for traversing of mobile formwork girder.Below in conjunction with an embodiment come into One step introduces the method for the present invention.
It is applicable in the precondition of the method for the present invention:
(1)Cast-in-situ box girder uses Construction Through Form on Traveler, and double width only puts into a set of mould bases.
(2)Traversing construction place with larger area, and place foundation bearing capacity is preferable.
(3)Rated load is the hydraulic flat car 1 of 200t.
The construction process of the method for the present invention is:
1st, original assembled place is carried out smooth and widened, digging machine crawler belt rolls repeatedly on traversing place, to ensure field The bearing capacity on ground.
2nd, per Pin girders 1(Lower part has cushion block 14)Position sets temporary rest pier at 4, as shown in Figure 1:Temporary rest pier is by straight Footpath 800mm steel pipes 11 and 2I45 shaped steel 12(There can be stiffener 15)Composition, casting concrete Extended chemotherapy 13, expands below Basic 13 sizes are 2.5 × 1.2 × 0.8m.Consider that hydraulic flat car needs ground on the scene to travel back and forth, basic top surface and ground are neat It is flat.
3rd, dropped down onto when right width mould bases is transferred to ground from bridge on temporary rest pier, temporary rest pier is apart from ground level 1.3m。
The 4th, jack 2 is set near front end and rearmost end temporary rest pier(Stagger hydraulic flat car entrucking position Put), hydraulic flat car is moved into girder and treats holding position.
5th, the turntable 31 of hydraulic flat car 3,32 height can be adjusted between 1m-1.4m, and the jacking of mould bases girder is left and is faced When buttress about 5cm, hydraulic pressure wooden handcart headstock can be voluntarily in place, and the tailstock is in place by loading machine.Headstock is located in girder termination, the tailstock It is located in away from girder other end 15m positions.
6th, such as Fig. 2,2 oil return of jack make girder 1 drop down onto on the turntable 32 of hydraulic flat car 3, remove temporary rest pier, Recruitment steel welded limiting prevents transverse shifting on hydraulic flat car turntable, and girder is fixed on hydraulic pressure to drawing with 5T chain blocks Flat car prevents from toppling.
Mould bases girder is gone to left width by the 7th, such as Fig. 3,4, hydraulic flat car with fan-shaped circuit by right width, in Extended chemotherapy position Temporary rest pier is set, girder jacking is left by flat car turntable by jack, flat car is opened from below mould bases girder.
8th, jack oil return, mould bases girder are dropped down onto on left width temporary rest pier, and mould bases list Pin girders complete sector across width It is traversing, such as Fig. 5.
9th, repeat above-mentioned step and play 4-8, complete across the width traversing construction of another Pin girders.
10th, overall fan-shaped across the width traversing construction of mould bases girder is completed.
It is only presently preferred embodiments of the present invention in summary, is not used for limiting the practical range of the present invention.It is i.e. all The equivalent changes and modifications made according to the content of scope of the present invention patent, all should be the technology category of the present invention.

Claims (1)

  1. A kind of 1. overall fan-shaped across the width method for traversing of mobile formwork girder, it is characterised in that:
    This method implement condition be:
    A, cast-in-situ box girder uses Construction Through Form on Traveler, and double width only puts into a set of mould bases;
    B, there is the traversing construction place of larger area, and place foundation bearing capacity is preferable;
    C, hydraulic flat car 1;
    The construction process of this method:
    A, original assembled place is carried out smooth and widened, digging machine crawler belt rolls repeatedly on traversing place, to ensure place Bearing capacity;
    Temporary rest pier at 4 is set per Pin girders position, below casting concrete Extended chemotherapy B,;
    C, dropped down onto when right width mould bases is transferred to ground from bridge on temporary rest pier;
    D, jack is set near front end and rearmost end temporary rest pier, need to stagger hydraulic flat car entrucking position, will Hydraulic flat car moves to girder and treats holding position;
    E, hydraulic flat car turntable is highly adjusted, and the jacking of mould bases girder is left temporary rest pier, hydraulic flat car headstock can be voluntarily In place, the tailstock is in place by loading machine;Headstock is located in girder termination, and the tailstock is located in girder other end neighbouring position;
    F, jack oil return makes girder drop down onto on hydraulic flat car turntable, removes temporary rest pier, in hydraulic flat car turntable Upper recruitment steel welded limiting prevents transverse shifting, and girder is fixed on hydraulic flat car to drawing with chain block prevents from toppling;
    G, mould bases girder is gone to left width by hydraulic flat car with fan-shaped circuit by right width, and interim branch is set in Extended chemotherapy position Pier, leaves flat car turntable, flat car is opened from below mould bases girder by jack by girder jacking;
    H, jack oil return, mould bases girder are dropped down onto on left width temporary rest pier, and mould bases list Pin girders are completed fan-shaped across traversing;
    I, repeat the above steps D-H, completes across the width traversing construction of another Pin girders;
    J, overall fan-shaped across the width traversing construction of mould bases girder is completed.
CN201611009922.4A 2016-11-17 2016-11-17 A kind of overall fan-shaped across the width method for traversing of mobile formwork girder Active CN106758863B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611009922.4A CN106758863B (en) 2016-11-17 2016-11-17 A kind of overall fan-shaped across the width method for traversing of mobile formwork girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611009922.4A CN106758863B (en) 2016-11-17 2016-11-17 A kind of overall fan-shaped across the width method for traversing of mobile formwork girder

Publications (2)

Publication Number Publication Date
CN106758863A CN106758863A (en) 2017-05-31
CN106758863B true CN106758863B (en) 2018-05-04

Family

ID=58968825

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611009922.4A Active CN106758863B (en) 2016-11-17 2016-11-17 A kind of overall fan-shaped across the width method for traversing of mobile formwork girder

Country Status (1)

Country Link
CN (1) CN106758863B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030027275A (en) * 2001-09-28 2003-04-07 브이에스엘코리아 주식회사 The construction equipment for minimizing the number of operation holes developed during the construction of the Bridge with Movable Scaffolding System
CN202658527U (en) * 2012-06-27 2013-01-09 中铁四局集团机电设备安装有限公司 Full-hydraulic linkage hole passing device for form traveler
CN104074142A (en) * 2014-07-11 2014-10-01 四川川交路桥有限责任公司 Box beam cast-in-place support whole-horizontal-moving construction method
CN104762881A (en) * 2015-03-31 2015-07-08 中交二航局第四工程有限公司 Method for transversely moving mobile formwork girder integrally
CN105463993A (en) * 2015-11-24 2016-04-06 中铁大桥局集团有限公司 Movable formwork suitable for multiple beams and construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030027275A (en) * 2001-09-28 2003-04-07 브이에스엘코리아 주식회사 The construction equipment for minimizing the number of operation holes developed during the construction of the Bridge with Movable Scaffolding System
CN202658527U (en) * 2012-06-27 2013-01-09 中铁四局集团机电设备安装有限公司 Full-hydraulic linkage hole passing device for form traveler
CN104074142A (en) * 2014-07-11 2014-10-01 四川川交路桥有限责任公司 Box beam cast-in-place support whole-horizontal-moving construction method
CN104762881A (en) * 2015-03-31 2015-07-08 中交二航局第四工程有限公司 Method for transversely moving mobile formwork girder integrally
CN105463993A (en) * 2015-11-24 2016-04-06 中铁大桥局集团有限公司 Movable formwork suitable for multiple beams and construction method

Also Published As

Publication number Publication date
CN106758863A (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN105155423A (en) Upward moving type movable formwork for continuous box girder construction
CN107044090B (en) A kind of construction method of dual deck bridge
CN103195450B (en) Hydraulic pressure tunnel invert operation trolley and inverted arch construction method
CN108442255A (en) A kind of mobile formwork bridge fabrication machine and the construction method of cast-in-place bridging
CN102660925B (en) Moveable formwork for variable-width curved bridge
CN103669217B (en) A kind of rear-support hanging basket and its entirety change width method for traversing
CN106976157A (en) A kind of post stretching precast beam pedestal for being applicable different length and cross sectional shape
CN108098982A (en) Large-span Precast box beam hydraulic deploying and retracting internal mold
CN103774558A (en) Automatic travelling type moveable formwork used in bridge construction
CN105544409B (en) Double guide beam bridge erecting machine sets up combination beam and now spells a section girder steel construction technology
JP5890060B1 (en) Bridge dismantling method using erection girder
CN106758863B (en) A kind of overall fan-shaped across the width method for traversing of mobile formwork girder
CN107858929A (en) Cast-in-situ Beam form fixer is filled with and removed the construction method of cast-in-place beam forms
CN102225580B (en) Method for longitudinally moving box girder internal mold
CN210827111U (en) Environment-friendly down self-propelled steel trestle structure
CN208430437U (en) A kind of mobile formwork bridge fabrication machine
CN212294398U (en) Integrally-moving type box culvert template
CN210361895U (en) Prefabricated field opening and closing door type protective steel plate trolley
CN113073556A (en) Descending type beam mold combination movable mold frame and construction method thereof
CN207027858U (en) A kind of post stretching precast beam pedestal for being applicable different length and cross sectional shape
CN207714162U (en) Across existing railway Business Line freely-supported tied arch pushing tow flat turn and high-order fall girder apparatus
JP3029378B2 (en) Installation method of bridge girder formwork device and its removal method
CN213653212U (en) Self-propelled cast-in-place box girder integrated bridge construction machine
CN110863419B (en) Mobile trestle for underpass tunnel and construction method thereof
CN208857707U (en) A kind of pushing tow prefabricated platform of band lifting and guide function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant