CN106758863A - A kind of overall fan-shaped across the width method for traversing of mobile formwork girder - Google Patents
A kind of overall fan-shaped across the width method for traversing of mobile formwork girder Download PDFInfo
- Publication number
- CN106758863A CN106758863A CN201611009922.4A CN201611009922A CN106758863A CN 106758863 A CN106758863 A CN 106758863A CN 201611009922 A CN201611009922 A CN 201611009922A CN 106758863 A CN106758863 A CN 106758863A
- Authority
- CN
- China
- Prior art keywords
- girder
- flat car
- traversing
- width
- mould bases
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/06—Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The present invention relates to a kind of overall fan-shaped across the width method for traversing of mobile formwork girder.Widen using original assembled place and suitably, realize that mobile formwork girder is fan-shaped across traversing using hydraulic flat car.The method accelerating construction progress while construction machinery cost is saved, can greatly improve efficiency of construction.It avoids the secondary spelling of mobile formwork girder from tearing open, secondary precompressed, reduces plant equipment and personnel's input, saves construction cost, accelerating construction progress.
Description
Technical field
Turn width traversing construction the present invention relates to mobile formwork ground, particularly a kind of overall sector of mobile formwork girder is across width
Method for traversing.
Background technology
Standard Span Continuous cast-in-situ box girder part uses Construction Through Form on Traveler on current highway, in order to reduce the throwing of construction
Enter, typically all first constructed a width using a set of mobile formwork, Dismantling of Movable Shuttering Form is gone into another width weight after single width of having constructed
Assembly newly is carried out, then another width construction of cast-in-situ box-beam is carried out using assembled mobile formwork.This kind of method there are mobile formwork
Girder needs the shortcomings of secondary spelling is torn open, time-consuming for secondary precompressed, and how costly plant equipment input is.
The content of the invention
It is an object of the invention to provide a kind of overall fan-shaped across the width method for traversing of mobile formwork girder, mainly solve above-mentioned
Technical problem existing for prior art, it avoids the secondary spelling of mobile formwork girder from tearing open, secondary precompressed, reduces plant equipment and people
Member's input, saves construction cost, accelerating construction progress.
To achieve the above object, the technical scheme is that:
A kind of overall fan-shaped across the width method for traversing of mobile formwork girder, it is characterised in that:
The method implement condition be:
A, cast-in-situ box girder use Construction Through Form on Traveler, and double width only puts into a set of mould bases;
B, the traversing construction place with larger area, and place foundation bearing capacity is preferable;
C, hydraulic flat car 1;
The construction process of the method:
A, original assembled place is carried out smooth and is widened, digging machine crawler belt is rolled repeatedly on traversing place, to ensure place
Bearing capacity;
B, every Pin girders position set temporary rest pier at 4, below casting concrete Extended chemotherapy;
C, right width mould bases are dropped down onto on temporary rest pier when being transferred from bridge to ground;
D, jack is being set near rearmost end temporary rest pier foremost, need to stagger hydraulic flat car entrucking position, will
Hydraulic flat car moves to girder and treats holding position;
E, hydraulic flat car rotating disk are highly adjusted, and mould bases girder jacking is left into temporary rest pier, and hydraulic pressure wooden handcart headstock can voluntarily
Position, the tailstock is in place by loading machine;Headstock is located in girder termination, and the tailstock is located in away from girder other end neighbouring position;
F, jack oil return make girder drop down onto on hydraulic flat car rotating disk, remove temporary rest pier, in hydraulic flat car rotating disk
Upper recruitment steel welded limiting prevents transverse shifting, and girder is fixed on into hydraulic flat car to drawing with chain block prevents from toppling;
Mould bases girder is gone to left width by G, hydraulic flat car with fan-shaped circuit by right width, and interim branch is set in Extended chemotherapy position
Pier, flat car rotating disk is left by jack by girder jacking, and flat car is opened from mould bases girder lower section;
H, jack oil return, mould bases girder are dropped down onto on left width temporary rest pier, and mould bases list Pin girders complete fan-shaped across traversing;
I, repeat the above steps D-H, completes across the width traversing construction of another Pin girders;
Overall fan-shaped across the width traversing construction of J, mould bases girder is completed.
The invention has the advantages that:
Inventive process avoids girder it is secondary tear open spelling and secondary precompressed, substantial saving in tear open spell mould bases girder needed for it is artificial
And machinery, and prepare prepressing materials without a large amount of again, efficiency of construction is substantially increased, with good economic benefit.
Brief description of the drawings
Fig. 1 is the structural representation of temporary rest pier in the present invention.
Fig. 2 is the structural representation for removing temporary rest pier in the present invention by jack.
Fig. 3 is traversing situation schematic diagram one in the inventive method.
Fig. 4 is traversing situation schematic diagram two in the inventive method.
Fig. 5 is traversing situation schematic diagram three in the inventive method.
Specific embodiment
The invention discloses a kind of overall fan-shaped across the width method for traversing of mobile formwork girder.Enter below in conjunction with an embodiment
One step introduces the inventive method.
It is applicable the precondition of the inventive method:
(1)Cast-in-situ box girder uses Construction Through Form on Traveler, and double width only puts into a set of mould bases.
(2)Traversing construction place with larger area, and place foundation bearing capacity is preferable.
(3)Rated load is the hydraulic flat car 1 of 200t.
The construction process of the inventive method is:
1st, original assembled place is carried out smooth and is widened, digging machine crawler belt is rolled repeatedly on traversing place, to ensure place
Bearing capacity.
2nd, per Pin girders 1(Bottom has cushion block 14)Position sets temporary rest pier at 4, as shown in Figure 1:Temporary rest pier is by straight
Footpath 800mm steel pipe 11 and 2I45 shaped steel 12(There can be stiffener 15)Composition, casting concrete Extended chemotherapy 13, expands below
Basic 13 sizes are 2.5 × 1.2 × 0.8m.Consider that hydraulic flat car needs ground on the scene to travel back and forth, basic top surface is neat with ground
It is flat.
3rd, dropped down onto on temporary rest pier when right width mould bases is transferred to ground from bridge, temporary rest pier is apart from ground level
1.3m。
4th, jack 2 is being set near rearmost end temporary rest pier foremost(Stagger hydraulic flat car entrucking position
Put), hydraulic flat car is moved into girder and treats holding position.
5th, the rotating disk 31 of hydraulic flat car 3,32 height can be adjusted between 1m-1.4m, mould bases girder jacking is left and is faced
When buttress about 5cm, hydraulic pressure wooden handcart headstock can be voluntarily in place, and the tailstock is in place by loading machine.Headstock is located in girder termination, the tailstock
It is located in away from girder other end 15m positions.
6th, such as Fig. 2, the oil return of jack 2 makes girder 1 drop down onto on the rotating disk 32 of hydraulic flat car 3, removes temporary rest pier,
Recruitment steel welded limiting prevents transverse shifting on hydraulic flat car rotating disk, and girder is fixed on into hydraulic pressure to drawing with 5T chain blocks
Flat car prevents from toppling.
Mould bases girder is gone to left width by the 7th, such as Fig. 3,4, hydraulic flat car with fan-shaped circuit by right width, in Extended chemotherapy position
Temporary rest pier is set, girder jacking is left by flat car rotating disk by jack, flat car is opened from mould bases girder lower section.
8th, jack oil return, mould bases girder is dropped down onto on left width temporary rest pier, and mould bases list Pin girders complete sector across width
It is traversing, such as Fig. 5.
9th, repeat above-mentioned step and play 4-8, complete across the width traversing construction of another Pin girders.
10th, overall fan-shaped across the width traversing construction of mould bases girder is completed.
It is only in sum presently preferred embodiments of the present invention, not for limiting practical range of the invention.It is i.e. all
The equivalence changes made according to the content of scope of the present invention patent and modification, all should be technology category of the invention.
Claims (1)
1. overall fan-shaped across the width method for traversing of a kind of mobile formwork girder, it is characterised in that:
The method implement condition be:
A, cast-in-situ box girder use Construction Through Form on Traveler, and double width only puts into a set of mould bases;
B, the traversing construction place with larger area, and place foundation bearing capacity is preferable;
C, hydraulic flat car 1;
The construction process of the method:
A, original assembled place is carried out smooth and is widened, digging machine crawler belt is rolled repeatedly on traversing place, to ensure place
Bearing capacity;
B, every Pin girders position set temporary rest pier at 4, below casting concrete Extended chemotherapy;
C, right width mould bases are dropped down onto on temporary rest pier when being transferred from bridge to ground;
D, jack is being set near rearmost end temporary rest pier foremost, need to stagger hydraulic flat car entrucking position, will
Hydraulic flat car moves to girder and treats holding position;
E, hydraulic flat car rotating disk are highly adjusted, and mould bases girder jacking is left into temporary rest pier, and hydraulic pressure wooden handcart headstock can voluntarily
Position, the tailstock is in place by loading machine;Headstock is located in girder termination, and the tailstock is located in away from girder other end neighbouring position;
F, jack oil return make girder drop down onto on hydraulic flat car rotating disk, remove temporary rest pier, in hydraulic flat car rotating disk
Upper recruitment steel welded limiting prevents transverse shifting, and girder is fixed on into hydraulic flat car to drawing with chain block prevents from toppling;
Mould bases girder is gone to left width by G, hydraulic flat car with fan-shaped circuit by right width, and interim branch is set in Extended chemotherapy position
Pier, flat car rotating disk is left by jack by girder jacking, and flat car is opened from mould bases girder lower section;
H, jack oil return, mould bases girder are dropped down onto on left width temporary rest pier, and mould bases list Pin girders complete fan-shaped across traversing;
I, repeat the above steps D-H, completes across the width traversing construction of another Pin girders;
Overall fan-shaped across the width traversing construction of J, mould bases girder is completed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611009922.4A CN106758863B (en) | 2016-11-17 | 2016-11-17 | A kind of overall fan-shaped across the width method for traversing of mobile formwork girder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611009922.4A CN106758863B (en) | 2016-11-17 | 2016-11-17 | A kind of overall fan-shaped across the width method for traversing of mobile formwork girder |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106758863A true CN106758863A (en) | 2017-05-31 |
CN106758863B CN106758863B (en) | 2018-05-04 |
Family
ID=58968825
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611009922.4A Active CN106758863B (en) | 2016-11-17 | 2016-11-17 | A kind of overall fan-shaped across the width method for traversing of mobile formwork girder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106758863B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20030027275A (en) * | 2001-09-28 | 2003-04-07 | 브이에스엘코리아 주식회사 | The construction equipment for minimizing the number of operation holes developed during the construction of the Bridge with Movable Scaffolding System |
CN202658527U (en) * | 2012-06-27 | 2013-01-09 | 中铁四局集团机电设备安装有限公司 | Full-hydraulic linkage hole passing device for form traveler |
CN104074142A (en) * | 2014-07-11 | 2014-10-01 | 四川川交路桥有限责任公司 | Box beam cast-in-place support whole-horizontal-moving construction method |
CN104762881A (en) * | 2015-03-31 | 2015-07-08 | 中交二航局第四工程有限公司 | Method for transversely moving mobile formwork girder integrally |
CN105463993A (en) * | 2015-11-24 | 2016-04-06 | 中铁大桥局集团有限公司 | Movable formwork suitable for multiple beams and construction method |
-
2016
- 2016-11-17 CN CN201611009922.4A patent/CN106758863B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20030027275A (en) * | 2001-09-28 | 2003-04-07 | 브이에스엘코리아 주식회사 | The construction equipment for minimizing the number of operation holes developed during the construction of the Bridge with Movable Scaffolding System |
CN202658527U (en) * | 2012-06-27 | 2013-01-09 | 中铁四局集团机电设备安装有限公司 | Full-hydraulic linkage hole passing device for form traveler |
CN104074142A (en) * | 2014-07-11 | 2014-10-01 | 四川川交路桥有限责任公司 | Box beam cast-in-place support whole-horizontal-moving construction method |
CN104762881A (en) * | 2015-03-31 | 2015-07-08 | 中交二航局第四工程有限公司 | Method for transversely moving mobile formwork girder integrally |
CN105463993A (en) * | 2015-11-24 | 2016-04-06 | 中铁大桥局集团有限公司 | Movable formwork suitable for multiple beams and construction method |
Also Published As
Publication number | Publication date |
---|---|
CN106758863B (en) | 2018-05-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105155423A (en) | Upward moving type movable formwork for continuous box girder construction | |
CN102094392B (en) | Lower supported hanging basket in bridge construction and application thereof | |
CN103195450B (en) | Hydraulic pressure tunnel invert operation trolley and inverted arch construction method | |
CN103669217B (en) | A kind of rear-support hanging basket and its entirety change width method for traversing | |
CN102660925B (en) | Moveable formwork for variable-width curved bridge | |
CN106976157A (en) | A kind of post stretching precast beam pedestal for being applicable different length and cross sectional shape | |
CN103774558A (en) | Automatic travelling type moveable formwork used in bridge construction | |
CN105544409B (en) | Double guide beam bridge erecting machine sets up combination beam and now spells a section girder steel construction technology | |
CN108098982A (en) | Large-span Precast box beam hydraulic deploying and retracting internal mold | |
CN109797659A (en) | A kind of mobile asynchronous construction method of bracket of Wavelike steel webplate continuous bridge | |
CN105970822B (en) | 50m double-width upward moving type movable formwork and corresponding beam manufacturing construction method thereof | |
CN106758863B (en) | A kind of overall fan-shaped across the width method for traversing of mobile formwork girder | |
CN106192761B (en) | A kind of method for disassembling mobile formwork in the narrow short transition time section of bridge tunnel | |
CN204715212U (en) | A kind of guiding device for mobile formwork girder whole lateral moving | |
CN208430437U (en) | Movable formwork bridge fabrication machine | |
CN216712609U (en) | Novel cover digs interim road surface structure of construction | |
CN206538737U (en) | Aqueduct is all-hydraulic to open self-propelled template system | |
CN211340371U (en) | Under tunnel removes landing stage | |
CN108004908A (en) | A kind of lattice-type steel truss pylon cable-stayed bridge | |
CN110593117B (en) | Steel box girder installation system and construction method thereof | |
CN207027858U (en) | A kind of post stretching precast beam pedestal for being applicable different length and cross sectional shape | |
CN209923791U (en) | Workpiece for cross-line construction of formwork suspension casting combined system | |
CN203613465U (en) | Inner side move support disassembling device used after joining of coastal area separated-type bridges | |
CN105672131B (en) | It is a kind of first to push up the steel box-girder jacking technique and steel box girder cut afterwards | |
CN201665821U (en) | Crown block used for bridge erecting machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |