CN106743095A - Method for replacing rubber belt surface of inclined shaft belt conveyor - Google Patents

Method for replacing rubber belt surface of inclined shaft belt conveyor Download PDF

Info

Publication number
CN106743095A
CN106743095A CN201710055007.7A CN201710055007A CN106743095A CN 106743095 A CN106743095 A CN 106743095A CN 201710055007 A CN201710055007 A CN 201710055007A CN 106743095 A CN106743095 A CN 106743095A
Authority
CN
China
Prior art keywords
belt
old
band
new
fixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710055007.7A
Other languages
Chinese (zh)
Other versions
CN106743095B (en
Inventor
吴向东
程为书
陈国�
郭发金
余峰
张鲁鲁
阙胜利
王传勇
彭辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal Third Construction Group Mechanical And Electrical Installation Projects Ltd
China Coal No 3 Construction Group Co Ltd
Original Assignee
China Coal Third Construction Group Mechanical And Electrical Installation Projects Ltd
China Coal No 3 Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal Third Construction Group Mechanical And Electrical Installation Projects Ltd, China Coal No 3 Construction Group Co Ltd filed Critical China Coal Third Construction Group Mechanical And Electrical Installation Projects Ltd
Priority to CN201710055007.7A priority Critical patent/CN106743095B/en
Publication of CN106743095A publication Critical patent/CN106743095A/en
Application granted granted Critical
Publication of CN106743095B publication Critical patent/CN106743095B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G15/00Conveyors having endless load-conveying surfaces, i.e. belts and like continuous members, to which tractive effort is transmitted by means other than endless driving elements of similar configuration
    • B65G15/30Belts or like endless load-carriers

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Belt Conveyors (AREA)

Abstract

The invention discloses a method for replacing a rubber belt surface of a belt conveyor of an inclined shaft, which comprises the following steps: (1) unfolding, stacking and joint vulcanizing the new adhesive tape surface; (2) dismantling a coal baffle plate, a sweeper, a chute and a frame of the head and the tail of the belt conveyor; (3) overlapping the new belt and the old belt; (4) unloading, steering and driving the rollers by the overlap joints of the new and old belts; (5) lowering a new belt; (6) installing a clamp of a wellhead and vulcanizing; (7) removing the vulcanization facility and removing the pulley block; (8) recovering the old belt; (9) recovering a coal chute, a cleaning device, a coal baffle plate and a frame at the head and the tail of the machine; and (6) performing test run. The invention can solve the technical problems that the traditional replacement method is easy to damage the adhesive tape and equipment, has construction danger and overlong construction time, and causes the longer the production stop time, the larger the loss and the like.

Description

A kind of inclines conveyor belt running zone face replacing options
Technical field
The present invention relates to a kind of inclines conveyor belt running zone face replacing options.
Background technology
Unit in charge of construction change coal mine main incline shaft pit shaft adhesive tape zone face operation in, particularly large-scale rubber conveyer, its glue Band more than meter Chong Da 100kg, transportation lengths are directed to such situation more than 1000 meters, and interspersed, upper well is circulated using new band The method that old band is reclaimed on mouth vulcanized joint, ground, if small-sized belt feeder, as long as disclosure satisfy that vulcanization in the heapstead of ground And the condition of advancing equipment, zone face replacing can be carried out using the method, main construction procedure is as follows:
Step 1:Expansion of the virgin rubber with zone face, stack and joint vulcanization;1#, 2#, 3# fixture of the new band of arrangement decentralization;
Step 2:The spillplate of belt feeder head and tail, sweeper, chute, frame are removed;
Step 3:New zone face is introduced, 3# fixtures, new and old zone face drilling, overlap joint are installed;
Step 4:Lap joint crosses unloading, steering, drives roller, clamps 1#, 2# fixture;
Step 5:Start belt feeder, old under band drives new band decentralization;New band glides because deadweight is produced afterwards, drives the new under band in ground Put, cross aircraft tail cylinder to joint, up a segment distance;Finally start belt feeder, old band drives new band, to the operation of its lap joint To 2 meters of well head unloading roller rear side;
Step 6:New 4#, 5#, 6# fixture, drawing hoist, tackle pulley, the Locking Device for Hoisting for taking zone face, arrangement vulcanization are stayed after installation Facility simultaneously carries out last group of vulcanization of joint;
Step 7:Remove vulcanizing deice, remove tackle pulley, after stay zone face the sub-folder of 4#, 5#, 6# tri- have, winch, will wherein one Platform drawing hoist moved to and installed outside heapstead;The old fixture with both sides at broken belt position and fixation device are installed, in Shang Jing Break old band at mouthful lower belt surface, after stay the old belt lacing at two ends, withdraw fixture;
Step 8:Belt feeder is rotated forward with minimum speed, and old band is reclaimed on lower belt surface on rear side of unloading roller, and will by drawing hoist Derived old adhesive tape is drawn to outside heapstead;Old band lower belt surface joint is firm using rope sling binding with new band, and the old band product of tail When remaining more, a set of easy storage belting is installed between aircraft tail cylinder and belt holder, until after joint has crossed aircraft tail cylinder Remove again;
Step 9:Recover coal drop, clearing apparatus, spillplate, the frame of frame head and tail;Test running.
This construction method, is primarily present following technical barrier:
(1)Due to inclined shaft length, gradient, the larger odjective cause of the width of zone face, weight, thickness, even if using belt feeder just Turn to drive new band decentralization, the new existing speed of band decentralization can be gone out and be difficult to control, occur that new band is asynchronous with old tape speed, new band produces product Remaining situation, or even speed is uncontrolled, new band magnifying slip, extreme danger and loses huge;
(2)When new and old belt lap joint crosses unloading, steering, driving, aircraft tail cylinder, the steel plate in joint location easily causes roller table The damage of face pad, and due to thickness of belt, steel plate thickness, joint location is easily choked on belt holder, causes belt Machine is touched the new band zone face of askew or damage.
(3)Originally in decentralization process, speed is mainly old tape running speed to new band;After transferring a segment distance, due to new band Deadweight, drives belt feeder to rotate forward, and lowering velocity is controlled by fixture and disk brake;Joint crosses the upward segment distance of aircraft tail cylinder Afterwards, belt feeder is rotated forward and drives new belt lacing up;Above three link, be required to by the elasticity of the upper well head fixture of regulation and Gap between disk brake brake shoe and flashboard, preferably to control decentralization and the speed uplink of new zone face, speed is too small, skin Band can not normally start, and startup spot speed is larger, and speed is excessive, and new zone face magnifying slip occurs;When shutting down, All fixtures and disk brake cooperation are needed, single fixture and disk brake work can cause new zone face to tear.
(4)Before new band is transferred and gone upward in place, the load of belt feeder startup and operation is equivalent to itself adhesive tape weight Twice causes lap joint to run to ground, it is necessary to consider the motionless new band of belt feeder band occur, completes last group of adhesive tape Bond stitch vulcanization work;
(5)Lap joint is run to ground unloading roller rear side, need to be before lap joint dismounting, on the new zone face of completion after zone face Work is stayed, and ensures that the new band of upper zone face will not glide, otherwise will be unable to complete joint vulcanization;During arrangement fixture, new and old belt Zone face is difficult to put on the ambilateral bolt jackscrew device of folder into " arcs of recesses ".
(6)When old band lower belt surface is blocked, inner wire wire rope core can produce larger impact strength, and the personnel of easily causing receive The loss of wound or equipment;And after blocking, the belt lacings at two ends need to be drawn or after stay, especially with new with descending old Belt lacing, after the rope strength stayed it is excessive if cause new band to damage, it is too small if can cause old under band row excessive velocities;
(7)During old band is reclaimed, the big machine speed of service of skin is asynchronous with the speed that drawing hoist reclaims old band, otherwise unloading rolling The old band cumulative in cylinder side can not be pulled out, and cause old band to twine motionless into the repeated multiple times traction of unloading roller or drawing hoist, be made The motor damage of car drawing hoist;
(8)During old band is reclaimed, before end connector did not passed through aircraft tail cylinder instantly, the old band cumulative at tail position is more, Easily cause the old band of tail to twine into inside aircraft tail cylinder, cause normally reclaim old band, due to tail part narrow space, and Zone face weight is larger, using that cannot be handled well in the artificial short time, even if treatment also simply blocks the old band of cumulative, by both sides Joint is connected again.Not only the time is more long for do so, and there is also the old situation with cumulative after treatment.This method is not Can fundamentally Solve problems in construction, and the time is more long, and the off-time caused is more long, and the loss for bringing is bigger.
The content of the invention
It is traditional to solve it is an object of the invention to provide a kind of inclines conveyor belt running zone face replacing options Fragile adhesive tape and equipment that replacing options are present, and there is construction risk, the engineering time is long, causes the off-time to be got over It is long, the technical problem such as the loss that brings is bigger.
In order to realize foregoing invention purpose, a kind of inclines conveyor belt running zone face of the present invention is changed Method, comprises the following steps:
(1)Expansion of the virgin rubber with zone face, stack and joint vulcanization;
Stayed after being made using the existing armored concrete station post in heapstead, one mine double-speed winch traction virgin rubber band of arrangement will vulcanize Good virgin rubber band is stacked along heapstead outer belt center line, and all zone faces are overlapped back and forth along center line, and are added in two ends bending part Plus sleeper, should be noted that the first group of working face of tape splice drawn toward well head should be upward when stacking, last group of joint is introduced When working face should be down;One group of vulcanization canopy is arranged outside heapstead, length is more than vulcanized joint length and two groups of vulcanization platforms Length sum;Two groups of vulcanization platforms are processed, it is highly consistent with the vulcanization depth of beam for using, one end angle of platform should be symmetrical, Made by the inclined shaft belt inclination maximum, two group platforms are into an entirety;While floor tape joint vulcanizes, arrange and install New 1#, 2# fixture with lower belt surface of decentralization;3# fixtures are arranged on wall stud on the outside of heapstead just to belt centerline, should Sleeve clamp is supported using unloading roller tripod and heapstead station post;On rear side of bend pulley tripod, driving drum with turn To each arrangement 1#, 2# fixture between roller;
(2)The spillplate of belt feeder head and tail, sweeper, chute, frame are removed;
(3)New and old belt is overlapped;
Last group of belt lacings are drawn to heapstead nearby, new tape splice is introduced using crane, worn from the unloading side of rolling on Past, and downwards 180 ° of inflection is overlapped with the upper zone face at unloading roller rear, install heapstead outside fixture simultaneously band energetically, utilization The big machine carrying roller of skin arranges anti-wheel apparatus in fixture porch along lower end, both sides;New and old adhesive tape lap-joint must keep away in heapstead Drive old adhesive tape vulcanizing joint;New and old adhesive tape overlap joint overlap length requirement >=2.5m, when new and old belt drills, is drilled newly on ground in advance The hole of adhesive tape, template is made according to the hole on virgin rubber band, the old splint position for taking is drawn out, using clamping plate eye, every group of folder Plate is consistent with the position of number eye;The glue-line of covering is first cut off with blade, then Steel cord is blocked with oxygen or electric welding;New and old belt Arrange 11 groups of clamping plates up and down, and fasten it is firm;
(4)New and old belt lap joint crosses unloading, steering, drives roller;
After joint is made, in one group of flexible glue band of covering up and down of lap joint, flexible glue band is with new and old belt periphery with brill φ 6mm Hole, bundlees flexible glue band, and need to cover all clamping plates and new band head end using 8# iron wires;Belt feeder belt speed is adjusted to first Rotate forward minimum speed(It is the 10% of maximal rate), during old each roller through head with the new band of drive, new and old adhesive tape Lap-joint must set special messenger and be tracked inspection, to prevent lap-joint in the process of running, scrape belt holder or lap-joint's cracking; Guide pulley is partially passed through when new tape splice, roller is driven, to lap joint just into being parking at slope mouth, that is, adjusted Two groups of fixtures of whole 1#, 2# make the new and old belt that it clamps lower floor;It is fixed girder steel per sleeve clamp upper fixture, lower clamp is movable steel Beam, lower girder steel is withstood using jack, and control belt speed is reached with clamping belt;
(5)New band decentralization;
Three groups of fixtures are unclamped, starts belt feeder, old under band drives new band decentralization, after belt feeder stops, in time using 1#, 2#, 3# Three groups of the 6 of fixture groups of jack are suppressed, and new band is clamped completely;After a descending segment distance, under new band is produced because of deadweight Sliding power, makes belt feeder motor is not actuated, disk brake can be rotated forward in the state of unclamping, and drive the new band decentralization in ground, extremely Joint crosses aircraft tail cylinder, up a segment distance;Finally start belt feeder, old band drives new band, run to well to its lap joint At 2 meters of mouth unloading roller rear side;
(6)The fixture of well head is installed and is vulcanized;
Treat new and old adhesive tape lap joint through inclined shaft, tail, roll up pit shaft again, when finally running at unloading roller after stop; Now, the joint of new and old belt overlap joint is located at 2 meters or so of unloading roller epithelium zone face, after belt feeder stops completely, immediately 1#, 2# fixture of lower belt side are clamped, and will be tightened with bolt between upper and lower H profile steel fixture;Jack is beaten at 1#, 2# fixture Pressure, makes upper and lower fixture that new and old belt is clamped, and the connecting bolt to upper and lower fixture is fastened afterwards, and is used at fixture two ends Steel plate is by upper and lower fixture firm welding;Main slant well head toward 15 ~ 25 meters of epithelium tape holders in pit shaft and support rod is removed, is cleaned out Debris on belt holder crossbeam;New band epipelagic zone is clamped new and old belt with the secondary belt fixture of 4#, 5#, 6# tri-, then will be per secondary skin The connecting bolt of the upper and lower fixture of band is fastened with spanner, finally with steel plate at fixture two ends by upper and lower fixture firm welding;Its In in well head, down 20 meters of positions are installed the sub-folders of 4#, 5# two and have and assemble integral, 6# fixtures are installed in 25 meters of positions;In heapstead Belt feeder install on the concrete foundation pre-embedded bolt of bend pulley north side 1 it is slow twist, connect electricity debugging it is intact after, slow strand twines Steel wire rope;Connected with 4#, 5# fixture one end in pit shaft using four-ply steel wire rope with unification group tackle pulley using slow strand;In well Another of arrangement is slow in mouthful room twists the another of 4#, 5# fixture for coordinating another group of tackle pulley to use in four-ply steel wire rope and pit shaft End connects;Stayed on the big axle of bend pulley in heapstead after fixed pulley in two groups of tackle pulley systems, fixed block and big axle it Between using 4 strand steel wire ropes connect;After two groups of slow strands are connected with 4#, 5# fixture both sides in pit shaft, while starting slow strand, make folder Tool both sides then two slow band-type brakes for twisting are held tightly by the uniform energetic rear parking of tackle pulley;In down 5 meters of pit shaft 4#, 5# fixture A secondary 6# belt fixtures are installed at place, at 6# fixtures down 3 meters, are twined the new and old belt in upper strata and lower floor new and old belt with steel wire rope After fixation, then respectively it is connected with the steel wire rope at winding with a twin cable in the both sides of fixture, then will be per secondary The connecting bolt of the upper and lower girder steel of fixture is fastened with spanner, finally with steel plate at fixture two ends by upper and lower girder steel firm welding; Unloading roller to all of spillplate in main slant pit shaft porch and bracket and upper supporting roller is removed using the purlin car in heapstead; Using upper fixture and entablature from 3# fixtures outside car dismounting heapstead;The secondary lap joint of new and old belt is removed, using well head The segmentation of new belt is sling in driving in room, fabrication and installation vulcanization platform;Last group of joint of new belt is drawn using crane Enter in heapstead, zone face is completed using driving in heapstead;
(7)Remove vulcanizing deice, remove tackle pulley, after stay zone face the sub-folder of 4#, 5#, 6# tri- have, winch, will wherein one time Post winch moved to and installed outside heapstead;Old 7#, 1#, 2# fixture with both sides at broken belt position and fixation device are installed, are broken Fixture at band toward well head direction uses the 6# clamps removed in pit shaft, toward the fixture in unloading roller direction at broken belt As original 1#, 2# fixture.Break old band at upper well head lower belt surface, after stay the old belt lacing at two ends, withdraw fixture;
(8)Belt feeder is rotated forward with minimum speed, old band is reclaimed on lower belt surface on rear side of unloading roller, and will be derived by drawing hoist Old adhesive tape draw to outside heapstead;Old band lower belt surface joint and new band are firm using rope sling binding, and the old band cumulative of tail compared with When many, a set of easy storage belting is installed between aircraft tail cylinder and belt holder, until joint is torn open again after having crossed aircraft tail cylinder Remove;
With on self-control clamping plate and old band high-strength bolt card at the old band lower belt surface before and after broken belt position, and in clamping plate with old band Perforate at the heart, is connected with shackle and steel wire rope with the virgin rubber band winding of downside, the secondary rope card of cable wire end location arrangements 3;Old band Upper zone face equally uses fixture openings, is connected with drawing hoist outside shackle and heapstead;After above preparation is carried out, well head Drawing hoist steel wire rope is energetic outside room, checks whether the old belt lacing in lower end is connected firmly with new band;Before starting belt feeder, by belt Machine running speed is changed to be tried one's best with drawing hoist speed consistent;After all preparations are completed, belt feeder rotating forward is started, will be old Take zone face to be drawn to outside heapstead using drawing hoist outside heapstead, old band lower belt surface runs to along belt feeder traffic direction At upper zone face, it is drawn to outside heapstead using drawing hoist outside heapstead, old zone face is all reclaimed finish successively;
(9)Recover coal drop, clearing apparatus, spillplate, the frame of frame head and tail;Test running;
After band operation of old adhesive tape taking out all terminates, later work and belt feeder test running are carried out;Later work, including remove belt The operations such as fixture, recovery head coal drop, after all-work terminates, belt feeder production run.
Advantages of the present invention and have the beneficial effect that:
1st, using existing ground, pit shaft, shaft bottom execution conditions, the construction period is farthest saved;
2nd, the usage amount of construction equipment and machine rigging is few, and same construction equipment can be reclaimed in zone face unfolding, zone face vulcanization, old band Reused etc. link;The human resources of consumption are few, and most of work progress workload is small, safe;
3rd, lap joint is solved easily to tear, easily choke on belt holder, be easily damaged roller bed course;
4th, the new band uppity technical barrier of decentralization process medium velocity is solved;
5th, solve during old band recovery, tail is also easy to produce old band cumulative, it is impossible to reclaim the problem of old band;
6th, the old band of lower belt surface for solving cannot be using the technical barrier stayed after km steel wire rope;
7th, solve to vulcanize in last group of joint heapstead, the technical barrier that upper and lower strap surface is stayed after needing;
8th, the speed and the inconsistent problem of the big machine operating minimum speed of skin of the drawing hoist old band of recovery are solved.
Brief description of the drawings
Fig. 1 is inclined shaft adhesive tape zone face exchonge step schematic diagram of the invention.
Fig. 2 is job site floor plan of the invention.
Fig. 3 is the 1# fixture layout drawings on rear side of bend pulley base of the invention(Side).
Fig. 4 is the 1# fixture layout drawings on rear side of bend pulley base of the invention(Front).
Fig. 5 is the 2# fixture layout drawings in two groups of tripod centre positions of the invention.
Fig. 6 is the 3# fixture layout drawings in heapstead east side of the invention(Side).
Fig. 7 is the 3# fixture layout drawings in heapstead east side of the invention(Front).
Fig. 8 is new band leather belt head of the invention and old band overlap joint schematic diagram.
Fig. 9 is fixture making figure of the invention.
Figure 10 is the side view of fixture described in Fig. 9.
Numbered in figure:Sequence number 1-7 refers to 1 respectively in figure --- 7# fixtures, 8, bend pulley tripod, 9, driving drum three Frame, 10, unloading roller tripod, sequence number 11-14 refers to 1 respectively in figure --- 4# drawing hoists, 15, belt holder column, 16, folder Tool girder steel, 17,50T hydraulic jacks, 18, stand post H400*400 L=2900 2,19,45b# I-steel L=8000 2 (Connection unloads post of being stood outside tripod and heapstead), 20, H profile steel H400 × 400 × 18 × 21 L=8330mm amount to 2,21, 3# fixture girder steels, 22, punching bolt select 30 × 160mm of φ, single group fixture select 4 groups of bolts;23rd, gusset selects δ 20 × 356 × 186,36 pieces are used altogether;24th, pasting board selects δ 30 × 380 × 380, altogether using 2 pieces, for jack position; 25th, fixture and belt contacts face arrangement steel plate, checker plate δ 3mm, 500 × 2000mm, altogether 2 pieces;26th, H profile steel H400 Lower clamp length is 3400mm on × 400 × 18 × 21, processes 2 groups, 27, vulcanization canopy, 28, build trestle, 29, wellbore centre Line, 30, main slant pit shaft.
Specific embodiment
Specific steps of the invention describe in detail as follows:
(1)Expansion of the virgin rubber with zone face, stack and joint vulcanization:Stayed after being made using the existing armored concrete station post in heapstead, cloth A JSDB-19 mine double-speed winch traction virgin rubber band is put, the virgin rubber band that will be vulcanizated is stacked along heapstead outer belt center line, All zone faces are overlapped back and forth along center line, and add sleeper in two ends bending part, it is to avoid new zone face forms expendable bending Point, the first group of working face of tape splice that be should be noted when stacking toward well head traction answers upward, when last group of joint is introduced Working face should be down(See Fig. 1);The operation of Fig. 1 is mainly the step after belt zone face formally goes into operation, not the joint including early stage Vulcanization and fixture make;Old band is blocked twice altogether, for the first time on rear side of secondary drive roller, is stayed after being beneficial to, and second at two grades Drive roller upside, it is easy to reclaim.
One group of vulcanization canopy is arranged outside heapstead, length is more than vulcanized joint length and two groups of vulcanization land lengths sums, Dust is not infected with rain-tight leak during ensuring newly to vulcanize compared with belt lacing, will otherwise have a strong impact on vulcanized quality;Process two groups of sulphur Change platform, it is highly consistent with the vulcanization depth of beam for using, one end angle of platform should be symmetrical, by the inclined shaft belt inclination maximum Make, two group platforms are into an entirety.
While floor tape joint vulcanizes, the new fixture with lower belt surface of arrangement decentralization, the sleeve clamp of 1#, 2#, 3# tri- is not Installed on the premise of delaying the shaft production time;One is arranged on wall stud on the outside of heapstead just to belt centerline Sleeve clamp, the sleeve clamp is supported using unloading roller tripod and heapstead station post;On rear side of bend pulley tripod(Toward well Mouth direction), 1#, 2# fixture are respectively arranged between driving drum and bending roller, between the crossbeam and station note and tripod of fixture Full weld is fixed, altogether 3 groups of fixtures, using the elasticity between Manual hydraulic jack alignment jig and zone face(See Fig. 2, see Fig. 3, see Fig. 4, see Fig. 5, see Fig. 6, see Fig. 7).In fig. 2, after 1#32T drawing hoists complete adhesive tape unfolding, heapstead is moved to It is interior, after the decentralization in place of new belt, used as 2# cars;After belt vulcanization terminates, 2# is moved to outside heapstead, used as 4# winches Reclaimed for old band;2#, 3# stay new band to use above after;During new band unfolding, stacked along heapstead outer belt center line.
(2)The spillplate of belt feeder head and tail, sweeper, chute, frame are removed:In view of new and old belt lap joint The number of plies it is more, thickness is larger, it is necessary to remove spillplate and sweeper that the new band of influence is transferred immediately after mine stopping production;Chute Long-pending coal on the inside of device is more, after being removed, it is necessary to coal will be accumulated with pneumatic pick in time after removed cover, can remove at new tape entry Chute baffle;Well head unloading roller is removed to epithelium tape holder and carrying roller between pit shaft, is made upper between unloading roller and well head Zone face tiles, the overlapping splice work after being easy to;Above-mentioned all components need to mark when removing, and recover beneficial to the later stage, and Component is stayed after needing before the dismounting.
(3)New and old belt is overlapped:Most one group of belt lacings of skin are drawn to heapstead nearby, introducing virgin rubber band using crane connects Head, goes through from the unloading side of rolling on, and 180 ° of inflection downwards overlaps with the upper zone face at unloading roller rear, installs outside heapstead Simultaneously band energetically, anti-wheel apparatus is arranged using the big machine carrying roller of skin to fixture in fixture porch along lower end, both sides;New and old glue in heapstead Band lap-joint must avoid old adhesive tape vulcanizing joint.New and old adhesive tape overlap joint overlap length requirement >=2.5m, when new and old belt drills, The hole of virgin rubber band is drilled on ground in advance, template is made according to the hole on virgin rubber band, draw out the old splint position for taking, used Clamping plate eye, every group of clamping plate is consistent with the position of number eye;The glue-line of covering is first cut off with blade, then is blocked with oxygen or electric welding Steel cord;New and old belt arranges 11 groups of clamping plates up and down, and fasten it is firm(See Fig. 8).In fig. 8, connecting plate uses δ 14 × 300 × 150,11 groups of processing and fabricating, connecting plate bolt hole is bored using set during making, and edges and corners are polished;Single group connecting plate is used M24 × 130,10.9 grade high-strength big hexagon head bolts.
(4)New and old belt lap joint crosses unloading, steering, drives roller:After joint is made, in covering up and down for lap joint One group of flexible glue band of lid, flexible glue band, with φ 6mm holes are bored, bundlees flexible glue band, and need to be completely covered with new and old belt periphery using 8# iron wires There are clamping plate and new band head end in residence, it is to avoid steel plate damages bowl liner and belt head end is choked in frame.First by belt feeder band Velocity modulation is to rotating forward minimum speed(It is the 10% of maximal rate), during old each roller through head with the new band of drive, newly Old adhesive tape lap-joint must set special messenger and be tracked inspection, to prevent lap-joint in the process of running, scrape belt holder or overlap joint Place's cracking.
Guide pulley is partially passed through when new tape splice, roller is driven, to lap joint just into being at slope mouth Parking, that is, install two groups of fixtures of 1#, 2#.It is fixed girder steel per sleeve clamp upper fixture, lower clamp is movable girder steel, using very heavy Lower girder steel is withstood, control belt speed is reached with clamping belt.
(5)New band decentralization:Three groups of fixtures are unclamped, starts belt feeder, old under band drives new band decentralization, after belt feeder stops, Suppressed using tri- groups of the 6 of fixture groups of jack of 1#, 2#, 3# in time, new band is clamped completely;After a descending segment distance, New band produces sliding force because of deadweight, makes belt feeder motor is not actuated, disk brake can be rotated forward in the state of unclamping, and drives The new band decentralization in ground, crosses aircraft tail cylinder, up a segment distance to joint;Finally start belt feeder, old band drives new band, taken to it Joint is run to 2 meters of well head unloading roller rear side;In new band decentralization process, tri- groups of fixtures of 1#, 2#, 3# need to be strictly controlled Elasticity, no matter which kind of situation, in the situation that belt feeder shuts down, it is necessary to clamp new band immediately, jack is beaten every time After being pressed onto position, prized back once using crowbar;After jack hydraulic unclamps, it is necessary to return twist in time, lower clamp is close to strap surface, Jack is maintained at the state suppressed at any time.(See Fig. 9, see Figure 10)
(6)The fixture of well head is installed and is vulcanized:
Treat new and old adhesive tape lap joint through inclined shaft, tail, roll up pit shaft again, when finally running at unloading roller after stop. Now, the joint of new and old belt overlap joint is located at 2 meters or so of unloading roller epithelium zone face, after belt feeder stops completely, immediately 1#, 2# fixture of lower belt side are clamped, and will be tightened with 4 groups of M24*160 strength bolts between upper and lower H profile steel fixture, it is to avoid be long-term When not using, there is release phenomenon in 50t jack.Jack is suppressed at 2#, 3# fixture, makes upper and lower fixture new and old belt clamp Tightly, the connecting bolt afterwards to upper and lower fixture is fastened, and keeps away upper and lower fixture firm welding in fixture two ends steel plate Exempt from new belt lower belt surface toward having play phenomenon in pit shaft;
Remove main slant well head toward 15 ~ 25 meters of epithelium tape holders in pit shaft and support rod, the debris cleaned out on belt holder crossbeam.Newly Band epipelagic zone is clamped new and old belt with the secondary belt fixture of 4#, 5#, 6# tri-, then by the connection spiral shell of the upper and lower fixture of every secondary belt Bolt is fastened with spanner, finally with steel plate at fixture two ends by upper and lower fixture firm welding.Wherein in well head, down 20 meters of positions are pacified The dress sub-folder of 4#, 5# two has and assembles integral, and secondary 63 fixtures are installed in 25 meters of positions, fixture using H400 × 400 × 18 × 21 shaped steel, single shaped steel 3200mm long.
1 32T is installed on the concrete foundation pre-embedded bolt of bend pulley north side in heapstead belt feeder to twist slowly, electricity is connect After debugging is intact, slow strand twines 6 × 37-FC-300 meters of 1670- Φ 28mm steel wire ropes.Twisted slowly using 32T with unification group H50*4 Tackle pulley connected with 4#, 5# fixture south in pit shaft using four strands of φ 30m steel wire ropes.
The 3#50T arranged in heapstead twist slowly the tackle pulley with unification group H50*4 using four strands of φ 30mm steel wire ropes with 4#, 5# fixture the North in pit shaft is connected.
Stayed on the big axle of bend pulley in heapstead after fixed pulley in two groups of H50*4 tackle pulley systems, fixed block with it is big Using 4 bursts of φ 30m steel wire ropes connections between axle.
After two groups of 32T twist slowly with 4#, 5# fixture south in pit shaft, after north side connects, while start slow strand, make fixture south, Northern both sides then two slow band-type brakes for twisting are held tightly by the uniform energetic rear parking of tackle pulley.
A secondary 6# belt fixtures are installed at the sub-folder of pit shaft 2 tool down 5 meters, at fixture down 3 meters, will be upper with steel wire rope After the new and old belt of layer is fastened with the new and old belt of lower floor, then in south, the north side of fixture respectively with a bifilar φ 30mm steel wire Rope is connected with the steel wire rope at winding, and then the connecting bolt of the upper and lower fixture of every secondary belt is fastened with spanner, finally uses Steel plate is at fixture two ends by upper and lower fixture firm welding.
Unloading roller to all of spillplate in main slant pit shaft porch and bracket is removed using the purlin car in heapstead And upper supporting roller.
The upper fixture and entablature of 3# fixtures outside heapstead are removed from crane using 12T, so that the new belt for cutting is introduced In heapstead.
The secondary lap joint of new and old belt is removed, the segmentation of new belt is sling using the driving in heapstead, fabrication and installation Vulcanization platform 24m × 2.2m × 0.75m(Length × width × height)In order to vulcanize.Using crane by last group of joint of new belt Introduce in heapstead, zone face is completed using driving in heapstead.
(7)Remove vulcanizing deice, remove tackle pulley, after stay zone face the sub-folder of 4#, 5#, 6# tri- have, winch, will wherein one Platform drawing hoist moved to and installed outside heapstead;Old 7#, 1#, 2# fixture with both sides at broken belt position and clamping plate dress are installed Put, break old band at upper well head lower belt surface, after stay the old belt lacing at two ends, withdraw fixture;
(8)Belt feeder is rotated forward with minimum speed, old band is reclaimed on lower belt surface on rear side of unloading roller, and will be derived by drawing hoist Old adhesive tape draw to outside heapstead;Old band lower belt surface joint and new band are firm using rope sling binding, and the old band cumulative of tail compared with When many, a set of easy storage belting is installed between aircraft tail cylinder and belt holder, until joint is torn open again after having crossed aircraft tail cylinder Remove;
On rear side of head bend pulley(Towards tail), prepare disconnected old band lower belt surface.It is each before and after broken belt position before old band broken belt Arrange a sleeve clamp, and will draw in advance and after the clamping plate continued to employ install, old band can be blocked;
Upper end joint clamp uses original 1# fixtures or 2# fixtures, lower end fixture to be stayed after using the upper zone face removed before The 6# fixtures of new zone face.
With self-control clamping plate at old band lower belt surface before and after broken belt position(Made by oneself using 16mm steel plates)9 groups are used with old band On M24 high-strength bolt cards, and in clamping plate and the center perforate of old band, with 10t shackles and the virgin rubber of the steel wire ropes of φ 18.5 and downside Band winding is connected, the secondary rope card of cable wire end location arrangements 3, in decentralization process, notes observing the joint location situation, is entered in time Row regulation is processed;It is old to take zone face equally using clamping plate perforate, connected with 32t drawing hoists outside 20t shackles and heapstead.More than After preparation is carried out, 32t drawing hoists steel wire rope is energetic outside heapstead, checks whether the old belt lacing in lower end is connected with new band Firmly.Before starting belt feeder, belt feeder running speed is changed to be tried one's best with drawing hoist speed consistent(Concrete numerical value is referring to prop drawing Brand name symbol on winch).After all preparations are completed, belt feeder is started(Rotate forward), the old zone face that takes is utilized into heapstead Outer 32t drawing hoists are drawn to outside heapstead, and old band lower belt surface is run at upper zone face along belt feeder traffic direction, using well 32t drawing hoists are drawn to outside heapstead outside mouth room, all reclaim old zone face finish successively.
Note:Belt feeder arranges special messenger to guard at old band and new band lap joint situation and aircraft tail cylinder all the time when running Old band cumulative situation, notes abnormalities and stop immediately.When the old band cumulative of tail is more, make easy using two groups long support roller devices Interim storage belting, it is to avoid upper band roll enters in aircraft tail cylinder, head is reclaimed again to influence old zone face.
(9)Recover coal drop, clearing apparatus, spillplate, the frame of frame head and tail;Test running.
After band operation of old adhesive tape taking out all terminates, later work and belt feeder test running are carried out.Later work, including remove The operations such as belt fixture, recovery head coal drop, after all-work terminates, belt feeder production run.
Specific implementation step is briefly explained so that the large-scale adhesive tape zone face of inclined shaft is changed as an example:
1st, expansion of the virgin rubber with zone face, stack and joint vulcanization;
2nd, make and arrange the Third Mate's fixture for transferring new band;
3rd, the spillplate of belt feeder head and tail, sweeper, chute, bracket are removed;
4th, new and old belt is drilled using mould, it is ensured that new and old belt bolt hole is consistent;
5th, new zone face is introduced, 3# fixtures is installed, new and old belt suture overlap joint is fixed;
6th, lap joint crosses unloading, steering, drives roller, installs 1#, 2# fixture, and adjust brake disc brake clearance;
7th, belt feeder is started, old under band drives new 500 meters of band decentralization;New band drives the new band decentralization in ground because of deadweight afterwards, to connecing Head crosses aircraft tail cylinder, up 900 meters, now using the new band lowering velocity of three sleeve clamps adjustment, and disk type gate is adjusted into short range Control;Finally start belt feeder, old band drives new band, is run to 2 meters on rear side of well head unloading roller to its lap joint;
8th, the new three sub-folders tool for taking zone face and drawing hoist, tackle pulley are stayed after installing, vulcanizing deice is arranged and is carried out last The vulcanization of group joint;
9th, withdraw vulcanizing deice, remove tackle pulley, after stay zone face the sub-folder of 4#, 5#, 6# tri- have, winch, and in slope mouth Room west side is installed by one drawing hoist;
The 10th, old 7#, 1#, 2# fixture with broken belt position two ends and fixation device are installed, break old band, removes fixture;
11st, belt feeder 0.5m/s speed is rotated forward, and unloading roller rear side reclaims the old band of upper zone face in heapstead, and by heapstead west side Drawing hoist will be outside derived old band traction to heapstead;Old band lower belt surface joint is firm using rope sling binding with new band, extremely It is dismountable that it has crossed aircraft tail cylinder rear;
12nd, coal drop, clearing apparatus, spillplate, the bracket of frame head and tail are recovered;Test running.

Claims (1)

1. a kind of inclines conveyor belt running zone face replacing options, comprise the following steps:
(1)Expansion of the virgin rubber with zone face, stack and joint vulcanization;
Stayed after being made using the existing armored concrete station post in heapstead, one mine double-speed winch traction virgin rubber band of arrangement will vulcanize Good virgin rubber band is stacked along heapstead outer belt center line, and all zone faces are overlapped back and forth along center line, and are added in two ends bending part Plus sleeper, should be noted that the first group of working face of tape splice drawn toward well head should be upward when stacking, last group of joint is introduced When working face should be down;One group of vulcanization canopy is arranged outside heapstead, length is more than vulcanized joint length and two groups of vulcanization platforms Length sum;Two groups of vulcanization platforms are processed, it is highly consistent with the vulcanization depth of beam for using, one end angle of platform should be symmetrical, Made by the inclined shaft belt inclination maximum, two group platforms are into an entirety;While floor tape joint vulcanizes, arrange and install New 1#, 2# fixture with lower belt surface of decentralization, the fixture on the position is separately positioned on bend pulley tripod rear side, driving drum Between bending roller;3# fixtures are arranged on wall stud on the outside of heapstead just to belt centerline, the sleeve clamp is utilized Unloading roller tripod and heapstead station post are supported;
(2)The spillplate of belt feeder head and tail, sweeper, chute, frame are removed;
(3)New and old belt is overlapped;
Last group of belt lacings are drawn to heapstead nearby, new tape splice is introduced using crane, worn from the unloading side of rolling on Past, and 180 ° of inflection downwards overlaps with the upper zone face at unloading roller rear, simultaneously band is energetically, sharp for the 3# fixtures for installing outside heapstead With the big machine carrying roller of skin anti-wheel apparatus are arranged in 3# fixtures porch along lower end, both sides;New and old adhesive tape lap-joint is certain in heapstead Avoid old adhesive tape vulcanizing joint;New and old adhesive tape overlap joint overlap length requirement >=2.5m, when new and old belt drills, bores on ground in advance The hole of good virgin rubber band, template is made according to the hole on virgin rubber band, draws out the old splint position for taking, using clamping plate eye, often Group clamping plate is consistent with the position of number eye;The glue-line of covering is first cut off with blade, then Steel cord is blocked with oxygen or electric welding;Newly Old band arranges 11 groups of clamping plates up and down, and fasten it is firm;
(4)New and old belt lap joint crosses unloading, steering, drives roller;
After joint is made, in one group of flexible glue band of covering up and down of lap joint, flexible glue band is with new and old belt periphery with brill φ 6mm Hole, bundlees flexible glue band, and need to cover all clamping plates and new band head end using 8# iron wires;Belt feeder belt speed is adjusted to first Rotate forward minimum speed(It is the 10% of maximal rate), during old each roller through head with the new band of drive, new and old adhesive tape Lap-joint must set special messenger and be tracked inspection, to prevent lap-joint in the process of running, scrape belt holder or lap-joint's cracking; Guide pulley is partially passed through when new tape splice, roller is driven, to lap joint just into being parking at slope mouth, that is, adjusted Two groups of fixtures of whole 1#, 2# make the new and old belt that it clamps lower floor, are fixed girder steel per sleeve clamp upper fixture, and lower clamp is movable steel Beam, lower girder steel is withstood using jack, and control belt speed is reached with clamping belt;
(5)New band decentralization;
Tri- groups of fixtures of 1#, 2#, 3# are unclamped, starts belt feeder, old under band drives new band decentralization, after belt feeder stops, utilizing in time Three groups of the 6 of fixture groups of jack are suppressed, and new band is clamped completely;After a descending segment distance, under new band is produced because of deadweight Sliding power, makes belt feeder motor is not actuated, disk brake can be rotated forward in the state of unclamping, and drive the new band decentralization in ground, extremely Joint crosses aircraft tail cylinder, up a segment distance;Finally start belt feeder, old band drives new band, run to well to its lap joint At 2 meters of mouth unloading roller rear side;
(6)4#, 5#, 6# fixture of well head are installed and are vulcanized;
Treat new and old adhesive tape lap joint through inclined shaft, tail, roll up pit shaft again, when finally running at unloading roller after stop; Now, the joint of new and old belt overlap joint is located at 2 meters or so of unloading roller epithelium zone face, after belt feeder stops completely, immediately 1#, 2# fixture of lower belt side are clamped, and will be tightened with bolt between upper and lower H profile steel fixture;Jack is beaten at 1#, 2# fixture Pressure, makes upper and lower fixture that new and old belt is clamped, and the connecting bolt to upper and lower fixture is fastened afterwards, and is used at fixture two ends Steel plate is by upper and lower fixture firm welding;Main slant well head toward 15 ~ 25 meters of epithelium tape holders in pit shaft and support rod is removed, is cleaned out Debris on belt holder crossbeam;New band epipelagic zone is clamped new and old belt with the secondary belt fixture of 4#, 5#, 6# tri-, then will be per secondary skin The connecting bolt of the upper and lower fixture of band is fastened with spanner, finally with steel plate at fixture two ends by upper and lower fixture firm welding;Its In have in the well head sub-folder of 4#, 5# two that down 20 meters of positions are installed and assemble integral, a secondary 6# fixtures are installed in 25 meters of positions; Heapstead belt feeder install on the concrete foundation pre-embedded bolt of bend pulley north side 1 it is slow twist, connect electricity debugging it is intact after, slowly Steel wire rope is twined in strand;It is connected with 4#, 5# fixture one end in pit shaft using four-ply steel wire rope with unification group tackle pulley using slow strand It is good;Another of arrangement slow strand coordinates another group of tackle pulley using 4#, the 5# two in four-ply steel wire rope and pit shaft in heapstead The other end of sub-folder tool is connected;Stayed on the big axle of bend pulley in heapstead after fixed pulley in two groups of tackle pulley systems, it is fixed Connected using 4 strand steel wire ropes between pulley and big axle;After two groups of slow strands are connected with 4#, 5# fixture both sides in pit shaft, while Slow strand is started, fixture both sides is passed through the uniform energetic rear parking of tackle pulley, then hold two slow band-type brakes for twisting tightly;In the wellbore Down at 5 meters, the 6# fixtures installed again play safety effect to 4#, 5# fixture, prevent new zone face from gliding;Using well head Purlin car in room removes 1# unloading rollers to all of spillplate in main slant pit shaft porch and bracket and upper supporting roller;Using certainly Crane removes the upper fixture and entablature of 3# fixtures outside heapstead;The secondary lap joint of new and old belt is removed, using in heapstead Driving by new belt segmentation sling, fabrication and installation vulcanization platform;Last group of joint of new belt is introduced into well using crane In mouth room, zone face is completed using purlin car in heapstead;Carry out last group of joint vulcanization of the big machine of skin;
(7)Remove vulcanizing deice, remove tackle pulley, after stay the secondary belt fixture of 4#, 5#, 6# tri-, the winch of zone face, will wherein one Platform drawing hoist moved to and installed outside heapstead;The old 7# fixtures with both sides at broken belt position and fixation device, broken belt are installed Locate the 7# fixtures toward well head direction using the 6# clamps removed in pit shaft, toward the fixture in unloading roller direction at broken belt As original 1#, 2# fixture, stays the old belt lacing at two ends after;
(8)Belt feeder is rotated forward with minimum speed, old band is reclaimed on lower belt surface on rear side of unloading roller, and will be derived by drawing hoist Old adhesive tape draw to outside heapstead;Old band lower belt surface joint and new band are firm using rope sling binding, and the old band cumulative of tail compared with When many, a set of easy storage belting is installed between aircraft tail cylinder and belt holder, until joint is torn open again after having crossed aircraft tail cylinder Remove;On rear side of head bend pulley, prepare disconnected old band lower belt surface;Before old band broken belt, 7#, 1#, 2# are arranged before and after broken belt position Fixture, and will draw in advance and after the clamping plate continued to employ install, old band can be blocked;
With on self-control clamping plate and old band high-strength bolt card at the old band lower belt surface before and after broken belt position, and in clamping plate with old band Perforate at the heart, is connected with shackle and steel wire rope with the virgin rubber band winding of downside, the secondary rope card of cable wire end location arrangements 3;Old band Upper zone face equally uses clamping plate perforate, is connected with drawing hoist outside shackle and heapstead;After above preparation is carried out, well head Drawing hoist steel wire rope is energetic outside room, checks whether the old belt lacing in lower end is connected firmly with new band;Before starting belt feeder, by belt Machine running speed is changed to be tried one's best with drawing hoist speed consistent;After all preparations are completed, belt feeder rotating forward is started, will be old Take zone face to be drawn to outside heapstead using drawing hoist outside heapstead, old band lower belt surface runs to along belt feeder traffic direction At upper zone face, it is drawn to outside heapstead using drawing hoist outside heapstead, old zone face is all reclaimed finish successively;
(9)Recover coal drop, clearing apparatus, spillplate, the frame of frame head and tail;Test running;
After band operation of old adhesive tape taking out all terminates, later work and belt feeder test running are carried out;Later work, including remove belt The operations such as fixture, recovery head coal drop, after all-work terminates, belt feeder production run.
CN201710055007.7A 2017-01-24 2017-01-24 Method for replacing rubber belt surface of inclined shaft belt conveyor Active CN106743095B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710055007.7A CN106743095B (en) 2017-01-24 2017-01-24 Method for replacing rubber belt surface of inclined shaft belt conveyor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710055007.7A CN106743095B (en) 2017-01-24 2017-01-24 Method for replacing rubber belt surface of inclined shaft belt conveyor

Publications (2)

Publication Number Publication Date
CN106743095A true CN106743095A (en) 2017-05-31
CN106743095B CN106743095B (en) 2019-02-19

Family

ID=58941865

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710055007.7A Active CN106743095B (en) 2017-01-24 2017-01-24 Method for replacing rubber belt surface of inclined shaft belt conveyor

Country Status (1)

Country Link
CN (1) CN106743095B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108974772A (en) * 2018-06-26 2018-12-11 山西天地王坡煤业有限公司 A kind of method of the main tunnel rubber belt conveyor replacement adhesive tape in underground
CN110757091A (en) * 2019-09-23 2020-02-07 中国二十冶集团有限公司 Online transformation method of belt conveyor
CN111203526A (en) * 2020-03-16 2020-05-29 泛凯斯特汽车零部件(江苏)有限公司 Method for replacing conveyor belt for cooling castings
CN111824715A (en) * 2020-07-02 2020-10-27 南通联科机械制造有限公司 Solution method for ribbon of belt conveyor
CN111958219A (en) * 2020-09-28 2020-11-20 淮南矿业(集团)有限责任公司 Belt replacing method of button sewing belt conveyor
CN112320212A (en) * 2020-11-11 2021-02-05 江苏省矿业工程集团有限公司 Mechanized continuous quick belt replacing device and process for main inclined shaft belt conveyor
CN113184611A (en) * 2021-06-09 2021-07-30 莱芜钢铁集团建筑安装工程有限公司 Adhesive tape replacing method for adhesive tape machine
CN113334059A (en) * 2021-07-13 2021-09-03 广西科技大学 Belt quick replacement robot for mining belt conveyor
CN113958362A (en) * 2021-10-29 2022-01-21 成都环境工程建设有限公司 Method for releasing adhesive tape of underground long-distance conveyor
CN114986760A (en) * 2022-07-09 2022-09-02 中煤第三建设集团机电安装工程有限责任公司 Method for replacing rubber belt of rubber belt conveyor under special conditions

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1733572A (en) * 2004-08-03 2006-02-15 神华集团有限责任公司 Method for replacing belt of adhesive tape machine
CN101891080A (en) * 2010-06-30 2010-11-24 中煤第五建设有限公司 Rapid belt replacing method
CN101934915A (en) * 2010-09-10 2011-01-05 山西晋城无烟煤矿业集团有限责任公司 Method for replacing rubber belt by long-distance steel cord rubber belt conveyor
CN102042031A (en) * 2010-10-30 2011-05-04 枣庄矿业(集团)有限责任公司蒋庄煤矿 Process for replacing adhesive tape for adhesive tape transporter of coal mine main shaft loading chamber
CN102942067A (en) * 2012-11-09 2013-02-27 中国神华能源股份有限公司 Belt installing method and changing method of belt conveyor and installing or changing system thereof
CN104016168A (en) * 2014-06-07 2014-09-03 太原理工大学 Belt replacing method for rubber belt winding and unwinding device of belt conveyor
CN104909112A (en) * 2015-06-04 2015-09-16 山西晋城无烟煤矿业集团有限责任公司 Fast replacement process for long-distance steel cord belt
JP2016160101A (en) * 2015-03-05 2016-09-05 大成建設株式会社 Belt conveyor device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1733572A (en) * 2004-08-03 2006-02-15 神华集团有限责任公司 Method for replacing belt of adhesive tape machine
CN101891080A (en) * 2010-06-30 2010-11-24 中煤第五建设有限公司 Rapid belt replacing method
CN101934915A (en) * 2010-09-10 2011-01-05 山西晋城无烟煤矿业集团有限责任公司 Method for replacing rubber belt by long-distance steel cord rubber belt conveyor
CN102042031A (en) * 2010-10-30 2011-05-04 枣庄矿业(集团)有限责任公司蒋庄煤矿 Process for replacing adhesive tape for adhesive tape transporter of coal mine main shaft loading chamber
CN102942067A (en) * 2012-11-09 2013-02-27 中国神华能源股份有限公司 Belt installing method and changing method of belt conveyor and installing or changing system thereof
CN104016168A (en) * 2014-06-07 2014-09-03 太原理工大学 Belt replacing method for rubber belt winding and unwinding device of belt conveyor
JP2016160101A (en) * 2015-03-05 2016-09-05 大成建設株式会社 Belt conveyor device
CN104909112A (en) * 2015-06-04 2015-09-16 山西晋城无烟煤矿业集团有限责任公司 Fast replacement process for long-distance steel cord belt

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108974772A (en) * 2018-06-26 2018-12-11 山西天地王坡煤业有限公司 A kind of method of the main tunnel rubber belt conveyor replacement adhesive tape in underground
CN110757091A (en) * 2019-09-23 2020-02-07 中国二十冶集团有限公司 Online transformation method of belt conveyor
CN111203526B (en) * 2020-03-16 2021-11-02 泛凯斯特汽车零部件(江苏)有限公司 Method for replacing conveyor belt for cooling castings
CN111203526A (en) * 2020-03-16 2020-05-29 泛凯斯特汽车零部件(江苏)有限公司 Method for replacing conveyor belt for cooling castings
CN111824715A (en) * 2020-07-02 2020-10-27 南通联科机械制造有限公司 Solution method for ribbon of belt conveyor
CN111958219A (en) * 2020-09-28 2020-11-20 淮南矿业(集团)有限责任公司 Belt replacing method of button sewing belt conveyor
CN112320212A (en) * 2020-11-11 2021-02-05 江苏省矿业工程集团有限公司 Mechanized continuous quick belt replacing device and process for main inclined shaft belt conveyor
CN113184611A (en) * 2021-06-09 2021-07-30 莱芜钢铁集团建筑安装工程有限公司 Adhesive tape replacing method for adhesive tape machine
CN113334059A (en) * 2021-07-13 2021-09-03 广西科技大学 Belt quick replacement robot for mining belt conveyor
CN113334059B (en) * 2021-07-13 2022-05-27 广西科技大学 Belt quick replacement robot for mining belt conveyor
CN113958362A (en) * 2021-10-29 2022-01-21 成都环境工程建设有限公司 Method for releasing adhesive tape of underground long-distance conveyor
CN114986760A (en) * 2022-07-09 2022-09-02 中煤第三建设集团机电安装工程有限责任公司 Method for replacing rubber belt of rubber belt conveyor under special conditions
CN114986760B (en) * 2022-07-09 2024-05-10 中煤第三建设集团机电安装工程有限责任公司 Method for replacing rubber belt of rubber belt conveyor under special condition

Also Published As

Publication number Publication date
CN106743095B (en) 2019-02-19

Similar Documents

Publication Publication Date Title
CN106743095A (en) Method for replacing rubber belt surface of inclined shaft belt conveyor
CN105016184B (en) Vertical multirope friction winder process for replacing hoisting ropes
CN106698207A (en) Construction method for dismounting shield tunneling machine in tunnel
CN108974772B (en) Method for replacing rubber belt of rubber belt conveyor of underground main roadway
CN105317008B (en) A kind of Integral lifting method of steel truss girder cable-stayed bridge steel truss girder segment
CN112320212A (en) Mechanized continuous quick belt replacing device and process for main inclined shaft belt conveyor
CN104909112A (en) Fast replacement process for long-distance steel cord belt
CN105460759B (en) A kind of method that main shaft winch tail rope is changed
CN111472797B (en) Implementation method for detaching TBM in hole
CN106081836A (en) Vertical shaft head rope and tail rope replacing options
CN101934915A (en) Method for replacing rubber belt by long-distance steel cord rubber belt conveyor
CN107355248A (en) A kind of fully mechanized coal face fully-mechanized mining equipment method for rapidly mounting
CN113021699A (en) Method for quickly replacing adhesive tape of long-distance large-bandwidth mining belt conveyor for ten million-ton mine
CN103449115B (en) The collapsible fuselage of belt conveyer and extension band type conveyor
CN101391721A (en) Novel technology for changing hoist steel wire rope of tower type friction winder
CN203473770U (en) Foldable conveyor body of belt type conveyor and telescopic belt type conveyor
RU2409513C1 (en) Method of replacement of ropes of mine winding plant with friction pulley, and device for its implementation
CN105952008A (en) An elastic felt hanging method for a large full-containment low-temperature storage tank
CN106957014A (en) Movable hoisting mechanism
CN113277408A (en) Multi-rope quick-replacement construction system and construction method
CN218171443U (en) Adhesive tape replacing device of Ou metallurgical furnace vertical adhesive tape machine
CN212716706U (en) Novel hydraulic support transfers equipment
CN217555604U (en) Steel sleeve integral lifting device
AU2021254556B2 (en) Power device for lowering pipe string in moon pool region
CN108729362B (en) Large-span pipe bridge vertical face circulating cable replacement system and use method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 234000 Anhui province Suzhou City Yongqiao district near the River Road No. 189

Applicant after: China Coal Third Construction Group Mechanical and Electrical Installation Projects Ltd.

Applicant after: China Coal Third Construction (Group) Co.,Ltd.

Address before: 234000 Anhui city in Suzhou province near the River Road No. 67

Applicant before: China Coal Third Construction Group Mechanical and Electrical Installation Projects Ltd.

Applicant before: China Coal Third Construction (Group) Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant