CN106741603B - The flow container fast and accurately localization method when liquefaction vessel is built - Google Patents

The flow container fast and accurately localization method when liquefaction vessel is built Download PDF

Info

Publication number
CN106741603B
CN106741603B CN201611019176.7A CN201611019176A CN106741603B CN 106741603 B CN106741603 B CN 106741603B CN 201611019176 A CN201611019176 A CN 201611019176A CN 106741603 B CN106741603 B CN 106741603B
Authority
CN
China
Prior art keywords
flow container
guiding device
section
installation site
localization method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611019176.7A
Other languages
Chinese (zh)
Other versions
CN106741603A (en
Inventor
金燕子
唐诗渊
王忠强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hudong Zhonghua Shipbuilding Group Co Ltd
Original Assignee
Hudong Zhonghua Shipbuilding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hudong Zhonghua Shipbuilding Group Co Ltd filed Critical Hudong Zhonghua Shipbuilding Group Co Ltd
Priority to CN201611019176.7A priority Critical patent/CN106741603B/en
Publication of CN106741603A publication Critical patent/CN106741603A/en
Application granted granted Critical
Publication of CN106741603B publication Critical patent/CN106741603B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B71/00Designing vessels; Predicting their performance
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The present invention relates to one kind when liquefaction vessel is built flow container fast and accurately localization method comprising guide plate and suspension centre following steps: are respectively set on flow container;The installation site of flow container installs dismountable guiding device on body section;Welding equipment operates eye plate on deck, and the wirerope on lifting equipment is connected to flow container to be hung to the top for being pulled to installation site on suspension centre, and chain block is separately connected suspension centre and operation eye plate to position flow container;In the installation site casting epoxy resin of flow container, start lifting equipment for flow container to whereabouts, chain block controls the stability of flow container, falls and be stuck in guide plate in the guiding device specially designed;Flow container promptly falls to installation site under precise control;Wirerope and chain block are removed, then removes reusable guiding device.Disposable localization method of the invention has the characteristics that lifting accurately and rapidly, and after lifting, and the guiding device being removed is for reuse.

Description

The flow container fast and accurately localization method when liquefaction vessel is built
Technical field
It is quick, quasi- the present invention relates to being carried out when the construction of the liquefied gas carrier of shipbuilding, especially c-type independent tank formula to flow container Really lifting guiding and the method for positioning.
Background technique
LNG carrier is mainly the storage and transport that natural gas is carried out by flow container, and relatively common liquefaction day Right gas ship is the LNG carrier with c-type independent tank formula.Needing the LNG carrier built at present is that storage volume is super Cross 10000 cubes of large-scale flow container.On LNG carrier, in order to guarantee stability and safety, flow container and bulkhead gap It is very small, but the quality of flow container itself is but very big.In building course, also the relevant lifting work of flow container is mostly enterprising in river surface Row, any small trend fluctuation or heaving of the sea can all cause the fluctuation of crane barge and construction ship, extreme influence flow container is just It is really in place.It, must before lifting in order to guarantee the accurate in place of flow container and flow container external insulation layer and stainless steel sheet| be protected not to be broken Corresponding lifting guide-localization guide must be established.
Currently, shipyard is to there are two types of the tank installation localization methods of the liquefied gas carrier of c-type independent tank formula both at home and abroad, one is draws Line ocular estimate, by wirerope bolt on the guiding otic placode of flow container, the movement that crane or crane barge is fully utilized makes flow container wirerope institute It is substantially aligned in position and its location of saddle support aboard ship, then fall tank installation.This method to the stormy waves weather conditions of lifting require compared with Height limits greatly the size weight of flow container, and the operating time is long, careless slightly that card tank phenomenon may occur.Two lead to be fixed Rail device, one guiding device of welding equipment above liquid container saddle seat, guide lug on flow container can follows track fall into cabin.This method is implemented When, to make flow container relatively difficult into guide rail, while fixing the live welding equipment of guide rail and cutting off heavy workload, coating failure mechanics are big, Guide rail bracket can only first use, it is big to the material loss of batch ship.
We have applied for a patent of invention 200410052784.9, entitled " the active guiding of tank installation in 2004 And positioning device and its installation method ", this method is found that while that goal of the invention can be completed in practice, reaches corresponding invention Effect, but need to improve there is also some problems: 1. positioning device structures and use are all relative complex, need to install multiple Matching piece;2. not being able to satisfy quick needs, epoxy resin has been done positioning not yet and has been completed in practice;3. guide rod and guide groove It is easy to appear when cooperation and blocks or be detached from situation;4. being difficult to adapt to the location and installation of large tank.
Summary of the invention
The technical problem to be solved in the present invention is that overcome above-mentioned the deficiencies in the prior art, provide it is a kind of can be by large-scale flow container It is quick and precisely positioned into rail, while facilitating installation again and removing, reused lifting guide-localization and installation method.This hair Fast and accurately localization method is greatly improved the one-time success rate of tank installation to flow container when bright liquefaction vessel is built, and effectively controls Shipbuilding cost processed.
Technology of the invention solves design: the civilian dress weldering lifting guide plate in flow container manufacture;In block assembly Otic placode is used in installation and guide device connection in corresponding position in segmentation;The appropriate location setting that flow container hanging ring is corresponded on main deck pulls Cucurbit eye plate, heavy industry slides into flow container guiding otic placode by pulling chain hoist to adjust flow container position when lifting In the specific guide groove of dedicated guiding device, rapidly and accurately realizes fall tank location and installation at the appointed time.
In order to achieve the above object of the invention, the specific technical solution that the invention patent provides is:
When liquefaction vessel is built, fast and accurately localization method, the flow container are greater than 10000 cubic metres to flow container to one kind Large-scale flow container, which is characterized in that the localization method comprises the following steps that
(1) guide plate is respectively set in the flow container two sides, which is symmetrically disposed on the side of flow container tube two sides Wall outer surface, the line between opposite two guide plates are slightly below flow container axle center and are parallel to horizontal plane;In the upper side of flow container Four suspension centres are set on wall;
(2) it is equipped with the installation site of flow container on body section, is equipped with removably in the installation site two sides of flow container Guiding device is additionally provided with the snap ring of multiple vertical spacing arrangements, the guiding device on the side wall of the installation site two sides of flow container Be integrated design, and the guiding device includes integral type leading truck, U-shaped guide groove in structure and buckles downwards, The integral type leading truck is the integral structure being bent by strip steel plate, which includes to be sequentially connected Be vertically directed section, oblique guide section and supporting section, described being vertically directed on the lateral surface of section is welded with U-shaped guide groove, Multiple downward buckles are welded on opposite medial surface, the U-shaped guide groove is the U-shaped being symmetrically bent to form by a steel bar Structure is closely fixed on oblique guide section after the upper opening bending of the U-shaped guide groove, and the oblique guide section is opposite It is bent backward with obtuse inclinations with realizing in being vertically directed section, the supporting section, which is connected on oblique guide section, has acute angle Inclination angle is bent downward with realizing, the end of the supporting section and the section that is vertically directed are concordant with the connecting portion of oblique guide section, The downward buckle is accordingly stuck in snap ring;
(3) four operation eye plates of welding equipment in two side deck of installation site top of flow container, by the steel wire on lifting equipment Rope is connected on the suspension centre of flow container, and flow container is hung and is pulled to above the installation site of body section flow container, and by four chain blocks Suspension centre and operation eye plate are separately connected with flow container is accurate and can be stably positioned;
(4) first the casting epoxy resin in the installation site of flow container, starting lifting equipment to whereabouts, utilize flow container simultaneously The stability of four chain block control flow containers is dropped down onto flow container in guiding device, with ensuring not shake so that flow container two The guide plate of side is stuck in the U-shaped guide groove on guiding device, and the gap between guide plate and U-shaped guide groove is kept to be greater than 5mm And it is less than 10mm;
(5) flow container is promptly fallen under guiding device and chain block control, and controls fall time and is less than 3min falls to installation site to flow container, checks and accepts until test passes;
(6) wirerope and chain block are removed, then the guiding device of integral type is removed, is passed through when removing guiding device Pull out disassembly upwards to realize overall pulling down and position for the installation of same type flow container.
As the prioritization scheme of present invention flow container fast and accurately localization method when liquefaction vessel is built, the guiding dress There are four installing, four guiding devices are positioned opposite in the installation site two sides of flow container and correspond to two-by-two.
As the prioritization scheme of present invention flow container fast and accurately localization method when liquefaction vessel is built, the guide plate peace At 600mm below flow container horizontal centre, guide plate maximum outer rim must exceed flow container edge insulation layer 150mm.
It is quasi- in advance before lifting as the prioritization scheme of present invention flow container fast and accurately localization method when liquefaction vessel is built Standby multiple 5t chain hoists, on main deck the operation eye plate of welding equipment perpendicular to deck level and with longitudinal member under deck Above deck in 45o welded corner joint, operation eye plate is connect with chain block by cable wire, shackle, plays heavy industry by pulling loop chain hand It draws cucurbit to adjust flow container position, slides into flow container guide plate in the U-shaped guide groove of guiding device.
Based on the above-mentioned technical proposal, present invention flow container fast and accurately localization method and prior art when liquefaction vessel is built Compared to having the following technical effect that:
(1) in the quick and precisely localization method of tank installation of the invention, the hoisting fixture of flow container is set using special Meter, its prominent specificity, convenience and versatility, and cooperate unique installation method that flow container can be made fast in cage installation Speed accurately determines position and saves stabilization;
(2) the quick and precisely localization method of tank installation of the invention can greatly improve the primary success of tank installation Rate, it is ensured that the integrity of tank body insulating surface after lifting effectively reduces the live welding equipment amount of ship, facilitates installation and removes, can It reuses, saves material and working hour, efficiently control shipbuilding cost.
(3) flow container of the invention is quickly and accurately positioned method and is applied in large-scale tank installation, is installed by special tool Meter, then strict control lifting time and gap precision, so that the fast and accurate for positioning target of flow container is achieved.
Detailed description of the invention
Fig. 1 is certain the model liquefaction vessel of the invention arrangement schematic diagram of flow container in hull when building.
Fig. 2 is the overall plan schematic diagram of flow container fast and accurately disposable localization method when liquefaction vessel of the present invention is built.
Fig. 3 is flow container fast and accurately guiding device in disposable localization method when invention liquefaction vessel is built Positive structure diagram.
Fig. 4 is flow container fast and accurately guiding device in disposable localization method when invention liquefaction vessel is built Side structure schematic view.
Specific embodiment
Below citing and in conjunction with attached drawing to it is of the invention liquefaction vessel build when flow container fast and accurately localization method make into The detailed description of one step in the hope of the apparent process flow that the invention patent method is explicitly described, and is related to dedicated The detailed construction of tooling forms and usage mode, but cannot be used as a limitation the scope of protection of the patent of the present invention.
The present invention is a kind of flow container when liquefaction vessel is built fast and accurately localization method, the flow container be greater than 10000 cubic metres of large-scale flow container.
As shown in Fig. 2, the localization method of flow container of the present invention comprises the following steps that
It (1) is that guide plate is respectively set in circular flow container two sides in cross section, which is symmetrically disposed on flow container pipe Two side external surfaces of body, the line between opposite two guide plates is slightly below flow container axle center and is parallel to horizontal plane, in flow container Four suspension centres are arranged in top, as depicted in figs. 1 and 2.
(2) dismountable guiding device is installed in the installation site two sides of flow container on body section.Here guiding device In order to realize its specificity and ease of use, completely new structure design is carried out, as shown in Figure 3 and Figure 4, which is Integrated structure design.
The guiding device includes integral type leading truck 1, U-shaped guide groove 2 in structure and buckles downwards 3 three big Component part.The integral type leading truck 1 is the integral structure being bent by strip steel plate, which includes Have it is sequentially connected be vertically directed section 11, oblique guide section 12 and supporting section 13, described is vertically directed on the lateral surface of section 11 It is welded with U-shaped guide groove 2, multiple downward buckles 3 are welded on opposite medial surface, the U-shaped guide groove 2 is by one The U-shaped structure that root steel bar is symmetrically bent to form closely is fixed on oblique guiding after the upper opening bending of the U-shaped guide groove 2 In section 12, the oblique guide section 12 relative to section 11 is vertically directed there are obtuse inclinations to bend backward to realize, described Supporting section 13 be connected on oblique guide section 12 have acute included angle is bent downward with realizing, the end of the supporting section 13 with it is described It is vertically directed that section 11 is concordant with the connecting portion of oblique guide section 12, the downward buckle 3 is accordingly stuck in the installation positions of flow container It sets in the snap ring on side wall.
(3) four operation eye plates of welding equipment in two side deck of installation site top of flow container, by the steel wire on lifting equipment Rope is connected on the suspension centre of flow container, and flow container is hung and is pulled to above the flow container installation site of body section, and by four chain blocks Suspension centre and operation eye plate are separately connected with flow container is accurate and can be stably positioned.
(4) first start lifting equipment for flow container to whereabouts in the installation site casting epoxy resin of flow container, while utilizing four The stability of a chain block control flow container is dropped down onto flow container in guiding device, with ensuring not shake so that flow container two sides Guide plate be stuck in the guide groove on guiding device, and gap between guide plate and guide groove is kept to be less than 10mm and big In 5mm.
(5) by flow container guiding device and chain block control under promptly fall, control fall time less than 3 minutes, Flow container falls to installation site, and checks and accepts until test passes.
(6) wirerope and chain block are removed, then the guiding device of integral type is removed, is passed through when removing guiding device Disassembly is pulled out upwards to realize that integral demounting is spare, to position for the installation of subsequent same type flow container.
Use through nearly 2 years a plurality of ships proves, present invention flow container fast and accurately localization method energy when liquefaction vessel is built It is enough rapidly and accurately to realize positioning into rail for flow container, it, can be significantly due to structure design, production and the application of Integral guiding device Improve the one-time success rate of tank installation, it is ensured that the integrity of tank body insulating surface after lifting effectively reduces the scene dress of ship Weldering amount facilitates installation and removes, reusable, saves material and working hour, efficiently controls shipbuilding cost.

Claims (4)

1. fast and accurately localization method, the flow container are greater than 10000 cubic metres to a kind of flow container when liquefaction vessel is built Large-scale flow container, the cross section of the large size flow container are circle, which is characterized in that the localization method comprises the following steps that
(1) guide plate is respectively set in the flow container two sides, which is symmetrically disposed on outside the side wall of flow container tank body two sides Surface, the line between opposite two guide plates are slightly below flow container axle center and are parallel to horizontal plane;In the upper portion side wall of flow container Four suspension centres are set;
(2) it is equipped with the installation site of flow container on body section, dismountable guiding is installed in the installation site two sides of flow container Device, is additionally provided with the snap ring of multiple vertical spacing arrangements on the side wall of the installation site two sides of flow container, which is one The design of body structure, the guiding device includes integral type leading truck, U-shaped guide groove in structure and buckles downwards, described Integral type leading truck be the integral structure being bent by strip steel plate, which includes sequentially connected perpendicular Straight guide section, oblique guide section and supporting section, described being vertically directed on the lateral surface of section are welded with U-shaped guide groove, relatively Medial surface on be welded with multiple downward buckles, the U-shaped guide groove is the U-shaped knot being symmetrically bent to form by a steel bar Structure, the U-shaped guide groove upper opening bending after be closely fixed on oblique guide section, the oblique guide section relative to It is vertically directed section to bend backward with obtuse inclinations to realize, the supporting section is connected on oblique guide section to incline with acute angle Angle is bent downward with realizing, the end of the supporting section is concordant with the connecting portion for being vertically directed section and oblique guide section, institute Buckle downwards is stated accordingly to be stuck in snap ring;
(3) four operation eye plates of welding equipment in two side deck of installation site top of flow container connect the wirerope on lifting equipment It connects on the suspension centre of flow container, flow container is hung and is pulled to above the installation site of body section flow container, and four chain blocks are distinguished Connection suspension centre and operation eye plate are with accurate by flow container and can be stably positioned;
(4) the first casting epoxy resin in the installation site of flow container starts lifting equipment for flow container to whereabouts, while utilizing four Chain block controls the stability of flow container to ensure not shake, and flow container is dropped down onto guiding device, so that flow container two sides Guide plate is stuck in the U-shaped guide groove on guiding device, and gap between guide plate and U-shaped guide groove is kept to be greater than 5mm and small In 10mm;
(5) flow container is promptly fallen under guiding device and chain block control, and controls fall time and is less than 3min, to Flow container falls to installation site, checks and accepts until test passes;
(6) wirerope and chain block are removed, then the guiding device of integral type is removed, by upward when removing guiding device Disassembly is pulled out to realize overall pulling down and position for the installation of same type flow container.
2. the flow container fast and accurately localization method according to claim 1 when liquefaction vessel is built, which is characterized in that described Guiding device set there are four, four guiding devices are positioned opposite in the installation site two sides of flow container and correspond to two-by-two.
3. the flow container fast and accurately localization method according to claim 1 when liquefaction vessel is built, which is characterized in that described Guide plate is mounted at flow container horizontal centre or less 600mm, and guide plate maximum outer rim must exceed flow container edge insulation layer 150mm.
4. the flow container fast and accurately localization method according to claim 1 when liquefaction vessel is built, which is characterized in that lifting Before prepare multiple 5t chain hoists in advance, on main deck the operation eye plate of welding equipment perpendicular to deck level and under deck Above deck in 45o welded corner joint, operation eye plate is connect with chain block by cable wire, shackle longitudinal member, is played heavy industry and is passed through drawing Dynamic chain hoist adjusts flow container position, slides into flow container guide plate in the U-shaped guide groove of guiding device.
CN201611019176.7A 2016-11-21 2016-11-21 The flow container fast and accurately localization method when liquefaction vessel is built Active CN106741603B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611019176.7A CN106741603B (en) 2016-11-21 2016-11-21 The flow container fast and accurately localization method when liquefaction vessel is built

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611019176.7A CN106741603B (en) 2016-11-21 2016-11-21 The flow container fast and accurately localization method when liquefaction vessel is built

Publications (2)

Publication Number Publication Date
CN106741603A CN106741603A (en) 2017-05-31
CN106741603B true CN106741603B (en) 2019-01-25

Family

ID=58969696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611019176.7A Active CN106741603B (en) 2016-11-21 2016-11-21 The flow container fast and accurately localization method when liquefaction vessel is built

Country Status (1)

Country Link
CN (1) CN106741603B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108100157A (en) * 2017-12-15 2018-06-01 佛山市厚德众创科技有限公司 A kind of ultra-large type liquified gas carries flow container segmentation precision control method
CN108263557A (en) * 2017-12-20 2018-07-10 广州文冲船厂有限责任公司 Large-scale pitch fallers tank installation method and its spacing collar
CN108891530A (en) * 2018-06-21 2018-11-27 招商局重工(江苏)有限公司 A kind of deck panel division methods of stand alone type storage tank type LNG ship
CN110194240A (en) * 2019-05-25 2019-09-03 招商局重工(江苏)有限公司 A kind of flow container installation and locating method of Large LNG ship
CN110304198A (en) * 2019-06-17 2019-10-08 沪东中华造船(集团)有限公司 A kind of harbour hanging method filling ship c-type flow container
CN110562385B (en) * 2019-08-15 2020-12-18 广州文冲船厂有限责任公司 Positioning method of tank body

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1587015A (en) * 2004-07-13 2005-03-02 沪东中华造船(集团)有限公司 Movable guide and positioning device for hoisting liquid tank and its mounting method
CN1970388A (en) * 2005-11-21 2007-05-30 沪东中华造船(集团)有限公司 Production method of spherical liquid container saddle seat for ship
CN103832543B (en) * 2014-03-19 2016-02-17 上海江南长兴重工有限责任公司 A kind of flow container mounting structure of large-scale liquefied gas carrier and installation and locating method thereof

Also Published As

Publication number Publication date
CN106741603A (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN106741603B (en) The flow container fast and accurately localization method when liquefaction vessel is built
CN106516021B (en) Self-propelled underwater tunnel immersed tube carrying and mounting integrated ship
CN101429928B (en) Integral hoisting method for wind generator set on the sea
CN106882325B (en) A kind of split type rudder paddle diversion pipe hanging method
CN108163138B (en) Cabin-out method for overhaul of main engine of ship
CN104443260B (en) A kind of all-direction propeller underwater portion erecting device and method
CN102167137B (en) Method for positioning independent cargo space and carrier body of asphalt carrier
CN105366005B (en) A kind of replacing options of mooring anchor leg
CN108455451B (en) A kind of 600 tons of gantry cranes hold the method for hanging installation superelevation flare tower
CN104136358A (en) Method and apparatus for handling wind turbine components during transport and assembly
CN104875847A (en) Method for quickly carrying middle transverse bulkhead of container ship
CN109403365B (en) Safe outgoing system and process for unmanned caisson
WO2023082524A1 (en) Compartment hoisting and docking method for mounting offshore wind turbine by means of floating ship
JP2012011845A (en) Method for installing tension mooring floating body structure, and ship for installing the same
CN203372980U (en) Detachable top cover hanger applicable to pressurized water reactor
CN108860450A (en) A kind of propeller for vessels blade assemble method
CN212685871U (en) Ship body-based operation equipment installation system and ship with same
CN110053720A (en) Immersed tube combination transport installs equipment and transportation installation method
CN109606547A (en) A kind of container ship transverse bulkhead sectional guide rail installation carriage and its application method
CN205369040U (en) Suspension bridge is under construction on bank stiffening beam secondary and is swung and move device
CN103963931A (en) Large component semi-submersible water transport installation system and construction method
KR101429551B1 (en) Installation module of trolley hoist for vessel or marine structure and the operating method of it
CN109368508B (en) The offshore lifting method of large size valve on floating production storage offloading's standpipe
CN208856786U (en) Hoisting tooling suitable for Turbo-charged Marine Boiler
CN106522234B (en) A kind of the underwater grouting formwork structure and its construction method of pole section increasing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Jin Yanzi

Inventor after: Tang Shiyuan

Inventor after: Wang Zhongqiang

Inventor before: Jin Yanzi

Inventor before: Wang Zhongqiang

GR01 Patent grant
GR01 Patent grant