CN108891530A - A kind of deck panel division methods of stand alone type storage tank type LNG ship - Google Patents

A kind of deck panel division methods of stand alone type storage tank type LNG ship Download PDF

Info

Publication number
CN108891530A
CN108891530A CN201810646733.0A CN201810646733A CN108891530A CN 108891530 A CN108891530 A CN 108891530A CN 201810646733 A CN201810646733 A CN 201810646733A CN 108891530 A CN108891530 A CN 108891530A
Authority
CN
China
Prior art keywords
deck
storage tank
topside
segmented
ship
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810646733.0A
Other languages
Chinese (zh)
Inventor
王守桂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Merchants Heavy Industry Jiangsu Co Ltd
Original Assignee
China Merchants Heavy Industry Jiangsu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Merchants Heavy Industry Jiangsu Co Ltd filed Critical China Merchants Heavy Industry Jiangsu Co Ltd
Priority to CN201810646733.0A priority Critical patent/CN108891530A/en
Publication of CN108891530A publication Critical patent/CN108891530A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The present invention relates to ship production design technical fields, refer in particular to a kind of deck panel division methods of free-standing storage tank type LNG ship, segmentation division is carried out to deck, deck layout above each cargo area storage tank is at a deck panel, its horizontal plane projection size is greater than free-standing LNG storage tank horizontal plane projection size, is conducive to LNG storage tank handling installation;Segmentation surrounding closes up mouth using wedge shape, realizes that segmentation is quick, carrying is facilitated to close up;Independent segmented be segmented with topside in deck is designed at transverse bulkhead to connect, and is improved the bulk strength of carrying stage shell, is reduced the deformation of hull.

Description

A kind of deck panel division methods of stand alone type storage tank type LNG ship
Technical field
The present invention relates to Ship Design Technology fields, and in particular to a kind of deck panel stroke of stand alone type storage tank type LNG ship Divide method.
Background technique
LNG ship refers to the specialized ships that LNG is transported to receiving station from liquefaction plant, at present the storage tank of world's LNG carrier Type system has stand alone type and two kinds of diaphragm type, and very big, the free-standing storage tank of influence is built in design that the form of storage tank transport LNG Refer to be not connected with Ship Structure or be not Ship Structure component part cargo containment container, one is placed in each cargo hold A stand alone type storage tank is not easy to the lifting of LNG storage tank, places for storing LNG.
Summary of the invention
In view of the above-mentioned problems, the invention aims to provide a kind of deck panel division of free-standing storage tank type LNG ship Method after carrying out segmentation division to deck, closes up mouth using wedge shape, carries out quickly closing up assembly to each segmentation, it is spacious to retain deck Mouthful, facilitate free-standing LNG storage tank to be hoisted in cargo hold by deck opening, it is ensured that handling, the installation of free-standing LNG storage tank are wanted It asks.
In order to achieve the above object, this invention takes following technical solutions:
Step 1: dividing the deck region of equal amount according to the cargo hold quantity of ship;
Step 2: each deck region is divided into, deck panel, the segmentation of larboard topside, starboard topside is segmented, tail deck is independently divided Section, first deck are independent segmented, and the surrounding being respectively segmented closes up seam using wedge shape;
Step 3: deck panel is divided two deck subsections according to the capacity of equipment of shipyard, Ground arrangement;
Step 4: deck subsection carries out total group after the completion of building, deck panel is formed;
Step 5: the segmentation of larboard topside, starboard topside handling subsection to dock to be placed on double bottom block and weld positioning;
Step 6: being hoisted to dock for initial and end deck is independent segmented, it is placed on initial and end transverse bulkhead respectively and welds positioning, with The topside of the left and right side of a ship is segmented connection;
It is placed Step 7: free-standing LNG storage tank is hoisted in cargo hold on double bottom block by deck opening, the left and right side of a ship The independent segmented deck opening horizontal plane projection size surrounded in deck of topside segmentation and initial and end, i.e. deck panel horizontal plane are thrown Shadow size is greater than free-standing LNG storage tank horizontal plane projection size, value 500mm;
Step 8: deck panel is hoisted to deck opening, topside segmentation, the independent segmented conjunction in deck of head and the tail with port and starboard Hold together, so far entire cargo area segment folding forming.
The present invention has following advantages and effect:Deck subsection forms deck panel on internal field level land, and working procedure mentions Precedingization, operation internal field, high altitude operation esd ground reduce high altitude operation risk, and entire cargo area deck panel is once hung Position is transported to, production efficiency is improved;Before deck panel installation, cargo area deck is opened wide completely, is convenient for equipment and materials handling, insulation It is laid with, LNG storage tank is into cabin location and installation.
Detailed description of the invention
Fig. 1 is flow chart of the invention.
Specific embodiment
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached The embodiment of figure description is exemplary, and for explaining only the invention, and is not considered as limiting the invention.
In the description of the present invention, unless otherwise specified and limited, it should be noted that term " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be mechanical connection or electrical connection, the connection being also possible to inside two elements can It, can also be indirectly connected through an intermediary to be to be connected directly.It for the ordinary skill in the art, can basis Concrete condition understands the concrete meaning of above-mentioned term.
The deck panel division methods of described a kind of free-standing storage tank type LNG ship referring to Fig.1, include the following steps:
Step 1 divides the deck region of equal amount according to the cargo hold quantity of ship;
Each deck region is divided into deck panel by step 2, larboard topside is segmented, starboard topside is segmented, tail deck is independently divided Section, first deck are independent segmented, and the surrounding being respectively segmented closes up seam using wedge shape;Seam is closed up using wedge shape, deck panel can be convenient The topside segmentation for importing the left and right side of a ship and the independent segmented deck surrounded in deck of initial and end are open, and realization quickly closes up positioning, together When the left and right side of a ship topside segmentation and initial and end deck it is independent segmented can effectively support deck be segmented, code at mouth is closed up in reduction Plate;
Deck panel is divided two subsections according to factors such as the capacity of equipment of shipyard, Ground arrangements by step 3;
Step 4, deck subsection carry out total group after the completion of building, form deck panel, deck subsection(6)(7)It is flat in internal field Ground forms deck panel, and working procedure is changed in advance, and high altitude operation esd ground reduces high altitude operation risk;Entire cargo area Handling of deck panel in place, improves production efficiency;Reduce deck in dock and close up seam, improves the complete of insulator laying Whole degree;
Step 5, first larboard topside segmentation, starboard topside handling subsection to dock, is placed on double bottom block and welds positioning;
Step 6 is hoisted to dock for the deck of initial and end is independent segmented respectively, be placed on initial and end transverse bulkhead respectively weld it is fixed Position is segmented with the topside of the left and right side of a ship and connects, and the independent segmented topside with the left and right side of a ship in the deck of initial and end, which is segmented, at transverse bulkhead connects It connects, the bulk strength of carrying stage shell can be improved, reduce the deformation of hull;Exit passageway can be provided simultaneously, facilitates people from two sides Member's walking and material transport;
Free-standing LNG storage tank is hoisted in cargo hold on double bottom block by deck opening and is placed by step 7, the left and right side of a ship Topside segmentation and the independent segmented deck opening horizontal plane projection size surrounded in the deck i.e. deck panel horizontal plane of initial and end project Size is greater than free-standing LNG storage tank horizontal plane projection size, and value 500mm, the topside segmentation of the left and right side of a ship and tail, first deck are only After vertical segment carrying, free-standing LNG storage tank is hung in cargo hold in which can be convenient by deck opening.
Deck panel is hoisted to deck opening by step 8, and the deck of topside segmentation and initial and end with the left and right side of a ship is independent Segment folding, so far entire cargo area segment folding forming.
The present invention has following advantages and effect:Deck subsection forms deck panel on internal field level land, and working procedure mentions Precedingization, operation internal field, high altitude operation esd ground reduce high altitude operation risk, and entire cargo area deck panel is once hung Position is transported to, production efficiency is improved;Before deck panel installation, cargo area deck is opened wide completely, is convenient for equipment and materials handling, insulation It is laid with, LNG storage tank is into cabin location and installation.
In the description of this specification, the description meaning of reference term " one embodiment ", " example " or " some examples " etc. Refer to that particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one reality of the invention It applies in example or example.In the present specification, schematic expression of the above terms are not necessarily referring to identical embodiment or show Example.Moreover, particular features, structures, materials, or characteristics described can be in any one or more of the embodiments or examples It can be combined in any suitable manner.
Although an embodiment of the present invention has been shown and described, it will be understood by those skilled in the art that:Not A variety of change, modification, replacement and modification can be carried out to these embodiments in the case where being detached from the principle of the present invention and objective, this The range of invention is defined by the claims and their equivalents.

Claims (1)

1. a kind of deck panel division methods of stand alone type storage tank type LNG ship, it is characterised in that:It comprises the steps of:
Step 1: dividing the deck region of equal amount according to the cargo hold quantity of ship;
Step 2: each deck region is divided into, deck panel, the segmentation of larboard topside, starboard topside is segmented, tail deck is independently divided Section, first deck are independent segmented, and the surrounding being respectively segmented closes up seam using wedge shape;
Step 3: deck panel is divided two deck subsections according to the capacity of equipment of shipyard, Ground arrangement;
Step 4: deck subsection carries out total group after the completion of building, deck panel is formed;
Step 5: the segmentation of larboard topside, starboard topside handling subsection to dock to be placed on double bottom block and weld positioning;
Step 6: being hoisted to dock for initial and end deck is independent segmented, it is placed on initial and end transverse bulkhead respectively and welds positioning, with The topside of the left and right side of a ship is segmented connection;
It is placed Step 7: free-standing LNG storage tank is hoisted in cargo hold on double bottom block by deck opening, the left and right side of a ship The independent segmented deck opening horizontal plane projection size surrounded in deck of topside segmentation and initial and end, i.e. deck panel horizontal plane are thrown Shadow size is greater than free-standing LNG storage tank horizontal plane projection size, value 500mm;
Step 8: deck panel is hoisted to deck opening, topside segmentation, the independent segmented conjunction in deck of head and the tail with port and starboard Hold together, so far entire cargo area segment folding forming.
CN201810646733.0A 2018-06-21 2018-06-21 A kind of deck panel division methods of stand alone type storage tank type LNG ship Pending CN108891530A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810646733.0A CN108891530A (en) 2018-06-21 2018-06-21 A kind of deck panel division methods of stand alone type storage tank type LNG ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810646733.0A CN108891530A (en) 2018-06-21 2018-06-21 A kind of deck panel division methods of stand alone type storage tank type LNG ship

Publications (1)

Publication Number Publication Date
CN108891530A true CN108891530A (en) 2018-11-27

Family

ID=64345523

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810646733.0A Pending CN108891530A (en) 2018-06-21 2018-06-21 A kind of deck panel division methods of stand alone type storage tank type LNG ship

Country Status (1)

Country Link
CN (1) CN108891530A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112278183A (en) * 2020-09-17 2021-01-29 沪东中华造船(集团)有限公司 Method for building liquid dome deck sections of LNG ship in same tyre
CN114044107A (en) * 2021-12-02 2022-02-15 沪东中华造船(集团)有限公司 Two-dimensional positioning method for ship broadside segment segmentation folding
CN114162283A (en) * 2021-12-15 2022-03-11 江南造船(集团)有限责任公司 Convex deck component installation method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB141042A (en) * 1918-03-21 1921-04-28 Alfredo Carlo Janni Improvements in or connected with concrete ships and methods of building such ships
CN202279208U (en) * 2011-10-18 2012-06-20 大连船舶重工集团有限公司 Screw jack device for assembling ship body sections
CN202337342U (en) * 2011-11-14 2012-07-18 江苏新扬子造船有限公司 Scaffold structure for butt joint of transverse bulkhead and deck
CN104646841A (en) * 2013-11-21 2015-05-27 天津市海王星海上工程技术股份有限公司 Deck sectional-carrying butt-jointed welding seam optimizing method
CN106741603A (en) * 2016-11-21 2017-05-31 沪东中华造船(集团)有限公司 The flow container fast and accurately localization method when liquefaction vessel is built
CN107697224A (en) * 2016-08-09 2018-02-16 启东丰顺船舶重工有限公司 A kind of LNG liquefied gas carriers flow container enters cargo hold hoisting
CN107974917A (en) * 2017-11-15 2018-05-01 中铁大桥勘测设计院集团有限公司 One kind bending node, curve continuous steel girder bridge and its design method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB141042A (en) * 1918-03-21 1921-04-28 Alfredo Carlo Janni Improvements in or connected with concrete ships and methods of building such ships
CN202279208U (en) * 2011-10-18 2012-06-20 大连船舶重工集团有限公司 Screw jack device for assembling ship body sections
CN202337342U (en) * 2011-11-14 2012-07-18 江苏新扬子造船有限公司 Scaffold structure for butt joint of transverse bulkhead and deck
CN104646841A (en) * 2013-11-21 2015-05-27 天津市海王星海上工程技术股份有限公司 Deck sectional-carrying butt-jointed welding seam optimizing method
CN107697224A (en) * 2016-08-09 2018-02-16 启东丰顺船舶重工有限公司 A kind of LNG liquefied gas carriers flow container enters cargo hold hoisting
CN106741603A (en) * 2016-11-21 2017-05-31 沪东中华造船(集团)有限公司 The flow container fast and accurately localization method when liquefaction vessel is built
CN107974917A (en) * 2017-11-15 2018-05-01 中铁大桥勘测设计院集团有限公司 One kind bending node, curve continuous steel girder bridge and its design method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
华乃导等: "《船舶设计教学手册》", 28 February 1999, 中国标准出版社 *
王云梯等: "《船体装配工艺》", 31 October 1994, 哈尔滨工程大学出版社 *
黄胜等: "《液化气运输船实用手册》", 31 August 1992, 哈尔滨船舶工程学院出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112278183A (en) * 2020-09-17 2021-01-29 沪东中华造船(集团)有限公司 Method for building liquid dome deck sections of LNG ship in same tyre
CN112278183B (en) * 2020-09-17 2023-12-08 沪东中华造船(集团)有限公司 Same-tire construction method for LNG ship liquid dome deck segmentation
CN114044107A (en) * 2021-12-02 2022-02-15 沪东中华造船(集团)有限公司 Two-dimensional positioning method for ship broadside segment segmentation folding
CN114162283A (en) * 2021-12-15 2022-03-11 江南造船(集团)有限责任公司 Convex deck component installation method
CN114162283B (en) * 2021-12-15 2023-01-20 江南造船(集团)有限责任公司 Convex deck component installation method

Similar Documents

Publication Publication Date Title
CN108891530A (en) A kind of deck panel division methods of stand alone type storage tank type LNG ship
CN109850066B (en) Ship assembly carrying method
CN110466680A (en) A kind of method for loading of double cabin type ship block
CN113955044A (en) Method for carrying total section of LNG (liquefied Natural gas) cabin of container ship, total section of LNG cabin and container ship
CN108407968B (en) Segmentation division method for side ballast tank
CN112977729B (en) Ship and method of constructing the same
JP2002512150A (en) OBO ship or bulk carrier
CN113772042A (en) Cargo compartment segmentation design method for 8-million-cubic-level thin-film LNG ship and cargo compartment segmentation
CN104071726A (en) Intelligent wharf hydraulic type container receiving and transporting platform and method
KR100718928B1 (en) Giga-block method using many sea-cranes
CN108945296A (en) A kind of corrugated bulkhead sectional construction method
CN202988574U (en) Bivalve grab bucket for grabbing viscous material
CN106364626A (en) Ship hatch negative corner packaging structure
CN102218587B (en) Fillet-welding method for trough-shaped bulkhead and upper deck of vessel
KR20090007920A (en) Ship assembling and launching method using divided land and marine construction
CN100415596C (en) Tech. for carrying super building on oil ship
CN115660215B (en) Method, system and equipment for optimizing combination of air freight container loading and stowage
CN111268057A (en) Method for assembling and welding main sections and closing main sections of ships or marine equipment
CN105667709A (en) Hull manufacturing method
CN101200200A (en) Marine transporting method for van-type semi-trailer and van-type semi-trailer
CN109466693A (en) A kind of ore carrier cargo hold method of modifying
CN113562115B (en) Arrangement method of ship bilge structure, ship bilge structure and ship
CN204956854U (en) Hatch encloses, hatch board and have that this hatch encloses, multipurpose ship of hatch board
KR20130000742A (en) Upper deck plate with knuckle of membrane lng carrier and membrane lng storage unit
CN218949397U (en) Cargo tank layout structure of gas transport ship

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181127

RJ01 Rejection of invention patent application after publication