CN106738404A CN201611086161.2A CN201611086161A CN106738404A CN 106738404 A CN106738404 A CN 106738404A CN 201611086161 A CN201611086161 A CN 201611086161A CN 106738404 A CN106738404 A CN 106738404A
Authority
CN
China
Prior art keywords
mixing drum
feeding warehouse
vibratory sieve
charging process
bin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611086161.2A
Other languages
Chinese (zh)
Other versions
CN106738404B (en
Inventor
徐维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Set Up In Wuhu Packaging Co Ltd
Original Assignee
Set Up In Wuhu Packaging Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Set Up In Wuhu Packaging Co Ltd filed Critical Set Up In Wuhu Packaging Co Ltd
Priority to CN201611086161.2A priority Critical patent/CN106738404B/en
Publication of CN106738404A publication Critical patent/CN106738404A/en
Application granted granted Critical
Publication of CN106738404B publication Critical patent/CN106738404B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29BPREPARATION OR PRETREATMENT OF THE MATERIAL TO BE SHAPED; MAKING GRANULES OR PREFORMS; RECOVERY OF PLASTICS OR OTHER CONSTITUENTS OF WASTE MATERIAL CONTAINING PLASTICS
    • B29B7/00Mixing; Kneading
    • B29B7/02Mixing; Kneading non-continuous, with mechanical mixing or kneading devices, i.e. batch type
    • B29B7/06Mixing; Kneading non-continuous, with mechanical mixing or kneading devices, i.e. batch type with movable mixing or kneading devices
    • B29B7/10Mixing; Kneading non-continuous, with mechanical mixing or kneading devices, i.e. batch type with movable mixing or kneading devices rotary
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29BPREPARATION OR PRETREATMENT OF THE MATERIAL TO BE SHAPED; MAKING GRANULES OR PREFORMS; RECOVERY OF PLASTICS OR OTHER CONSTITUENTS OF WASTE MATERIAL CONTAINING PLASTICS
    • B29B13/00Conditioning or physical treatment of the material to be shaped
    • B29B13/10Conditioning or physical treatment of the material to be shaped by grinding, e.g. by triturating; by sieving; by filtering
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29BPREPARATION OR PRETREATMENT OF THE MATERIAL TO BE SHAPED; MAKING GRANULES OR PREFORMS; RECOVERY OF PLASTICS OR OTHER CONSTITUENTS OF WASTE MATERIAL CONTAINING PLASTICS
    • B29B7/00Mixing; Kneading
    • B29B7/02Mixing; Kneading non-continuous, with mechanical mixing or kneading devices, i.e. batch type
    • B29B7/22Component parts, details or accessories; Auxiliary operations
    • B29B7/24Component parts, details or accessories; Auxiliary operations for feeding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29BPREPARATION OR PRETREATMENT OF THE MATERIAL TO BE SHAPED; MAKING GRANULES OR PREFORMS; RECOVERY OF PLASTICS OR OTHER CONSTITUENTS OF WASTE MATERIAL CONTAINING PLASTICS
    • B29B7/00Mixing; Kneading
    • B29B7/02Mixing; Kneading non-continuous, with mechanical mixing or kneading devices, i.e. batch type
    • B29B7/22Component parts, details or accessories; Auxiliary operations
    • B29B7/28Component parts, details or accessories; Auxiliary operations for measuring, controlling or regulating, e.g. viscosity control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29BPREPARATION OR PRETREATMENT OF THE MATERIAL TO BE SHAPED; MAKING GRANULES OR PREFORMS; RECOVERY OF PLASTICS OR OTHER CONSTITUENTS OF WASTE MATERIAL CONTAINING PLASTICS
    • B29B7/00Mixing; Kneading
    • B29B7/80Component parts, details or accessories; Auxiliary operations
    • B29B7/82Heating or cooling

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Accessories For Mixers (AREA)

Abstract

The invention discloses a kind of charging process for plastics, the charging process is comprised the following steps:1) the first material and second material respectively, are put into first feeding warehouse and the second feeding warehouse of the feeding device for packing tube, and are put into the first material and second material correspondingly respectively in the first storing bin and the second storing bin;2) the first induced-draught fan and the second induced-draught fan being arranged on correspondingly respectively on the first mixing drum and the second mixing drum, are started, to enable that described the first material is stirred in entering the first mixing drum by the first suction tube;3) temperature control valve (TCV) installed in heater one end, is started, heat can be entered into the first mixing drum and the second mixing drum by endothermic tube;4), second material in the first material and the second mixing drum in first mixing drum is stirred.The charging process can prevent deficiencies of stores, to ensure packing tube quality, and can save human resources again.

Description

For the charging process of plastics
Technical field
The present invention relates to packing tube processing, in particular it relates to a kind of charging process for plastics.
Background technology
At present, with the progress of society, the automaticity of various big-and-middle-sized machineries is higher, in the charging of manufacture packing tube During, manual dispensing generally is, the material that will be prepared puts into feeding warehouse, is then fed into being stirred in mixing drum mixed Close uniform, however, inevitably there is the phenomenon of deficiencies of stores due to being artificial blowing in the material in feeding warehouse, and then Technological process below can be influenceed, if operating personnel do not have found deficiencies of stores in time, the matter of the packing tube to producing Amount has considerable influence.
Thus, there is provided one kind is prevented from deficiencies of stores, and then ensures packing tube quality, and can save human resources again The charging process for plastics be urgent need to resolve of the present invention problem.
The content of the invention
It is an object of the invention to provide a kind of charging process for plastics, the charging process is prevented from deficiencies of stores, To ensure packing tube quality, and human resources can be saved again.
To achieve these goals, the invention provides a kind of charging process for plastics, the charging process includes Following steps:
1) the first material and second material, are put into of the feeding device for packing tube correspondingly respectively One feeding warehouse and the second feeding warehouse, and it is put into the first material correspondingly respectively in the first storing bin and the second storing bin With second material;
2) the first induced-draught fan and second being arranged on correspondingly respectively on the first mixing drum and the second mixing drum, is started Induced-draught fan, is stirred with enabling described the first material to be entered into by the first suction tube in the first mixing drum, described Second material can be entered into by the second suction tube and be stirred in the second mixing drum;
3) temperature control valve (TCV) installed in heater one end, is started, to enable the heat of heater by endothermic tube In having respectively entered first mixing drum and second mixing drum;
4), second material in the first material in first mixing drum and second mixing drum is stirred Mix;
The feeding device includes material bin, the first suction tube, the second suction tube, the first mixing drum, the second mixing drum, suction Heat pipe, heater and hair-dryer;One end of first suction tube is communicated in the first feeding warehouse of the material bin, and the other end connects Pass through first mixing drum;One end of second suction tube is communicated in the second feeding warehouse of the material bin, and the other end connects Pass through second mixing drum;And the first induced-draught fan is installed to enable first suction tube on first mixing drum Material is sucked into the first mixing drum from first feeding warehouse, be provided with second mixing drum the second induced-draught fan with Enable that from second feeding warehouse be sucked into the second mixing drum material by second suction tube;The endothermic tube One end is communicated on first mixing drum and second mixing drum, and the other end is connected in the heating by temperature control valve (TCV) On device;And the hair-dryer is arranged on the side relative with the temperature control valve (TCV) of the heater;The material bin bag The first storing bin is included, first feeding warehouse of first storing bin is communicated in, is disposed adjacent in first feeding warehouse Second feeding warehouse and the second storing bin for being communicated in second feeding warehouse;First storing bin is tilted to be provided with One vibratory sieve, and first vibratory sieve tilt port towards first feeding warehouse, first feeding warehouse and described first First pressure sensor is also equipped between the tilt port of vibratory sieve;Multiple first is provided with the compass screen surface of first vibratory sieve Projection, and the multiple first projection is along multiple diagonal setting of the compass screen surface of first vibratory sieve, and the multiple first Projection is arranged to the other end along described cornerwise one end.
Preferably, second storing bin is tilted is provided with the second vibratory sieve, and second vibratory sieve tilt port Towards second feeding warehouse;Second pressure biography is provided between the tilt port of second feeding warehouse and second vibratory sieve Multiple second projections are provided with sensor, and the compass screen surface of second vibratory sieve, and the multiple second projection is along described second Multiple diagonal of the compass screen surface of vibratory sieve are set, and the multiple second projection is along the diagonal of the compass screen surface of second vibratory sieve One end arrange to the other end.
Preferably, the distance between adjacent described two first projections are identical, and the multiple first projection length edge The compass screen surface of first vibratory sieve is gradually reduced from bottom to top.
Preferably, the distance between two neighboring described second projection is identical, and the multiple second projection length edge The compass screen surface of second vibratory sieve is gradually reduced from bottom to top.
Preferably, dividing plate is detachably connected between first feeding warehouse and second feeding warehouse, to cause institute Stating the first feeding warehouse and second feeding warehouse can separate;And the height of the dividing plate is more than or equal to the height of the material bin Degree.
Preferably, first mixing drum is provided with rabbling mechanism;The rabbling mechanism includes being vertically installed at described the Agitating shaft in one mixing drum and the multiple paddles being movably arranged on agitating shaft, and the paddle radius from bottom to top Gradually reduce.
Preferably, multiple apertures are provided with the paddle, and multiple apertures are set near the agitating shaft.
Preferably, first mixing drum and second mixing drum are all formed as cylinder, and are arranged on agitating shaft bottom The radius of the paddle at end is equal to the radius of the cylinder.
According to above-mentioned technical proposal, the present invention provides a kind of charging process for plastics, and the charging process includes following Step:1) the first material and second material, are put into the first feeding warehouse and the second feeding warehouse correspondingly respectively, and It is put into the first material and second material in first storing bin and the second storing bin correspondingly respectively;2) difference, is started The first induced-draught fan and the second induced-draught fan on the first mixing drum and the second mixing drum are arranged on correspondingly, to cause described the A kind of material can be entered into by the first suction tube and is stirred in the first mixing drum, and second material can be by Two suction tubes are entered into and are stirred in the second mixing drum;3) temperature control valve (TCV) installed in heater one end, is started, to cause During the heat of heater can have respectively entered first mixing drum and second mixing drum by endothermic tube;4), to institute Second material stated in the first material in the first mixing drum and second mixing drum is stirred;So by the first Material and second material are drawn into the first mixing drum and the second mixing drum by the first suction tube and the second suction tube, and The first material and second material are put into correspondingly respectively in the first storing bin and the second storing bin, so, when The first material in one storing bin supplies first material storehouse in real time, when the first material in the first storing bin is only remained necessarily During amount, warning device warning reminding operating personnel feed the first material, and then reach the phenomenon for preventing the first deficiencies of stores; Similarly, it is also possible to prevent second phenomenon of deficiencies of stores;And then ensure the quality of packing tube.
Other features and advantages of the present invention will be described in detail in subsequent specific embodiment part.
Brief description of the drawings
Accompanying drawing is, for providing a further understanding of the present invention, and to constitute the part of specification, with following tool Body implementation method is used to explain the present invention together, but is not construed as limiting the invention.In the accompanying drawings:
Fig. 1 is the structural representation of the feeding device for packing tube of preferred embodiment of the invention.
Description of reference numerals
1st, the first suction tube 2, the second suction tube
3rd, the first mixing drum 4, the second mixing drum
5th, endothermic tube 6, heater
7th, hair-dryer 8, the first induced-draught fan
9th, the second induced-draught fan 10, temperature control valve (TCV)
11st, the first storing bin 12, the first feeding warehouse
13rd, first pressure sensor 14, first is raised
15th, the second storing bin 16, the second feeding warehouse
17th, second pressure sensor 18, second is raised
19th, the first vibratory sieve 20, the second vibratory sieve
Specific embodiment
Specific embodiment of the invention is described in detail below in conjunction with accompanying drawing.It should be appreciated that this place is retouched The specific embodiment stated is merely to illustrate and explain the present invention, and is not intended to limit the invention.
In the present invention, in the case where opposite explanation is not made, " upper and lower, left and right, inside and outside " etc. are included in term The noun of locality only represents orientation of the term under normal service condition, or be skilled artisan understands that be commonly called as, without should It is considered as the limitation to the term.
The present invention provides a kind of charging process for plastics, and the charging process is comprised the following steps:
1) the first material and second material, are put into of the feeding device for packing tube correspondingly respectively One feeding warehouse 12 and the second feeding warehouse 16, and it is put into correspondingly respectively in the first storing bin 11 and the second storing bin 15 A kind of material and second material;
2) and of the first induced-draught fan 8 being arranged on correspondingly respectively on the first mixing drum 3 and the second mixing drum 4, is started Second induced-draught fan 9, is stirred with enabling described the first material to be entered into by the first suction tube 1 in first mixing drum 3 Mix, second material can be entered into by the second suction tube 2 and be stirred in second mixing drum 4;
3) temperature control valve (TCV) 10 installed in the one end of heater 6, is started, to enable the heat of heater 6 by inhaling Heat pipe 5 is had respectively entered in first mixing drum 3 and second mixing drum 4;
4), second material in the first material in first mixing drum 3 and second mixing drum 4 is carried out Stirring;
The feeding device includes material bin, the first suction tube 1, the second suction tube 2, the first mixing drum 3, the second mixing drum 4th, endothermic tube 5, heater 6 and hair-dryer 7;One end of first suction tube 1 is communicated in the first feeding warehouse of the material bin 12, the other end is communicated in first mixing drum 3;What one end of second suction tube 2 was communicated in the material bin second enters Feed bin 16, the other end is communicated in second mixing drum 4;And the first induced-draught fan 8 is installed to cause on first mixing drum 3 Can be sucked into material from first feeding warehouse 12 in first mixing drum 3 by first suction tube 1, second stirring Second induced-draught fan 9 is installed to enable that second suction tube 2 sucks material from second feeding warehouse 16 on cylinder 4 Into the second mixing drum 4;One end of the endothermic tube 5 is communicated on first mixing drum 3 and second mixing drum 4, separately One end is connected on the heater 6 by temperature control valve (TCV) 10;And the hair-dryer 7 be arranged on the heater 6 with institute State on the relative side of temperature control valve (TCV) 10;The material bin includes the first storing bin 11, is communicated in first storing bin 11 First feeding warehouse 12, be disposed adjacent in first feeding warehouse 12 second feeding warehouse 16 and be communicated in described Second storing bin 15 of two feeding warehouses 16;First storing bin 11 is tilted to be provided with the first vibratory sieve 19, and described first The tilt port of vibratory sieve 19 towards first feeding warehouse 12, the inclination of first feeding warehouse 12 and first vibratory sieve 19 First pressure sensor 13 is also equipped between mouthful;Multiple first projections 14 are provided with the compass screen surface of first vibratory sieve 19, It is and the multiple first projection 14 is set along multiple diagonal of the compass screen surface of first vibratory sieve 19 and the multiple first convex 14 are played to be arranged to the other end along described cornerwise one end.
Objective of the invention, is to provide one kind and is prevented from deficiencies of stores, and then the packing tube for ensureing to produce The first material and second material are passed through the He of the first suction tube 1 by the charging process for plastics of quality, the charging process Second suction tube 2 is drawn into the first mixing drum 3 and the second mixing drum 4, and in the first storing bin 11 and the second storing bin 15 It is middle to be put into the first material and second material correspondingly respectively, so, the first material in the first storing bin 11 First material storehouse is supplied in real time, and when the first material in the first storing bin 11 only remains a certain amount of, warning device alarm is carried Awake operating personnel feed the first material, and then reach the phenomenon for preventing the first deficiencies of stores;Similarly, it is also possible to prevent second Plant the phenomenon of deficiencies of stores;And then ensure the quality of packing tube.As shown in figure 1, the feeding device that the charging process is used Including the first storing bin 11, the second storing bin 15, the first feeding warehouse 12, the second feeding warehouse 16, the first suction tube 1, the second suction Pipe 2, the first mixing drum 3 and second mixing drum 4 etc., the one end of the first suction tube 1 is communicated in the first feeding warehouse 12, and the other end is communicated in First mixing drum 3, one end of the second suction tube 2 is communicated in the second feeding warehouse 16, and the other end is communicated in the second mixing drum 4;And Also be tiltedly installed with the first vibratory sieve 19 in first storing bin 11, and the first vibratory sieve 19 tilt port towards the first feeding warehouse 12, it is also equipped with first pressure sensor 13 between the tilt port of the first feeding warehouse 12 and the first vibratory sieve 19;First storing Storehouse 11 is used for material is supplied in the first feeding warehouse 12, originally, can all be put in the first feeding warehouse 12 and the first storing bin 11 Full with substance, with the carrying out of program, the material in the first feeding warehouse 12 is gradually decreased, now, the material in the first storing bin 11 Can be fed in the first feeding warehouse 12, when the material in the first storing bin 11 is finished, first pressure sensor 13 is by signal Pass to the warning device for being electrically connected to first pressure sensor 13, warning device warning reminding operating personnel charging.Herein, may be used To set a specific pressure value on first pressure sensor 13, when the pressure on first pressure sensor 13 gets to this tool Body pressure value, the first pressure sensor 13 is to transmit letter to the warning device being connected electrically on the first pressure sensor 13 Number, to cause that warning device is alarmed.The specific pressure value can specifically set according to operating personnel, and it is one close that can set In zero numerical value, usually when the material in the first storing bin 11 is less, warning device is alarm.
In addition, the first storing bin 11 is tilted to be provided with the first vibratory sieve 19, and the first vibratory sieve 19 tilt port court To the first feeding warehouse 12, with reference to the present invention, those skilled in the art are to understand to be, under tilt port mentioned here is generally directed to One end, the present invention is no exception, i.e. downward-sloping one end that the first vibratory sieve 19 is obliquely installed is entered towards the first feeding warehouse 12 And flow to the first feeding warehouse 12 under gravity when material is by the first vibratory sieve 19, here, in the first vibratory sieve 19 Compass screen surface on be additionally provided with multiple first projections 14, and multiple first projections 14 along the multiple right of the compass screen surface of the first vibratory sieve 19 Linea angulata is set, and is arranged to the other end from cornerwise one end;This is to give the material for flowing downward one resistance, preventing Material stream it is too fast, outwards spill, produce the phenomenon for wasting.The vibration of first vibratory sieve 19 is, in order to prevent solid accumulation, to improve The automaticity of charging, protects the safety of operating personnel.Herein it should be noted that the first vibratory sieve 19 is arranged on the first storage It is the more commonly used mounting means in thing storehouse 11, does not elaborate here.
This kind of feeding device can save the time that operating personnel frequently observe material in the first feeding warehouse 12, save people Power;Importantly, so can in time remind operating personnel to feed, deficiencies of stores are prevented, it is ensured that the packing tube produced Quality.
Generally, packing tube be all by inside and outside two layers, therefore, charging when, two kinds of materials are added separately, i.e., The first material is mixed in proportion and puts into the first feeding warehouse 12, and then inhaled the first material by the first suction tube 1 Enter in the first mixing drum 3 to be stirred uniformly, then entering back into smelting furnace carries out melting;Second material is mixed in proportion The second feeding warehouse 16 is put into well, and then second material is drawn into the second mixing drum 4 by the second suction tube 2 is stirred Mix uniform, be then re-fed into smelting furnace.
Additionally, when the comparing of the first material and second material is moist, temperature of the regulation connection on heater 6 is adjusted Section valve 10, to first in enabling the temperature on heater 6 to enter into the first mixing drum 3 and the second mixing drum 4 by endothermic tube 5 Plant material and second material is dried.Required temperature is come with specific reference to the first material and second moist degree of material It is fixed.
Here, to improve efficiency, second storing bin 15 is tilted to be provided with the second vibratory sieve 20, and described second shakes The tilt port of dynamic sieve 20 is towards second feeding warehouse 16;The tilt port of second feeding warehouse 16 and second vibratory sieve 20 Between be provided with multiple second projections 18 be provided with second pressure sensor 17, and the compass screen surface of second vibratory sieve 20, and The multiple second projection 18 is set along multiple diagonal of the compass screen surface of second vibratory sieve 20, and the multiple second raised 18 arrange to the other end along cornerwise one end of the compass screen surface of second vibratory sieve 20.So, the thing in the second feeding warehouse 16 Material will not produce the phenomenon of shortage, on the one hand improve speed of production, on the other hand, it is ensured that the quality of packing tube.
In a preferred embodiment, between first feeding warehouse 12 and second feeding warehouse 16 removably Dividing plate is connected with, to enable that first feeding warehouse 12 and second feeding warehouse 16 are separated;And the height of the dividing plate More than or equal to the height of the material bin.When the packing tube of required production only needs to a kind of material, can dismantle dividing plate, allow Required material is all loaded onto in one feeding warehouse 12 and the second feeding warehouse 16, the phenomenon of deficiencies of stores so can be further prevented. When two kinds of materials are needed, the height of dividing plate can prevent the first material and second material more than or equal to the height of material bin Mixing.
In a preferred embodiment, the distance between adjacent described two first projections 14 are identical and described many The length of individual first projection 14 is gradually reduced from bottom to top along the compass screen surface of first vibratory sieve 19.In order to enable material Enough smoothly and uniformly to be slid from the compass screen surface of the first vibratory sieve 19, the distance between adjacent described two first projections 14 set It is set to identical;The length of multiple first projections 14 is gradually reduced from bottom to top along the compass screen surface of the first vibratory sieve 19 on the one hand can Material spluttering is prevented, solid accumulation on the other hand can also be prevented in the bottom of the first vibratory sieve 19.
In the case of further preferably, the distance between two neighboring described second projection 18 is identical, and the multiple the The length of two projections 18 is gradually reduced from bottom to top along the compass screen surface of second vibratory sieve 20.So, the first feeding warehouse 12 and Material in two feeding warehouses 16 can keep preferable state, it is ensured that packing tube production process is normally carried out.
In a preferred embodiment, to enable that material uniformly mixes, installed in first mixing drum 3 There is rabbling mechanism;The rabbling mechanism includes the agitating shaft being vertically installed in first mixing drum 3 and is movably arranged on to stir The multiple paddles on axle are mixed, and the radius of the paddle gradually reduces from bottom to top.So, when multiple paddles rotate Material can be well mixed, it is in order that the bottom of the first mixing drum 3 must be dropped into that the radius of paddle gradually reduces from bottom to top The material in portion can be stirred evenly further.
Under a kind of implementation method being more highly preferred to, multiple apertures, and multiple apertures are provided with the paddle Set near the agitating shaft.Multiple apertures are set in stirring also can slow down the phenomenon of materials from spattering, and multiple apertures Also proximate agitating shaft setting.
In addition, first mixing drum 3 and second mixing drum 4 are all formed as cylinder, and it is arranged on agitating shaft bottom The radius of the paddle at end is equal to the radius of the cylinder.First mixing drum 3 and the second mixing drum 4 are set to cylinder, So enabling to material can further be stirred.
The preferred embodiment of the present invention is described in detail above in association with accompanying drawing, but, the present invention is not limited to above-mentioned reality The detail in mode is applied, in range of the technology design of the invention, various letters can be carried out to technical scheme Monotropic type, these simple variants belong to protection scope of the present invention.
It is further to note that each particular technique feature described in above-mentioned specific embodiment, in not lance In the case of shield, can be combined by any suitable means, in order to avoid unnecessary repetition, the present invention to it is various can The combination of energy is no longer separately illustrated.
Additionally, can also be combined between a variety of implementation methods of the invention, as long as it is without prejudice to originally The thought of invention, it should equally be considered as content disclosed in this invention.

Claims (8)

1. a kind of charging process for plastics, it is characterised in that the charging process is comprised the following steps:
1) first that, the first material and second material are put into the feeding device for packing tube correspondingly respectively enters Feed bin (12) and the second feeding warehouse (16), and put correspondingly respectively in the first storing bin (11) and the second storing bin (15) Enter the first material and second material;
2) the first induced-draught fan (8) being arranged on correspondingly respectively on the first mixing drum (3) and the second mixing drum (4), is started With the second induced-draught fan (9), to enable that described the first material enters into the first mixing drum (3) by the first suction tube (1) In be stirred, second material can be entered into by the second suction tube (2) and be stirred in the second mixing drum (4);
3) temperature control valve (TCV) (10) installed in heater (6) one end, is started, to enable that the heat of heater (6) passes through Endothermic tube (5) is had respectively entered in first mixing drum (3) and second mixing drum (4);
4), second material in the first material and second mixing drum (4) in first mixing drum (3) is carried out Stirring;
The feeding device includes material bin, the first suction tube (1), the second suction tube (2), the first mixing drum (3), the second stirring Cylinder (4), endothermic tube (5), heater (6) and hair-dryer (7);One end of first suction tube (1) is communicated in the material bin The first feeding warehouse (12), the other end is communicated in first mixing drum (3);One end of second suction tube (2) is communicated in Second feeding warehouse (16) of the material bin, the other end is communicated in second mixing drum (4);And first mixing drum (3) On be provided with the first induced-draught fan (8) with cause first suction tube (1) can be by material from first feeding warehouse (12) It is sucked into the first mixing drum (3), the second induced-draught fan (9) is installed on second mixing drum (4) to cause described second to inhale From second feeding warehouse (16) can be sucked into the second mixing drum (4) material by expects pipe (2);The endothermic tube (5) One end is communicated on first mixing drum (3) and second mixing drum (4), and the other end is connected by temperature control valve (TCV) (10) On the heater (6);And the hair-dryer (7) be arranged on the heater (6) with the temperature control valve (TCV) (10) phase To side on;The material bin includes the first storing bin (11), is communicated in described the first of first storing bin (11) and enters Feed bin (12), be disposed adjacent in first feeding warehouse (12) second feeding warehouse (16) and be communicated in it is described second charging Second storing bin (15) in storehouse (16);First storing bin (11) is tilted to be provided with the first vibratory sieve (19), and described The tilt port of one vibratory sieve (19) is towards first feeding warehouse (12), first feeding warehouse (12) and first vibratory sieve (19) first pressure sensor (13) is also equipped between tilt port;It is provided with the compass screen surface of first vibratory sieve (19) many Individual first raised (14), and multiple diagonal of compass screen surface of the multiple first raised (14) along first vibratory sieve (19) set Put, and the multiple first raised (14) are arranged to the other end along described cornerwise one end.
2. charging process according to claim 1, it is characterised in that second storing bin (15) is tilted to be provided with Two vibratory sieves (20), and second vibratory sieve (20) tilt port towards second feeding warehouse (16);Second charging Second pressure sensor (17), and second vibration are provided between the tilt port of storehouse (16) and second vibratory sieve (20) Multiple second raised (18), and the multiple second raised (18) are provided with the compass screen surface for sieving (20) along second vibratory sieve (20) multiple diagonal of compass screen surface are set, and the multiple second raised (18) are along the compass screen surface of second vibratory sieve (20) Cornerwise one end is arranged to the other end.
3. charging process according to claim 1, it is characterised in that between adjacent described two first raised (14) away from From identical, and the length of the multiple first raised (14) gradually drops from bottom to top along the compass screen surface of first vibratory sieve (19) It is low.
4. charging process according to claim 2, it is characterised in that between two neighboring described second raised (18) away from From identical, and the length of the multiple second raised (18) gradually drops from bottom to top along the compass screen surface of second vibratory sieve (20) It is low.
5. charging process according to claim 1, it is characterised in that first feeding warehouse (12) and second charging Storehouse is detachably connected with dividing plate between (16), to cause that first feeding warehouse (12) and second feeding warehouse (16) can Separate;And the height of the dividing plate is more than or equal to the height of the material bin.
6. charging process according to claim 1, it is characterised in that first mixing drum (3) is provided with rabbling mechanism; The rabbling mechanism includes the agitating shaft being vertically installed in first mixing drum (3) and is movably arranged on many on agitating shaft Individual paddle, and the radius of the paddle gradually reduces from bottom to top.
7. charging process according to claim 6, it is characterised in that multiple apertures are provided with the paddle, and it is many The individual aperture is set near the agitating shaft.
8. charging process according to claim 6, it is characterised in that first mixing drum (3) and second stirring Cylinder (4) is all formed as cylinder, and is arranged on the radius that the radius of the paddle of agitating shaft bottom is equal to the cylinder.
CN201611086161.2A 2016-11-30 2016-11-30 Charging process for plastics Active CN106738404B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611086161.2A CN106738404B (en) 2016-11-30 2016-11-30 Charging process for plastics

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611086161.2A CN106738404B (en) 2016-11-30 2016-11-30 Charging process for plastics

Publications (2)

Publication Number Publication Date
CN106738404A true CN106738404A (en) 2017-05-31
CN106738404B CN106738404B (en) 2018-09-14

Family

ID=58914094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611086161.2A Active CN106738404B (en) 2016-11-30 2016-11-30 Charging process for plastics

Country Status (1)

Country Link
CN (1) CN106738404B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010137377A (en) * 2008-12-09 2010-06-24 Meisei Ind Co Ltd Apparatus for supplying two-liquid curable resin
CN102922751A (en) * 2012-11-21 2013-02-13 中国科学院宁波材料技术与工程研究所 Resin transfer molding glue injection machine for continuous fiber reinforced nylon 6 composite material
CN203110187U (en) * 2012-12-24 2013-08-07 浙江普利金塑胶有限责任公司 Self-control feeding device for raw materials of PVB (Polyvinyl Butyral) membranes

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010137377A (en) * 2008-12-09 2010-06-24 Meisei Ind Co Ltd Apparatus for supplying two-liquid curable resin
CN102922751A (en) * 2012-11-21 2013-02-13 中国科学院宁波材料技术与工程研究所 Resin transfer molding glue injection machine for continuous fiber reinforced nylon 6 composite material
CN203110187U (en) * 2012-12-24 2013-08-07 浙江普利金塑胶有限责任公司 Self-control feeding device for raw materials of PVB (Polyvinyl Butyral) membranes

Also Published As

Publication number Publication date
CN106738404B (en) 2018-09-14

Similar Documents

Publication Publication Date Title
CN106390904B (en) It is a kind of can grinding screen material integrated reacting device
TW201604509A (en) Method for drying material being processed, and horizontal rotary dryer
CN206642603U (en) A kind of intelligent soft magnetic materials proportioner
CN107804679A (en) A kind of anti-blocking material-falling hopper
CN107405679A (en) Cast sand cooler
CN106516256A (en) Charging device used for packaging barrel
CN106738404A (en) For the charging process of plastics
CN207708947U (en) A kind of fluorescent powder production agitating device
JP2007254835A (en) Hopper and apparatus for drying and preheating raw material for blast furnace
CN211601316U (en) Solid material cooling device
CN206358452U (en) Feeding device for packing tube
CN106628370A (en) Feeding device for packaging barrel
CN209584329U (en) A kind of high-iron-content pellet production system
CN107252645A (en) A kind of powder stirrer
CN111174533A (en) Stepped vibration fluidized bed dryer
JP5165943B2 (en) Granulated product sizing equipment for metal-containing by-products
CN207708895U (en) A kind of fertilizer applicator agitating device
JPH0622664B2 (en) Batch type powder mixer
CN107754665A (en) A kind of fertilizer applicator agitating device
CN105252664B (en) mixing device for sheet material
CN207359413U (en) One kind drying mixer
JP2003260346A (en) High-speed agitation type disperser
CN208223073U (en) A kind of plastic grain drying device
CN206783548U (en) A kind of drying impurity removed system of dry process ferrite prefiring material
CN217258462U (en) 3D is premix device for printer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Charging method for plastic

Effective date of registration: 20200427

Granted publication date: 20180914

Pledgee: Huizhou Commercial Bank Co.,Ltd. Wuhu Zhongshan South Road Branch

Pledgor: WUHU LICHUANG PACKAGING Co.,Ltd.

Registration number: Y2020980001855

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230321

Granted publication date: 20180914

Pledgee: Huizhou Commercial Bank Co.,Ltd. Wuhu Zhongshan South Road Branch

Pledgor: WUHU LICHUANG PACKAGING CO.,LTD.

Registration number: Y2020980001855