CN106707418A - Auxiliary equipment of fiber connection - Google Patents
Auxiliary equipment of fiber connection Download PDFInfo
- Publication number
- CN106707418A CN106707418A CN201510483450.5A CN201510483450A CN106707418A CN 106707418 A CN106707418 A CN 106707418A CN 201510483450 A CN201510483450 A CN 201510483450A CN 106707418 A CN106707418 A CN 106707418A
- Authority
- CN
- China
- Prior art keywords
- fibre
- holding meanss
- fibre junction
- junction auxiliary
- support plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Light Guides In General And Applications Therefor (AREA)
Abstract
The invention relates to auxiliary equipment of fiber connection. The auxiliary equipment for transferring a fiber connector, an optical cable connected with a fiber of a fiber connector preliminarily, and a protection assembly installed at the optical cable comprises a preliminary positioning device and a support frame. The preliminary positioning device consists of a first holding device for holding a fiber connector, a second holding device for holding an optical cable, and a third holding device being arranged between the first holding device and the second holding device and being used for holding a protection assembly. The support frame includes a first binding end bound with the first holding device detachably, a second binding end bound with the second holding device detachably, and a handle arranged between the first binding end and the second binding end. With the auxiliary equipment, the fiber, the fiber connector, and the cable that are in preliminary connection can be transferred as an integrated one and be installed in fiber processing equipment so as to execute the follow-up assembling operation; and then a cable joint with a fiber connector is assembled. Therefore, the connection part of the fiber can be protected from being damaged by impacts.
Description
Technical field
Embodiments of the invention are related to a kind of fibre-optical process equipment, more particularly, it relates to a kind of in jointed fiber
During for shifting the auxiliary equipment of the preliminary optical fiber for continuing.
Background technology
During joint connection in site is carried out to the optical cable for entering the users such as office, family, first by optical cable
User scene is applied to, the optical fiber of optical cable is continued, made by operating personnel with the optical fiber of the joints of optical fibre again
The optical fiber of optical cable is optically coupled to the joints of optical fibre, so as to form the fiber cable joint with the joints of optical fibre;Afterwards,
The joints of optical fibre for connecting fiber cable joint are tied with the joints of optical fibre of the photoelectric conversion device of user terminal again
Close, so as to realize fiber entering household.Therefore, this fiber cable joint is to form assembling in user to be formed.
Usually, optical cable is including the fiber cores (also referred to as glass core) positioned at center, outside fiber cores
Coating (cladding) and positioned at outermost protective layer.By the optical fiber and the joints of optical fibre of optical cable
Optical fiber continued before, it is necessary to the protective layer at the fibre junction end of optical cable and coating are removed so that
Expose bare fibre to be continued.On the other hand, the optical fiber of the joints of optical fibre is pre-installed in the joints of optical fibre,
And expose the bare fibre of predetermined length.Can be by the way of thermal welding by the optical fiber and the joints of optical fibre of optical cable
Optical fiber tentatively continued.It is the intensity and the stability of physical property of the preliminary optical fiber for continuing of enhancing, needs
Multiple protection components to be installed at the position tentatively continued, to form constitutionally stable fiber cable joint.
In the prior art, by the optical fiber of optical cable and the light of the joints of optical fibre typically in a thermal welding equipment
Fibre is tentatively continued, and the optical fiber of preliminary welding is transferred in another operation equipment again then, with successively
Multiple protection components are installed, and ultimately form fiber cable joint.In the process and peace of the preliminary optical fiber for continuing of transfer
During dress protection component, because optical fiber is easily bent, if misoperation, may cause tentatively to continue
Optical fiber situations such as dislocation occurs, disconnects, so as to produce bad connection, and then influence the transmission of optical signal.
The content of the invention
The purpose of the present invention aims to solve the problem that at least one side of the above-mentioned problems in the prior art and defect
Face.
It is an object of the present invention to provide a kind of fibre junction auxiliary equipment, can stably shift preliminary
The optical fiber for continuing, to ensure that optical fiber stably continues.
According to an aspect of the present invention, there is provided a kind of fibre junction auxiliary equipment, for shifting optical fiber connection
The preliminary optical cable for continuing of the optical fiber of device and the joints of optical fibre and the protection component on optical cable, institute
Stating fibre junction auxiliary equipment includes Primary Location device and support frame frame.Primary Location device, including:First
Holding meanss, are configured for keeping the joints of optical fibre;Second holding meanss, are configured for
Keep the optical cable;And the 3rd holding means, it is arranged on first holding meanss and the second holding meanss
Between, and be configured for keeping the protection component.Support frame includes and first holding meanss
The second binding end that the first binding end for removably combining removably is combined with the second holding meanss, with
And the handle between the first binding end and the second binding end.
Fibre junction auxiliary equipment according to an embodiment of the present also includes pallet component, the tray set
Part includes support plate, and the support plate is configured for installing the Primary Location device.
Fibre junction auxiliary equipment according to an embodiment of the present, first holding meanss include:
Main part, is provided with the first holding tank matched with the exterior contour of the joints of optical fibre, the optical fiber connection
Device is arranged in first holding tank.
Fibre junction auxiliary equipment according to an embodiment of the present, first holding meanss also include:
Generally U-shaped positioning framework, including it is pivotably mounted on two arms on the main part and positioned at institute
The connecting portion between two arms is stated, the connecting portion is provided with generally U-shaped locating slot, and the locating slot sets
Being set to allows the fiber containment of the joints of optical fibre in the locating slot, with to the joints of optical fibre
Optical fiber is positioned.
Fibre junction auxiliary equipment according to an embodiment of the present, the pallet component also includes installing
The first installing mechanism in the support plate, is configured for removably installing the first holding dress
Put.
Fibre junction auxiliary equipment according to an embodiment of the present, first installing mechanism includes:
Installation portion, in the support plate;Bottom, is connected to the side of the installation portion, and described first protects
Device is held to place on said bottom;And two the first relative walls, on said bottom parallel to institute
The longitudinal direction for stating optical cable extends, and is positioned with the both sides to first holding meanss.
Fibre junction auxiliary equipment according to an embodiment of the present, first installing mechanism is arranged to
Can in a longitudinal direction be moved relative to the support plate.
Fibre junction auxiliary equipment according to an embodiment of the present, first installing mechanism also includes:
Second wall, upwardly extends from the support plate;Two the 3rd walls, are arranged to and second vertical wall surface
Right, the installation portion is arranged between second wall and the 3rd wall, first wall and bottom from
Passed through between two the 3rd walls;Two first guiding bars, it is vertical installed in second wall and the 3rd
Between wall;And two the first springs, it is separately mounted on the first guiding bar so that the installation portion
The elastic force for resisting first spring is moved relative to second wall.
Fibre junction auxiliary equipment according to an embodiment of the present, first holding meanss with it is described
First installing mechanism is combined by snap.
Fibre junction auxiliary equipment according to an embodiment of the present, in two first walls extremely
Few one is provided with first locking mechanism, and first holding meanss are releasably locked at into described first
In installing mechanism.
Fibre junction auxiliary equipment according to an embodiment of the present, first locking mechanism includes:First
Cantilever, extends from the bottom up;First locking projection, from the upper end of first cantilever described in
The main part of the first holding meanss is protruded, and first holding meanss are maintained at into first installing mechanism
In;And first relieving mechanism, extend away from first locking projection from the upper end of first cantilever,
By pressing first relieving mechanism so that first locking projection departs from the main part.
Fibre junction auxiliary equipment according to an embodiment of the present, the first locking mechanism includes can
The cam on first wall is pivotally mounted on, the jut of the cam can turn to described first
The top of the main part of holding meanss.
Fibre junction auxiliary equipment according to an embodiment of the present, the installation portion is provided with described
The first holding projection that the top of the main part of the first holding meanss extends, first holding meanss are protected
Hold on first installing mechanism.
Fibre junction auxiliary equipment according to an embodiment of the present, the first combination of the support frame
End is combined with the main part by snap.
Fibre junction auxiliary equipment according to an embodiment of the present, first binding end is provided with locking
Portion, the main part is provided with the opening for accommodating first binding end, is provided with the opening and institute
State the cooperation sticking department of sticking department combination.
Fibre junction auxiliary equipment according to an embodiment of the present, the main part also includes:From institute
State the second cantilever that the upper end of opening extends internally perpendicular to the surface of the main part, the cooperation sticking department
It is arranged on second cantilever.
Fibre junction auxiliary equipment according to an embodiment of the present, the sticking department and the cooperation are locked
One in portion is determined for lock slots, and another is the second locking projection that can be attached in the lock slots.
Fibre junction auxiliary equipment according to an embodiment of the present, the bottom of first installing mechanism
Unlocking mechanism is provided with, is configured for releasing the sticking department and is coordinated the locking between sticking department, to permit
First binding end of perhaps described support frame departs from from main part.
Fibre junction auxiliary equipment according to an embodiment of the present, the unlocking mechanism includes being arranged on
Solution latching projection on the bottom of first installing mechanism, first slope is provided with the end of second cantilever,
When first holding meanss are arranged on the pallet component, the solution latching projection is by with described first
Ramp interface and offset second cantilever, so as to release the sticking department and coordinate the lock between sticking department
It is fixed.
Fibre junction auxiliary equipment according to an embodiment of the present, the bottom of first holding meanss
Surface is provided with least one depressed part, and the first magnet, first holding meanss are fixed in the depressed part
It is pull-in on the upper surface of the bottom of first installing mechanism by first magnet.
Fibre junction auxiliary equipment according to an embodiment of the present, second holding meanss include:
First pedestal;Lid, on first pedestal, the lid be provided with for the carriage
The joint portion that second binding end of frame is combined;And elastic retaining device, installed in first base and cover
On body, it is combined together with by the first base and cover body elasticity.
Fibre junction auxiliary equipment according to an embodiment of the present, the phase of the first base and cover body
To at least one of surface be provided with the pressing mechanism of the protective layer for accommodating and extruding the optical cable.
Fibre junction auxiliary equipment according to an embodiment of the present, second binding end and lid are adopted
It is combined together with magnetic attraction or snap.
Fibre junction auxiliary equipment according to an embodiment of the present, the pallet component also includes installing
The second installing mechanism in the support plate, is configured for second holding meanss removably
In the support plate.
Fibre junction auxiliary equipment according to an embodiment of the present, second installing mechanism includes:
Fixed part, is fixed in the support plate;Two second guiding bars, installed in the fixed part and the branch
Between the wall of the end of support plate;Move portion, is movably mounted on the second guiding bar, with institute
State and moved relative to the fixed part in support plate;And two second springs, it is separately mounted to described second
On guiding bar, and between the fixed part and move portion.First pedestal is provided with:Location division,
First pedestal is arranged in the support plate by the location division;And first stop part, from described
The both sides of the first pedestal outwardly, and are resisted against the side relative with the second spring of the move portion.
Fibre junction auxiliary equipment according to an embodiment of the present, the move portion with described second
The opposite side of spring is provided with the second slope and the erection part being connected with second slope, and described first stops
Portion slides into the erection part by second slope.
Fibre junction auxiliary equipment according to an embodiment of the present, second is additionally provided with the support plate
Stop part, second stop part is arranged for limiting the moving section of the move portion.
Fibre junction auxiliary equipment according to an embodiment of the present, the protection component includes:First
Heat-shrink tube, installed in the position of continuing of the optical fiber of the optical fiber and optical cable of the joints of optical fibre;Elastic tube, peace
Mounted in the outside of first heat-shrink tube;And second heat-shrink tube, installed in the outside of the elastic tube.The
Three holding meanss include the first halfbody being arranged in the support plate and matched with first halfbody second
Halfbody, first halfbody combined with the second body with formed respectively with first heat-shrink tube, elastic tube,
The accommodating chamber of the exterior contour matching of the second heat-shrink tube and optical cable.
Fibre junction auxiliary equipment according to an embodiment of the present, first halfbody is provided with multiple
Guide post, described the second half form multiple bullports for coordinating with the guide post respectively in vivo.
Fibre junction auxiliary equipment according to an embodiment of the present, the pallet component also includes installing
In the drive mechanism of the support plate bottom, be configured for driving first halfbody and the second body that
This leaves.
Fibre junction auxiliary equipment according to an embodiment of the present, in first halfbody and the second half
At least one drive hole is respectively equipped with body, the support plate is provided with multiple corresponding with the drive hole
Slit, the slit extends along the direction that is transversely to the longitudinal direction perpendicular to optical cable.The drive mechanism includes:
Two groups of drive pins, each described drive pin is inserted into accordingly from the bottom of the support plate through the slit
In drive hole;And two movable blocks, installed in the bottom of the support plate, respectively with first halfbody
Corresponding with the second body, drive pin described in two groups is separately mounted on the movable block, two movable block quilts
It is arranged to move away from each other or movement close to each other, so as to drive first halfbody and the second body to beat
Open or close.
Fibre junction auxiliary equipment according to an embodiment of the present, the drive mechanism also includes:It is convex
Wheel mechanism, is installed in rotation on the support plate bottom and is located between two movable blocks by pivot;
Two the 3rd guiding bars, between two lower walls of support plate, and through two movable blocks;
And multiple back-moving springs, on the described 3rd guiding bar and positioned between the lower wall and movable block.
Fibre junction auxiliary equipment according to an embodiment of the present, drive mechanism also includes driving handle,
On the pivot of the cam mechanism, to drive the cam mechanism to rotate.
Fibre junction auxiliary equipment according to an embodiment of the present, the drive mechanism also includes:Silk
Thick stick, between two lower walls of support plate, and is screwed respectively with two movable blocks;With
And motor, it is configured for driving the leading screw to rotate.
Fibre junction auxiliary equipment according to an embodiment of the present, second halfbody and the second body
It is combined together using magnetic attraction or snap.
Fibre junction auxiliary equipment according to an embodiment of the present also includes guide rail mechanism, installed in institute
The bottom of support plate is stated, is slidably connected with installation frame.
During the optical fiber of optical cable is connected into the joints of optical fibre, it is possible to use of the invention above-mentioned
The fibre junction auxiliary equipment of various embodiments is using the optical fiber for tentatively continuing, the joints of optical fibre and optical cable as one
Individual global transfer is simultaneously installed in fibre-optical process equipment, to perform follow-up assembly operation and be finally assembling to tool
There is the fiber cable joint of the joints of optical fibre.During shifting and the preliminary optical fiber for continuing is installed, can prevent
The position of continuing of optical fiber will not be damaged due to being impacted, for example, avoid generation partly or completely breaking
The bad phenomenon such as open, misplace.
By the description made for the present invention of below with reference to accompanying drawing, other objects and advantages of the present invention will be aobvious
And be clear to, and can help that complete understanding of the invention will be obtained.
Brief description of the drawings
Fig. 1 is the optical cable for being provided with the joints of optical fibre of the embodiment for showing an exemplary of the invention
The schematic perspective view of joint;
Fig. 2 is the floor map for showing fiber cable joint shown in Fig. 1;
Fig. 3 is the longitudinal sectional view for showing the fiber cable joint shown in Fig. 2;
Fig. 4 is provided with the optical cable of protection component in advance solid before being shown in being connected to the joints of optical fibre is shown
It is intended to;
Fig. 5 is the floor map for showing optical cable shown in Fig. 4;
Fig. 6 is the longitudinal sectional view for showing optical cable shown in Fig. 5;
Fig. 7 is the three-dimensional signal of the fibre-optical process equipment of the embodiment for showing an exemplary of the invention
Figure;
Fig. 8 is to show that the fibre junction auxiliary equipment of the embodiment for utilizing an exemplary of the invention will
The preliminary optical fiber for continuing is arranged on the schematic perspective view on the fibre-optical process equipment shown in Fig. 7;
Fig. 9 be shown in removing the support frame of fibre junction auxiliary equipment in the case of Fig. 8 after it is vertical
Body schematic diagram;
Figure 10 is the solid of the fibre junction auxiliary equipment of the embodiment for showing an exemplary of the invention
Schematic diagram, shows the preliminary optical fiber for continuing on Primary Location device in figure;
Figure 11 is the decomposing schematic representation for showing fibre junction auxiliary equipment shown in Figure 10;
Figure 12 is to show the Primary Location device of the fibre junction auxiliary equipment shown in Figure 11 and tentatively continue
The schematic perspective view of the interim component of optical fiber composition;
Figure 13 is another schematic perspective view for showing the interim component shown in Figure 12;
Figure 14 is another schematic perspective view for showing the interim component shown in Figure 12;
Figure 15 is the schematic perspective view for showing interim component shown in Figure 12 when the 3rd holding meanss are opened;
Figure 16 is the enlarged diagram for showing the part A shown in Figure 13;
When Figure 17 is the support frame for showing the fibre junction auxiliary equipment shown in Figure 10 and interim component combination
Longitudinal sectional view;
Figure 18 is the enlarged diagram for showing the part B shown in Figure 17;
Figure 19 is the schematic perspective view of the pallet component for showing the fibre junction auxiliary equipment shown in Figure 11;
Figure 20 is another schematic perspective view for showing the pallet component shown in Figure 19;
Figure 21 is the enlarged diagram for showing the C portion shown in Figure 20;
Figure 22 is another schematic perspective view for showing the pallet component shown in Figure 19, and the 3rd is shown in figure
Holding meanss;
Figure 23 is the enlarged diagram for showing the D parts shown in Figure 22;
Figure 24 is to show to utilize support frame that interim component is tentatively arranged on sectional perspective when on pallet component
Schematic diagram;
Figure 25 is to show to utilize support frame that interim component is tentatively arranged on longitudinal section view when on pallet component
Figure;
Figure 26 is the enlarged diagram for showing the E parts shown in Figure 25;
Figure 27 is to show the longitudinal section view being fully mounted at interim component using support frame when on pallet component
Figure;
Figure 28 is the enlarged diagram for showing the F parts shown in Figure 28;
Figure 29 is to show the schematic perspective view being arranged on interim component when on pallet component;
Figure 30 opens schematic perspective view during three holding meanss in the case of being shown in Figure 29;
Figure 30 A are the enlarged diagrams for showing the G parts shown in Figure 30;
Figure 31 is the support frame side view for showing a kind of exemplary embodiment of the invention;
Figure 32 is a kind of schematic perspective view for showing support frame shown in Figure 31;
Figure 33 shows another schematic perspective view of support frame shown in Figure 31;
Figure 34 is the three-dimensional signal of the first holding meanss for showing a kind of exemplary embodiment of the invention
Figure, shows the joints of optical fibre and the retainer of the first holding meanss is in hold mode in figure;
Figure 35 is another schematic perspective view for showing the first holding meanss shown in Figure 34;
Figure 36 is to show that the joints of optical fibre shown in Figure 34 are in the schematic perspective view of release conditions in retainer;
Figure 37 is another schematic perspective view for showing the first holding meanss shown in Figure 36;And
Figure 38 is that the solid of the bottom of the pallet component of the embodiment for showing an exemplary of the invention is shown
It is intended to.
Specific embodiment
Below by embodiment, and with reference to accompanying drawing, technical scheme is described in further detail.
In the description, same or analogous drawing reference numeral indicates same or analogous part.It is following right referring to the drawings
The explanation of embodiment of the present invention is intended to explain present general inventive concept of the invention, without should be understood
It is to a kind of limitation of the invention.
In addition, in the following detailed description, for ease of explaining, elaborating many concrete details to provide
To the comprehensive understanding of present disclosure embodiment.It should be apparent, however, that one or more embodiments are specific without these
Can also be carried out in the case of details.In other cases, known construction and device is diagrammatically
Embody to simplify accompanying drawing.
General technical design of the invention, there is provided a kind of fibre junction auxiliary equipment, for shifting
Keep the preliminary optical cable for continuing of optical fiber of the joints of optical fibre and the joints of optical fibre and on optical cable
Protection component, the fibre junction auxiliary equipment includes:Primary Location device and support frame.Primary Location
Device includes:First holding meanss, are configured for keeping the joints of optical fibre;Second holding meanss,
It is configured for keeping the optical cable;And the 3rd holding means, be arranged on first holding meanss and
Between second holding meanss, and it is configured for keeping the protection component.Support frame include with it is described
The first binding end that first holding meanss are removably combined removably combined with the second holding meanss
Two binding ends and the handle between the first binding end and the second binding end.
Fig. 1 is the optical cable for being provided with the joints of optical fibre of the embodiment for showing an exemplary of the invention
The schematic perspective view of joint 2000;Fig. 2 is the floor map for showing fiber cable joint shown in Fig. 1;Fig. 3 is
The longitudinal sectional view of the fiber cable joint shown in display Fig. 2.Fibre junction is aided according to an embodiment of the invention
Equipment 100 can be combined with a kind of fibre-optical process equipment 1000 of the embodiment shown in Fig. 8-9, be assembled into figure
The fiber cable joint 2000 for being provided with the joints of optical fibre shown in 1-3.
As Figure 7-9, fibre-optical process equipment 1000 mainly includes surrounding housing 6, the peace of a body structure
Optical fiber ablation equipment 400 and optical fiber mounted in the top of housing 6 cut equipment 500.
Referring to Fig. 1-3, usually, by the optical fiber 202 of the optical fiber 301 of optical cable 300 and the joints of optical fibre 200
, it is necessary to the protective layer 302 and coating 303 at the fibre junction end of optical cable 300 are removed before being continued,
So as to expose bare fibre 301 to be continued.On the other hand, the optical fiber 202 of the joints of optical fibre 200 is installed in advance
In the joints of optical fibre 200, and expose the optical fiber 202 of predetermined length.Can be by the way of thermal welding by light
The optical fiber 301 of cable 300 is tentatively continued with the optical fiber 202 of the joints of optical fibre 200, so as to form preliminary
The optical fiber for continuing.
It is the preliminary intensity of optical fiber for continuing of enhancing and the stability of physical property, it is necessary in the portion for tentatively continuing
Position is installed by multiple protection components.As Figure 4-Figure 6, these protection components include:It is made up of thermoplastic
First heat-shrink tube 401, installed in the optical fiber 202 of the joints of optical fibre 200 and connecing for the optical fiber 301 of optical cable 300
Continuous position 203;Elastic tube 402, installed in the outside of first heat-shrink tube 401;And second heat-shrink tube
403, installed in the outside of elastic tube 402.Further, protection component also includes tail sleeve 404, from optical cable
300 protective layer 302 is socketed on the second heat-shrink tube 403 and is connected to the housing 202 of the joints of optical fibre 200.
By the optical fiber 301 of optical cable 300 and the optical fiber 202 of the joints of optical fibre 200 in a thermal welding equipment
Tentatively continued, then using the fibre junction auxiliary equipment 100 of the embodiment of the present invention by preliminary welding
Optical fiber is transferred on fibre-optical process equipment 1000 as Figure 7-9, with install successively the first heat-shrink tube 401,
The heat-shrink tube 403 of elastic tube 402 and second.
Figure 10 is the fibre junction auxiliary equipment 100 of the embodiment for showing an exemplary of the invention
Schematic perspective view, shows the preliminary optical fiber for continuing on Primary Location device in figure;Figure 11 is aobvious
The decomposing schematic representation of fibre junction auxiliary equipment 100 shown in diagram 10;Figure 12-16 is shown shown in Figure 11
The solid of the interim component of the Primary Location device of fibre junction auxiliary equipment and the optical fiber composition for tentatively continuing is shown
It is intended to;Figure 17 is that the support frame and interim component for showing the fibre junction auxiliary equipment shown in Figure 10 are combined
When longitudinal sectional view;Figure 18 is the enlarged diagram for showing the part B shown in Figure 17.
As shown in Figure 10-18, the embodiment of an exemplary of the invention, fibre junction auxiliary equipment
100 be used for shift the joints of optical fibre 200, the protection component on the optical fiber 301 of optical cable 300 and
The optical fiber 301 for passing through the preliminary optical cable 300 for continuing of fusion splicing devices with the optical fiber 202 of the joints of optical fibre 200.Light
Fibre continues auxiliary equipment 100 including Primary Location device and support frame 5.Primary Location device includes:First
Holding meanss 1, are configured for keeping being mounted with advance the joints of optical fibre 200 of optical fiber, and one end light
Fine 202 expose the joints of optical fibre 200;Second holding meanss 2, are configured for keeping optical cable 300;With
And the 3rd holding means 3, it is arranged between the first holding meanss 1 and the second holding meanss 2, and be configured to
For keeping including the protection component of the first heat-shrink tube 401, the heat-shrink tube 403 of elastic tube 402 and second.
Figure 31 is the support frame side view for showing a kind of exemplary embodiment of the invention;Figure 32 is
A kind of schematic perspective view of support frame shown in display Figure 31;Figure 33 shows the another of support frame shown in Figure 31
A kind of schematic perspective view.In a kind of exemplary embodiment, support frame 5 includes and the first holding meanss 1
The second binding end that the first binding end 52 for removably combining removably is combined with the second holding meanss 2
53 and the handle 51 between the first binding end and the second binding end.Support frame 5 has substantially
U-shaped, is so easy to operating personnel to grasp handle 51.
Fibre junction auxiliary equipment 100 according to embodiments of the present invention is used to shift the joints of optical fibre 200, installs
Protection component on the optical fiber of optical cable 300 and tentatively continued with the optical fiber 202 of the joints of optical fibre 200
Optical cable 300.Specifically, before preliminary subsequent operations are performed, using installed in fibre-optical process equipment
Optical fiber on 1000 cuts equipment 500 and the protective layer 302 outside optical cable 300 is cut and removed, and recycles
Optical fiber ablation equipment peels off the coating 303 outside fiber cores, exposes optical fiber 301 to be continued;Afterwards,
As Figure 4-Figure 6, successively by tail sleeve 404, the second heat-shrink tube 403, the heat-shrink tube 401 of elastic tube 402 and first
It is enclosed within optical cable 300 to be continued;Afterwards, the first holding meanss 1 are arranged on the light with optical fiber 202
On fiber connector 200, the second holding meanss are arranged on optical cable in the outside of protection component, using the 3rd
Holding meanss at least fix the second heat-shrink tube 403, the heat-shrink tube 401 of elastic tube 402 and first;Afterwards, in light
Fibre continues and the optical fiber 301 of optical cable 300 is routed into the joints of optical fibre 200 by the way of thermal welding in equipment
Optical fiber 202 on, so as to form interim component as shown in figs. 12-15;Afterwards, by the of support frame 5
One binding end 52 and the second binding end 53 are respectively installed in the first holding meanss 1 and the second holding meanss 2,
So as to form structure as shown in figure 17.In this case, it is possible to hand-held handle 51 and lift whole interim
Component, can so prevent the position 203 of continuing of optical fiber 301 and 202 will not damage due to being impacted,
For example, avoiding the generation partly or completely bad phenomenon such as disconnection, dislocation.It is possible to further hand-held
It is follow-up to perform on the fibre-optical process equipment 1000 that be transferred to whole interim component shown in Fig. 7-9 by handle 51
Protection component installation procedure.
As shown in FIG. 10 and 11, fibre junction auxiliary equipment 100 according to embodiments of the present invention also includes support
Disk component 4, is configured for installing Primary Location device.Pallet component includes that support plate 41 (below will
Describe in detail).Further, fibre junction auxiliary equipment 100 also includes guide rail mechanism 46, guide rail mechanism
46 bottoms for being arranged on support plate 41, are slidably connected with installation frame.For example, with reference to Fig. 8 and 9, profit
Pallet component 4 can be slidably mounted on the installation of the housing of fibre-optical process equipment 100 with guide rail mechanism 46
On framework.So, when fibre-optical process equipment is operated, pallet component 4 can be pulled out, and in operation
Pallet component 4 is pushed into the casing of fibre-optical process equipment 100 afterwards.
Figure 34-35 is that the solid of the first holding meanss 1 for showing a kind of exemplary embodiment of the invention is shown
It is intended to, the joints of optical fibre 200 is shown in figure and the retainer of the first holding meanss is in hold mode;
Figure 36-37 is to show that the joints of optical fibre shown in Figure 34 are in the schematic perspective view of release conditions in retainer.
Referring to Figure 34-37, a kind of exemplary embodiment of the invention, the first holding meanss 1 include:It is main
Body portion 11, is provided with the first holding tank 13 matched with the exterior contour of the joints of optical fibre 200, so that optical fiber connects
Device 200 is connect in the first holding tank 13, and prevents the joints of optical fibre 200 from being moved in the first holding tank
It is dynamic.
In a kind of exemplary embodiment, the first holding meanss 1 also include:Generally U-shaped positioning framework 12,
Including two arms 121 being pivotably mounted on main part 11 and the connection between two arms 121
Portion 122, connecting portion 122 is provided with generally U-shaped locating slot 123, and locating slot 123 is arranged in posting
The optical fiber 202 of the joints of optical fibre 200 is allowed in the case of the hold mode that frame 12 is positioned at shown in Figure 34 and 35
It is contained in locating slot 123, is positioned with the optical fiber 202 to the joints of optical fibre 200, prevents optical fiber 202
Vertical with the longitudinal direction of optical fiber.
Figure 19 is the three-dimensional signal of the pallet component 4 for showing the fibre junction auxiliary equipment 100 shown in Figure 11
Figure;Figure 20 is another schematic perspective view for showing the pallet component shown in Figure 19;Figure 21 is display Figure 20
The enlarged diagram of shown C portion;Figure 22 is that the another kind for showing the pallet component 4 shown in Figure 19 stands
Body schematic diagram, shows the 3rd holding meanss in figure;Figure 23 is the amplification for showing the D parts shown in Figure 22
Schematic diagram;Figure 29 is shown when removing support frame after interim component is fully mounted on pallet component
Schematic perspective view.
Referring to Figure 10-11,19-23,29 and 34-37, a kind of exemplary embodiment of the invention
Fibre junction auxiliary equipment, pallet component 4 also includes the first installing mechanism 42 in support plate 41,
First installing mechanism 42 is configured for removably installing the first holding meanss 1.Specifically, first
Installing mechanism 42 includes:Installation portion 421, in support plate 41;Bottom 423, in a longitudinal direction
The side of installation portion 421 is connected to, the first holding meanss 1 are placed on bottom 423;And two relative
The first wall 422, on bottom 423 parallel to optical cable 300 longitudinal direction extend, with to first keep
The both sides of device 1 are positioned, to prevent the first holding meanss 1 from moving in a lateral direction.
In a kind of exemplary embodiment, the first installing mechanism 42 is arranged to exist relative to support plate 41
Moved on longitudinal direction.Specifically, the first installing mechanism 42 also includes:Second wall 429, from support
Disk 41 is upward and extends in a lateral direction;Two the 3rd walls 428, are arranged to and the face of the second wall 429
Right, installation portion 421 is arranged between the second wall 428 and the 3rd wall 428, two the first walls 422
And bottom 423 passes through between two the 3rd walls 428;Two first guiding bars 426, it is vertical installed in second
Between the wall 428 of wall 429 and the 3rd;And two the first springs 427, it is separately mounted to first guiding
On bar 426 so that the installation portion 421 resists the elastic force of first spring 427 relative to the second wall
429 movements.
In a kind of exemplary embodiment, as shown in Figure 21,23 and 29, first holding meanss 1 with
First installing mechanism 42 is combined by snap, to prevent the first holding meanss 1 under the state of left and right
Depart from from the first installing mechanism 42.Further, at least one of two first walls 422 are provided with
One locking mechanism, first holding meanss 1 are releasably locked in first installing mechanism 42.
In one embodiment, as shown in Figure 21,23 and 29, first locking mechanism includes:First cantilever
4221, upwardly extended from bottom 423, the aligned inside of the first cantilever 4221 and the first wall 422;First
Locking projection 4222, from the upper end of first cantilever 4221 towards the main part 11 of the first holding meanss 1
It is prominent, first holding meanss 1 are maintained in first installing mechanism 42, protected with stop first
Device 1 is held to depart from from the top of the first installing mechanism 42;And first relieving mechanism 4223, from described first
The upper end of cantilever 4221 stretches out away from first locking projection 4222, is released by pressing described first
Laying mechanism 4223 causes that the first locking projection 4222 departs from the main part 11, so as to allow to keep first
Device 1 takes out from the first installing mechanism 42.
In a kind of alternate embodiment, the first locking mechanism includes that being pivotably mounted on first stands
Cam on wall 422, the jut of the cam can turn to the main part of first holding meanss 1
11 top, so as to prevent and allow the first holding meanss to depart from the first installing mechanism.
Further, the installation portion 421 is provided with the upper of the main part 11 of first holding meanss 1
The first holding projection 425 of Fang Yanshen, the first holding meanss 1 are maintained on the first installing mechanism 42.
Figure 17 is the support frame 5 and interim component for showing the fibre junction auxiliary equipment 100 shown in Figure 10
With reference to when longitudinal sectional view;Figure 18 is the enlarged diagram for showing the part B shown in Figure 17;Figure 24 is
Interim component is tentatively arranged on sectional perspective schematic diagram when on pallet component 4 using support frame 5 for display;
Figure 25 is to show to utilize support frame 5 that interim component is tentatively arranged on longitudinal section view when on pallet component 4
Figure;Figure 26 is the enlarged diagram for showing the E parts shown in Figure 25;Figure 27 is that display utilizes support frame
5 interim component is fully mounted at longitudinal sectional view when on pallet component 4;Figure 28 is shown in display Figure 28
F parts enlarged diagram.
In one embodiment, as shown in Figure 17-18,24-28,31-37, the first combination of support frame 5
End 52 is combined with the main part 11 by snap.Specifically, the first binding end 52 is provided with locking
Portion 54, not used for the opening 14 for accommodating first binding end 52, the opening on the main part 11
The cooperation sticking department 16 combined with the sticking department 54 is provided with 14.
In one embodiment, as shown in Figure 17-18,24-28,31-37, the main part 11 also includes:
From the second cantilever 15 that the upper end of the opening 14 extends internally perpendicular to the surface of the main part 11, institute
Cooperation sticking department 16 is stated to be arranged on second cantilever 15.For example, the sticking department 54 and the cooperation
One in sticking department 16 is lock slots, and another is that the second locking that can be attached in the lock slots is prominent
Rise;It is another or the sticking department 54 and coordinated in sticking department 16 are the second locking projection
Individual is the lock slots that can be attached in second locking projection.
In a further embodiment, the bottom of the first installing mechanism 42 is provided with unlocking mechanism 424, solves lock machine
Structure 424 is configured for releasing the sticking department 45 and coordinates the locking between sticking department 16, to allow
First binding end 52 of the support frame 5 departs from from main part 11.Specifically, as Figure 18,21,
Shown in 26, unlocking mechanism 424 includes the solution latching projection being arranged on the bottom 423 of the first installing mechanism 42,
First slope 17 is provided with the end of second cantilever 15, when hand-held supports framework 5 keeps described first
Device 1 is arranged on when on the first installing mechanism 42 of the pallet component 4, as the solution of unlocking mechanism 424
Latching projection offsets second cantilever 15 by being contacted with the first slope 17, so as to release described
Locking between sticking department 54 and cooperation sticking department 16.
In one embodiment, as shown in Figure 19,26 and 34-37, the bottom of first holding meanss 1
Surface is provided with least one depressed part 18, and the first magnet 19, described first are fixed in the depressed part 18
Holding meanss 1 are pull-in on being made up of ferromagnetic material for first installing mechanism by first magnet 19
On the upper surface of bottom 423.
Referring to Figure 12,13,19,20,22,30 and 30A, in a kind of exemplary implementation of the invention
In the fibre junction auxiliary equipment 100 of example, second holding meanss 2 include the first pedestal 21 and lid 22,
Lid 22 is arranged on first pedestal 21, and the lid 21 is provided with for the with support frame 5
The joint portion 221 that two binding end 53 is combined;And elastic retaining device 23, installed in first pedestal 21
On lid 22, flexibly it is combined together with by first pedestal 21 and lid 22.
In one embodiment, set at least one of relative surface of the first pedestal 21 and lid 22
There is the pressing mechanism (not shown) for accommodating and extruding the protective layer 302 of the optical cable 300.So, when
Lid 22 is combined when on the first pedestal 21 using elastic retaining device 23, pressing mechanism is to optical cable 300
Protective layer 302 extruded so that protective layer 302 somewhat deforms, so as to firmly fix optical cable
300。
In one embodiment, the second binding end 53 of support frame 5 and lid 22 using magnetic attraction or
Person's snap is combined together.For example, being provided with depressed part 221 on lid 22, it is fixed with depressed part
Magnet, coordinate magnet is provided with the end of the second binding end 53, when the second binding end 53 inserts depressed part 221
When middle, the second binding end 53 can be maintained in depressed part 221 by way of magnetic attraction.This area
Technical staff be appreciated that and be used for for the second holding meanss 2 and fix optical cable 300, its lighter in weight, because
The second holding meanss 2 are attached to the second binding end 53 of support frame 5 by the way of magnetic force combination for this.
On the other hand, the first holding meanss 1 are used for fixed fiberoptic connector 200, and its weight is relatively large, therefore material
First binding end 52 is attached to the first holding meanss 1 by the mode that material buckle is combined.In a kind of interchangeable reality
Apply in example, second binding end 53 and lid 22 of support frame 5 are combined together using snap.
In a kind of exemplary embodiment, referring to Figure 12-15,19,20,22,30 and 30A, the pallet
Component 41 also includes the second installing mechanism 43 in the support plate 41, the quilt of the second installing mechanism 43
It is configured for for the second holding meanss 2 being removably mounted on the support plate 41.Specifically, it is described
Second installing mechanism 43 includes:Fixed part 431, is fixed in support plate 41;Two second guiding bars 433,
Between the wall 436 of the fixed part 431 and the end of the support plate 41;Move portion 432,
Be movably mounted on the second guiding bar 433, with the support plate 41 relative to the fixed part 431
It is mobile;And two second springs 434, it is separately mounted on the second guiding bar 433, and positioned at described
Between fixed part 431 and move portion 432.
As shown in Figure 14 and 30A, the first pedestal 21 of the second holding meanss 2 is provided with:Location division 212,
First pedestal 21 is arranged in the support plate 41 by the location division 212;And first stop
Portion 211, from the both sides of the first pedestal 21 outwardly, and it is being resisted against move portion 432 with second bullet
The relative side of spring 434.In one embodiment, location division 212 is arranged to be formed in the first pedestal 21
At least one depressed part in lower surface, fixes magnet (not shown), first base in the depressed part
Seat 21 is pull-in on the upper surface of the move portion 432 being made up of ferromagnetic material by the magnet.
As shown in Figure 20 and 30A, in a kind of exemplary embodiment, the move portion 432 with described
The opposite side of two springs 434 is provided with the second slope 4321 and upright with what second slope 4321 was connected
Portion 4322, first stop part 211 slides into erection part 4322 by second slope 4321.
In one embodiment, as shown in fig. 30 a, the second stop part 435 is additionally provided with the support plate 41,
Second stop part 435 is arranged for limiting the moving section of the move portion 432.
So, when the second holding meanss 2 are arranged on the second installing mechanism 43, can be with hand-held supports frame
The handle 51 of frame 5 so that the first stop part 211 of the second holding meanss is slided along second slope 4321
To erection part 4322, while driving the elastic force movement of the confrontation second spring 434 of move portion 432, final first
Pedestal 21 is by magnetic attraction to the upper surface of move portion 432.
As shown in Figure 10-16, in the fibre junction auxiliary equipment of exemplary embodiment of the invention, the
Three holding meanss 3 include the first halfbody 31 in support plate 41 and are matched with first halfbody
Second halfbody 32, first halfbody 31 combined with the second body 32 with formed respectively with first pyrocondensation
The accommodating chamber of the exterior contour matching of pipe 401, elastic tube 402, the second heat-shrink tube 403 and optical cable 300.This
Sample, the first heat-shrink tube 401, the heat-shrink tube 403 of elastic tube 402 and second are maintained in the 3rd holding meanss 3,
The first heat-shrink tube 401, the heat-shrink tube 403 of elastic tube 402 and second are avoided in operation along optical cable 300
It is mobile.
Further, the first halfbody 31 is provided with multiple guide posts 311, second halfbody 32 and forms many
The individual bullport 321 for coordinating with the guide post 311 respectively.The body 32 of second halfbody 31 and second is adopted
It is combined together with magnetic attraction or snap, to firmly hold the first heat-shrink tube 401, elastic tube
402 and second heat-shrink tube 403.
In one embodiment, as shown in Figure 10,11,16,19 and 38, the pallet component 4 is also wrapped
The drive mechanism 44 installed in the bottom of the support plate 41 is included, drive mechanism 44 is configured for driving institute
State the first halfbody 31 and the second body 32 away from each other.Specifically, in first halfbody 31 and second
It is respectively equipped with least one drive hole 33 on halfbody 32, the support plate 41 is provided with multiple with the driving
The corresponding slit 45 in hole 33, the slit 45 is transversely to the longitudinal direction direction along perpendicular to optical cable 300
Extend.Drive mechanism 44 includes:Two groups of drive pins 441, each described drive pin 441 is from the support plate
41 bottom is inserted into corresponding drive hole 33 through the slit 45;And two movable blocks 442,
Movable block 442 is arranged on the bottom of the support plate 41, respectively with the body of first halfbody 31 and second
32 is corresponding, and drive pin 441 is separately mounted on the movable block 442 described in two groups, two movable blocks 442
It is configured to move away from each other or movement close to each other, so as to drive first halfbody 31 and second
Body 32 is opened or closed.
In one embodiment, as shown in Figure 10,11,16,19 and 38, drive mechanism 44 also includes:
Cam mechanism 443, is installed in rotation on the bottom of the support plate 41 and is located at two institutes by pivot 444
State between movable block 442;Two the 3rd guiding bars 447, installed in two lower walls 448 of support plate 41
Between, and through two movable blocks 442;And multiple back-moving spring (not shown), installed in described
On 3rd guiding bar 447 and positioned between the lower wall 448 and movable block 442.So, in cam machine
Not on movable block 442 during applying power, back-moving spring can drive movable block 442 to reset to structure 443, from
And close the first halfbody 31 and the second body 32.
Further, drive mechanism 44 also includes driving handle 445, and driving handle 445 is arranged on described convex
Take turns on the pivot pivot 444 of mechanism 443, to drive the cam mechanism 443 to rotate.
In a kind of alternate embodiment, the drive mechanism also includes:Two leading screws 446, installed in branch
Between two lower walls 448 of support plate 41, and it is screwed with two movable blocks 442;And drive
Motor (not shown), is configured for driving the leading screw 446 to rotate, so as to drive movable block 442 to move
It is dynamic.
Describe to connect optical fiber using the fibre junction auxiliary equipment 100 of the embodiment of the present invention with reference to the accompanying drawings
Device 200, the protection component on the optical fiber of optical cable 300 and with the beginning of the optical fiber of the joints of optical fibre 200
The optical cable 300 that step continues is shifted and the operating process on the fibre-optical process equipment 100 described in Fig. 7-9.
First, equipment 500 is cut by outside optical cable 300 using the optical fiber on fibre-optical process equipment 1000
The protective layer 302 in portion cuts and removes, and recycles optical fiber ablation equipment by the coating 303 outside fiber cores
Peel off, expose optical fiber 301 to be continued;Afterwards, as Figure 4-Figure 6, successively by the heat of tail sleeve 404, second
The draw 403, the heat-shrink tube 401 of elastic tube 402 and first are enclosed within optical cable 300 to be continued.
Afterwards, the first holding meanss 1 are arranged on the joints of optical fibre 200 with optical fiber 202, by the
Two holding meanss are arranged on optical cable in the outside of protection component, and the second heat-shrink tube is fixed using the 3rd holding meanss
403rd, the heat-shrink tube 401 of elastic tube 402 and first;Afterwards, using the side of thermal welding in fibre junction equipment
Be routed to the optical fiber 301 of optical cable 300 on the optical fiber 202 of the joints of optical fibre 200 by formula, so as to be formed such as figure
Interim component shown in 12-15.
Afterwards, first binding end 52 and the second binding end 53 of support frame 5 are respectively installed to the first guarantor
Hold in the holding meanss 2 of device 1 and second, so as to form structure as shown in figure 17;In the case, may be used
Lift whole interim component with hand-held handle 51.
Afterwards, as shown in Figure 21,24-26, whole interim component as shown in figure 17 is lifted, by interim group
Part is inclined, and the end of the main part 11 of the first holding meanss 1 is placed first and is kept the bottom of projection 425;By
Gradually interim component is laid flat, in the process, unlocking mechanism 424 by contacting with the first slope 17 and
Offset second cantilever 15, so as to release the sticking department 54 and coordinate the locking between sticking department 16.
Now, it is allowed to depart from the first binding end 52 of support frame 5 from the first holding meanss 1.
Referring to Figure 30 A, during interim component is laid flat, the first stop part 211 of the second holding meanss 2
Erection part 4322 is slided into along second slope 4321, while driving the confrontation second spring of move portion 432
434 elastic force movement, final first pedestal 21 passes through magnetic attraction to the upper surface of move portion 432, from
And form the structure shown in Figure 10.
Afterwards, first binding end 52 and the second binding end 53 of support frame 5 are kept into dress from first respectively
Put and removed with the second holding meanss, so as to form the structure as shown in Fig. 9,29 and 30.
It should be noted that can be after structure as shown in figures 29 and 30 be formed, then by pallet component 4
It is installed on fibre-optical process equipment 1000.In a kind of alternate embodiment, can first by pallet component
On fibre-optical process equipment, afterwards, knot as shown in figure 17 is installed on fibre-optical process equipment 1000
Structure.
During the optical fiber of optical cable is connected into the joints of optical fibre, it is possible to use of the invention above-mentioned
The fibre junction auxiliary equipment of various embodiments is using the optical fiber for tentatively continuing, the joints of optical fibre and optical cable as one
Individual global transfer is simultaneously installed in fibre-optical process equipment, to perform follow-up assembly operation and finally be assembled into tool
There is the fiber cable joint of the joints of optical fibre.During shifting and the preliminary optical fiber for continuing is installed, can prevent
The position of continuing of optical fiber will not be damaged due to being impacted, for example, avoid generation partly or completely breaking
The bad phenomenon such as open, misplace.Further, whole transfer and installation process are simple, easy to operate, improve
The finished product rate and production efficiency of the joints of optical fibre.
It will be understood to those skilled in the art that embodiment described above is all exemplary, and this
The technical staff in field can make improvements, and the structure described in various embodiments is in not recurring structure
Or independent assortment can be carried out in the case of the conflict in terms of principle.
Although with reference to accompanying drawing, the present invention is described, and the embodiment disclosed in accompanying drawing is intended to this hair
Bright preferred embodiment is illustrative, and it is not intended that to a kind of limitation of the invention.
Although some embodiments of this present general inventive concept have been shown and have illustrated, those of ordinary skill in the art
It will be understood that, in the case of the principle without departing substantially from this present general inventive concept and spirit, these embodiments can be done
Go out to change, the scope of the present invention is limited with claim and their equivalent.
It should be noted that word " including " other elements or step are not excluded for, word "a" or "an" is not
Exclude multiple.In addition, the scope that any element label of claim should not be construed as limiting the invention.
Claims (36)
1. a kind of fibre junction auxiliary equipment, connects for shifting the joints of optical fibre and optical fiber
The preliminary optical cable for continuing of the optical fiber of device and the protection component on optical cable, the optical fiber
The auxiliary equipment that continues includes:
Primary Location device, including:
First holding meanss, are configured for keeping the joints of optical fibre;
Second holding meanss, are configured for keeping the optical cable;And
3rd holding meanss, be arranged on first holding meanss and the second holding meanss it
Between, and be configured for keeping the protection component;And
Support frame, including the first combination removably combined with first holding meanss
The second binding end and combined positioned at first that end is removably combined with the second holding meanss
Handle between end and the second binding end.
2. fibre junction auxiliary equipment according to claim 1, also including pallet component,
The pallet component includes support plate, and the support plate is configured for installing described preliminary fixed
Position device.
3. fibre junction auxiliary equipment according to claim 2, wherein, described first
Holding meanss include:
Main part, is provided with the first holding tank matched with the exterior contour of the joints of optical fibre,
The joints of optical fibre are arranged in first holding tank.
4. fibre junction auxiliary equipment according to claim 3, wherein, described first
Holding meanss also include:
Generally U-shaped positioning framework, including be pivotably mounted on the main part two
Individual arm and the connecting portion between described two arms, the connecting portion are provided with substantially U
The locating slot of shape, the locating slot is positioned to allow for the fiber containment of the joints of optical fibre in institute
State in locating slot, positioned with the optical fiber to the joints of optical fibre.
5. fibre junction auxiliary equipment according to claim 3, wherein, the pallet
Component also includes the first installing mechanism in the support plate, is configured for removable
First holding meanss are installed with unloading.
6. fibre junction auxiliary equipment according to claim 5, wherein, described first
Installing mechanism includes:
Installation portion, in the support plate;
Bottom, is connected to the side of the installation portion, and first holding meanss are placed on described
On bottom;And
Two the first relative walls, on said bottom parallel to the longitudinal direction of the optical cable
Extend, positioned with the both sides to first holding meanss.
7. fibre junction auxiliary equipment according to claim 6, wherein, described first
Installing mechanism is arranged to be moved in a longitudinal direction relative to the support plate.
8. fibre junction auxiliary equipment according to claim 7, wherein, described first
Installing mechanism also includes:
Second wall, upwardly extends from the support plate;
Two the 3rd walls, are arranged to be arranged on second vertical wall surface pair, the installation portion
Between second wall and the 3rd wall, first wall and bottom are from two the described 3rd
Passed through between wall;
Two first guiding bars, between second wall and the 3rd wall;And
Two the first springs, are separately mounted on the first guiding bar so that the installation portion
The elastic force for resisting first spring is moved relative to second wall.
9. fibre junction auxiliary equipment according to claim 6, wherein, described first
Holding meanss are combined with first installing mechanism by snap.
10. fibre junction auxiliary equipment according to claim 9, wherein, described in two
At least one of first wall is provided with first locking mechanism, by first holding meanss
It is releasably locked in first installing mechanism.
11. fibre junction auxiliary equipments according to claim 10, wherein, the first lock
Determining mechanism includes:
First cantilever, extends from the bottom up;
First locking projection, from the upper end of first cantilever towards first holding meanss
Main part is protruded, and first holding meanss are maintained in first installing mechanism;With
And
First relieving mechanism, prolongs from the upper end of first cantilever away from first locking projection
Stretch, by pressing first relieving mechanism so that first locking projection departs from the main body
Portion.
12. fibre junction auxiliary equipments according to claim 10, wherein, described
One locking mechanism includes the cam being pivotably mounted on first wall, the cam
Jut can turn to the top of the main part of first holding meanss.
13. fibre junction auxiliary equipments according to claim 6, wherein, the installation
The first holding projection that the top that portion is provided with the main part of first holding meanss extends,
It is maintained on first installing mechanism with by first holding meanss.
14. fibre junction auxiliary equipments according to claim 6, wherein, the support
First binding end of framework is combined with the main part by snap.
15. fibre junction auxiliary equipments according to claim 14, wherein, described
One binding end is provided with sticking department,
The main part is provided with the opening for accommodating first binding end, in the opening
It is provided with the cooperation sticking department combined with the sticking department.
16. fibre junction auxiliary equipments according to claim 15, wherein, the master
Body portion also includes:Extended internally perpendicular to the surface of the main part from the upper end of the opening
Second cantilever, the cooperation sticking department is arranged on second cantilever.
17. fibre junction auxiliary equipments according to claim 16, wherein, the lock
One in portion and the cooperation sticking department is determined for lock slots, and another is described for that can be attached to
The second locking projection in lock slots.
18. fibre junction auxiliary equipments according to claim 17, wherein, described
The bottom of one installing mechanism is provided with unlocking mechanism, is configured for releasing the sticking department and matching somebody with somebody
The locking between sticking department is closed, to allow the first binding end of the support frame de- from main part
From.
19. fibre junction auxiliary equipments according to claim 18, wherein, the solution
Latch mechanism includes being arranged on solution latching projection on the bottom of first installing mechanism, described the
The end of two cantilevers is provided with first slope, when first holding meanss are arranged on the tray set
When on part, the solution latching projection makes second cantilever inclined by being contacted with the first slope
Move, so as to release the sticking department and coordinate the locking between sticking department.
20. fibre junction auxiliary equipments according to claim 6, wherein, described
The lower surface of one holding meanss is provided with least one depressed part, and is fixed in the depressed part
One magnet, first holding meanss are pull-in on first fitting machine by first magnet
On the upper surface of the bottom of structure.
21. according to any one of claim 2-20 described fibre junction auxiliary equipment, its
In, second holding meanss include:
First pedestal;
Lid, on first pedestal, the lid be provided with for the support
The joint portion that second binding end of framework is combined;And
Elastic retaining device, on the first base and cover body, and by first base
Seat and lid are flexibly combined together.
22. fibre junction auxiliary equipments according to claim 21, wherein, described
At least one of relative surface of one base and cover body is provided with for accommodating and extruding institute
State the pressing mechanism of the protective layer of optical cable.
23. fibre junction auxiliary equipments according to claim 21, wherein, described
Two binding ends and lid are combined together using magnetic attraction or snap.
24. fibre junction auxiliary equipments according to claim 21, wherein, the support
Disk component also includes the second installing mechanism in the support plate, be configured for by
Second holding meanss are removably mounted in the support plate.
25. fibre junction auxiliary equipments according to claim 24, wherein,
Second installing mechanism includes:
Fixed part, is fixed in the support plate;
Two second guiding bars, installed in the end of the fixed part and the support plate
Between wall;
Move portion, is movably mounted on the second guiding bar, with the support
Moved relative to the fixed part on disk;And
Two second springs, are separately mounted on the second guiding bar, and positioned at described
Between fixed part and move portion,
First pedestal is provided with:
Location division, first pedestal is arranged on the support plate by the location division
On;And
First stop part, from the both sides of first pedestal outwardly, and is resisted against institute
State the side relative with the second spring of move portion.
26. fibre junction auxiliary equipments according to claim 25, wherein, the shifting
The side opposite with the second spring in dynamic portion be provided with the second slope and with second slope
The erection part of connection, first stop part is slided into described upright by second slope
Portion.
27. fibre junction auxiliary equipments according to claim 25, wherein, the branch
The second stop part is additionally provided with support plate, second stop part is arranged for limiting the movement
The moving section in portion.
28. according to any one of claim 2-27 described fibre junction auxiliary
Equipment, wherein,
The protection component includes:
First heat-shrink tube, installed in optical fiber and the optical fiber of optical cable of the joints of optical fibre
Continue position;
Elastic tube, installed in the outside of first heat-shrink tube;And
Second heat-shrink tube, installed in the outside of the elastic tube,
3rd holding meanss include the first halfbody in the support plate and with described the
One halfbody matching the second halfbody, first halfbody combined with the second body with formation respectively with
The receiving of the exterior contour matching of first heat-shrink tube, elastic tube, the second heat-shrink tube and optical cable
Chamber.
29. fibre junction auxiliary equipments according to claim 28, wherein, described
One halfbody is provided with multiple guide posts, described the second half formed in vivo it is multiple respectively with the guiding
The bullport that post coordinates.
30. fibre junction auxiliary equipments according to claim 28, wherein, disk component
Also include the drive mechanism installed in the support plate bottom, be configured for driving described the
One halfbody and the second body are away from each other.
31. fibre junction auxiliary equipments according to claim 30, wherein, described
At least one drive hole is respectively equipped with first halfbody and the second halfbody, the support plate is provided with
Multiple slits corresponding with the drive hole, the slit is along the longitudinal direction perpendicular to optical cable
Horizontal direction extend,
The drive mechanism includes:
Two groups of drive pins, each described drive pin passes through the slit from the bottom of the support plate
It is inserted into corresponding drive hole;And
Two movable blocks, installed in the bottom of the support plate, respectively with first halfbody and
Second body is corresponding, and drive pin described in two groups is separately mounted on the movable block, two shiftings
Motion block is configured to move away from each other or movement close to each other, so as to drive described the first half
Body and the second body are opened or closed.
32. fibre junction auxiliary equipments according to claim 31, wherein, motivation structure
Also include:
Cam mechanism, the support plate bottom is installed in rotation on and positioned at two by pivot
Between the movable block;
Two the 3rd guiding bars, between two lower walls of support plate, and through two
The movable block;And
Multiple back-moving springs, on the described 3rd guiding bar and positioned at the lower wall and shifting
Between motion block.
33. fibre junction auxiliary equipments according to claim 32, wherein, driving machine
Structure also includes driving handle, on the pivot of the cam mechanism, to drive the cam
Mechanism rotates.
34. fibre junction auxiliary equipments according to claim 31, wherein, the drive
Motivation structure also includes:
Leading screw, between two lower walls of support plate, and divides with two movable blocks
It is not screwed;And
Motor, is configured for driving the leading screw to rotate.
35. fibre junction auxiliary equipments according to claim 28, wherein, described
Two halfbodies and the second body are combined together using magnetic attraction or snap.
36. according to any one of claim 2-35 described fibre junction auxiliary equipment, also
Including guide rail mechanism, installed in the bottom of the support plate, it is slidably connected with installation frame.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510483450.5A CN106707418A (en) | 2015-08-07 | 2015-08-07 | Auxiliary equipment of fiber connection |
PCT/CN2016/093222 WO2017024982A1 (en) | 2015-08-07 | 2016-08-04 | Auxiliary device for optical fiber splicing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510483450.5A CN106707418A (en) | 2015-08-07 | 2015-08-07 | Auxiliary equipment of fiber connection |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106707418A true CN106707418A (en) | 2017-05-24 |
Family
ID=58918331
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510483450.5A Pending CN106707418A (en) | 2015-08-07 | 2015-08-07 | Auxiliary equipment of fiber connection |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106707418A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111694104A (en) * | 2020-07-20 | 2020-09-22 | 中铁武汉电气化局集团有限公司 | Urban rail transit 5G antenna optical cable installation auxiliary device that colds pressing |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030215195A1 (en) * | 2002-05-17 | 2003-11-20 | Sumitomo Electric Industries, Ltd. | Method and jig for handling and transferring fusion-spliced optical fibers |
CN101027583A (en) * | 2004-09-24 | 2007-08-29 | 3M创新有限公司 | Splice holder device |
CN103597388A (en) * | 2011-02-17 | 2014-02-19 | 泰科电子瑞侃有限公司 | Portable device for attaching a connector to an optical fiber |
CN203909345U (en) * | 2014-05-16 | 2014-10-29 | 武汉奥新科技股份有限公司 | A hand-held type optical fiber connector coupling apparatus |
CN204101773U (en) * | 2014-08-12 | 2015-01-14 | 王京宁 | Optical fiber pressure structure and field assembling type optical connector |
-
2015
- 2015-08-07 CN CN201510483450.5A patent/CN106707418A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030215195A1 (en) * | 2002-05-17 | 2003-11-20 | Sumitomo Electric Industries, Ltd. | Method and jig for handling and transferring fusion-spliced optical fibers |
CN101027583A (en) * | 2004-09-24 | 2007-08-29 | 3M创新有限公司 | Splice holder device |
CN103597388A (en) * | 2011-02-17 | 2014-02-19 | 泰科电子瑞侃有限公司 | Portable device for attaching a connector to an optical fiber |
CN203909345U (en) * | 2014-05-16 | 2014-10-29 | 武汉奥新科技股份有限公司 | A hand-held type optical fiber connector coupling apparatus |
CN204101773U (en) * | 2014-08-12 | 2015-01-14 | 王京宁 | Optical fiber pressure structure and field assembling type optical connector |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111694104A (en) * | 2020-07-20 | 2020-09-22 | 中铁武汉电气化局集团有限公司 | Urban rail transit 5G antenna optical cable installation auxiliary device that colds pressing |
CN111694104B (en) * | 2020-07-20 | 2024-04-16 | 中铁武汉电气化局集团有限公司 | Urban rail transit 5G antenna optical cable installation auxiliary device that colds pressing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104656203B (en) | Optical communication connector | |
CN101512405B (en) | Pre-connectorized fiber optic cable network interconnection apparatus | |
US5071220A (en) | Joint closure module and box for optical fiber cables | |
CN102204049B (en) | Sealing enclosure | |
CN106133572A (en) | Slidably optical link module with cable slack management | |
US8616526B2 (en) | Insertion device for a cable in an existing pipe network | |
JP2009015322A (en) | Rack for optical distribution frame | |
CA2123159C (en) | Transmission line switching apparatus and method therefor | |
CN104246570A (en) | Cable pulling grip having toolless removal | |
EP2999984A1 (en) | Optical cable splice cassettes with slack covers | |
CN107111061A (en) | Laser cleaves multirow ribbon-like fibre | |
CN107132623A (en) | A kind of joints of optical fibre | |
CN106707418A (en) | Auxiliary equipment of fiber connection | |
US5533160A (en) | Apparatus for splicing optical fibers | |
JP2007121603A (en) | Closure for optical cable connection | |
Lindenmann | Photonic wire bonding as a novel technology for photonic chip interfaces | |
JP5407540B2 (en) | Holder, fusion splicer and fusion splicing method | |
JP2002543451A (en) | Optical fiber splicing equipment | |
JPH11349230A (en) | Optical cable reel and method for temporarily mounting optical cable using it | |
CN204989543U (en) | Optical fiber splicing auxiliary assembly | |
JP2013109269A (en) | Alignment jig for optical fiber, alignment method for optical fiber, and fusion method for optical fiber | |
JP2019520613A (en) | Optical fiber fusion machine | |
CN205027933U (en) | Optic fibre treatment facility | |
JP2004086060A (en) | Optical module and optical termination box | |
CN106707417A (en) | Optical fiber processing equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170524 |