CN106703824A - Suspension folding anchor rod drilling system - Google Patents

Suspension folding anchor rod drilling system Download PDF

Info

Publication number
CN106703824A
CN106703824A CN201510769785.3A CN201510769785A CN106703824A CN 106703824 A CN106703824 A CN 106703824A CN 201510769785 A CN201510769785 A CN 201510769785A CN 106703824 A CN106703824 A CN 106703824A
Authority
CN
China
Prior art keywords
motion
folding device
fixed
rig
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510769785.3A
Other languages
Chinese (zh)
Inventor
马振凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510769785.3A priority Critical patent/CN106703824A/en
Publication of CN106703824A publication Critical patent/CN106703824A/en
Pending legal-status Critical Current

Links

Abstract

The invention provides a suspension folding anchor rod drilling system. The system is used for the drilling and temporary support during the anchor rod support, and is mainly used in the applications of mine tunnel, traffic and water irrigation tunnel. The system comprises at least a mobile system hanging at a slide rail located at the top of the tunnel, a folding device fixedly installed on the mobile system, a drilling machine assembly fixed to the folding device, wherein the folding device comprises at least a folding part for fixing the drilling machine assembly and a fixed part which is fixed to the mobile system. The drilling machine assembly comprises at least one group of top anchor rod drilling machine and a retractable vertical column. Both the top anchor rod drilling machine and the retractable vertical column are all fixedly connected with the folding part of the folding device. The application of the suspension folding anchor rod drilling system can greatly increase the construction speed of the anchor rod support tunnel, reduce the tunneling cost, and guarantee the safety of the drilling work surface.

Description

Suspended collapsible armature boring system
Technical field
The present invention relates to mine working, the drilling of traffic and the suspension roof support in water conservancy tunnel and supporting field, Refer in particular to a kind of suspended collapsible tunneling boring armature boring system used in tunnel.
Background technology
Jumbolter is the key equipment in roadway bolting support work.During tunnelling, by liquid Pressure pillar carries out gib to just exposed top board, then carries out drilling armature boring and rockbolt installation etc. Support work.At present the jumbolter that uses can be divided into from the power for using electrodynamic type, pneumatic type and Fluid pressure type;Monomer-type, drill carriage formula or machine-carried type can be divided into from structure.Monomer-type is by being manually entered behaviour Make area, operation monomer jumbolter completes armature boring and installation, and whole operation process labour intensity is big, Security is poor, and drilling efficiency is low, slow into lane speed;Drill carriage formula is that many anchors are installed on a bench drill car Bar drill machine simultaneously drill, it need with development machine alternately operating, i.e., development machine complete driving operation after to Backed off after random certain distance is roofboltier vacating space, completes drilling and installment work by roofboltier, so Roofboltier exits preparation subsequent cycle driving again afterwards.This operating type drilling efficiency is high, but there is also Because lane space is narrow and small, development machine intersects the problem of mobile difficulty with roofboltier, receives its applicable elements Severely restricts are arrived;Machine-carried type is that many jumbolters are installed on development machine, although it overcomes drill carriage Formula bore mode development machine intersects the problem of mobile difficulty, but because cost and applicable elements with roofboltier Limitation, scene application is little.
Therefore, how to improve drilling efficiency and into lane speed, reduce into lane expense, ensure supporting operation peace Be entirely the invention solves the problems that problem.
The content of the invention
It is an object of the invention to provide the suspended collapsible tunneling boring armature boring system of one kind, the system is by anchor Bar drill machine is folded to tunnel top, makes full use of lane space, it is possible to realize carrying out multiple drillings simultaneously Purpose, be greatly reduced the bore operation time, improve drilling efficiency and into lane speed;Meanwhile, will have Effect solves to intersect mobile being stranded with development machine because lane space is narrow and small using the mobile space above gradeline Difficult problem.
The present invention provides a kind of suspended collapsible armature boring system, at least sliding including being suspended in tunnel top Mobile system on rail, is fixedly mounted on the folding device on the mobile system, and be fixed on described Rig assembly in folding device;Wherein described folding device at least includes the fixation rig assembly Foldable portion and it is fixed on the fixed part of the mobile system;Described rig assembly at least includes One group of top jumbolter and telescopic prop, described top jumbolter are solid with the telescopic prop Surely the foldable portion of the folding device is connected.
Wherein, described mobile system at least includes fixed support plate, hanger and the first motion, Described fixed support plate is fixedly connected with the fixed part of the folding device, described hanger suspention One end of the first described motion, first motion promotes described fixed support plate movement.
Wherein, the foldable portion of described folding device is the rotatable crossbeam for installing the rig assembly, The earrings of the setting that described rotatable crossbeam passes through two ends is fixedly connected with rotation cylinder rod, and fixed part is The stationary housing being fixedly connected with the fixed support plate of described mobile system.
Wherein, described top jumbolter includes rig and the second motion, and described rig is by the Two motions are controlled to be moved to top and drilled, the fixed part of described the second motion with it is described can Foldable portion of the fixed part of telescopic prop with described folding device is fixedly connected.
Wherein, described top jumbolter includes rig and the second motion, and described rig is by the Two motions are controlled to be moved to top and drilled, the fixed part of described the second motion with it is described can The fixed part of telescopic prop is fixedly connected, and the fixed part of the telescopic prop is fixedly connected on described Folding device foldable portion.
Wherein, described rig assembly also includes setting the side jumbolter of adjacent tunnel side wall at least side And telescopic prop, described telescopic prop is fixed on the foldable portion of the folding device, institute The side jumbolter stated is vertically arranged and is fixed on the telescopic prop with the telescopic prop.
Wherein, described side jumbolter includes rig and the 3rd motion, and described rig is by the Three motions are controlled to be moved to side and drilled, the fixed part of described the 3rd motion with it is described can The fixed part of telescopic prop is fixedly connected, and the fixed part of the telescopic prop is fixedly connected on described Folding device foldable portion.
Wherein, described telescopic prop is telescopic hydraulic or gas strut.
Wherein, first, second, third described motion is hydraulic motion mechanism or air pressure fitness machine Structure or rack-and-pinion motion or worm and gear motion.
Advantageous Effects of the invention are:It is installed on a stand together by the way that many jumbolters are concentrated When drill, solve monomer jumbolter drilling efficiency it is low, into lane speed is slow, labor strength big, The poor problem of security;Rig of the present invention is separate with development machine, with folding structure, Tunnel upper space can be folded in after armature boring, installation terminate, be moved forward and backward and is vacateed to development machine Working space, does not interfere with mutually spatially with the development machine walked on base plate, solves the two intersection Mobile difficult problem.Meanwhile, cost easier than machine-carried type operating type of the invention is lower, applicable Condition is wider.
Brief description of the drawings
Fig. 1 is the suspended collapsible direction view of jumbolter system three of the invention;
Fig. 1 a are shown a-a enlarged sections;
Fig. 1 b are the partial enlarged drawing of the folding device shown in Fig. 1;
Fig. 2 is structural representation of the suspended collapsible jumbolter system of the invention in tunnel;
Fig. 3 a are the state that rig assembly in system of the invention is folded in the parallel top board in tunnel top;
Fig. 3 b are the state of the rig assembly vertical working top board in system of the invention;
Fig. 4 is the position relationship schematic diagram of system work process of the invention.
Specific embodiment
The present invention provides a kind of suspended collapsible armature boring machine, with reference to shown in Fig. 1, at least including being fixed on Mobile system B in the top slide rail of tunnel, is fixedly mounted on the folding device C on the mobile system, And it is fixed on the rig assembly A on the folding device C;Described folding device C at least includes solid The foldable portion for determining the rig assembly A and the fixed part for being fixed on the mobile system, fold The effect of device C can be to fold up rig assembly A, give development machine vacating space, realize this hair Intersect movement between bright tunneling boring armature boring equipment and development machine, with reference to Fig. 3 a and Fig. 3 b, can See that rig assembly A folds front and rear state in tunnel;Described rig assembly A at least includes one group of top Plate jumbolter and telescopic prop, described top jumbolter by the telescopic prop with it is described The foldable portion of folding device C is fixedly connected.Telescopic prop described in system for telescopic hydraulic or Gas strut, illustrates by example of telescopic hydraulic pillar in the present embodiment.
As shown in figure 1, described mobile system B at least includes fixed support plate 4, hanger 7,8,9 And first motion 10;In the apparatus of the present: invention, described railroad is pushed up to be arranged on tunnel The slide rail in portion, the slide rail can be that the track of production and application in former tunnel can also individually be laid;Described consolidates Determine support plate 4 to be fixedly connected with the fixed part of the folding device C, it is described with reference to shown in Fig. 1 Hanger 9 suspends in midair and fixes one end of the first described motion 10, first motion 10 Described fixed support plate 4 is promoted to move forward.The foldable portion of described folding device C is installation The rotatable crossbeam 3 of the rig assembly, the earrings of the setting that described rotatable crossbeam 3 passes through two ends It is fixedly connected with rotation cylinder rod 5, fixed part is to be fixed with the fixed support plate 4 of described mobile system The stationary housing 6 of connection.
With reference to Fig. 1 and Fig. 2, in the present embodiment, described top jumbolter 1 include rig 13 with And second motion 12, described rig 13 controls to be moved to top and drilled from the second motion 12, Fixed part and institute of the fixed part of the second described motion 12 by the telescopic prop 11 The foldable portion of the folding device C for stating is fixedly connected.In addition, in the structure of the present embodiment, it is described The second motion 12 fixed part and the telescopic prop 11 fixed part (scalable branch The upper end of post 11) it is fixedly connected, the fixed part of the telescopic prop 11 is fixedly connected on described The foldable portion of folding device C.In the present embodiment, the second described motion uses telescopic oil cylinder Illustrate, with reference to Fig. 2, described roofbolt rig 1 passes through the Suspending fixation of telescopic oil cylinder 12 in liquid The top of pillar 11 is pressed, in roof bolt hole, first makes hydraulic prop 11 vertical with back simultaneously Firm support top board 4, opening jumbolter 1 rotates it, makes its upward while opening telescopic oil cylinder 12 It is mobile, until completing top plate drilling work.
Described rig assembly A also includes setting a side jumbolter of adjacent tunnel side wall at least side 2 and telescopic prop 14, described telescopic prop 14 is fixed on the foldable of the folding device C Part, described side jumbolter 2 is vertically arranged and is fixed on the telescopic prop 14 described can be stretched On contracting pillar 14.In the present embodiment, described side jumbolter 2 is transported including rig 16 and the 3rd Motivation structure 15, described rig 16 is controlled to be moved to side and drilled from the 3rd motion 15, described The fixed part of the 3rd motion 15 is fixedly connected with the fixed part of the telescopic prop 14, institute The fixed part for stating telescopic prop 14 is fixedly connected on the foldable portion of described folding device C.System Described telescopic prop in system is telescopic hydraulic or gas strut, in the present embodiment with scalable branch Post 14 is telescopic hydraulic pillar, and the 3rd motion 15, for example is illustrated, helps anchor for telescopic oil cylinder During bar drill hole, first make hydraulic prop 14 vertical with back and firm support top board 4, open side anchor pole Rig 2 rotates it, it is marched forward while opening telescopic oil cylinder 15, until completing side boring work. In addition, first, second, third heretofore described motion is hydraulic motion mechanism or air pressure transporting Motivation structure or rack-and-pinion motion or worm and gear motion, in the present embodiment, are transported with hydraulic pressure Illustrated as a example by motivation structure.
As shown in figure 4, be system work process schematic diagram of the invention, specifically, the shifting in the present invention Dynamic system is suspended on the slide rail at the top of tunnel, it is possible to by the first motion be telescopic oil cylinder control into Row is movable, and the rig assembly is fixed in described folding device, and is folded in tunnel top, Development machine carries out coal cutting operation (such as Fig. 4 a) in tunnel, tunnel certain distance after, the top in tunnel or Side needs to be reinforced and can just proceed coal cutting operation, i.e., from jumbolter to tunnel top and Flank hole install anchor pole or anchor cable, therefore development machine according to design complete driving task after, retreat one Segment distance, vacates tunnel inner space to carry out gib and armature boring and installation;In the present embodiment, Rig assembly A include at least one top jumbolter 1 or side jumbolter 2, carry out armature boring and Installation exercise.Development machine coal cutting finishes retrogressing certain distance, and rear hitch frame 9 is locked on slide rail, Telescopic oil cylinder 10 promotes hanger 7,8 and rig assembly A to reach (such as Fig. 4 b);Open rotation oil Cylinder, makes rotation cylinder rod 5 drive rig assembly A to turn to the position vertical with back, beats firm hydraulic pressure The just exposed top board of 11 pairs, pillar carries out gib, and then jumbolter 1 carries out bore operation, drilling After the completion of anchor pole (such as Fig. 4 c) is installed with the pushing tow of jumbolter 1 and rotary motion;Anchor pole work is installed After finishing, rotary oil cylinder is opened, make rotation cylinder rod 5 drive rig assembly A to turn to flat with back Capable position;Telescopic oil cylinder 10 pulls hanger 7,8 and rig assembly A to retreat certain distance (Fig. 4 d), For development machine, coal cutting is ready again, starts the driving of subsequent cycle.In the present embodiment, hanger Hanger 7,8, the locking device of release hanger 9 are locked in 9 advance through, using telescopic oil cylinder 10 Contraction realize.
In the present embodiment, hydraulic jack has been used for critical piece realizes linear motion and rotates, these Motion can also use other universal machine part (such as cylinder, hydraulic cylinder, rack-and-pinion, worm and gears Deng) realize.
Advantageous Effects of the invention are:It is installed on a stand together by the way that many jumbolters are concentrated When drill, solve monomer jumbolter drilling efficiency it is low, into lane speed is slow, labor strength big, The poor problem of security;Borer system of the invention is separate with development machine, with folding knot Structure, tunnel upper space can be folded in after armature boring, installation terminate, and moved forward and backward to development machine Between soaring, do not interfered with mutually spatially with the development machine walked on base plate, solve the two and intersect shifting Move difficult problem.Meanwhile, cost easier than machine-carried type operating type of the invention is lower, be applicable bar Part is wider.
In the present invention, rig, hydraulic prop, mechanical structure, action control, rig and mechanical movement Power etc. employs general industrial technology, therefore concrete principle will not be repeated here, above is of the invention Preferred embodiments, any formal limitation is not made to the present invention.It is every to be according to technology of the invention Refer to any simple modification, equivalent variations and modification that the example to more than is made, still fall within skill of the present invention In the range of art scheme.

Claims (9)

1. a kind of suspended collapsible armature boring system, it is characterised in that at least including being suspended in tunnel top Mobile system on portion's slide rail, is fixedly mounted on the folding device on the mobile system, and be fixed on Rig assembly in the folding device;Wherein
Described folding device at least includes the foldable portion of the fixation rig assembly and is fixed on institute State the fixed part of mobile system;
Described rig assembly at least includes one group of top jumbolter and telescopic prop, described top anchor Bar drill machine is fixedly connected with the foldable portion of the folding device with the telescopic prop.
2. suspended collapsible armature boring system according to claim 1, it is characterised in that described Mobile system at least include fixed support plate, hanger and the first motion, described fixed branch Board is fixedly connected with the fixed part of the folding device, the first described fortune of described hanger suspention One end of motivation structure, first motion promotes described fixed support plate movement.
3. suspended collapsible armature boring system according to claim 1, it is characterised in that described The foldable portion of folding device be the rotatable crossbeam for installing the rig assembly, described is rotatable The earrings of the setting that crossbeam passes through two ends is fixedly connected with rotation cylinder rod, and fixed part is and described movement The stationary housing that the fixed support plate of system is fixedly connected.
4. suspended collapsible armature boring system according to claim 1, it is characterised in that described Top jumbolter include rig and the second motion, described rig controls by the second motion Moved to top and drilled, the fixed part of described the second motion and the fixation of the telescopic prop Foldable portion of the part with described folding device is fixedly connected.
5. suspended collapsible armature boring system according to claim 1, it is characterised in that described Top jumbolter include rig and the second motion, described rig controls by the second motion Moved to top and drilled, the fixed part of described the second motion and the fixation of the telescopic prop Part is fixedly connected, and what the fixed part of the telescopic prop was fixedly connected on described folding device can Folded portion.
6. suspended collapsible armature boring system according to claim 1, it is characterised in that described Rig assembly also include setting the side jumbolter and scalable branch of adjacent tunnel side wall at least side Post, described telescopic prop is fixed on the foldable portion of the folding device, and described side anchor pole is bored Machine is vertically arranged and is fixed on the telescopic prop with the telescopic prop.
7. suspended collapsible armature boring system according to claim 6, it is characterised in that described Side jumbolter include rig and the 3rd motion, described rig controls by the 3rd motion Moved to side and drilled, the fixed part of described the 3rd motion and the fixation of the telescopic prop Part is fixedly connected, and what the fixed part of the telescopic prop was fixedly connected on described folding device can Folded portion.
8. suspended collapsible armature boring system according to claims 1 to 7, it is characterised in that institute The telescopic prop stated is telescopic hydraulic or gas strut.
9. suspended collapsible armature boring system according to claims 1 to 7, it is characterised in that institute First, second, third motion stated is hydraulic motion mechanism or air pressure motion or rack-and-pinion Motion or worm and gear motion.
CN201510769785.3A 2015-11-13 2015-11-13 Suspension folding anchor rod drilling system Pending CN106703824A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510769785.3A CN106703824A (en) 2015-11-13 2015-11-13 Suspension folding anchor rod drilling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510769785.3A CN106703824A (en) 2015-11-13 2015-11-13 Suspension folding anchor rod drilling system

Publications (1)

Publication Number Publication Date
CN106703824A true CN106703824A (en) 2017-05-24

Family

ID=58929973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510769785.3A Pending CN106703824A (en) 2015-11-13 2015-11-13 Suspension folding anchor rod drilling system

Country Status (1)

Country Link
CN (1) CN106703824A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110295934A (en) * 2019-06-21 2019-10-01 天地科技股份有限公司 Portal frame Anchor Care device
CN110832166A (en) * 2019-02-01 2020-02-21 河南理工大学 Anchoring equipment and working method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2140958Y (en) * 1992-11-21 1993-08-25 陈玉金 Folding hydraulic anchoring bolt drill
JPH1136788A (en) * 1997-07-23 1999-02-09 Taisei Corp Tunnel-boring construction method by continuously supplied support
CN2364217Y (en) * 1998-12-01 2000-02-16 煤炭科学研究总院南京研究所 Ominbearing combined anchoring-bolt drilling setting machine
CN201747390U (en) * 2010-07-09 2011-02-16 沈阳天安矿山机械科技有限公司 Suspension type multifunctional tunnel operation machine
CN202031619U (en) * 2011-04-15 2011-11-09 山西大同大学 Suspended mobile temporary supporting device of excavation roadway
CN203403900U (en) * 2013-08-02 2014-01-22 天地上海采掘装备科技有限公司 Hoisting self-moving type anchor-rod cable bolting equipment
CN104632241A (en) * 2014-12-28 2015-05-20 李宝 Track crane with excavation function
CN204716247U (en) * 2015-01-26 2015-10-21 南京石诚井巷装备有限责任公司 Suspension stone drifting machinery arm device
CN205778890U (en) * 2015-11-13 2016-12-07 马振凯 Suspended collapsible armature boring system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2140958Y (en) * 1992-11-21 1993-08-25 陈玉金 Folding hydraulic anchoring bolt drill
JPH1136788A (en) * 1997-07-23 1999-02-09 Taisei Corp Tunnel-boring construction method by continuously supplied support
CN2364217Y (en) * 1998-12-01 2000-02-16 煤炭科学研究总院南京研究所 Ominbearing combined anchoring-bolt drilling setting machine
CN201747390U (en) * 2010-07-09 2011-02-16 沈阳天安矿山机械科技有限公司 Suspension type multifunctional tunnel operation machine
CN202031619U (en) * 2011-04-15 2011-11-09 山西大同大学 Suspended mobile temporary supporting device of excavation roadway
CN203403900U (en) * 2013-08-02 2014-01-22 天地上海采掘装备科技有限公司 Hoisting self-moving type anchor-rod cable bolting equipment
CN104632241A (en) * 2014-12-28 2015-05-20 李宝 Track crane with excavation function
CN204716247U (en) * 2015-01-26 2015-10-21 南京石诚井巷装备有限责任公司 Suspension stone drifting machinery arm device
CN205778890U (en) * 2015-11-13 2016-12-07 马振凯 Suspended collapsible armature boring system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110832166A (en) * 2019-02-01 2020-02-21 河南理工大学 Anchoring equipment and working method
CN110832166B (en) * 2019-02-01 2021-09-17 河南理工大学 Anchoring equipment and working method
CN110295934A (en) * 2019-06-21 2019-10-01 天地科技股份有限公司 Portal frame Anchor Care device

Similar Documents

Publication Publication Date Title
CN106089258B (en) Tunnel device and construction method
CN101451427B (en) Drilling device and drilling method
CN101832102B (en) Movable two-platform partitioned four-arm hanging wall anchor rod and anchor cable construction drill carriage
CN105221069B (en) A kind of rock drilling device for drill jumbo
CN108868810B (en) Cantilever type tunneling and anchoring integrated machine
CN102434154A (en) Development machine-mounted anchor rod drilling rig
CN106121537B (en) Without coal column gob side entry retaining Qie Dingcheng lanes construction method
CN212898509U (en) Airborne automatic anchoring and protecting mechanism
CN103174382B (en) Multifunctional hydraulic anchor rod drill carriage
CN207905721U (en) Multi-functional drill boom and rock drilling vehicle with the drill boom
CN105332653A (en) Fully-hydraulic mechanical drilling and exploration drilling vehicle
CN203271588U (en) Wheel type truck-mounted drilling rig
CN103277046B (en) Wheel type truck-mounted drilling rig
CN106703824A (en) Suspension folding anchor rod drilling system
CN202055821U (en) Two-arm top slope anchor rod and anchor rope construction drill wagon with movable lifting platform
CN103470184B (en) Double-arm hydraulic tunneling jumbo
CN205778890U (en) Suspended collapsible armature boring system
CN104948109A (en) Suspension type omni-directional anchor rod drill carriage
CN107448152B (en) Hydraulic combined jumbolter working platform
CN103628903B (en) Roadway full-fracture-surface anchoring-rod and anchoring-rope integrated parallel installation method and device
CN207847625U (en) Rectangular shaped roadways driving moves into covering device certainly without support repeatedly
CN215485863U (en) Compact advance support single-rail double-arm hydraulic anchor rod drill carriage
CN101915097B (en) Machine-mounted tunneling, drilling and anchoring comprehensive integrated operation device
CN108167006B (en) A kind of rock roadway in coal mine drilling anchor device and its construction method
CN207110982U (en) Combined hydraulic jumbolter workbench

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170524

WD01 Invention patent application deemed withdrawn after publication