CN106703273A - Method of mounting sunroof - Google Patents

Method of mounting sunroof Download PDF

Info

Publication number
CN106703273A
CN106703273A CN201611162116.0A CN201611162116A CN106703273A CN 106703273 A CN106703273 A CN 106703273A CN 201611162116 A CN201611162116 A CN 201611162116A CN 106703273 A CN106703273 A CN 106703273A
Authority
CN
China
Prior art keywords
lighting roof
steel construction
construction block
roof steel
lattice column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611162116.0A
Other languages
Chinese (zh)
Other versions
CN106703273B (en
Inventor
孟鑫
莫文教
潘卓
杨学文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kocel Steel Structure Co Ltd
Original Assignee
Kocel Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kocel Steel Structure Co Ltd filed Critical Kocel Steel Structure Co Ltd
Priority to CN201611162116.0A priority Critical patent/CN106703273B/en
Publication of CN106703273A publication Critical patent/CN106703273A/en
Application granted granted Critical
Publication of CN106703273B publication Critical patent/CN106703273B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D3/00Roof covering by making use of flat or curved slabs or stiff sheets
    • E04D3/02Roof covering by making use of flat or curved slabs or stiff sheets of plane slabs, slates, or sheets, or in which the cross-section is unimportant
    • E04D3/06Roof covering by making use of flat or curved slabs or stiff sheets of plane slabs, slates, or sheets, or in which the cross-section is unimportant of glass or other translucent material; Fixing means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A method of mounting a sunroof relates to the field of buildings and comprises the steps of S1, setting lattice columns in a wall frame; S2, setting first and second hanging points on the surface of each of a plurality of sunroof steel structural blocks; S3, lifting the sunroof steel structural blocks, and setting the outer edges of the sunroof steel structural blocks at the upper end of the wall frame; S4, releasing the second hanging points, setting the inner edges of the sunroof steel structural blocks at the upper ends of the lattice columns, and releasing the first hanging points; S5, repeating the steps S3 to S4, lifting the remaining sunroof steel structural blocks, welding the edges of the plurality of sunroof steel structural blocks to form a compete sunroof steel structural frame; S6, mounting lighting glass to the surface of the sunroof steel structural frame; S7, removing the settings in the step S1. The method provided herein enables a sunroof to be installed under limitations, such as narrow construction sit and high construction plane.

Description

A kind of installation method of lighting roof
Technical field
The present invention relates to building field, in particular to a kind of installation method of lighting roof.
Background technology
As economic fast development, architecture structure form are more and more various, also brought to building trade more and more Challenge, for example, currently in order to make building structure that there is good daylighting, appeared in after daylighting epimerite people the visual field it In, and with also more and more extensive, particularly in large scale business synthesis building structure, be generally required for setting lighting roof Structure meets the daylighting requirement in market, although lighting roof can greatly improve the daylighting inside building structure, but, by In the special of its structure and position, trouble also is brought to construction, it is specific as follows to state:
The installation of lighting roof, usually first carries out assembly welding, then carry out integral hoisting or direct in pre- buried end on ground Successively assembled welding on seat.But due to the limitation in some job site places, construction site large-area construction waterproof, place is narrow Small, operation platform is high, it is impossible to realize integral hoisting or successively assembled welding.
The content of the invention
It is an object of the invention to provide a kind of installation method of lighting roof, using the installation method, can be on construction ground Lighting roof is installed under narrow and small, the construction restrictive condition such as plane is high.
What embodiments of the invention were realized in:
A kind of installation method of lighting roof, its installation steps is:S1:Lattice column is set in wall frame.S2:Some The surface of lighting roof steel construction block sets the first suspension centre and the second suspension centre, and the first suspension centre and the second suspension centre are along lighting roof steel construction block Inner edge to the center of gravity both sides that lighting roof steel construction block is respectively arranged on the direction of the outer rim of lighting roof steel construction block.S3:Will Tower crane outside wall frame is connected with the first suspension centre and the second suspension centre, lighting roof steel construction block is lifted, by lighting roof steel construction block Outer rim be positioned over the upper end of wall frame.S4:Discharge the second suspension centre;Lighting roof cylinder structure block is lifted by the first suspension centre, will The inner edge of lighting roof steel construction block is positioned over the upper end of lattice column;Discharge the first suspension centre.S5:Repeat S3 to S4, it is right successively Remaining lighting roof steel construction block is lifted, and the inner edge to some lighting roof steel construction blocks is welded, and constitutes complete adopting Spire steel structure frame.S6:Daylighting embedding glass is installed on lighting roof steel structure frame surface.S7:Set in dismounting S1 Device.
Inventor has found:Existing lighting roof is installed, and usually first carries out assembly welding on ground, then carry out integral hoisting Or the directly successively assembled welding on pre-buried base.But due to the limitation in some job site places, construction site large area is applied Work waterproof, narrow field, operation platform is high, it is impossible to realize integral hoisting or successively assembled welding.Therefore, inventor has invented The installation method of the lighting roof stated.The first step, workmen installs lattice column, the lattice of installation in the wall frame of pre- construction The summit of the height of post and the lighting roof of pre-installation is to the highly consistent of ground.Second step, workmen is in transport to construction field The surface of some lighting roof steel construction blocks on ground along the inner edge of lighting roof steel construction block on the direction of outer rim, lighting roof steel construction The center of gravity both sides of block are respectively provided with the first suspension centre and the second suspension centre.3rd step, a tower crane is provided with outside the chamber frame of construction, The hoisting height of tower crane will meet the demand of construction, and tower crane is connected with the first suspension centre and the second suspension centre, lift lighting roof steel construction Block, the outer rim of lighting roof steel construction block is positioned over the chamber frame upper end of construction.4th step, tower crane discharges the second suspension centre, hangs Tower lifts lighting roof steel construction block by the first suspension centre, and the inner edge of lighting roof steel construction block is positioned over the upper end of lattice column, tower Hang the first suspension centre of release.5th step, repeats the 3rd step to the 4th step, remaining lighting roof steel construction block is lifted, then Workmen positioned at lattice column upper end welds successively to the outer rim of these lighting roof steel construction blocks so that these lighting roofs Steel construction block constitutes a complete lighting roof spire steel structure frame.Be installed on for daylighting embedding glass by the 6th step, workmen Lighting roof spire steel structure frame surface.7th step, after above-mentioned steps to be done, workmen removes lattice column and baffle plate.This If kind of the lighting roof assembled by dry plate lighting roof steel construction block welding, by the tower crane sub-region and sub-area outside wall frame of constructing The carrying out in domain lifts so that lighting roof can be high in some construction site large-area construction waterproofs, narrow field, operation platform, nothing Method is realized being installed under integral hoisting or the successively restrictive condition such as assembled welding.
In an embodiment of the present invention, in step sl, baffle plate is set in wall frame upper end.In step s3, The outer rim of lighting roof steel construction block is positioned over the upper end of wall frame, and against baffle plate.
In an embodiment of the present invention, in step sl, the assembling of some standard section of tower crane is constituted into lattice column.
In an embodiment of the present invention, in step sl, in wall frame set lattice column base, lattice column with Lattice column base is connected.
In an embodiment of the present invention, in step sl, assembled with some I-steel and constitute lattice column base.
In an embodiment of the present invention, in step sl, by lattice column by some wireropes and wall frame Wall is attached.
In an embodiment of the present invention, in step s 2, the second suspension centre includes two sub- suspension centres, two sub- suspension centres point The both sides of the center line of lighting roof steel construction block are not arranged at.
In an embodiment of the present invention, in step s 5, adjacent lighting roof steel construction block is connected by square tubes soldering Connect.
In an embodiment of the present invention, in step s 5, the inner edge of some lighting roof steel construction blocks respectively be connected Plate weld.
In an embodiment of the present invention, in step s 5, some lighting roof steel construction blocks use symmetrical with connecting plate The order for installing connection is welded.
The embodiment of the present invention at least possesses following beneficial effect:
The installation method of a kind of lighting roof provided in an embodiment of the present invention, if it is divided into dry plate lighting roof by lighting roof Steel construction block, then sets the first suspension centre and the second suspension centre, by being arranged on hanging outside wall frame in lighting roof steel construction block Tower, lifts the first suspension centre and the second suspension centre, and the outer rim of lighting roof steel construction block is lifted to the upper end of wall frame, then releases The second suspension centre is put, the inner edge of lighting roof steel construction block is hung to the upper end of lattice column, discharge the first suspension centre, it is then lifted successively Remaining lighting roof steel construction block, and weld successively, constitute complete lighting roof steel structure frame.Daylighting glass finally is inlayed, it is complete Into the installation of lighting roof.Using the installation method, daylighting can be installed under narrow and small on construction ground, the construction restrictive condition such as plane is high Top.
Brief description of the drawings
Technical scheme in order to illustrate more clearly the embodiments of the present invention, below will be attached to what is used needed for embodiment Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, thus be not construed as it is right The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this A little accompanying drawings obtain other related accompanying drawings.
Fig. 1:A kind of lighting roof schematic diagram in the embodiment of the present invention 1;
Fig. 2:Lighting roof steel structure frame schematic diagram in the embodiment of the present invention 1;
Fig. 3:Lattice column base schematic diagram in the embodiment of the present invention 1;
Fig. 4:Scheme of installation in the embodiment of the present invention 1;
Fig. 5:Lighting roof steel construction block schematic diagram in the embodiment of the present invention 1;
Fig. 6:A kind of lifting schematic diagram of lighting roof steel construction block in the embodiment of the present invention 1;
Fig. 7~Fig. 9:Lighting roof steel construction block welding sequential schematic in the embodiment of the present invention 1;
Figure 10:Another lifting schematic diagram of lighting roof steel construction block in the embodiment of the present invention 1.
Icon:100- lighting roofs;400- lighting roof steel structure frames;200- tubular wall frames;300- tower cranes;101- is pushed up Point;110- lattice column bases;111- I-steel;120- standard section of tower crane;130- lattice columns;131- lattice columns upper end;140- steel Cable;150- baffle plates;160- lighting roof steel construction blocks;The suspension centres of 161- first;The suspension centres of 162- second;The sub- suspension centres of 163-;164- inner edges; 165- outer rims;170- circle connecting plates;180- square tubes;190- daylighting glass;210- inwalls;220- tubular wall frames upper end; 500- bases.
Specific embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is A part of embodiment of the present invention, rather than whole embodiments.Present invention implementation generally described and illustrated in accompanying drawing herein The component of example can be arranged and designed with a variety of configurations.
Therefore, the detailed description of embodiments of the invention below to providing in the accompanying drawings is not intended to limit claimed The scope of the present invention, but be merely representative of selected embodiment of the invention.Based on the embodiment in the present invention, this area is common The every other embodiment that technical staff is obtained under the premise of creative work is not made, belongs to the model of present invention protection Enclose.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi It is defined in individual accompanying drawing, then it need not be further defined and explained in subsequent accompanying drawing.
In the description of the invention, it is necessary to explanation, term " interior ", etc. instruction orientation or position relationship be based on attached Orientation or position relationship shown in figure, or the orientation usually put when using of the invention product or position relationship, be only for It is easy to the description present invention and simplifies describe, rather than indicating or imply signified device or element there must be specific side Position, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
In the description of the invention, in addition it is also necessary to explanation, unless otherwise clearly defined and limited, term " setting ", " connection " should be interpreted broadly, for example, it may be being fixedly connected, or be integrally connected;Can mechanically connect, can be direct It is connected, it is also possible to be indirectly connected to by intermediary, can be two connections of element internal.For the ordinary skill of this area For personnel, above-mentioned term concrete meaning in the present invention can be understood with concrete condition.
Embodiment 1
As shown in figure 1, Fig. 1 schematically shows the schematic diagram of lighting roof 100 in this specific embodiment.Specifically, such as Fig. 2, lighting roof steel structure frame 400 is in circular arch shape.The lighting roof steel structure frame 400 of lighting roof 100 is by some lighting roof steel Block structure 160 is made of welded connection, and the side of lighting roof steel construction block 160 is in certain radian.
The installation method of lighting roof 100 is described in detail below:
S1:In the center of tubular wall frame 200, lattice column base 110 is provided with, such as Fig. 3, lattice column base 110 is adopted With the arranged crosswise of I-steel 111, such as Fig. 4, setting is made up of the assembling of some standard section of tower crane 120 above lattice column base 110 Lattice column 130 so that lattice column upper end 131 has just contradicted the summit 101 of the lighting roof 100 being pre-designed.Lattice column 130 It is attached with the inwall 210 of tubular wall frame 200 by some wireropes 140.Set in tubular wall frame upper end 220 and kept off Plate 150.
S2:At the construction field (site), such as Fig. 5, workmen sets the first suspension centre on the surface of some lighting roof steel construction blocks 160 161 and second suspension centre 162, wherein the first suspension centre 161 and the second suspension centre 162 along the inner edge 164 of lighting roof steel construction block 160 to adopting The center of gravity both sides of lighting roof steel construction block 160, and second are respectively arranged on the direction of the outer rim 165 of spire steel construction block 160 Suspension centre 162 includes two sub- suspension centres 163.Two sub- suspension centres 163 are separately positioned on the two of the center line of lighting roof steel construction block 160 Side.
S3:Such as Fig. 6, tower crane 300 is provided with outside tubular wall frame 200.By the first suspension centre 161 and two sub- suspension centres 163 are connected with tower crane 300.Tower crane 300 is sling lighting roof steel construction block 160 so that the outer rim 165 of lighting roof steel construction block 160 It is positioned over tubular wall frame upper end 220, and against baffle plate 150.
S4:Tower crane 300 discharges two sub- suspension centres 163.Tower crane 300 is sling lighting roof steel construction block by the first suspension centre 161 160, lattice column upper end 131 is placed into the inner edge 164 of lighting roof steel construction block 160, tower crane 300 discharges the first suspension centre 161.
S5:Repeat S3 to S4, remaining lighting roof steel construction block 160 is lifted, such as Fig. 7, Fig. 8, Fig. 9, apply Workman person is in lattice column upper end 131 successively by the inner edge 164 of these lighting roof steel construction blocks 160 by a circular connecting plate 170 It is welded to connect with the order for being symmetrically installed connection.Adjacent lighting roof steel construction block 160 is welded to connect by square tube 180. So as to constitute complete lighting roof steel structure frame 400.
S6:Workmen is inlayed installed in the surface of lighting roof steel structure frame 400 daylighting glass 190 by work high above the ground On.
S7:Remove lattice column base 110, lattice column 130, wirerope 140, baffle plate 150.
By above-mentioned step S1, S2, S3, S4, S5, S6, S7, lighting roof 100 is set to be installed to tubular wall frame 200 On.If the method passes through lighting roof 100 to be divided into dry plate lighting roof steel construction block 160 and daylighting glass 190.Then in lighting roof On the surface of steel construction block 160, the first suspension centre 161 and two sub- suspension centres 163 are set, by being arranged on outside tubular wall frame 200 Tower crane 300, lifting around the first suspension centre 161 of the center of gravity of lighting roof steel construction block 160 and two sub- suspension centres 163, to ensure to hang Stability during dress.First the outer rim 165 of lighting roof steel construction block 160 is lifted to tubular wall frame upper end 220, is then released Two sub- suspension centres 163 are put, the inner edge 164 of lighting roof steel construction block 160 lattice column upper end 131 is hung to, then discharge the first suspension centre 161, outer rim 165 is so first lifted to tubular wall frame upper end 220, then inner edge 164 to lattice column upper end 131 is lifted, solve The problem of hoisting height, its caused by way of this block of lifting lighting roof steel construction step by step 160 hoisting height compared with Existing hoisting height reduction.Then remaining lighting roof steel construction block 160 is lifted successively, and be symmetrically welded successively, constituted Whole lighting roof steel structure frame 400.It is final to inlay daylighting glass 190, complete the installation of lighting roof 100.
It should be noted that:
In a kind of installation method of lighting roof 100 that the present embodiment is provided, lighting roof 100 is mounted in tubular wall frame On 200, in other specific embodiments, the wall frame for installing lighting roof 100 is not limited only to a property, other shapes Wall frame is equally applicable.
Lighting roof 100 is not limited only to circular arch shape, and in other specific embodiments, lighting roof 100 can be flat Etc. other shapes.
The step of the present embodiment in S1, lattice column base 110 is in order to by lattice column using the arranged crosswise of I-steel 111 The 130 fully dispersed transmission of the power born, it is ensured that the construction safety of lattice column 130.In other specific embodiments, lattice column bottom Seat 110 can be arranged by other modes, it is ensured that the construction safety of lattice column 130.
The step of the present embodiment in S1, set lattice column base 110 be in order that the pressure that is subject to of lattice column can Sufficiently dispersion.In other specific embodiments, lattice column base 110 can be cancelled according to actual conditions.
The step of the present embodiment in S1, lattice column 130 is by some wireropes 140 and the inwall of tubular wall frame 200 210 are attached, be in order to ensure the stabilization construction of lattice column 130, in other specific embodiments, can be in lattice column 130 lower ends carry out consolidation process.In other specific embodiments, wirerope 140 can be cancelled according to actual conditions.
The step of the present embodiment in S1, it is in step s3, limit lighting roof steel construction block to set baffle plate 150 160 outer rim 165, places lighting roof steel construction block 160 and offsets.In other specific embodiments, can be according to actual conditions Cancel baffle plate 150.
The step of the present embodiment in S3, the outer rim 165 of lighting roof steel construction block 160 is positioned over tubular wall frame upper end 220.In other specific embodiments, such as Figure 10 in step sl, can be set by work in tubular wall frame upper end 220 The base 500 that word steel 111 is constituted so that in step S3, the outer rim 165 of lighting roof steel construction block 160 is arranged on base 500, Carry out consolidation process.
The step of the present embodiment in S2, two sub- suspension centres 163 be in order to constitute triangle suspension centre with the first suspension centre 161, from And two suspension centres 161 of sub- suspension centre 163 and first of slinging that the tower crane 300 for enabling is stablized.In other specific embodiments, can To determine the quantity of the sub- suspension centre 163 that the second suspension centre 162 includes according to actual conditions.
The step of the present embodiment in S5, workmen carries out weld job in lattice column upper end 131.In other specific realities Apply in mode, lattice column upper end 131 can set a cable construction platform, convenient construction personnel's operation.
The step of the present embodiment in S5, lighting roof steel construction block 160 is welded by a circular connecting plate 170 's.In other specific embodiments, lighting roof steel construction block 160 can be welded by the connecting plate of other shapes or Cancel connecting plate, directly the inner edge 164 to some lighting roof steel construction blocks 160 is welded.
The step of the present embodiment in S5, lighting roof steel construction block 160 is welded to connect with being symmetrically installed the order of connection , it is in order to when being welded to connect, lighting roof steel construction block 160 can keep being welded to connect for balance and stability.In other specific realities Apply in example, lighting roof steel construction block 160 can be welded to connect according to performance with the order of other installation connections.
Inventor has found:Existing lighting roof is installed, and usually first carries out assembly welding on ground, then carry out integral hoisting Or the directly successively assembled welding on pre-buried base.But due to the limitation in some job site places, construction site large area is applied Work waterproof, narrow field, operation platform is high, it is impossible to realize integral hoisting or successively assembled welding.
Therefore, inventor has invented the installation method of above-mentioned lighting roof 100.The installation side provided using the present embodiment Method so that lighting roof 100 can be high in some construction site large-area construction waterproofs, narrow field, operation platform, it is impossible to realizes whole Installed under body lifting or the successively restrictive condition such as assembled welding.
The preferred embodiments of the present invention are the foregoing is only, is not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.It is all within the spirit and principles in the present invention, made any repair Change, equivalent, improvement etc., should be included in protection scope of the present invention it.

Claims (10)

1. a kind of installation method of lighting roof, it is characterised in that:Its installation steps is:
S1:
Lattice column is set in wall frame;
S2:
The first suspension centre and the second suspension centre are set on the surface of some lighting roof steel construction blocks, first suspension centre and described second hangs Point is described to being respectively arranged on the direction of the outer rim of the lighting roof steel construction block along the inner edge of the lighting roof steel construction block The center of gravity both sides of lighting roof steel construction block;
S3:
Tower crane outside the wall frame is connected with first suspension centre and second suspension centre;
The lighting roof steel construction block is lifted, the outer rim of the lighting roof steel construction block is positioned over the upper of the wall frame End;
S4:
Discharge the second suspension centre;
Lighting roof steel construction block is lifted by the first suspension centre, the inner edge of the lighting roof steel construction block is positioned over the lattice column Upper end;
Discharge the first suspension centre;
S5:Repeat S3 to S4, the remaining lighting roof steel construction block is lifted, successively to some lighting roofs The inner edge of steel construction block is welded, and constitutes complete lighting roof steel structure frame;
S6:Daylighting embedding glass is installed on the lighting roof steel structure frame surface;
S7:Remove the lattice column.
2. the installation method of lighting roof according to claim 1, it is characterised in that:
In step sl, baffle plate is set in the wall frame upper end;
In step s3, the outer rim of the lighting roof steel construction block is positioned over the upper end of the wall frame, and against the gear Plate.
3. the installation method of lighting roof according to claim 1, it is characterised in that:
In step sl, the assembling of some standard section of tower crane is constituted into the lattice column.
4. the installation method of lighting roof according to claim 1, it is characterised in that:
In step sl, lattice column base is set in the wall frame, and the lattice column is connected with the lattice column base.
5. the installation method of lighting roof according to claim 4, it is characterised in that:
In step sl, assembled with some I-steel and constitute the lattice column base.
6. the installation method of lighting roof according to claim 1, it is characterised in that:
In step sl, the lattice column is attached by some wireropes with the inwall of the wall frame.
7. the installation method of lighting roof according to claim 1, it is characterised in that:
In step s 2, second suspension centre includes two sub- suspension centres, and two sub- suspension centres are respectively arranged at the lighting roof The both sides of the center line of steel construction block.
8. the installation method of lighting roof according to claim 1, it is characterised in that:
In step s 5, the adjacent lighting roof steel construction block is connected by square tubes soldering.
9. the installation method of lighting roof according to claim 1, it is characterised in that:
In step s 5, the inner edge of some lighting roof steel construction blocks respectively be connected plate weld.
10. the installation method of lighting roof according to claim 9, it is characterised in that:
In step s 5, some lighting roof steel construction blocks are symmetrically installed the order being connected with connecting plate use and are welded Connect.
CN201611162116.0A 2016-12-15 2016-12-15 A kind of installation method of lighting roof Active CN106703273B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611162116.0A CN106703273B (en) 2016-12-15 2016-12-15 A kind of installation method of lighting roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611162116.0A CN106703273B (en) 2016-12-15 2016-12-15 A kind of installation method of lighting roof

Publications (2)

Publication Number Publication Date
CN106703273A true CN106703273A (en) 2017-05-24
CN106703273B CN106703273B (en) 2019-01-08

Family

ID=58939044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611162116.0A Active CN106703273B (en) 2016-12-15 2016-12-15 A kind of installation method of lighting roof

Country Status (1)

Country Link
CN (1) CN106703273B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114876067A (en) * 2022-03-02 2022-08-09 中建二局安装工程有限公司 Hyperbolic pipe steel structure support frame and assembling method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6658812B1 (en) * 1999-07-29 2003-12-09 Andrew David Tomlinson Domed construction
US20080022608A1 (en) * 2006-07-31 2008-01-31 Altus Engineering, Ltd. System and method for modular construction of a dome structure and assembly components for facilitating same
CN101387129A (en) * 2008-09-19 2009-03-18 常州第一建筑工程有限公司 Steel frame mounting method for glass roof
CN101725179A (en) * 2009-11-06 2010-06-09 清华大学 Construction method of integrally rotating, drawing up and slipping large steel arch structure
CN103510711A (en) * 2012-06-29 2014-01-15 中国有色金属工业第六冶金建设有限公司 Method for lifting top ring in dome structure installation
CN105863173A (en) * 2016-04-06 2016-08-17 中国建筑局(集团)有限公司 Installation method for day-lighting ceiling

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6658812B1 (en) * 1999-07-29 2003-12-09 Andrew David Tomlinson Domed construction
US20080022608A1 (en) * 2006-07-31 2008-01-31 Altus Engineering, Ltd. System and method for modular construction of a dome structure and assembly components for facilitating same
CN101387129A (en) * 2008-09-19 2009-03-18 常州第一建筑工程有限公司 Steel frame mounting method for glass roof
CN101725179A (en) * 2009-11-06 2010-06-09 清华大学 Construction method of integrally rotating, drawing up and slipping large steel arch structure
CN103510711A (en) * 2012-06-29 2014-01-15 中国有色金属工业第六冶金建设有限公司 Method for lifting top ring in dome structure installation
CN105863173A (en) * 2016-04-06 2016-08-17 中国建筑局(集团)有限公司 Installation method for day-lighting ceiling

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114876067A (en) * 2022-03-02 2022-08-09 中建二局安装工程有限公司 Hyperbolic pipe steel structure support frame and assembling method thereof

Also Published As

Publication number Publication date
CN106703273B (en) 2019-01-08

Similar Documents

Publication Publication Date Title
CN102864936B (en) Combination lifting construction method for large-scale high hollow building roof of steel structure
CN102019998B (en) Erection embarking method of upper and lower water side cabins
US20220213705A1 (en) Method for entire removal of space truss and assistive support mechanism
CN206692235U (en) A kind of steel structure dome lifts by crane erecting device
CN102733615B (en) Unsymmetrical integral lifting construction method
CN204899274U (en) Prefabricated concrete structure goes along with sb. to guard him frame outward
CN104989111A (en) Construction method for steel structure high-rise hoisting
CN202658590U (en) Integral assembled drilling platform
CN104291222A (en) Rigid protection and crane integration system inside super high-rise building core tube
CN106703273A (en) Method of mounting sunroof
CN105090613A (en) Hoisting method of gas pipeline in external wall of super high-rise building
CN105239804B (en) Assembly and lift-erecting method of indirect air-cooling system stretching platforms
CN205575407U (en) Boiler drum hoisting device
CN113756503B (en) Construction method of Z-shaped streamer hall
CN202689489U (en) Frame column construction operation frame
CN215160351U (en) Lifting device for assembled enamel tank
CN201825635U (en) Hoisting structure of power station boiler
CN104030176A (en) Balance beam for lifting platform truss and lifting method thereof
CN114033189A (en) Large-area high-altitude grid structure aluminum grid ceiling construction device and construction method
CN113445723A (en) Construction platform for mounting overhanging structure curtain wall and mounting method
CN205654064U (en) Aerial work platform of extra -high voltage framework
CN110805189A (en) Method for mounting steel structure of daylighting roof
CN219219743U (en) Portable lifting attached scaffold
CN220201125U (en) Beam lifting device
CN220888323U (en) Liftable formula steel bar binding platform for high mound of rectangle is applicable to

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant