CN106702990A - Installation process for back well drilling type platform sleeving-free wellhead - Google Patents

Installation process for back well drilling type platform sleeving-free wellhead Download PDF

Info

Publication number
CN106702990A
CN106702990A CN201611166188.2A CN201611166188A CN106702990A CN 106702990 A CN106702990 A CN 106702990A CN 201611166188 A CN201611166188 A CN 201611166188A CN 106702990 A CN106702990 A CN 106702990A
Authority
CN
China
Prior art keywords
casing pipe
insulation casing
sea
water insulation
waterproof casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611166188.2A
Other languages
Chinese (zh)
Inventor
韩延波
许南
张秀林
马德强
王文龙
李中华
鞠文杰
高飞
于泽强
梁光强
曹然
曹一然
李树升
张大伟
王长林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Original Assignee
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, Offshore Oil Engineering Co Ltd filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201611166188.2A priority Critical patent/CN106702990A/en
Publication of CN106702990A publication Critical patent/CN106702990A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The invention provides an installation process for a back well drilling type platform sleeving-free wellhead. The installation process comprises the following installation steps that 1, a water insulation casing pipe is divided into three or four sections of water insulation casing pipe bodies, the first two or three sections of water insulation casing pipe bodies are made to reach the designed driving depth after penetration into the seabed, and the tail section of water insulation casing pipe body is reserved; 2, a pipe guide frame is installed on the sea; 3, the first two or three sections of water insulation casing pipe bodies which reach the designed driving depth after penetration into the seabed are installed on the sea; 4, an upper assembling block is built on the land, and the tail section of water insulation casing pipe body is installed and fixed to a wellhead area of the upper assembling block; 5, the upper assembling block and the tail section of water insulation casing pipe body fixed to the upper assembling block are transported on the sea; and 6, after the upper assembling block is installed on the sea, fixing of the tail section of water insulation casing pipe body is removed, and the tail section of water insulation casing pipe body is connected back to the first two or three sections of water insulation casing pipe bodies. According to the installation process for the back well drilling type platform sleeving-free wellhead, the problems that the lifting difficulty of the upper assembling block on the sea is large, and the requirements for a weather window and the sea conditions are high are solved; and in addition, wellhead sleeving is avoided, so that the installation risk of the upper assembling block on the sea is reduced.

Description

Drilling well type platform exempts to cover the mounting process of well head afterwards
Technical field
The present invention relates to the Attention problems of drilling platforms, more particularly to a kind of peace for exempting from set well head for rear drilling well type platform Dress technique, belongs to Offshore Engineering field.
Background technology
At present, with the popularization and application of modularization rig, traditional drill ship carries out preboring after the completion of jacket installation The platform of completion is gradually decreased, corresponding use crane barge driving into type waterproof casing design and installation technology, always edge With the form matched with the pre- drilling well of drill ship, i.e.,:In the jacket Attention problems stage, by the disposable injection of waterproof casing to setting Meter driving depth (its elevation of top is general at 23 meters or so).Although when such platform chunk is installed, waterproof casing top nothing is adopted Oil tree, but still need to carry out the superelevation difficulty lifting that waterproof casing passes through two-layer chunk horizontal plate during chunk installation.
The content of the invention
It is a primary object of the present invention to the disadvantages mentioned above for overcoming prior art to exist, and provide a kind of rear drilling well type platform Exempt from the mounting process of set well head, it is installed waterproof casing in two stages, i.e.,:Jacket Attention problems in the first stage Period carry out install waterproof casing first three section or first-half (according to concrete scheme), minor details waterproof casing (i.e. final section every Jacket pipe) hung on upper chunk bank in advance in the land formation stage, and load transporting and hoisting onto ship with chunk, make minor details water proof set Pipe only needs tieback, without injection (i.e. without piling), not only solve upper chunk offshore lifting difficulty it is big, to weather window and Sea situation situation requirement problem high;And, it is to avoid set well head, reduce upper chunk Attention problems risk, save conduit Frame Attention problems duration, the efficiency for substantially increasing upper chunk sea.
The purpose of the present invention is realized by following technical scheme:
A kind of rear drilling well type platform exempts to cover the mounting process of well head, it is characterised in that:Using following installation steps:
The first step:Waterproof casing is divided into three sections or four sections, and is reached after making first-half or first three section injection sea bed To design driving depth, and reserve the waterproof casing of minor details;
Second step:Jacket is at sea installed;
3rd step:Design driving depth is reached after the first-half of Attention problems waterproof casing or first three section injection sea bed;
4th step:In land formation upper chunk, and the waterproof casing of minor details is fixed on the well head of upper chunk Area;
5th step:Marine transportation upper chunk and the minor details waterproof casing being fixed in upper chunk;
6th step:After the completion of Attention problems upper chunk, release minor details waterproof casing fixation, and with first-half or The waterproof casing of first three section carries out tieback.
Beneficial effects of the present invention:
1) cause that chunk bank land formation completion status is maximized, saved the marine connection debugging stage well head of platform The workload that plot structure beam is installed;
2) solve the problems, such as that upper chunk offshore lifting difficulty is big, high to weather window and the requirement of sea situation situation;
3) set well head, pre-hung minor details waterproof casing are avoided, the eccentricity issues of conventional well head chunk are correct for, top is reduced Chunk offshore lifting risk;
4) the marine efficiency of upper chunk is improve while saving the jacket Attention problems duration.
Brief description of the drawings
Fig. 1 is mounting process schematic diagram of the present invention.
Major Symbol explanation in figure:
1. jacket, 2. waterproof casing, 3, upper chunk.
Specific embodiment
As shown in figure 1, the present invention uses following installation steps:
The first step:The segmentation of waterproof casing 2 is optimized, waterproof casing 2 three sections or four sections is divided into, and make preceding two Design driving depth is reached after section or first three section (being determined depending on specific design requirement) injection sea bed, and reserves the water proof of minor details Sleeve pipe 2;
Second step:Jacket 1 is at sea installed;
3rd step:The first-half of Attention problems waterproof casing 2 or first three section (being determined depending on specific design requirement) injection sea Design driving depth is reached after bed, design standard is reached;
4th step:In land formation upper chunk 3, and the waterproof casing 2 of minor details is fixed on the well of upper chunk 3 Mouth region;
5th step:Marine transportation upper chunk 3 and the minor details waterproof casing 2 being fixed in upper chunk 3;
6th step:After the completion of Attention problems upper chunk 3, release minor details waterproof casing 2 fixation, and with first-half or Person first three section waterproof casing 2 carry out tieback.
Above-mentioned jacket, upper chunk are prior art, and the technology of not specified (NS) is prior art, therefore is repeated no more.
The above, is only presently preferred embodiments of the present invention, and any formal limitation is not made to the present invention, all It is any simple modification, equivalent variations and the modification made to above example according to technical spirit of the invention, still falls within In the range of technical solution of the present invention.

Claims (1)

1. a kind of rear drilling well type platform exempts to cover the mounting process of well head, it is characterised in that:Using following installation steps:
The first step:Waterproof casing is divided into three sections or four sections, and makes to reach after first-half or first three section injection sea bed to set Meter driving depth, and reserve the waterproof casing of minor details;
Second step:Jacket is at sea installed;
3rd step:Design driving depth is reached after the first-half of Attention problems waterproof casing or first three section injection sea bed;
4th step:In land formation upper chunk, and the waterproof casing of minor details is fixed on the bank of upper chunk;
5th step:Marine transportation upper chunk and the minor details waterproof casing being fixed in upper chunk;
6th step:After the completion of Attention problems upper chunk, release minor details waterproof casing fixation, and with first-half or first three The waterproof casing of section carries out tieback.
CN201611166188.2A 2016-12-16 2016-12-16 Installation process for back well drilling type platform sleeving-free wellhead Pending CN106702990A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611166188.2A CN106702990A (en) 2016-12-16 2016-12-16 Installation process for back well drilling type platform sleeving-free wellhead

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611166188.2A CN106702990A (en) 2016-12-16 2016-12-16 Installation process for back well drilling type platform sleeving-free wellhead

Publications (1)

Publication Number Publication Date
CN106702990A true CN106702990A (en) 2017-05-24

Family

ID=58938981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611166188.2A Pending CN106702990A (en) 2016-12-16 2016-12-16 Installation process for back well drilling type platform sleeving-free wellhead

Country Status (1)

Country Link
CN (1) CN106702990A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108560524A (en) * 2018-04-13 2018-09-21 海洋石油工程股份有限公司 For marine drilling well early period and the installation method of later stage platform
CN109505293A (en) * 2018-10-16 2019-03-22 中海福陆重工有限公司 A kind of building method of waterproof casing platform
CN111706289A (en) * 2020-05-29 2020-09-25 海洋石油工程(青岛)有限公司 Offshore oil platform wellhead area building module and building method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85106162A (en) * 1985-08-15 1987-03-04 麦克德莫特国际公司 The conduit guide system of offshore drilling platform
CN103953022A (en) * 2014-05-05 2014-07-30 中国海洋石油总公司 Supersized wellhead platform
WO2014130320A1 (en) * 2013-02-19 2014-08-28 Conocophillips Company Floatable subsea platform (fsp)
CN204225076U (en) * 2014-11-06 2015-03-25 中国海洋石油总公司 A kind of production wellhead fender bracket supported by waterproof casing

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85106162A (en) * 1985-08-15 1987-03-04 麦克德莫特国际公司 The conduit guide system of offshore drilling platform
WO2014130320A1 (en) * 2013-02-19 2014-08-28 Conocophillips Company Floatable subsea platform (fsp)
CN103953022A (en) * 2014-05-05 2014-07-30 中国海洋石油总公司 Supersized wellhead platform
CN204225076U (en) * 2014-11-06 2015-03-25 中国海洋石油总公司 A kind of production wellhead fender bracket supported by waterproof casing

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108560524A (en) * 2018-04-13 2018-09-21 海洋石油工程股份有限公司 For marine drilling well early period and the installation method of later stage platform
CN108560524B (en) * 2018-04-13 2020-03-27 海洋石油工程股份有限公司 Installation method for offshore early drilling and later platform
CN109505293A (en) * 2018-10-16 2019-03-22 中海福陆重工有限公司 A kind of building method of waterproof casing platform
CN111706289A (en) * 2020-05-29 2020-09-25 海洋石油工程(青岛)有限公司 Offshore oil platform wellhead area building module and building method thereof
CN111706289B (en) * 2020-05-29 2022-07-05 海洋石油工程(青岛)有限公司 Offshore oil platform wellhead area building module and building method thereof

Similar Documents

Publication Publication Date Title
CN103046521A (en) Novel, simple and easy wellhead rack structure and construction method
CN102312442A (en) Construction method of trestle steel pipe pile foundation
CN106702990A (en) Installation process for back well drilling type platform sleeving-free wellhead
CN204370469U (en) A kind of drilled pile long leg jacket offshore wind turbine foundation
CN104805854A (en) Method for constructing deep-water ultra-long steel plate pile cofferdam in tide environment
CN104818978A (en) One-well multi-control method for offshore low-permeability reservoir thick oil layer exploitation
CN202990947U (en) Basement type underwater dry wellhead structure
CN106368197B (en) Settling type self installation platform with large-scale well head
CN103015442B (en) Method for constructing split type cofferdam
CN105003232B (en) A kind of ultra-deep sea marine oil and gas dry type production system and its installation evacuation method
CN104088266A (en) Standardized movable wellhead platform installed in floatover mode
CN211312521U (en) Self-locking nested deep water drilling surface conduit
CN105951699A (en) Self-install oil production platform and installation method thereof
CN201310089Y (en) Offshore wellhead platform supported by water-proof sleeve pipes
CN203808035U (en) Ultra-large wellhead platform
CN203684192U (en) Offshore jacket production platform
EP2933379B1 (en) Shipborne truss combined in-situ testing platform
CN103015459A (en) Construction method for underwater baring platform steel cover box on storm surge river mouth
CN106150396A (en) A kind of offshore drill uses riser pipe special thread female joint
CN101761341A (en) Simple wellhead frame structure and construction method
CN203846472U (en) Pilot production wellhead platform
CN114837587A (en) Recyclable wellhead module for marine riser-free mud closed-cycle drilling
CN204199262U (en) Simple and easy cylinder stake formula wellhead platform
CN105672949B (en) A kind of underwater drilling basal disc for TLP
CN105648996A (en) Lifting ballasting barge applicable to installation of simple wellhead platform and mounting method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Applicant after: China Offshore Oil Group Co., Ltd.

Applicant after: Offshore Oil Engineering Co., Ltd.

Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Applicant before: China National Offshore Oil Corporation

Applicant before: Offshore Oil Engineering Co., Ltd.