CN106679910A CN201611245453.6A CN201611245453A CN106679910A CN 106679910 A CN106679910 A CN 106679910A CN 201611245453 A CN201611245453 A CN 201611245453A CN 106679910 A CN106679910 A CN 106679910A
Authority
CN
China
Prior art keywords
lever
load
counterweight
test
counter weight
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611245453.6A
Other languages
Chinese (zh)
Other versions
CN106679910B (en
Inventor
宋建永
徐强
李明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Research Institute of Highway Ministry of Transport
Original Assignee
Research Institute of Highway Ministry of Transport
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Research Institute of Highway Ministry of Transport filed Critical Research Institute of Highway Ministry of Transport
Priority to CN201611245453.6A priority Critical patent/CN106679910B/en
Publication of CN106679910A publication Critical patent/CN106679910A/en
Application granted granted Critical
Publication of CN106679910B publication Critical patent/CN106679910B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M5/00Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings
    • G01M5/0008Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings of bridges
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M5/00Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings
    • G01M5/0075Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings by means of external apparatus, e.g. test benches or portable test systems

Abstract

The invention discloses a test beam long-term loading system and method. The loading system comprises a lever, a tension bar, a distributive beam, a counterweight device, a hydraulic pressure weight adjusting device, a ground anchor and a force transmission and testing device; the design of a loading system is carried out using the lever principle, firstly based on the test requirements, the size of the applied load as required is set; after the determination of the size of the load, the length ratio of the short arm and the long arm of the lever is designed from the size of the test site, the size of the loading lever and other aspects, under the precondition that the weight of the lever is not taken into consideration; in theory, the larger is the length ratio of the short arm and the long arm of the lever, the larger is the weight applied to the force bearing point of the long arm, and the larger is the amplifying multiple of the load at the force bearing point of the lever, and the aim of applying relatively large load is further achieved by utilizing relatively small weight. The long-term loading system is easy to operate, the loading and unloading save time and labor, the performance is stable, and long-term testing is guaranteed. The long-term loading system in the later period does not require special maintenance, and basically is not affected by external conditions.

Description

The long-term loading system and method for a kind of test beam
Technical field
The present invention relates to bridge structure experiment load domains, more particularly to a kind of test beam long-term loading system and side Method.
Background technology
In bridge structure basic technology Research And Engineering application study, to obtain the mechanical index of some structures or component Feature, often with real bridge construction component as prototype, by the theory of similarity make model as research object, then carry out mechanical property Can test, and then reaction of the model configuration component in the case where stress is loaded.Therefore, suitable loading method is selected to be set with loading Standby is to ensure the key that whole experiment work is smoothed out.
General structural experiment room is equipped with the pressure testing machine and reaction frame of a constant load tonnage, is applied to component short When phase mechanical property test is loaded, its advantage is to use Hydrauservo System, and by computer control, technical merit is higher, convenient point Level plus unloading, and energy controlled loading speed, test efficiency are higher.If long-term (long tens days if short using above-mentioned pressure testing machine Then several years, or more long) when applying dead load and carrying out Mechanics Performance Testing, then the wasting of resources is easily caused, because its is expensive, One structural experiment room can not possibly have a lot, and many experiments are all used in queuing, it is impossible to by a long-term occupancy of experiment.Simultaneously Easily being interrupted by supply of electric power causes experiment to be interrupted.In addition, loading system itself can be by safeguarding stream time It is very long, it is difficult to ensure that the stability of load.
For structure long-term behaviour load test, at present using it is most be to pile up loading blocks or use small-sized machine The jack method that ordinatedly anchor pole is loaded with reaction frame, this is for some mini Mod components, and finder charge class requirement is relatively low, Low cost, can reach good effect.And the component larger for moulded dimension, the reaction of its mechanics need to meet the requirement of test, Generally require and apply larger load, can be only achieved the target of research, according to preloading loading, then need substantial amounts of high density to add Block is carried, it is relatively costly, plus unloading inconvenience.Such as using the small-size jack method that ordinatedly anchor pole is loaded with reaction frame, then it is difficult Meet the requirement of loading grade.
The content of the invention
It is simple for production it is an object of the invention to provide one kind, it is easy to assembly, it is capable of achieving large scale test component for a long time Stabilization loading long-term loading system and method, so as to solve foregoing problems present in prior art.
To achieve these goals, the technical solution adopted by the present invention is as follows:
A kind of long-term loading system of test beam, including lever, stayed mast, distribution beam, counter weight device, hydraulic pressure adjust refitting Put, earth anchor and power are transmitted and test device;The two ends of the lever are designated as first end and the second end respectively;Near described The position of first end is provided with connection adjustor, and the connection adjustor is connected with the top of the stayed mast, the pulling force The bottom of bar is connected by connector with the earth anchor;Near described first between the first end and the second end A load load(ing) point is set at the position of end, is set successively from top to bottom in lever bottom described in the position of the load load(ing) point Power transmission is equipped with test device, distribution beam, power distribution load(ing) point backing plate, test beam, experiment beam support and test beam pedestal;Institute State and set one or one near the position of the second end between the second end of lever and the load load(ing) point Above counterweight mount point, the counter weight device is connected with the counterweight mount point;In carry, unload or adjust the counter weight device When, the hydraulic pressure weight adjusting device is placed in the counter weight device lower section and is used as the support platform of the counter weight device.
Preferably, the top surface in lever described in the load loading Position is provided with two levelling tubes, wherein:One water Quasi- pipe arranges that another levelling tube is arranged perpendicular to the lever length direction along the lever length direction, used as regulation institute State the reference unit of loading system horizontality.
Preferably, it is provided with the lever between the second end and the load load(ing) point and is slidably filled Put, the slidably device is provided with one by the location hole fixed position that is arranged on the lever, the location hole Or more than one, when the location hole is more than one, each location hole spaced set;On the automatic sliding device It is provided with one or more counterweight mount points.
Preferably, multiple institutes are equidistantly provided with the lever between the second end and the load load(ing) point State counterweight mount point.
Preferably, the counter weight device is mainly made up of counterweight basket with standard bulk material placed within;It is described to match somebody with somebody Weight basket is made up of shaped steel as skeleton construction, then welded reinforcement, and counterweight basket top surrounding is welded with suspension ring or suspension hook, described Suspension ring or suspension hook be connected with the counterweight mount point on the lever by lifting rope or be arranged on the lever slidably Counterweight mount point connection on device;
And/or
The counter weight device is mainly made up of one or more weights, and extension is provided with the top of the weights Hook, the bottom of the weights is provided with suspension hook or suspension ring, when using the counterweight by it is described hook with the lever on Counterweight mount point connection or be connected with the counterweight mount point being arranged on the slidably device on the lever;When an institute Multiple counterweights are used by being arranged on suspension hook or suspension ring the string extension of the counterweight bottom when stating counterweight weight deficiency.
Preferably, the power transmission is mainly assembled with test device by pressure sensor, steel ring, upper lower bolster, its It is mainly used in testing the actual loaded amount of the loading system, is additionally operable to the load of stable delivery leverage generation to described point With on beam.
Preferably, the connection adjustor is used to connect the lever and the stayed mast, is additionally operable to adjust the pulling force The length of bar realizes the first end of the regulation lever and the distance of the earth anchor, and then adjusts the horizontal of the lever State;The connection adjustor is hinged with the lever.
A kind of long-term loading method of test beam, comprises the following steps:
Test beam is positioned on experiment beam support and test beam pedestal in advance, distribution beam is positioned over institute by power distribution requirement State on the stress point of test beam back, pre-adjusting makes the test beam and the distribution beam be in horizontality, power transmission with Test device is placed in the distribution beam end face center position, and advance demand flag goes out the load loading Position of lever bottom surface, makes institute The load loading Position of lever is stated perpendicular to the distribution beam and the power transmission and test device top is positioned over, by even Connecing device makes stayed mast bottom be connected with earth anchor, stayed mast top is connected with the lever by connection adjustor, by lifting rope, Suspension ring/suspension hook makes counter weight device be connected or by hanging with the counterweight mount point of the slidably device being arranged on the lever Rope, suspension ring/suspension hook make the counter weight device be connected with the counterweight mount point being arranged on the lever;The counter weight device lower section Hydraulic pressure weight adjusting device is placed in advance, the lever stress is made by applying balancing weight in the counter weight device, make the thick stick The stress of bar is delivered to the distribution beam, and then is delivered to the test beam, when load is applied to pre-provisioning request, checks the thick stick Whether level tube bubble on bar is placed in the middle, to determine whether the lever reaches level requirement, such as not between two parties, then by adjusting After stating counter weight device or directly integrally lifting the counter weight device using the hydraulic pressure weight adjusting device, adjust the stayed mast with The connection adjustor between the lever, according to the lever level condition, elongates or shortens the stayed mast, makes described Lever is in horizontality, finally, the actual loading that load(ing) point is determined with test device is transmitted by the power.
Preferably, it is further comprising the steps of:
Load value needed for obtaining the load load(ing) point is precalculated according to test requirements document, further according to the lever length And the load load(ing) point present position, precalculate and draw the counterweight mount point Ying Chu positions and the counter weight device Required weight, adjusts with the foundation and conduct for determining the counterweight mount point position as adjustment and determines the counter weight device The foundation of required weight;Also it is used as the determination counter weight device when needing and realizing counterweight by the multiple counter weight devices of carry The foundation of quantity.
Preferably, it is further comprising the steps of:
According to the weight and the lever length that precalculate the counter weight device for obtaining, the load load(ing) point institute Place position, the counterweight mount point present position, calculate the lever and hold downwarp amount of the lotus early stage under counterweight effect, enter And before counter weight device described in carry, one end of the lever carry counterweight is tilted and institute by adjusting the connection adjustor State downwarp amount to measure accordingly, and then the lever is exactly in horizontality after the counter weight device carry.
The beneficial effects of the invention are as follows:
(1) solve the problems, such as that electro-hydraulic system continuously long-time stable cannot be loaded, and can be outer any indoors Place carries out the long-term loading of test beam.
(2) defect of preloading loading or small-size jack loading method is solved, load of test beam loading etc. is extended Level, is capable of achieving the loading demand of long-term, short-term higher level load.
(3) generalization that the long-term load test of bridge structure loads facility is realized, without motorized, the loading of automation Equipment, using electricity wisely can be according to experiment demand, and voluntarily simple designs, easy to process.
(4) the long-term loading system of the present invention is easy to operate, and it is time saving and energy saving to load and unload, stable performance, it is ensured that experiment Long-time carry out.
(5) present invention is not influenceed in the long-term loading system later stage by external condition substantially without specially safeguarding.
(6) put on load on test beam can real-time monitoring, can be by corresponding adjusting means real-time regulation load shape State.
Brief description of the drawings
Fig. 1 is the structural representation of long-term loading system of the invention;
Fig. 2 is the side view of power transmission and test device in the present invention;
Fig. 3 is for connecting the structural representation of stayed mast and the connector of earth anchor in the present invention;
Fig. 4 is for connecting the structural representation of stayed mast and the connection adjustor of lever in the present invention;
Wherein:1 is lever, and 2 is levelling tube, and 3 is slidably device (3-1 is bolt, 3-2 to slide steel tank), 4 is suspension ring (counterweight mount point), and 5 is stayed mast, and 6 is distribution beam, and 7 is counterweight basket, and 8 is balancing weight, and 9 is lifting rope, and 10 is counterweight, 11 is hand-hydraulic weight adjusting device, and 12 is earth anchor, and 13 is that (13-1 is upper lower bolster, and 13-2 is customization with test device for power transmission Steel ring, 13-3 is pressure sensor), 14 is that (14-1 is welding steel, and 14-2 is for connecting the connector of stayed mast and earth anchor High-strength bolt, 14-3 is high-strength bolt nut, and 14-4 is earth anchor screw rod), 15 is connection stayed mast and the connection adjustor of lever (15-1 is welding steel, and 15-2 is high-strength bolt, and 15-3 is high-strength bolt nut), 16 is test beam, and 17 is that power distributes loading Point backing plate, 18 is experiment beam support, and 19 is test beam pedestal.
Specific embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, below in conjunction with accompanying drawing, the present invention is entered Row is further described.It should be appreciated that specific embodiment described herein is only used to explain the present invention, it is not used to Limit the present invention.
Principle summary of the invention:
The design of loading system is carried out using lever principle:First according to experiment demand, what is be further applied load needed for setting is big It is small, after load determines, it should the aspect design lever short arm such as size from test site, size of loading lever and long-armed Length ratio, do not considering lever in itself on the premise of weight, lever short arm and long-armed length ratio are bigger in theory, right Long-armed stress point applying weight is bigger, and the multiple that can amplify lever-loading point loading is bigger, and then realizes using smaller heavy Amount realizes applying the target of larger load.
Hardware construction of the invention:
Long-term loading system of the invention includes:Lever, stayed mast, distribution beam, counter weight device, hydraulic pressure weight adjusting device, Anchor, power transmission are adjusted with test device, for being connected stayed mast with the connector of earth anchor, the connection for being connected stayed mast and lever The critical pieces such as section device:
(1) lever:According to test requirements document, suitable section steel material may be selected and processes, it is true according to finder charge grade Determine lever size and sheet metal thickness, it is ensured that the deformation that lever does not make a difference using function in itself;According to test site, loading rule Mould, lever intensity etc. determine load loading Position;Lever surface sets two levelling tubes, an edge above load load(ing) point Lever length direction arranges that another is arranged perpendicular to lever length direction, the level condition of lever can be shown, as regulation The device of the horizontality of lever, to improve the accuracy of loading.
As further optimization, the slidably device of lever long-armed one end top settable, while lever long arm end Location hole is set on steel plate, and this is slidably also provided with location hole on the corresponding steel plate of device, and the freedom is made by bolt Carriage and lever do not occur along lever longitudinal sliding motion, the location hole on lever can spaced set, such long arm end receives Force (counter weight device mount point) can move freely, and then realize the long-armed various ratios with galianconism length of lever, expand The arbitrariness of lever-loading, makes loading system more flexibility in terms of load is adjusted.
Slidably device side is welded with the suspension ring or suspension hook of hanging basket (counter weight device), as further optimization, The long-armed one end of lever can be positioned below some equidistant suspension ring or suspension hook, used as hitch point (the counterweight carry of suspended counterweight counterweight Point), so on each hitch point can suspended counterweight counterweight, formed leverage, realize the diversified forms of lever-loading.
(2) stayed mast:Processed by high-strength bolt, be connected with lever and earth anchor respectively, be primarily subjected to pulling force, be whole The main bearing member of loading system.
(3) distribution beam:According to test requirements document, suitable shaped steel may be selected and processes, determined according to finder charge grade Distribution beam size and sheet metal thickness, its effect predominantly distribute the load of lever applying to or multiple spot position of test beam at 2 points, To meet requirement of the test beam to loading position.
(4) counter weight device:Be integrally formed hanging basket as skeleton construction, then welded reinforcement by shaped steel, the weight of itself with Standard bulk material placed within constitutes counter weight device, and hanging basket top surrounding is welded with suspension ring/suspension hook, is connected by lifting rope Suspension ring/suspension hook on lever, and then realize the applying of counterweight.Standard bulk material can be made mark by materials such as concrete, steel The block (balancing weight) of quasi- weight, according to lever principle, by simple conversion, what can intuitively be further applied load is big for testing crew It is small.Additionally, the size that lever-loading point loading is determined with test device can be transmitted by power, the essence being further applied load further is verified Degree.
As another form of counter weight device, counter weight device also can it is customized by steel or other similar materials be some tools The weight for having the counterweight of hook, counterweight can design several different weight, and hook is designed with counterweight, by hook during loading It is suspended on lever lower section.
(5) hydraulic pressure weight adjusting device:Converted by appropriate by Manual hydraulic jack finished product, stablize laborsaving, as The attachment device of counter weight device, can use as the support platform of counter weight device, can be avoided when lever horizontality is adjusted Balancing weight is repeated plus unloads, Optimized loading system improves loading accuracy.
(6) earth anchor:Stayed mast anchor, is formed by concrete for making, according to finder charge grade, test site condition And other require etc. design earth anchor size, be embedded in below ground in advance in advance, be connected with stayed mast by connector, be primarily subjected to The uplift force of stayed mast.
(7) power transmission and test device:Assembled by pressure sensor, customization steel ring, upper lower bolster, its Main Function It is the actual loaded amount of test loading system, while reaching the load of stable delivery leverage generation in distribution beam.
(8) for connecting the connector of stayed mast and earth anchor:By earth anchor screw rod, welding steel, high-strength bolt and its nut External member is constituted, and reaches the effect of connection earth anchor and stayed mast.
(9) for connecting the connection adjustor of stayed mast and lever:By welding steel, high-strength bolt and its nut set etc. Constitute, reach the effect of connection stayed mast and lever, while stayed mast force rod can be adjusted by adjusting the nut on stayed mast The length of part, and then adjust the horizontality of lever.
Below in conjunction with accompanying drawing 1,2,3,4, by example in detail technical scheme:
The long-term loading system of test beam mainly include lever, stayed mast, distribution beam, counter weight device, hydraulic pressure weight adjusting device, Earth anchor, power transmission with test device, for being connected stayed mast with the connector of earth anchor, the connection for being connected stayed mast and lever The critical pieces such as adjuster.Above-mentioned part is by after certain processing, transformation, assembling, can be applied to bridge structure experiment long-term Loading.
Embodiment 1
The long-term loading system of test beam as shown in Figure 1,2,3, 4, including lever 1, levelling tube 2, slidably device 3 (bolt 3-1 slides steel tank 3-2), suspension ring 4, stayed mast 5, distribution beam 6, hanging basket 7, balancing weight 8, lifting rope 9, hand-hydraulic Weight adjusting device 11, earth anchor 12, (13-1 is upper lower bolster, and 13-2 is customization steel ring, and 13-3 is pressure with test device 13 for power transmission Sensor), for the connector 14 that connects stayed mast and earth anchor, (14-1 is welding steel, and 14-2 is high-strength bolt, and 14-3 is height Strength bolt nut, 14-4 is earth anchor screw rod), for connect stayed mast and lever connection adjustor 15 (15-1 is welding steel, 15-2 is high-strength bolt, and 15-3 is high-strength bolt nut), test beam 16, power distribution load(ing) point backing plate 17 tests beam support 18, Test beam pedestal 19.During specific assembling, mainly completed by following steps:
(1) first, according to loading system design drawing, above-mentioned all parts and component are completed in processing factory and test site Making.
A. three pieces of vertical steel plate welds between upper and lower two blocks of steel plates (or two pieces of vertical steel plate welds in H profile steel Both sides or one piece of vertical steel plate weld between lower steel plate on square steel), that is, machine the lever 1 of loading system, The top of load load(ing) point correspondence position is installed by the orthogonal levelling tube 2 of transverse and longitudinal.Simultaneously in advance with stayed mast connection end Side steel plate opens connecting hole by design requirement, and location hole is equidistantly being opened by design requirement with counter weight device connection end top surface.
B. three blocks of steel plates (or directly use U-shaped steel) are welded into U-shaped slip steel tank 3-2, it is reverse mounted as can be Slidably device on lever slidably, opens location hole, and process the bolt 3-1 supporting with it in its top board. The slidably effect of device is exactly to realize the flexibility that counter weight device hangs in lever.
C. the lifting rope 9 on suspension ring 4, counter weight device slidably on device has the finished product can to order;Distribution beam 6 is processed Method is identical with lever, but does not exist connecting hole in its structure, is intended only as load distribution and uses.
D. counterweight basket 7 is mainly formed by shaped steel or reinforcement welding, and balancing weight 8 is the bloom processed by standard size and weight Or concrete block, counter weight device mainly assembles jointly by counterweight basket 7, balancing weight 8, lifting rope 9, specially:Blue 7 top of counterweight Suspension ring 4 are welded with, slidably device slides steel tank plate-side plate welding there are suspension ring 4, slidably the suspension ring on device are blue with counterweight Suspension ring coupled together by lifting rope.
E. hydraulic pressure weight adjusting device 11 both can be as the placement platform of counter weight device, while being adjusted in loading procedure is tested Counter weight device is moved up and down, and then adjusts the load that counter weight device is applied on lever, it is possible to reduce matching somebody with somebody in counter weight device Number of times is unloaded in adding for pouring weight 8, can be made by appropriate transformation using hydraulic stem, hydraulic jack, bearing plate etc..
F. earth anchor 12 needs to carry out concreting in testing ground, or can also be realized to drawing using prefabricated ground anchor beam The anchorage effect of power bar.
G. power transmission is welded by upper and lower billet 13-1 with test device 13 with customization steel ring 13-2, and and pressure sensor 13-3 assembles, mainly as the measure foundation that whole loading system is finally further applied load.
H. it is used to connect the regulation connector 15 of stayed mast and lever by both sides steel plate, front and rear steel plate, by-level steel plate The welding steel 15-1 of composition is made, and the both sides steel plate that it is connected with lever has perforate, and high-strength bolt 15-2 passes through both sides The perforate of steel plate and the perforate of lever side plate, then the connection with lever is realized by high-strength bolt nut 15-3.Stayed mast 5 is passed through The perforate of by-level steel plate realizes the connection with the regulation connector by high-strength bolt nut 15-3 again.
I. it is used to connect the connector 14 of stayed mast and earth anchor by drag link end both sides steel plate, front and rear steel plate, by-level steel Plate is made by the welding steel 14-1 that earth anchor end both sides steel plate, lower horizontal steel plate are constituted.Stayed mast 5 passes through by-level The perforate of steel plate realizes the connection with the connector by high-strength bolt nut 14-3 again.The both sides steel plate at its earth anchor end has out Hole, high-strength bolt 14-2 is through earth anchor end both sides steel plate and drag link end both sides steel plate, then is realized by high-strength bolt nut 14-3 The connection of the connector drag link end and earth anchor end steel plate.Earth anchor end lower horizontal steel plate also has perforate, earth anchor screw rod 14-4 simultaneously Through the horizontal steel plate, then the connection that the connector earth anchor end and earth anchor are realized by high-strength bolt nut 14-3.
(2) secondly, all parts also can by it is described above carry out component assembly after the completion of, you can carry out the whole of loading system Body is assembled, and specific assembling scheme is:Test beam 16 is positioned on testing bed, testing stand 19 in advance, and power distributes load(ing) point backing plate 17 with experiment Beam support 18 is placed on design attitude in advance, and distribution beam 6 is positioned on test beam back stress point by power distribution requirement, is passed through Levelling tube is pre-adjusted makes test beam 16 and distribution beam 6 be in horizontality, and power transmission is placed in distribution beam with test device 13 End face center position, advance demand flag goes out the load loading Position of lever bottom surface, makes lever perpendicular to distribution beam and is positioned over power Transmission and the top of test device 13, make stayed mast be connected with earth anchor by connector, and stayed mast and thick stick are made by connection adjustor Bar is connected, then by lifting rope 9, suspension ring 4, slidably device etc. counterweight blue 7 is connected with lever 1.Counter weight device lower section shifts to an earlier date Hand-hydraulic weight adjusting device 11 is placed, to facilitate counter weight device to be lifted at any time and decline.
(3) again, make lever stress by applying balancing weight 8, lever force is delivered to distribution beam, and then be delivered to experiment Beam body, because the slidably device for being connected with counter weight device can be longitudinal by equidistant freely activity along lever, therefore, applying In the case of certain balancing weight 8, it is possible to achieve the loading demand of different class of loading.
(4) it is last, when load is applied to pre-provisioning request, check whether the bubble of 1 levelling tube of lever 2 is placed in the middle, such as not between two parties, can After adjusting balancing weight 8 or directly lifting counter weight device using the entirety of hand-hydraulic weight adjusting device 11, regulation connection regulation Device 15, according to the level condition of lever 1, elongates or shortens stayed mast 5, is repeated several times, and lever 1 can be made to be in horizontality (actual When using, lever can be calculated and hold downwarp amount of the lotus early stage under counterweight effect, lever Balance weight end is somewhat tilted a certain amount, etc. Horizontality is exactly in after lever system stabilization).Finally, the reality with the measuring load load(ing) point of test device 13 is transmitted by power Border load.
Embodiment 2
The long-term loading system of test beam as shown in Figure 1,2,3, 4, including lever 1, levelling tube 2, suspension ring 4, stayed mast 5, Distribution beam 6, counterweight 10, earth anchor 12, (13-1 is upper lower bolster, and 13-2 is customization steel ring, and 13-3 is with test device 13 for power transmission Pressure sensor), for the connector 14 that connects stayed mast and earth anchor, (14-1 is welding steel, and 14-2 is high-strength bolt, 14-3 It is high-strength bolt nut, 14-4 is earth anchor screw rod), for the connection adjustor 15 that connects stayed mast and lever, (15-1 is welding Steel plate, 15-2 is high-strength bolt, and 15-3 is high-strength bolt nut), test beam 16, power distribution load(ing) point backing plate 17, test beam branch Seat 18, test beam pedestal 19.During specific assembling, mainly completed by following steps:
(1) first, according to loading system design drawing, above-mentioned all parts and component are completed in processing factory and test site Making.
A. three pieces of vertical steel plate welds between upper and lower two blocks of steel plates (or two pieces of vertical steel plate welds in H profile steel Both sides or one piece of vertical steel plate weld between lower steel plate on square steel), that is, machine the lever 1 of loading system, The top of load load(ing) point correspondence position is installed by the orthogonal levelling tube 2 of transverse and longitudinal.Pressed in the bottom surface of lever 1 in advance simultaneously etc. Spacing welds the suspension ring 4 for carry counterweight 10.
B. the processing method of distribution beam 6 is identical with lever, but does not exist connecting hole in its structure, and being intended only as load distribution makes With.
C. counterweight 10 is made by steel or the bigger lead prepared material of density, can in advance be customized to the weight of Different Weight Code, each top of counterweight 10 should be designed with hook, and envisaged underneath has suspension ring, and during loading, counterweight 10 can both be hung directly from thick stick Bar lower section on the suspension ring of welding, also can resuspend counterweight in counterweight 10 lower section itself in advance, can so realize any of lever Grade is loaded, and makes flexibility and convenience of the loading system with more loading.
D. earth anchor 12 needs to carry out concreting in testing ground, or can also be realized to drawing using prefabricated ground anchor beam The anchorage effect of power bar.
E. power transmission is welded by upper and lower billet 13-1 with test device 13 in customization steel ring 13-2, and and pressure sensor 13-3 assembles, mainly as the measure foundation that whole loading system is finally further applied load.
F. it is used to connect the regulation connector 15 of stayed mast and lever by both sides steel plate, front and rear steel plate, by-level steel plate The welding steel 15-1 of composition is made, and the both sides steel plate that it is connected with lever has perforate, and high-strength bolt 15-2 passes through both sides The perforate of steel plate and the perforate of lever side plate, then the connection with lever is realized by high-strength bolt nut 15-3.Stayed mast 5 is passed through The perforate of by-level steel plate realizes the connection with the connector by high-strength bolt nut 15-3 again.
G. it is used to connect the connector 14 of stayed mast and earth anchor by drag link end both sides steel plate, front and rear steel plate, by-level steel Plate is made by the welding steel 14-1 that earth anchor end both sides steel plate, lower horizontal steel plate are constituted.Stayed mast 5 passes through by-level The perforate of steel plate realizes the connection with the connector by high-strength bolt nut 14-3 again.The both sides steel plate at its earth anchor end has out Hole, high-strength bolt 14-2 is through earth anchor end both sides steel plate and drag link end both sides steel plate, then is realized by high-strength bolt nut 14-3 The connection of the connector drag link end and earth anchor end steel plate.Earth anchor end lower horizontal steel plate also has perforate, earth anchor screw rod 14-4 simultaneously Through the horizontal steel plate, then realize connecting earth anchor end and earth anchor by the connector by high-strength bolt nut 14-3.
(2) secondly, all parts also can by it is described above carry out component assembly after the completion of, you can carry out the whole of loading system Body is assembled, and specific assembling scheme is:Test beam 16 is positioned on testing bed, testing stand 19 in advance, and power is distributed load(ing) point backing plate 17 and tests beam Bearing 18 is placed on design attitude in advance, and distribution beam 6 is positioned on test beam back stress point by power distribution requirement, by water Quasi- pipe 2 is pre-adjusted makes test beam 16 and distribution beam 6 be in horizontality, and power transmission is placed in distribution back with test device 13 Face center, advance demand flag goes out the stress point position of lever bottom surface, makes the load load(ing) point of lever perpendicular to distribution beam and puts Power transmission and the top of test device 13 are placed in, stayed mast is connected with earth anchor by connector, pulling force is made by connection adjustor Bar is connected with lever.
(3) again, make lever stress by applying counterweight, the stress of lever is delivered to distribution beam, and then be delivered to examination Beam body is tested, because counterweight can be along lever longitudinally by equidistantly freely arranging, counterweight lower section also can again arrange counterweight, therefore, pass through Different counterweight arrangement, it is possible to achieve the loading demand of different class of loading.
(4) it is last, when load is applied to pre-provisioning request, check whether the bubble of 1 levelling tube of lever 2 is placed in the middle, such as not between two parties, can By plus connection adjustor 15 is adjusted after unloading counterweight, according to the level condition of lever 1, elongate or shorten stayed mast 5, be repeated several times, Lever 1 can be made to be in horizontality (when actually used, can be calculated lever and hold downwarp amount of the lotus early stage under counterweight effect, make thick stick Bar Balance weight end somewhat tilts a certain amount, and horizontality is exactly in after waiting lever system stabilization).Finally, by power transmit with The actual loading of the measuring load load(ing) point of test device 13.
By using above-mentioned technical proposal disclosed by the invention, following beneficial effect has been obtained:
(1) solve the problems, such as that electro-hydraulic system continuously long-time stable cannot be loaded, and can be outer any indoors Place carries out the long-term loading of test beam.
(2) defect of preloading loading or small-size jack loading method is solved, load of test beam loading etc. is extended Level, is capable of achieving the loading demand of long-term, short-term higher level load.
(3) generalization that the long-term load test of bridge structure loads facility is realized, without motorized, the loading of automation Equipment, using electricity wisely can be according to experiment demand, and voluntarily simple designs, easy to process.
(4) the long-term loading system of the present invention is easy to operate, and it is time saving and energy saving to load and unload, stable performance, it is ensured that experiment Long-time carry out.
(5) present invention is not influenceed in the long-term loading system later stage by external condition substantially without specially safeguarding.
(6) put on load on test beam can real-time monitoring, can be by corresponding adjusting means real-time regulation load shape State.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should Depending on protection scope of the present invention.

Claims (10)

1. the long-term loading system of a kind of test beam, it is characterised in that including lever, stayed mast, distribution beam, counter weight device, liquid Pressure weight adjusting device, earth anchor and power transmission and test device;The two ends of the lever are designated as first end and the second end respectively; Position near the first end is provided with connection adjustor, and the connection adjustor is connected with the top of the stayed mast, The bottom of the stayed mast is connected by connector with the earth anchor;It is close between the first end and the second end A load load(ing) point is set at the position of the first end, in lever bottom described in the position of the load load(ing) point from upper Under set gradually strong transmission with test device, distribution beam, power distribution load(ing) point backing plate, test beam, experiment beam support and experiment Beam pedestal;Near the position setting one of the second end between the second end of the lever and the load load(ing) point Individual or more than one counterweight mount point, the counter weight device is connected with the counterweight mount point;It is described in carry, unloading or adjustment During counter weight device, the hydraulic pressure weight adjusting device is placed in the counter weight device lower section to be made as the support platform of the counter weight device With.
2. the long-term loading system of test beam according to claim 1, it is characterised in that in the load loading Position The top surface of the lever is provided with two levelling tubes, wherein:One levelling tube arranges along the lever length direction, another water Quasi- pipe is arranged perpendicular to the lever length direction, used as the reference unit for adjusting the loading system horizontality.
3. the long-term loading system of test beam according to claim 1, it is characterised in that the second end and the load Slidably device is provided with the lever between lotus load(ing) point, the slidably device is by being arranged at the lever On location hole fixed position, the location hole is provided with one or more, when the location hole is more than one, respectively The location hole spaced set;One or more counterweight mount points are provided with the automatic sliding device.
4. the long-term loading system of test beam according to claim 1, it is characterised in that the second end and the load Multiple counterweight mount points are equidistantly provided with the lever between lotus load(ing) point.
5. the long-term loading system of test beam according to claim 1, it is characterised in that the counter weight device is main by matching somebody with somebody Weight basket is constituted with standard bulk material placed within;The counterweight basket is by shaped steel as skeleton construction, then welded reinforcement structure Suspension ring or suspension hook are welded with into, counterweight basket top surrounding, the suspension ring or suspension hook are by matching somebody with somebody on lifting rope and the lever The connection of weight mount point is connected with the counterweight mount point being arranged on the slidably device on the lever;
And/or
The counter weight device is mainly made up of one or more weights, and hook, institute are provided with the top of the weights The bottom for stating weights is provided with suspension hook or suspension ring, and the counterweight is linked up with and the counterweight on the lever by described when using Mount point is connected or is connected with the counterweight mount point being arranged on the slidably device on the lever;When a counterweight Multiple counterweights are used by being arranged on suspension hook or suspension ring the string extension of the counterweight bottom when weight is not enough.
6. the long-term loading system of test beam according to claim 1, it is characterised in that the power transmission and test device Mainly assembled by pressure sensor, steel ring, upper lower bolster, its actual loaded for being mainly used in testing the loading system Amount, is additionally operable to the load of stable delivery leverage generation to the distribution beam.
7. the long-term loading system of test beam according to claim 1, it is characterised in that the connection adjustor is used to connect Connect the lever and the stayed mast, be additionally operable to adjust the stayed mast length realize the first end of the regulation lever with The distance of the earth anchor, and then adjust the horizontality of the lever;The connection adjustor is hinged with the lever.
8. the long-term loading method of a kind of test beam, it is characterised in that comprise the following steps:
Test beam is positioned on experiment beam support and test beam pedestal in advance, distribution beam is positioned over the examination by power distribution requirement Test on the stress point of beam back, pre-adjusting makes the test beam and the distribution beam is in horizontality, power transmission and test Device is placed in the distribution beam end face center position, and advance demand flag goes out the load loading Position of lever bottom surface, makes the thick stick The load loading Position of bar is perpendicular to the distribution beam and is positioned over the power transmission and test device top, by connector Stayed mast bottom is connected with earth anchor, stayed mast top is connected with the lever by connection adjustor, by lifting rope, hang Ring/suspension hook makes counter weight device be connected or by hanging with the counterweight mount point of the slidably device being arranged on the lever Rope, suspension ring/suspension hook make the counter weight device be connected with the counterweight mount point being arranged on the lever;The counter weight device lower section Hydraulic pressure weight adjusting device is placed in advance, the lever stress is made by applying balancing weight in the counter weight device, make the thick stick The stress of bar is delivered to the distribution beam, and then is delivered to the test beam, when load is applied to pre-provisioning request, checks the thick stick Whether level tube bubble on bar is placed in the middle, to determine whether the lever reaches level requirement, such as not between two parties, then by adjusting After stating counter weight device or directly integrally lifting the counter weight device using the hydraulic pressure weight adjusting device, adjust the stayed mast with The connection adjustor between the lever, according to the lever level condition, elongates or shortens the stayed mast, makes described Lever is in horizontality, finally, the actual loading that load(ing) point is determined with test device is transmitted by the power.
9. the long-term loading method of test beam according to claim 8, it is characterised in that further comprising the steps of:
Load value needed for obtaining the load load(ing) point is precalculated according to test requirements document, further according to the lever length and described Load load(ing) point present position, precalculates the required weight for drawing the counterweight mount point Ying Chu positions and the counter weight device Amount, the foundation and conduct adjustment as adjustment and the determination counterweight mount point position is heavy with needed for the determination counter weight device The foundation of amount;When needing to realize counterweight by the multiple counter weight devices of carry also as the determination counter weight device quantity Foundation.
10. the long-term loading method of test beam according to claim 9, it is characterised in that further comprising the steps of:
According to precalculating the weight and the lever length of the counter weight device for obtaining, position residing for the load load(ing) point Put, the counterweight mount point present position, calculate the lever and hold lotus downwarp amount of the early stage under counterweight effect, Jin Er Before counter weight device described in carry, by adjust the connection adjustor make the lever carry counterweight one end tilt with it is described under The amount of scratching is measured accordingly, and then the lever is exactly in horizontality after the counter weight device carry.
CN201611245453.6A 2016-12-29 2016-12-29 The long-term loading system and method for a kind of test beam Expired - Fee Related CN106679910B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611245453.6A CN106679910B (en) 2016-12-29 2016-12-29 The long-term loading system and method for a kind of test beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611245453.6A CN106679910B (en) 2016-12-29 2016-12-29 The long-term loading system and method for a kind of test beam

Publications (2)

Publication Number Publication Date
CN106679910A true CN106679910A (en) 2017-05-17
CN106679910B CN106679910B (en) 2018-02-13

Family

ID=58873397

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611245453.6A Expired - Fee Related CN106679910B (en) 2016-12-29 2016-12-29 The long-term loading system and method for a kind of test beam

Country Status (1)

Country Link
CN (1) CN106679910B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107607391A (en) * 2017-10-28 2018-01-19 大连理工大学 A kind of multi-grade lever loading experimental apparatus
CN107664602A (en) * 2017-10-24 2018-02-06 山东科技大学 A kind of mechanical load formula Experiments of Machanics system and application method
CN109470841A (en) * 2018-12-29 2019-03-15 中铁五局集团有限公司 For testing the multifunctional stirring experimental rig of shield soil improvement effect
CN109696351A (en) * 2019-01-21 2019-04-30 中国林业科学研究院木材工业研究所 It is a kind of for recombinating the long-term tensile load test device of composite construction bamboo
CN109781558A (en) * 2018-09-29 2019-05-21 江苏省产品质量监督检验研究院 A kind of program control type mechanical stress experimental rig
CN110455652A (en) * 2019-09-10 2019-11-15 江苏中信博新能源科技股份有限公司 A kind of push rod compression test platform and test method
CN111272444A (en) * 2020-03-04 2020-06-12 石家庄华燕交通科技有限公司 Forklift detection control system
CN112033651A (en) * 2020-07-08 2020-12-04 人本股份有限公司 Lever assembly for counterweight test
CN112504587A (en) * 2020-12-02 2021-03-16 西安建筑科技大学 Device and method for testing bending creep strain of concrete continuous beam bridge under lever holding load
CN112554060A (en) * 2020-11-20 2021-03-26 中车石家庄车辆有限公司 Preparation method, structure and erection method of precast beam for test
CN113063660A (en) * 2021-02-05 2021-07-02 海洋石油工程股份有限公司 Load testing device of ocean platform slideway beam

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006078384A (en) * 2004-09-10 2006-03-23 Momose Kikai Sekkei Kk Load variable type strength tester
CN102749250A (en) * 2012-07-06 2012-10-24 四川大学 Uniaxial-creep testing machine
CN103335897A (en) * 2013-05-31 2013-10-02 西南交通大学 Concrete creep test apparatus and method
CN104749047A (en) * 2015-04-15 2015-07-01 上海市建筑科学研究院(集团)有限公司 Bent member mechanical property testing device and application method thereof
CN104949888A (en) * 2015-06-05 2015-09-30 西安建筑科技大学 Multiscale loading device for recycled concrete long-term crack test

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006078384A (en) * 2004-09-10 2006-03-23 Momose Kikai Sekkei Kk Load variable type strength tester
CN102749250A (en) * 2012-07-06 2012-10-24 四川大学 Uniaxial-creep testing machine
CN103335897A (en) * 2013-05-31 2013-10-02 西南交通大学 Concrete creep test apparatus and method
CN104749047A (en) * 2015-04-15 2015-07-01 上海市建筑科学研究院(集团)有限公司 Bent member mechanical property testing device and application method thereof
CN104949888A (en) * 2015-06-05 2015-09-30 西安建筑科技大学 Multiscale loading device for recycled concrete long-term crack test

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107664602A (en) * 2017-10-24 2018-02-06 山东科技大学 A kind of mechanical load formula Experiments of Machanics system and application method
CN107664602B (en) * 2017-10-24 2024-01-12 山东科技大学 Mechanical loading type mechanical experiment system and use method
CN107607391A (en) * 2017-10-28 2018-01-19 大连理工大学 A kind of multi-grade lever loading experimental apparatus
CN109781558B (en) * 2018-09-29 2021-08-10 江苏省产品质量监督检验研究院 Program-controlled mechanical stress test device
CN109781558A (en) * 2018-09-29 2019-05-21 江苏省产品质量监督检验研究院 A kind of program control type mechanical stress experimental rig
CN109470841A (en) * 2018-12-29 2019-03-15 中铁五局集团有限公司 For testing the multifunctional stirring experimental rig of shield soil improvement effect
CN109696351A (en) * 2019-01-21 2019-04-30 中国林业科学研究院木材工业研究所 It is a kind of for recombinating the long-term tensile load test device of composite construction bamboo
CN110455652A (en) * 2019-09-10 2019-11-15 江苏中信博新能源科技股份有限公司 A kind of push rod compression test platform and test method
CN111272444A (en) * 2020-03-04 2020-06-12 石家庄华燕交通科技有限公司 Forklift detection control system
CN112033651A (en) * 2020-07-08 2020-12-04 人本股份有限公司 Lever assembly for counterweight test
CN112554060A (en) * 2020-11-20 2021-03-26 中车石家庄车辆有限公司 Preparation method, structure and erection method of precast beam for test
CN112554060B (en) * 2020-11-20 2023-02-28 中车石家庄车辆有限公司 Preparation method, structure and erection method of precast beam for test
CN112504587A (en) * 2020-12-02 2021-03-16 西安建筑科技大学 Device and method for testing bending creep strain of concrete continuous beam bridge under lever holding load
CN112504587B (en) * 2020-12-02 2022-09-16 西安建筑科技大学 Device and method for testing bending creep strain of concrete continuous beam bridge under lever holding load
CN113063660A (en) * 2021-02-05 2021-07-02 海洋石油工程股份有限公司 Load testing device of ocean platform slideway beam

Also Published As

Publication number Publication date
CN106679910B (en) 2018-02-13

Similar Documents

Publication Publication Date Title
CN106679910B (en) The long-term loading system and method for a kind of test beam
CN102706734B (en) Loading test device and method of asymmetric lateral-force-resisting structure
CN210766774U (en) Positioning device for steel reinforcement cage and lattice column
CN102162774B (en) Steel-structure distribution-girder-type double-track whole opening box girder static load test device and construction method thereof
CN105372034A (en) Constructional lightgage steel joist and fitting one-piece test apparatus
CN110284535A (en) A kind of vertical load loading device for civil engineering field test
CN112252482B (en) Hydraulic lifting device for steel structure roof and construction method thereof
CN106865414A (en) A kind of combined hanging installation method of Con casting ladle panoramic table
CN212514042U (en) Vertical loading test device of indoor model pile
CN1939836B (en) Load balance adjusting method and equipment of lifting jacks, and jack-up equipment
CN108842954A (en) A kind of huge different section Honeycomb Beam structural system construction method of installation of aerofoil profile roofing
CN105317052B (en) Tower crane foundation bolt fixing method
CN113959550A (en) Unequal-arm balance loading unit, weighbridge calibrating device and weighbridge calibrating method
CN209455933U (en) A kind of superimposed sheet lifting appliance for hoisting
CN205157294U (en) Be used for loaded test device of concrete two -way slab large deformation
CN109883673B (en) Shed frame test method in pilot tunnel excavation process
CN107587770A (en) Disjunctor storehouse synchronization slding form operation method
CN106812216A (en) A kind of mast Cable forces system integral installation method
CN207959875U (en) A kind of construction scaffold
CN106013817A (en) Integral hoisting detection device for large-area steel structure and use method of integral hoisting detection device for large-area steel structure
CN109505404A (en) The intelligent recognition and restraint system of roof system deformation
CN107655662B (en) A kind of installation of screw pile and combined loading test device
CN203795318U (en) Integral hoisting system for rebar cage for large members
CN206737445U (en) The vertical dual-purpose adjuster of Simple horizontal
CN111074794A (en) Prepressing system for hanging basket of cantilever beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180213

Termination date: 20181229