CN106677713B - Reinforce drilling machine - Google Patents
Reinforce drilling machine Download PDFInfo
- Publication number
- CN106677713B CN106677713B CN201710164326.1A CN201710164326A CN106677713B CN 106677713 B CN106677713 B CN 106677713B CN 201710164326 A CN201710164326 A CN 201710164326A CN 106677713 B CN106677713 B CN 106677713B
- Authority
- CN
- China
- Prior art keywords
- drilling cramp
- main
- substrate
- cramp
- drilling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
- E21B15/003—Supports for the drilling machine, e.g. derricks or masts adapted to be moved on their substructure, e.g. with skidding means; adapted to drill a plurality of wells
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
The present invention relates to stake machine technical fields, especially a kind of reinforcing drilling machine, it includes weight balancing centre mount, substrate, it is provided with main drilling cramp and secondary drilling cramp straight up respectively at the both ends of substrate, it is provided with active force head on guide rail on main drilling cramp, secondary power head is set on the guide rail on secondary drilling cramp, main brace bar and secondary hound are provided on substrate, main brace bar is connect with the upper position of main drilling cramp, and secondary hound is connect with the upper position of secondary drilling cramp;It is outward extended with supporting rod respectively at the both ends of substrate, downward support base is respectively arranged at the both ends of each supporting rod.A kind of obtained reinforcing drilling machine of the present invention, it passes through the design of symmetrical main drilling cramp on weight balancing centre mount, substrate and substrate, secondary drilling cramp, it can be so that drilling cramp be more steady in operation process, stability higher, only need 180 ° of substrate rotating that can carry out bore operation after the completion of fetching earth operation simultaneously, without carrying out the displacement of drilling machine, operating cost is greatly reduced, construction operation efficiency is improved.
Description
Technical field
The present invention relates to stake machine technical field, especially a kind of reinforcing drilling machine.
Background technology
Existing stake machine is all the fixed substrate on weight balancing centre mount, and a drilling cramp is arranged in one end of substrate,
Active force head and secondary power head are respectively set on drilling cramp, so during fetching earth or drilling, the gravity of drilling cramp side increases
Add, be easy to cause a pusher side and fall.Simultaneously during existing stake machine use, after the completion of being fetched earth using secondary power head, then need
Mobile stake machine, makes active force head be directed at hole of fetching earth and drills, and manipulation process trouble influences operating efficiency.
Invention content
It is a kind of simple in structure that the purpose of the present invention is to solve the deficiencies of the above technologies and provide, without movement after positioning
It can be fetched earth and bore operation, the reinforcing drilling machine of operating efficiency and operational reliability can be greatly improved.
In order to achieve the above object, a kind of reinforcing drilling machine designed by the present invention, it includes weight balancing centre mount, in weight
It is provided with substrate on amount centre of equilibrium seat, by rotating axis connection, rotation axis between the substrate and weight balancing centre mount
It is rotatablely connected between weight balancing centre mount, is fixedly connected between rotation axis and substrate, is arranged in weight balancing centre mount
Dynamic mechanism, is sequentially connected between actuating unit and rotation axis;It is provided with main drilling cramp straight up respectively at the both ends of substrate
With secondary drilling cramp, the rotation axis is located between main drilling cramp and secondary drilling cramp, and the distance between main drilling cramp and rotation axis are equal to pair
The distance between drilling cramp and rotation axis;Be both provided with the guide rail of two vertical directions on main drilling cramp and secondary drilling cramp, and guide rail with
It is mutually parallel between main drilling cramp, secondary drilling cramp, active force head is provided on the guide rail on main drilling cramp, the guide rail on secondary drilling cramp
The secondary power head of upper setting is rotatably connected to main landing gear in substrate and main drilling cramp junction, turns in substrate and secondary drilling cramp junction
It is dynamic to be connected with auxiliary landing gear, No.1 winch, No. two winches are provided on substrate;Hawser on No.1 winch rises and falls around master
Main drilling cramp top is extended to after frame, and is connect with active force head after bypassing the pulley on main drilling cramp top, the steel wire on No. two winches
Rope extends to secondary drilling cramp top after bypassing auxiliary landing gear, and around being connect with secondary power head after the pulley on secondary drilling cramp top, in base
Main brace bar and secondary hound are provided on plate, main brace bar is connect with the upper position of main drilling cramp, secondary hound and secondary drilling cramp
Upper position connection;At 0-90 ° of angle between main brace bar and main drilling cramp, at 0-90 ° between secondary hound and secondary drilling cramp
Angle;It is outward extended with supporting rod respectively at the both ends of substrate, downward branch is respectively arranged at the both ends of each supporting rod
Support seat.
Above-mentioned technical proposal according to drilling needs, weight balancing centre mount is positioned, is then utilized in use
Secondary power head on secondary drilling cramp drives the drilling rod that fetches earth to fetch earth, after the completion of fetching earth, then dynamic inside weight balancing centre mount
Force mechanisms drive 180 ° of rotation axis and substrate rotating, and the active force head on main drilling cramp is made to be directed at lower section operating area, using actively
Power head drives drilling drilling rod to drill completion region of fetching earth, and carries out subsequent construction operation after drilling again.In the above process, nothing
It needs the position of mobile drill can be completed to fetch earth and bored pile, can greatly reduce use cost, while improving construction operation
Efficiency.The design of main landing gear, auxiliary landing gear can reduce No.1 winch, the pulling force that No. two winches are born, so as to be power
The increase of nose heave amount and provide safeguard, in addition main drilling cramp, secondary drilling cramp are symmetrical arranged, and so that the stationarity of drilling machine is obtained
It is promoted, while need to only rotate the 180 ° of job state that the two can be completed switchings, it is simple and convenient.
The top of main drilling cramp is provided with main sunpender, the outboard end of main sunpender is located at the side of guide rail, is set on substrate
Set No. three winches, the hawsers of No. three winches extends to the pulley further around excessively main sunpender outboard end after the pulley on main drilling cramp top
It is connected with the No.1 fixture for hoisting object afterwards;The top of secondary drilling cramp is provided with secondary sunpender, the outboard end position of secondary sunpender
In the side of guide rail, No. four winches are set on substrate, the hawsers of No. four winches extends to after the pulley on secondary drilling cramp top again
No. two fixtures for hoisting object are connected with after pulley around secondary sunpender outboard end.The design of the structure, can be further
Drilling machine function is promoted, and drilling machine can be facilitated to be picked and placeed to drilling rod in operation process, promotes assembly, removal efficiency.
Main brace bar, secondary hound quantity be at least two, and link position difference of the main brace bar on substrate
Connect straight both sides positioned at main drilling cramp center, secondary drilling cramp center, link position of the secondary hound on substrate is located at
Main drilling cramp center, secondary drilling cramp center connect straight both sides.The design of the structure can make winner's drilling cramp, secondary drilling cramp on substrate
Connection more firm stable, and the stationarity of both sides is more preferably, avoids that the accident that side is fallen occurs.
Main brace bar and the junction of main drilling cramp are located at the 1/3 of main drilling cramp upper end, the connection of secondary hound and secondary drilling cramp
Place is located at the 1/3 of secondary drilling cramp upper end.Since drilling rod is in operation process, often fetch earth, the depth that drills is not up to brill
The limit of meter is set up, so the region that major and minor power head starts operation can be positioned at the position of the following certain distance in drilling cramp top;Together
When in drilling, fetching earth operation process, when originating operation, pulling force that major and minor power head is born etc. is relatively small, major and minor dynamic
The maximum region of power head stress is normally in the middle part of drilling cramp and once, therefore the design of above-mentioned technical proposal, can be preferably to drilling cramp
It is fixed, connectivity robustness is more preferable, for the pulling force dispersibility and reliability higher on drilling cramp.
The direction of the supporting rod is formed by straight line and is mutually perpendicular to main drilling cramp center, secondary drilling cramp center, and main brill
The support base at the supporting rod both ends of frame side is identical as the distance between main drilling cramp, the support at the supporting rod both ends of secondary drilling cramp side
Seat is identical as the distance between secondary drilling cramp.The design of the structure can preferably be supported the drilling machine in operation process, to
Ensure the stability in drilling machine operation process and reliability.
The obtained a kind of reinforcing drilling machine of the present invention, by symmetrically being led on weight balancing centre mount, substrate and substrate
The design of drilling cramp, secondary drilling cramp can so that drilling cramp is more steady in operation process, stability higher, while complete in operation of fetching earth
It needs 180 ° of substrate rotating that can carry out bore operation at rear, without carrying out the displacement of drilling machine, greatly reduces operating cost, carry
High construction operation efficiency.
Description of the drawings
Fig. 1 is the front view of the present invention;
Enlarged diagram after the part omission that Fig. 2 is Fig. 1;
Fig. 3 is the vertical view of the present invention.
Specific implementation mode
The present invention will be further described below by way of embodiments in conjunction with the accompanying drawings.
Embodiment 1:
As shown in Figure 1, Figure 2, Figure 3 shows, a kind of reinforcing drilling machine of the present embodiment description, it includes weight balancing centre mount 1,
It is provided with substrate 2 on weight balancing centre mount 1, is connected by rotation axis 3 between the substrate 2 and weight balancing centre mount 1,
It is rotatablely connected, is fixedly connected between rotation axis 3 and substrate 2, in weight balancing between rotation axis 3 and weight balancing centre mount 1
It is provided with actuating unit in heart seat 1, is sequentially connected between actuating unit and rotation axis 3;Distinguish straight up at the both ends of substrate 2
It is provided with main drilling cramp 4 and secondary drilling cramp 5, the rotation axis 3 is located between main drilling cramp 4 and secondary drilling cramp 5, and main drilling cramp 4 and rotation
The distance between axis 3 is equal to secondary the distance between drilling cramp 5 and rotation axis 3;It is both provided with two on main drilling cramp 4 and secondary drilling cramp 5
The guide rail of vertical direction, and it is mutually parallel between guide rail and main drilling cramp 4, secondary drilling cramp 5, it is arranged on the guide rail on main drilling cramp 4
There is active force head 6, secondary power head 7 is set on the guide rail on secondary drilling cramp 5, is rotatably connected in substrate 2 and 4 junction of main drilling cramp
Main landing gear 10 is rotatably connected to auxiliary landing gear 11 in substrate 2 and 5 junction of secondary drilling cramp, is provided with No.1 winch on a substrate 2
12, No. two winches 14;Hawser on No.1 winch 12 extends to 4 top of main drilling cramp after bypassing main landing gear 10, and around master
It is connect with active force head 6 after the pulley on 4 top of drilling cramp, the hawser on No. two winches 14 extends to pair after bypassing auxiliary landing gear 11
5 top of drilling cramp, and around being connect with secondary power head 7 after the pulley on 5 top of secondary drilling cramp, it is provided with 8 He of main brace bar on a substrate 2
Secondary hound 9, main brace bar 8 are connect with the upper position of main drilling cramp 4, and secondary hound 9 is connect with the upper position of secondary drilling cramp 5;
It is at an acute angle between main brace bar 8 and main drilling cramp 4, it is at an acute angle between secondary hound 9 and secondary drilling cramp 5;The both ends of substrate 2 respectively to
It is extended with supporting rod 16 outside, downward support base 17 is respectively arranged at the both ends of each supporting rod 16.
The top of main drilling cramp 4 is provided with main sunpender 18, the outboard end of main sunpender 18 is located at the side of guide rail, in substrate
No. three winches 13 are set on 2, and the hawsers of No. three winches 13 extends to after the pulley on 4 top of main drilling cramp outside further around main sunpender 18 excessively
The No.1 fixture for hoisting object is connected with after the pulley of side end;The top of secondary drilling cramp 5 is provided with secondary sunpender 19, pair is hung
The outboard end of bar 19 is located at the side of guide rail, and No. four winches 15 are arranged on a substrate 2, and the hawser of No. four winches 15 extends to
Further around No. two folders being connected with after the pulley of 19 outboard end of secondary sunpender excessively for hoisting object after the pulley on 5 top of secondary drilling cramp
Tool.
Main brace bar 8, secondary hound 9 quantity be two, and the link position difference of main brace bar 8 on a substrate 2
Connect straight both sides, the link position difference of secondary hound 9 on a substrate 2 positioned at 4 center of main drilling cramp, 5 center of secondary drilling cramp
Connect straight both sides positioned at 4 center of main drilling cramp, 5 center of secondary drilling cramp.
Main brace bar 8 and the junction of main drilling cramp 4 are located at the 1/3 of 4 upper end of main drilling cramp, secondary hound 9 and secondary drilling cramp 5
Junction is located at the 1/3 of 5 upper end of secondary drilling cramp.
The direction of the supporting rod 16 is formed by straight line and is mutually perpendicular to 4 center of main drilling cramp, 5 center of secondary drilling cramp, and
The support base 17 at 16 both ends of supporting rod of 4 side of main drilling cramp is identical as the distance between main drilling cramp 4, the support of 5 side of secondary drilling cramp
The support base 17 at 16 both ends of bar is identical as the distance between secondary drilling cramp 5.
Claims (5)
1. a kind of reinforcing drilling machine, it includes weight balancing centre mount, and substrate, feature are provided on weight balancing centre mount
It is:By rotating axis connection between the substrate and weight balancing centre mount, turn between rotation axis and weight balancing centre mount
Dynamic connection, is fixedly connected between rotation axis and substrate, is provided with actuating unit in weight balancing centre mount, actuating unit with turn
It is sequentially connected between moving axis;It is provided with main drilling cramp and secondary drilling cramp, the rotation axle position straight up respectively at the both ends of substrate
Between main drilling cramp and secondary drilling cramp, and the distance between main drilling cramp and rotation axis are equal to secondary the distance between drilling cramp and rotation axis;
The guide rail of two vertical directions is both provided on main drilling cramp and secondary drilling cramp, and between guide rail and main drilling cramp, secondary drilling cramp mutually
It is parallel, active force head is provided on the guide rail on main drilling cramp, secondary power head is set on the guide rail on secondary drilling cramp, substrate with
Main drilling cramp junction is rotatably connected to main landing gear, auxiliary landing gear is rotatably connected in substrate and secondary drilling cramp junction, in substrate
On be provided with No.1 winch, No. two winches;Hawser on No.1 winch extends to main drilling cramp top after bypassing main landing gear, and
It is connect with active force head after pulley around main drilling cramp top, the hawser on No. two winches extends to pair after bypassing auxiliary landing gear
Drilling cramp top, and around being connect with secondary power head after the pulley on secondary drilling cramp top, main brace bar is provided on substrate and pair is oblique
Strut, main brace bar are connect with the upper position of main drilling cramp, and secondary hound is connect with the upper position of secondary drilling cramp;Main brace bar with
At 0-90 ° of angle between main drilling cramp, at 0-90 ° of angle between secondary hound and secondary drilling cramp;The both ends of substrate respectively to
It is extended with supporting rod outside, downward support base is respectively arranged at the both ends of each supporting rod.
2. a kind of reinforcing drilling machine according to claim 1, it is characterized in that:The top of main drilling cramp is provided with main sunpender, it is main
The outboard end of sunpender is located at the side of guide rail, and No. three winches are arranged on substrate, and the hawser of No. three winches extends to main brill
Further around the No.1 fixture being connected with after the pulley of excessively main sunpender outboard end for hoisting object after the pulley on frame top;It is bored in pair
The top of frame is provided with secondary sunpender, and the outboard end of secondary sunpender is located at the side of guide rail, No. four winches of setting on substrate, No. four
The hawser of winch extends to after the pulley on secondary drilling cramp top further around being connected with after the pulley of excessively secondary sunpender outboard end for hanging
Fill No. two fixtures of object.
3. a kind of reinforcing drilling machine according to claim 1 or 2, it is characterized in that:Main brace bar, secondary hound quantity be
At least two, and link position of the main brace bar on substrate is located at main drilling cramp center, the be linked to be straight line in secondary drilling cramp center
Both sides, link position of the secondary hound on substrate be located at main drilling cramp center, secondary drilling cramp center and connect straight two
Side.
4. a kind of reinforcing drilling machine according to claim 3, it is characterized in that:Main brace bar and the junction of main drilling cramp are located at master
At the 1/3 of drilling cramp upper end, the junction of secondary hound and secondary drilling cramp is located at the 1/3 of secondary drilling cramp upper end.
5. a kind of reinforcing drilling machine according to claim 4, it is characterized in that:In the direction of the supporting rod and main drilling cramp
The heart, secondary drilling cramp center are formed by straight line and are mutually perpendicular to, and the support base at the supporting rod both ends of main drilling cramp side and main drilling cramp it
Between distance it is identical, the support base at the supporting rod both ends of secondary drilling cramp side is identical as the distance between secondary drilling cramp.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710164326.1A CN106677713B (en) | 2017-03-20 | 2017-03-20 | Reinforce drilling machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710164326.1A CN106677713B (en) | 2017-03-20 | 2017-03-20 | Reinforce drilling machine |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106677713A CN106677713A (en) | 2017-05-17 |
CN106677713B true CN106677713B (en) | 2018-08-21 |
Family
ID=58829207
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710164326.1A Active CN106677713B (en) | 2017-03-20 | 2017-03-20 | Reinforce drilling machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106677713B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107587846A (en) * | 2017-09-30 | 2018-01-16 | 桐乡市天顺模具有限公司 | A kind of drilling cramp |
CN107724386A (en) * | 2017-09-30 | 2018-02-23 | 桐乡市天顺模具有限公司 | A kind of stake machine |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2581509Y (en) * | 2002-04-01 | 2003-10-22 | 曹兴明 | Three-purpose pile driver for drilling, vibration extracting and vibration tamping foundation large head pile |
CN1467346A (en) * | 2002-06-24 | 2004-01-14 | 颜可仁 | Extrusion, fetching, multi-branch perfusion pile drill |
CN202755890U (en) * | 2012-09-20 | 2013-02-27 | 瑞安市八达工程机械有限公司 | Walking type double circling downhole drill |
CN103398868A (en) * | 2013-01-11 | 2013-11-20 | 河北科技大学 | Specific-depth soil layer soil sample acquisition apparatus and acquisition method thereof |
CN103615000A (en) * | 2013-12-18 | 2014-03-05 | 上海强劲地基工程股份有限公司 | Construction device of original-state earth-borrowing cast-in-place pile |
CN203685020U (en) * | 2014-01-14 | 2014-07-02 | 铁道第三勘察设计院集团有限公司 | Super-light shallow hole sampling drill |
CN104612154A (en) * | 2014-12-24 | 2015-05-13 | 桐乡市天顺模具有限公司 | Stressing self-tapping pile machine |
CN206581897U (en) * | 2017-03-20 | 2017-10-24 | 桐乡市天顺模具有限公司 | Reinforce rig |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004316380A (en) * | 2003-04-11 | 2004-11-11 | Tetsuo Kesen | Method for mounting pile and its mounting device |
-
2017
- 2017-03-20 CN CN201710164326.1A patent/CN106677713B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2581509Y (en) * | 2002-04-01 | 2003-10-22 | 曹兴明 | Three-purpose pile driver for drilling, vibration extracting and vibration tamping foundation large head pile |
CN1467346A (en) * | 2002-06-24 | 2004-01-14 | 颜可仁 | Extrusion, fetching, multi-branch perfusion pile drill |
CN202755890U (en) * | 2012-09-20 | 2013-02-27 | 瑞安市八达工程机械有限公司 | Walking type double circling downhole drill |
CN103398868A (en) * | 2013-01-11 | 2013-11-20 | 河北科技大学 | Specific-depth soil layer soil sample acquisition apparatus and acquisition method thereof |
CN103615000A (en) * | 2013-12-18 | 2014-03-05 | 上海强劲地基工程股份有限公司 | Construction device of original-state earth-borrowing cast-in-place pile |
CN203685020U (en) * | 2014-01-14 | 2014-07-02 | 铁道第三勘察设计院集团有限公司 | Super-light shallow hole sampling drill |
CN104612154A (en) * | 2014-12-24 | 2015-05-13 | 桐乡市天顺模具有限公司 | Stressing self-tapping pile machine |
CN206581897U (en) * | 2017-03-20 | 2017-10-24 | 桐乡市天顺模具有限公司 | Reinforce rig |
Also Published As
Publication number | Publication date |
---|---|
CN106677713A (en) | 2017-05-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103848360B (en) | A kind of group tower tower crane being provided with packaged type balance weight system | |
CN203403418U (en) | Steel casing double-layer guide frame structure | |
CN106677713B (en) | Reinforce drilling machine | |
CN206345591U (en) | A kind of building tower crane with safety hanging cradle | |
CN202064840U (en) | Four-drill column drill derrick | |
CN102303821B (en) | Luffing tower crane with balanced type suspension arm based on traction luffing of steel rope | |
CN201495051U (en) | Crane jib for flat-top tower crane | |
CN202296907U (en) | Suspension arm balanced movable arm tower crane capable of luffing based on steel rope traction | |
CN109963807A (en) | Offshore crane vessel and method of operation | |
CN201024903Y (en) | An artesian well tower | |
CN105829203B (en) | Stake upset system, ship and the method for overturning stake | |
CN206581897U (en) | Reinforce rig | |
CN101016827A (en) | 18 m hydraulic pressure rise and fall retractable drill tower | |
CN206590793U (en) | Connect arm assembly and the movable arm tower crane comprising the device in the air | |
CN106761437B (en) | Offshore drilling platform open front double-wellhead derrick | |
CN109941897A (en) | A kind of tower crane jacking method | |
CN207108310U (en) | Boom system and crane | |
CN201513126U (en) | Straight-oblique dual purpose hydraulic steel rope drilling tower | |
CN213807579U (en) | Derrick device for four-single upright column drilling machine | |
CN201762053U (en) | Simple automatic derrick | |
CN203699727U (en) | Tower crane jacking anti-dropping control device | |
CN103072903B (en) | Method for mounting high-rise pylon by using self-stable double-rocker elevating device | |
CN203065046U (en) | Self-stabilizing double-rocker-arm lifting device for installation of high-rise tower | |
CN203474321U (en) | Tower crane used for constructing and erecting electric transmission line iron towers | |
CN208345627U (en) | A kind of semicircular ring rail crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: Wutong street of Tongxiang city 314500 Jiaxing City, Zhejiang province Qi Road No. 186 building two Patentee after: Jiaxing Tiangang mechanical equipment Co., Ltd Address before: Wutong street of Tongxiang city 314500 Jiaxing City, Zhejiang province Qi Road No. 186 building two Patentee before: TONGXIANG TIANSHUN MOULD Co.,Ltd. |