CN106677713A - Stress drilling machine - Google Patents

Stress drilling machine Download PDF

Info

Publication number
CN106677713A
CN106677713A CN201710164326.1A CN201710164326A CN106677713A CN 106677713 A CN106677713 A CN 106677713A CN 201710164326 A CN201710164326 A CN 201710164326A CN 106677713 A CN106677713 A CN 106677713A
Authority
CN
China
Prior art keywords
drilling cramp
main
substrate
cramp
drill stand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710164326.1A
Other languages
Chinese (zh)
Other versions
CN106677713B (en
Inventor
浦晓锋
杨炎林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiaxing Tiangang mechanical equipment Co., Ltd
Original Assignee
Tongxiang Tianshun Mould Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongxiang Tianshun Mould Co Ltd filed Critical Tongxiang Tianshun Mould Co Ltd
Priority to CN201710164326.1A priority Critical patent/CN106677713B/en
Publication of CN106677713A publication Critical patent/CN106677713A/en
Application granted granted Critical
Publication of CN106677713B publication Critical patent/CN106677713B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • E21B15/003Supports for the drilling machine, e.g. derricks or masts adapted to be moved on their substructure, e.g. with skidding means; adapted to drill a plurality of wells

Abstract

The invention relates to the technical field of a piling machine, and in particular a stress drilling machine. The stress drilling machine comprises a weight balance center base, a base plate, a main drill stand and a secondary drill stand are respectively vertically arranged on the two ends of the base plate, a main power head is arranged on a guide rail of the main drill stand, a secondary power head is arranged on the guild rail of the secondary drill stand, a main inclining support rod and a secondary inclining support rod are arranged on the base plate, the main inclining support rod is connected with the upper middle part of the main drill stand, the secondary inclining support rod is connected with the upper middle part of the secondary drill stand; the two ends of the base plate extend outward and are respectively provided with a supporting rod, and the two ends of each supporting rod are respectively provided with a supporting base facing downwards. The obtained drilling machine, by the design of the weight balance center base, the base plate, and the main drill stand and the secondary drill stand symmetrically arranged on the base plate, makes it possible for the drill stand to be more steady in the operation process, the steadiness is even higher, meanwhile, after the soil sampling operation is completed, the base plate only needs to be rotated 180 DEG to conduct the drilling operations, and the drilling machine does not need to be moved; the operation costs are lowered to a large extent, and the operating efficiency for construction is increased.

Description

Reinforcing rig
Technical field
The present invention relates to stake machine technical field, especially a kind of reinforcing rig.
Background technology
Existing stake machine is all to fix substrate on weight balancing centre mount, and in one end of substrate a drilling cramp is arranged, Active force head and secondary unit head are respectively provided with drilling cramp, so during fetching earth or drilling, the gravity of drilling cramp side increases Plus, easily cause a pusher side and fall.Simultaneously during existing stake machine use, after the completion of being fetched earth using secondary unit head, then need Mobile stake machine, makes active force head be directed at hole of fetching earth and is drilled, and manipulation process trouble affects working performance.
The content of the invention
The invention aims to solve the not enough of above-mentioned technology and a kind of simple structure is provided, without the need for mobile after positioning Can be fetched earth and bore operation, the reinforcing rig of working performance and operational reliability can be greatly improved.
In order to achieve the above object, a kind of reinforcing rig designed by the present invention, it includes weight balancing centre mount, in weight Be provided with substrate on amount center of equilibriumPing Hengzhongxin seat, the rotary shaft connection between described substrate and weight balancing centre mount, rotary shaft with Connection is rotated between weight balancing centre mount, is fixedly connected between rotary shaft and substrate, be provided with weight balancing centre mount Actuating unit, is connected between actuating unit and rotary shaft;The two ends of substrate be provided with straight up respectively main drilling cramp and Secondary drilling cramp, described rotary shaft is located between main drilling cramp and secondary drilling cramp, and the distance between main drilling cramp and central shaft are equal to secondary brill The distance between frame and central shaft;Be respectively arranged with the guide rail of two vertical directions on main drilling cramp and secondary drilling cramp, and guide rail with It is mutually parallel between main drilling cramp, secondary drilling cramp, active force head is provided with the guide rail on main drilling cramp, the guide rail on secondary drilling cramp It is upper that secondary unit head is set, main landing gear is rotatably connected to main drilling cramp junction in substrate, turn with secondary drilling cramp junction in substrate It is dynamic to be connected with auxiliary landing gear, a winch, No. two winches are provided with substrate;Hawser on a number winch bypasses master and rises and falls Main drilling cramp top is extended to after frame, and is bypassed and is connected with active force head after the pulley on main drilling cramp top, the steel wire on No. two winches Rope is bypassed and extend to after auxiliary landing gear secondary drilling cramp top, and is bypassed and be connected with secondary unit head after the pulley on secondary drilling cramp top, in base Main brace bar and secondary hound are provided with plate, main brace bar be connected with the upper position of main drilling cramp, secondary hound and pair drilling cramp Upper position connection;Into 0-90 ° of angle between main brace bar and main drilling cramp, into 0-90 ° between secondary hound and secondary drilling cramp Angle;Support bar is outward extended with respectively at the two ends of substrate, and at the two ends of each support bar downward propping up is respectively arranged with Support seat.
Above-mentioned technical proposal, in use, according to drilling needs, then weight balancing centre mount positioning utilizes Secondary unit head on secondary drilling cramp drives the drilling rod that fetches earth to be fetched earth, after the completion of fetching earth, then dynamic inside weight balancing centre mount Force mechanisms drive 180 ° of rotary shaft and substrate rotating, make the active force head on main drilling cramp be directed at lower section operating area, using actively Power head drives drilling drilling rod to complete region to fetching earth and drills, and carries out subsequent construction operation after drilling again.In said process, nothing Complete to fetch earth and bored pile by the position for needing mobile drill, can greatly reduce use cost, while improving construction operation Efficiency.The design of main landing gear, auxiliary landing gear, can reduce a winch, the pulling force that No. two winches are born, so as to for power The increase of nose heave amount and provide safeguard, in addition main drilling cramp, secondary drilling cramp are symmetrical arranged, and obtain further the stationarity of rig Lifted, while only need to rotate that both job state switchings are completed by 180 °, it is simple and convenient.
The top of main drilling rod is provided with main suspension rod, the outboard end of main suspension rod is located at the side of guide rail, sets on substrate Put No. three winches, the hawser of No. three winches is extended to after the pulley on main drilling cramp top further around the pulley of excessively main suspension rod outboard end The fixture for hoisting object is connected with afterwards;The top of secondary drilling rod is provided with secondary suspension rod, the outboard end of secondary suspension rod is located to be led The side of rail, arranges No. four winches on substrate, and the hawser of No. four winches is extended to after the pulley on secondary drilling cramp top further around mistake The fixture for hoisting object is connected with after the pulley of secondary suspension rod outboard end.The design of the structure, can further lift rig Function, and rig can be facilitated to pick and place to drilling rod in operation process, lift assembling, removal efficiency.
Main brace bar, the quantity of secondary hound are at least two, and link position difference of the main brace bar on substrate Connect straight both sides positioned at main drilling cramp center, secondary drilling cramp center, link position of the secondary hound on substrate is located at respectively Main drilling cramp center, secondary drilling cramp center connect straight both sides.The design of the structure can make winner's drilling cramp, secondary drilling cramp on substrate Connection more firm stable, and the stationarity of both sides is more preferably, it is to avoid the accident that side is fallen occurs.
Main brace bar is located at the 1/3 of main drilling cramp upper end with the junction of main drilling cramp, the connection of secondary hound and secondary drilling cramp Place is located at the 1/3 of secondary drilling cramp upper end.Because drilling rod is in operation process, the depth for often fetch earth, drilling is not up to brill The limit of meter is set up, so major and minor unit head starts the region of operation and can be located at the position of the following certain distance in drilling cramp top;Together When drilling, fetching earth in operation process, during initial operation, pulling force that major and minor unit head is born etc. is relatively small, major and minor dynamic The maximum region of power head stress is normally at drilling cramp middle part and once, therefore the design of above-mentioned technical proposal, can be preferably to drilling cramp It is fixed, connectivity robustness is more preferably, higher for the pulling force dispersibility and reliability on drilling cramp.
The straight line that the direction of described support bar is formed with main drilling cramp center, secondary drilling cramp center is mutually perpendicular to, and main brill The support base at the support bar two ends of frame side is identical with the distance between main drilling cramp, the support at the support bar two ends of secondary drilling cramp side Seat is identical with the distance between secondary drilling cramp.The design of the structure, preferably can be supported to the rig in operation process, so as to Guarantee the stability and reliability in rig operation process.
A kind of reinforcing rig obtained by the present invention, it passes through master symmetrical on weight balancing centre mount, substrate and substrate The design of drilling cramp, secondary drilling cramp, can cause drilling cramp in operation process more steadily, stability is higher, while complete in operation of fetching earth Bore operation is carried out by needing 180 ° of substrate rotating into rear, the displacement without the need for carrying out rig greatly reduces operating cost, carries High construction operation efficiency.
Description of the drawings
Fig. 1 is the front view of the present invention;
Fig. 2 is the enlarged diagram after the local omission of Fig. 1;
Fig. 3 is the top view of the present invention.
Specific embodiment
The invention will be further described to combine accompanying drawing below by embodiment.
Embodiment 1:
As shown in Figure 1, Figure 2, Figure 3 shows, a kind of reinforcing rig of the present embodiment description, it includes weight balancing centre mount 1, in weight It is provided with substrate 2 on center of equilibriumPing Hengzhongxin seat 1, the rotary shaft 3 between described substrate 2 and weight balancing centre mount 1 connects, rotary shaft Connection is rotated between 3 and weight balancing centre mount 1, is fixedly connected between rotary shaft 3 and substrate 2, in weight balancing centre mount 1 Actuating unit is provided with, is connected between actuating unit and rotary shaft 3;It is provided with straight up respectively at the two ends of substrate 2 Main drilling cramp 4 and secondary drilling cramp 5, described rotary shaft 3 is located between main drilling cramp 4 and secondary drilling cramp 5, and between main drilling cramp 4 and central shaft Distance be equal to the distance between secondary drilling cramp 5 and central shaft;Two vertically sides are respectively arranged with main drilling cramp 4 and secondary drilling cramp 5 To guide rail, it is and mutually parallel between guide rail and main drilling cramp 4, secondary drilling cramp 5, be provided with the guide rail on main drilling cramp 4 actively Power 6, arranges secondary unit head 7 on the guide rail on secondary drilling cramp 5, be rotatably connected to master in substrate 2 and the junction of main drilling cramp 4 and rise and fall Frame 10, auxiliary landing gear 11 is rotatably connected in substrate 2 with the secondary junction of drilling cramp 5, and a winch 12, two is provided with a substrate 2 Number winch 14;Hawser on a number winch 12 bypasses and the top of main drilling cramp 4 is extended to after main landing gear 10, and bypasses main drilling cramp 4 It is connected with active force 6 after the pulley on top, the hawser on No. two winches 14 bypasses and secondary drilling cramp 5 is extended to after auxiliary landing gear 11 Top, and bypass and be connected with secondary unit head 7 after the pulley on the top of secondary drilling cramp 5, main brace bar 8 is provided with a substrate 2 and pair is oblique Strut 9, main brace bar 8 is connected with the upper position of main drilling cramp 4, and secondary hound 9 is connected with the upper position of secondary drilling cramp 5;It is main oblique It is at an acute angle between strut 8 and main drilling cramp 4, it is at an acute angle between secondary hound 9 and secondary drilling cramp 5;At the two ends of substrate 2 respectively to extension Stretching has support bar 16, and at the two ends of each support bar 16 downward support base 17 is respectively arranged with.
The top of main drilling rod is provided with main suspension rod 18, the outboard end of main suspension rod 18 is located at the side of guide rail, in substrate 2 No. three winches 13 of upper setting, the hawser of No. three winches 13 is extended to after the pulley on the top of main drilling cramp 4 outside further around excessively main suspension rod 18 The fixture for hoisting object is connected with after the pulley of side end;The top of secondary drilling rod is provided with secondary suspension rod 19, secondary suspension rod 19 Outboard end be located at the side of guide rail, No. four winches 15 are set on a substrate 2, the hawser of No. four winches 15 extends to secondary brill Further around the fixture being connected with after the pulley of the excessively secondary outboard end of suspension rod 19 for hoisting object after the pulley on the top of frame 5.
Main brace bar 8, the quantity of secondary hound 9 are two, and the link position difference on a substrate 2 of main brace bar 8 Connect straight both sides, the link position difference on a substrate 2 of secondary hound 9 positioned at the center of main drilling cramp 4, the secondary center of drilling cramp 5 Connect straight both sides positioned at the center of main drilling cramp 4, the secondary center of drilling cramp 5.
The junction of main brace bar 8 and main drilling cramp 4 is located at the 1/3 of the upper end of main drilling cramp 4, secondary hound 9 and secondary drilling cramp 5 Junction is located at the 1/3 of the secondary upper end of drilling cramp 5.
The straight line that the direction of described support bar 16 is formed with the center of main drilling cramp 4, the secondary center of drilling cramp 5 is mutually perpendicular to, and The support base 17 at the two ends of support bar 16 of the side of main drilling cramp 4 is identical with the distance between main drilling cramp 4, the support of the side of secondary drilling cramp 5 The support base 17 at the two ends of bar 16 is identical with the distance between secondary drilling cramp 5.

Claims (5)

1. a kind of to reinforce rig, it includes weight balancing centre mount, is provided with substrate on weight balancing centre mount, its feature It is:Rotary shaft connection between described substrate and weight balancing centre mount, rotates between rotary shaft and weight balancing centre mount Connection, is fixedly connected between rotary shaft and substrate, and actuating unit, actuating unit and rotation are provided with weight balancing centre mount It is connected between axle;Main drilling cramp and secondary drilling cramp are provided with straight up respectively at the two ends of substrate, described rotary shaft is located at Between main drilling cramp and secondary drilling cramp, and the distance between main drilling cramp and central shaft are equal to the distance between secondary drilling cramp and central shaft; It is respectively arranged with main drilling cramp and secondary drilling cramp between the guide rail of two vertical directions, and guide rail and main drilling cramp, secondary drilling cramp mutually It is parallel, active force head is provided with the guide rail on main drilling cramp, secondary unit head is set on the guide rail on secondary drilling cramp, substrate with Main drilling cramp junction is rotatably connected to main landing gear, auxiliary landing gear is rotatably connected to secondary drilling cramp junction in substrate, in substrate On be provided with a winch, No. two winches;Hawser on a number winch is bypassed and extend to after main landing gear main drilling cramp top, and It is connected with active force head after the pulley for bypassing main drilling cramp top, the hawser on No. two winches is bypassed and extend to after auxiliary landing gear pair Drilling cramp top, and bypass and be connected with secondary unit head after the pulley on secondary drilling cramp top, main brace bar is provided with substrate and pair is oblique Strut, main brace bar is connected with the upper position of main drilling cramp, and secondary hound is connected with the upper position of secondary drilling cramp;Main brace bar with Into 0-90 ° of angle between main drilling cramp, into 0-90 ° of angle between secondary hound and secondary drilling cramp;The two ends of substrate respectively to Support bar is extended with outward, and at the two ends of each support bar downward support base is respectively arranged with.
2. a kind of reinforcing rig according to claim 1, is characterized in that:The top of main drilling rod is provided with main suspension rod, it is main The outboard end of suspension rod is located at the side of guide rail, and No. three winches are arranged on substrate, and the hawser of No. three winches extends to main brill Further around the fixture being connected with after the pulley of excessively main suspension rod outboard end for hoisting object after the pulley on frame top;In secondary drilling rod Top is provided with secondary suspension rod, and the outboard end of secondary suspension rod is located at the side of guide rail, and No. four winches, No. four winches are arranged on substrate Hawser extend to after the pulley on secondary drilling cramp top further around being connected with for lifting object after the pulley of excessively secondary suspension rod outboard end The fixture of body.
3. a kind of reinforcing rig according to claim 1 and 2, is characterized in that:Main brace bar, the quantity of secondary hound are At least two, and link position of the main brace bar on substrate is linked to be straight line positioned at main drilling cramp center, secondary drilling cramp center respectively Both sides, link position of the secondary hound on substrate be located at respectively main drilling cramp center, secondary drilling cramp center and connect straight two Side.
4. a kind of reinforcing rig according to claim 3, is characterized in that:Main brace bar is located at master with the junction of main drilling cramp At the 1/3 of drilling cramp upper end, secondary hound is located at the 1/3 of secondary drilling cramp upper end with the junction of secondary drilling cramp.
5. a kind of reinforcing rig according to claim 4, is characterized in that:In the direction of described support bar and main drilling cramp The straight line that the heart, secondary drilling cramp center are formed is mutually perpendicular to, and the support base at the support bar two ends of main drilling cramp side and main drilling cramp it Between distance it is identical, the support base at the support bar two ends of secondary drilling cramp side is identical with the distance between secondary drilling cramp.
CN201710164326.1A 2017-03-20 2017-03-20 Reinforce drilling machine Active CN106677713B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710164326.1A CN106677713B (en) 2017-03-20 2017-03-20 Reinforce drilling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710164326.1A CN106677713B (en) 2017-03-20 2017-03-20 Reinforce drilling machine

Publications (2)

Publication Number Publication Date
CN106677713A true CN106677713A (en) 2017-05-17
CN106677713B CN106677713B (en) 2018-08-21

Family

ID=58829207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710164326.1A Active CN106677713B (en) 2017-03-20 2017-03-20 Reinforce drilling machine

Country Status (1)

Country Link
CN (1) CN106677713B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107587846A (en) * 2017-09-30 2018-01-16 桐乡市天顺模具有限公司 A kind of drilling cramp
CN107724386A (en) * 2017-09-30 2018-02-23 桐乡市天顺模具有限公司 A kind of stake machine

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2581509Y (en) * 2002-04-01 2003-10-22 曹兴明 Three-purpose pile driver for drilling, vibration extracting and vibration tamping foundation large head pile
CN1467346A (en) * 2002-06-24 2004-01-14 颜可仁 Extrusion, fetching, multi-branch perfusion pile drill
JP2004316380A (en) * 2003-04-11 2004-11-11 Tetsuo Kesen Method for mounting pile and its mounting device
CN202755890U (en) * 2012-09-20 2013-02-27 瑞安市八达工程机械有限公司 Walking type double circling downhole drill
CN103398868A (en) * 2013-01-11 2013-11-20 河北科技大学 Specific-depth soil layer soil sample acquisition apparatus and acquisition method thereof
CN103615000A (en) * 2013-12-18 2014-03-05 上海强劲地基工程股份有限公司 Construction device of original-state earth-borrowing cast-in-place pile
CN203685020U (en) * 2014-01-14 2014-07-02 铁道第三勘察设计院集团有限公司 Super-light shallow hole sampling drill
CN104612154A (en) * 2014-12-24 2015-05-13 桐乡市天顺模具有限公司 Stressing self-tapping pile machine
CN206581897U (en) * 2017-03-20 2017-10-24 桐乡市天顺模具有限公司 Reinforce rig

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2581509Y (en) * 2002-04-01 2003-10-22 曹兴明 Three-purpose pile driver for drilling, vibration extracting and vibration tamping foundation large head pile
CN1467346A (en) * 2002-06-24 2004-01-14 颜可仁 Extrusion, fetching, multi-branch perfusion pile drill
JP2004316380A (en) * 2003-04-11 2004-11-11 Tetsuo Kesen Method for mounting pile and its mounting device
CN202755890U (en) * 2012-09-20 2013-02-27 瑞安市八达工程机械有限公司 Walking type double circling downhole drill
CN103398868A (en) * 2013-01-11 2013-11-20 河北科技大学 Specific-depth soil layer soil sample acquisition apparatus and acquisition method thereof
CN103615000A (en) * 2013-12-18 2014-03-05 上海强劲地基工程股份有限公司 Construction device of original-state earth-borrowing cast-in-place pile
CN203685020U (en) * 2014-01-14 2014-07-02 铁道第三勘察设计院集团有限公司 Super-light shallow hole sampling drill
CN104612154A (en) * 2014-12-24 2015-05-13 桐乡市天顺模具有限公司 Stressing self-tapping pile machine
CN206581897U (en) * 2017-03-20 2017-10-24 桐乡市天顺模具有限公司 Reinforce rig

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107587846A (en) * 2017-09-30 2018-01-16 桐乡市天顺模具有限公司 A kind of drilling cramp
CN107724386A (en) * 2017-09-30 2018-02-23 桐乡市天顺模具有限公司 A kind of stake machine

Also Published As

Publication number Publication date
CN106677713B (en) 2018-08-21

Similar Documents

Publication Publication Date Title
US4109800A (en) Multi-stage well-drilling mast assembly
CN105502178B (en) A kind of telescopic arm crawler crane for possessing rotary digging function
CN106677713A (en) Stress drilling machine
CN108330972A (en) A kind of stirring piling all-in-one machine
CN206581897U (en) Reinforce rig
CN201024903Y (en) An artesian well tower
CN102303821B (en) Luffing tower crane with balanced type suspension arm based on traction luffing of steel rope
CN202296907U (en) Suspension arm balanced movable arm tower crane capable of luffing based on steel rope traction
CN101016827A (en) 18 m hydraulic pressure rise and fall retractable drill tower
CN202064840U (en) Four-drill column drill derrick
CN104533303B (en) To lie prone before a kind of mast of high pulling torque rotary drilling rig is folding formula transport structure
CN206987814U (en) A kind of plate-hammer crusher of improved structure
CN201513126U (en) Straight-oblique dual purpose hydraulic steel rope drilling tower
CN214031468U (en) Main platform of crawler crane
CN204571852U (en) To lie prone before a kind of mast of high pulling torque rotary drilling rig is folding formula transport structure
CN205100216U (en) Dismantled and assembled composite pile erects heavy formula floating pile driver
CN107420041A (en) One kind is without boring tower all-hydraulic power head rock-core borer
CN206468301U (en) A kind of balanced type gooseneck boom
CN113236122A (en) Rotary drilling rig
CN202401964U (en) Long spiral long-hole drilling machine
CN205527417U (en) Possesses flexible arm caterpillar crane who digs function soon
CN206280005U (en) A kind of device of control drill hole of drilling machine perpendicularity
CN217380427U (en) Integral lifting structure of derrick and base of land drilling machine
CN210564407U (en) Geological exploration drilling tower
JP2009046216A (en) Jib crane, and its raising/lowering method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: Wutong street of Tongxiang city 314500 Jiaxing City, Zhejiang province Qi Road No. 186 building two

Patentee after: Jiaxing Tiangang mechanical equipment Co., Ltd

Address before: Wutong street of Tongxiang city 314500 Jiaxing City, Zhejiang province Qi Road No. 186 building two

Patentee before: TONGXIANG TIANSHUN MOULD Co.,Ltd.

CP01 Change in the name or title of a patent holder