CN106677226A - Flexible barrier having restoration and vertical obstruction functions and preparation and application thereof - Google Patents

Flexible barrier having restoration and vertical obstruction functions and preparation and application thereof Download PDF

Info

Publication number
CN106677226A
CN106677226A CN201611022133.4A CN201611022133A CN106677226A CN 106677226 A CN106677226 A CN 106677226A CN 201611022133 A CN201611022133 A CN 201611022133A CN 106677226 A CN106677226 A CN 106677226A
Authority
CN
China
Prior art keywords
function
vertical divider
flexible barrier
vertical
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611022133.4A
Other languages
Chinese (zh)
Inventor
霍成立
刘力奇
刘泽军
甄胜利
刘勇
郑中华
郑峰
孙晓东
洪慧兰
贺真
郭智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Geoenviron Engineering and Technology Inc
Original Assignee
Beijing Geoenviron Engineering and Technology Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Geoenviron Engineering and Technology Inc filed Critical Beijing Geoenviron Engineering and Technology Inc
Priority to CN201611022133.4A priority Critical patent/CN106677226A/en
Publication of CN106677226A publication Critical patent/CN106677226A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/002Ground foundation measures for protecting the soil or subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/004Sealing liners

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a flexible barrier having restoration and vertical obstruction functions. The flexible barrier having the restoration and vertical obstruction functions comprises a restoration functional portion and a vertical obstruction portion. The restoration functional portion comprises two layers of nonwoven geotextile and a restoration functional material layer placed between the two layers of nonwoven geotextile. The vertical obstruction portion is composed of HDPE geomembrane. The vertical obstruction portion is fixed to the outer side of one of the two layers of nonwoven geotextile of the restoration functional portion. The flexible barrier having the restoration and vertical obstruction functions is established in the manner that the restoration functional portion and the HDPE geomembrane are combined, the problems that a traditional vertical anti-seepage barrier do not have the restoration function, and a permeable reactive barrier do not have the vertical obstruction function are solved, and the flexible barrier having the restoration and vertical obstruction functions has the advantages of being simple in construction, good in anti-seepage effect, good in restoration function and the like.

Description

With the flexible barrier and its preparation and application repaired with vertical divider function
Technical field
The present invention relates to subsoil water antiseepage and environment remediation field, and in particular to one kind has repairs and vertical divider function Flexible barrier and its preparation and application.
Background technology
With the fast development of China's industry, environmental pollution is caused also to be on the rise.Some chemical industry, the heap of bargh Field, dump leaching field, Tailings Dam etc. lack effective seepage control measure, cause industrial waste (liquid), chemical products, slag etc. to soil and Body of groundwater causes pollution, the environment that serious harm people depend on for existence.
The permeable reactive wall technology filled based on nano zero valence iron is widely used for containing heavy metal, petroleum hydrocarbon, nitro The groundwater remediation of aromatic is processed.Permeable reactive wall recovery technique has simple to operate, flexible arrangement, operating cost Low, the advantage of environment Small side effects is a kind of attractive groundwater remediation technology.But substantial amounts of test shows:By Its surface is set easily to be oxidized and be susceptible to reunite in the special construction of nano zero valence iron so as to which reactivity is reduced.Secondly, it is long The subsoil water souring of phase also results in the loss of Zero-valent Iron so as to be difficult to reach preferable repairing effect.Therefore, based on oozing Transflection answers wall technology difficulty or ease effectively to realize the vertical divider to pollutant.
Vertical seepage control can effectively realize the vertical divider to pollutant, control lateral transfer and the diffusion of pollutant.In State's patent CN104499510A discloses compound vertical seepage control barrier with CN104805871A, adopts HDPE geomembranes for main body Impervious material, vertical seepage control barrier is laid to realize the vertical divider to pollutant by vertical channel technique to contaminated site. The vertical seepage control barrier has the advantages that good seepage-proof property, wide adaptability, its osmotic coefficient k≤1.0 × 10-7cm/s.But, should Vertical seepage control barrier is, in contaminated site, can not to realize repairing pollutant in the way of physics by pollutant vertical divider Multiple degraded.
The content of the invention
The invention solves the problems that key technical problem be that existing permeable reactive wall does not possess effective vertical divider function, vertically Intercepting wall cannot realize repair function.
A kind of flexible barrier with reparation with vertical divider function that the present invention is provided, including:
Repair function portion, it includes:Two-layer non-woven geotextile and the repair function material being located between the harmless geotextiles of two-layer The bed of material;
Vertical divider portion, it is made up of HDPE geomembranes, and wherein the one of the repair function portion is fixed in the vertical divider portion The outside of non-woven geotextile.
Preferably, the non-woven geotextile is one kind or its combination of polyester-type or polypropylene non-woven geotextile, described The gram weight specification 300g/m of non-woven geotextile2~600g/m2.It is highly preferred that the non-woven geotextile spins for high-strength thick denier polypropylene Viscous needle-punched geotextiles.
The thickness of the repair function material layer is 3-5cm, and the repair function material layer contains bentonite, attapulgite clay and receives The loaded mesoporous material of rice Zero-valent Iron.
Preferably, in the repair function material layer the loaded mesoporous material of bentonite, attapulgite clay and nano zero valence iron quality Than for 1 ~ 2:1~2:7.
The loaded mesoporous material of nano zero valence iron carries out loading the material for obtaining for mesoporous material Al-SBA-15 to nano zero valence iron Material Fe(0)The load capacity of/Al-SBA-15, wherein nano zero valence iron is 10-20wt%.
The preparation method of the repair function material of the repair function material layer comprises the steps:Take bentonite, attapulgite clay With the loaded mesoporous material mixing of nano zero valence iron, pelletize obtains final product.Preferably, swelling soil granularity in the repair function material layer For 200 mesh, attapulgite clay granularity is 400 mesh, and the grain diameter of repair function material is 0.5-2mm.
Adhesive layer is provided between the vertical divider portion and the repair function portion, adhesive layer is solid by the bonding of vertical divider portion Due to the outside of a wherein non-woven geotextile in the repair function portion.
The adhesive layer is rubberized asphalt non-cured water-proof coating layer.
The vertical divider portion is the thick HDPE geomembranes of 2mm ~ 3mm.
The present invention also provides the above-mentioned preparation method with reparation with the flexible barrier of vertical divider function, including as follows Step:
1)The preparation of repair function material:The loaded mesoporous material mixing of bentonite, attapulgite clay and nano zero valence iron is taken, pelletize is obtained final product;
2)The preparation in repair function portion:Repair function material is laid on ground floor non-woven geotextile and forms repair function material Layer, then re-lays above it second layer non-woven geotextile, is then made by needling process using the fiber of non-woven geotextile Obtain ground floor non-woven geotextile and second layer non-woven geotextile is fixed together, and ground floor non-woven geotextile and second layer nonwoven soil Sandwiched repair function material layer in the middle of work cloth;
3)The fixation in vertical divider portion:Repair function portion is tiled first, then forms adhesive layer in its one side spraying adhesive, Vertical divider portion is covered on adhesive layer with fixation.
Specifically, repair function portion is tiled first, then rubberized asphalt non-cured water-proof coating is poured into during material is filled and is added Heat, when coating bulk temperature reaches sprayable state, is equably sprayed rubberized asphalt non-cured water-proof coating with flush coater On non-woven fabrics, timely bedding HDPE geomembranes in rear 30s have been sprayed, it is ensured that the bonding of repair function portion and HDPE geomembranes Property.
The present invention also provides above-mentioned with the application process repaired with the flexible barrier of vertical divider function, including following step Suddenly:
1)Fluting:Along the position vertical channel of contaminated site periphery, bottom land is excavated to underground impermeable stratum, in the mistake of vertical channel Mud off is adopted in journey;
2)It is described by being inserted in the slurry coat method of the vertical channel with reparation and the flexible barrier of vertical divider function To bottom land in vertical channel, wherein repair function portion is near contaminated side;
3)Slip casting:Soil and bentonite are constituted by plasticity mud injection bottom land using pumping mode, cover to away from described with reparation At the bottom 1-2m of the flexible barrier of vertical divider function;
4)Backfill:One of sand and clay or its mixture are backfilled in groove to remove slurry coat method.
It is further preferred that the preparation method of the repair function material is as follows:(1)、Fe(0)The preparation of/Al-SBA-15 Comprise the steps:, Al-SBA-15 mesoporous materials prepare.The deionization that P123 and Macrogol 4000 are dissolved into is taken first In water, it is uniformly dissolved in 40 °C of stirred in water bath, then weighs aluminum nitrate and be added in above-mentioned solution and be uniformly dissolved, keeps steady It is fixed constant, tetraethyl orthosilicate is added in above-mentioned solution, continue to stir 48h in 40 °C of water-bath, then product is turned Reactor is moved to, at a certain temperature hydro-thermal reaction 24h, last sucking filtration, washing, drying, and with 2 °C/min's under 650 °C Heating rate calcines 6h, obtains Al-SBA-15 mesoporous materials, wherein P123, Macrogol 4000, aluminum nitrate, tetraethyl orthosilicate Mass ratio be:40:20:1:40.、Fe(0)It is prepared by/Al-SBA-15.Ferrous sulfate is fully dissolved into first 100mL ethanol Aqueous solution, is subsequently adding Al-SBA-15 powder body ultrasonic disperse 5min in above-mentioned solution, after the completion of continue stir 20h, Ran Houzhuan In moving to the there-necked flask of 500mL, it is passed through nitrogen 15min and removes dissolved oxygen;State then up in solution add Polyethylene Glycol- 4000,30min is stirred, pH value is adjusted to into 6 with 1M NaOH solutions;Finally, in the case where constantly whisking, it is added dropwise over separatory funnel The aqueous solution of (1 drop/sec) 50mL potassium borohydrides, sustained response 40min again after dripping.Wherein ferrous sulfate, Al-SBA-15 powder Body, PEG-4000, the mass ratio of potassium borohydride are 4:4:1:2.After reaction, thing to be mixed sinks to bottom of bottle centrifugation and sinks Alternately washing 3 times of starch, the precipitate deionized deoxygenated water of gained and deoxidation dehydrated alcohol, dry in 70 °C in vacuum drying oven It is dry cooling to obtain Fe(0)/ Al-SBA-15 powder body.
The present invention's has following good effect with the flexible barrier and preparation method repaired with vertical divider function:
(1), nano zero valence iron is loaded using mesoporous material Al-SBA-15, is limited using the nano pore of mesoporous material Effect avoids the reunion of nano zero valence iron, reduces the surface energy and surface oxidation of nano zero valence iron, improves reactivity;In addition lead to Powder body pelletize is crossed, the loss of nano zero valence iron can be effectively reduced.
(2), compound in HDPE geomembranes using repair function portion, structure has the flexible screen repaired with vertical divider function concurrently Barrier, can preferably solve conventional vertical cut-pff wall and not have repair function, and permeable reactive wall does not possess vertical divider function Problem.
(3), the present invention has the advantages of construction is simple, and good seepage-proof property, repair function are good.
Description of the drawings
Fig. 1 is a kind of with the cross-sectional profile schematic diagram repaired with the flexible barrier of vertical divider function of the present invention.
Fig. 2 is that a kind of of the present invention cuts open with reparation with the repair function cross section of the flexible barrier of vertical divider function Face schematic diagram.
Specific embodiment
Below in conjunction with the accompanying drawings the invention will be further described with specific embodiment, so that those skilled in the art can be with It is better understood from the present invention and can be practiced, but illustrated embodiment is not as a limitation of the invention.
With reference to shown in Fig. 1,2, a kind of flexible barrier with reparation with vertical divider function of the present invention, including:
Repair function portion 1, as depicted in figs. 1 and 2, it is folded in two-layer non-woven geotextile by two-layer non-woven geotextile 101,103 Between repair function material 102 constitute;
Vertical divider portion 3, as shown in figure 1, it is made up of HDPE geomembranes, its of repair function portion 1 is fixed in vertical divider portion 3 In a non-woven geotextile outside;
Wherein, repair function portion 1 is bondd with vertical divider portion 3 by rubberized asphalt non-cured water-proof coating 2, and bonding is applied Work technique is spraying coating process.
Specifically, heretofore described non-woven geotextile is gram weight specification 300g/m2Or 600g/m2One kind or its combination, One kind or its combination of polyester-type or polypropylene non-woven geotextile;
Specifically, heretofore described repair function material is by bentonite, attapulgite clay, the loaded mesoporous material (Fe of nano zero valence iron (0)/Al-SBA-15) composition.Wherein the mass ratio of the loaded mesoporous material of bentonite, attapulgite clay, nano zero valence iron is 1 ~ 2:1~2:7, Repairing effect depends mainly on the ratio of the loaded mesoporous material of meter Zero-valent Iron, and mass fraction is optimal when being 7, and number is repaiied very little Multiple effect is too low, and number too greatly can not preferably pelletize.The number sum of bentonite and attapulgite clay is 3, by lamellar bentonite and Needle-like attapulgite clay is compounded, and granule can be made to have preferable adhesion strength.(Preferably bentonite, attapulgite clay, nano zero valence iron load is situated between The mass ratio of Porous materials is 2:1:7, now intercept and repair function is optimal), swelling soil granularity is 200 mesh, attapulgite clay granularity For 400 mesh, formed by powder body pelletize, grain diameter is 0.5-2mm.
Specifically, heretofore described geomembrane is the thick HDPE geomembranes of 2mm or 3mm.
Hereinafter, the present invention will be described for the concrete preparation method with reparation and the flexible barrier of vertical divider function:
(1), Fe is prepared(0)/ Al-SBA-15 powder body., first prepare Al-SBA-15 mesoporous materials.Weigh 50g P123 and 25g Macrogol 4000s are dissolved in the deionized water of 100mL, are uniformly dissolved in 40 °C of stirred in water bath, are then weighed 1.25g aluminum nitrates are added in above-mentioned solution and are uniformly dissolved, and holding stablizes constant, and the positive silicic acid second of 50g is added in above-mentioned solution Ester, continues to stir 48h in 40 °C of water-bath, then product is transferred to into reactor, hydro-thermal reaction 24h at 110 DEG C, Last sucking filtration, washing, drying, and 6h is calcined with the heating rate of 2 °C/min under 650 °C, obtain the mesoporous materials of Al-SBA-15 Material, wherein P123, Macrogol 4000, aluminum nitrate, the mass ratio of tetraethyl orthosilicate are:40:20:1:40., prepare Fe(0)/ Al-SBA-15.20g ferrous sulfate is fully dissolved into into 100mL ethanol waters, be subsequently adding 20g Al-SBA-15 powder body in Ultrasonic disperse 5min in above-mentioned solution, after the completion of continue stir 20h, in being then transferred to the there-necked flask of 500mL, be passed through nitrogen 15min removes dissolved oxygen;Addition 5g PEG-4000s in solution are stated then up, stir 30min, will with 1M NaOH solutions PH value is adjusted to 6;Finally, in the case where constantly whisking, the aqueous solution for being added dropwise over (1 drop/sec) 50mL potassium borohydrides with separatory funnel (contains 10g potassium borohydrides), sustained response 40min again after dripping.Wherein ferrous sulfate, Al-SBA-15 powder body, Polyethylene Glycol- 4000th, the mass ratio of potassium borohydride is 4:4:1:2.After reaction, thing to be mixed sinks to bottom of bottle centrifugation precipitate, gained it is heavy Alternately washing 3 times of starch deionized deoxygenated water and deoxidation dehydrated alcohol, Fe is obtained in 70 °C in vacuum drying oven Drying and cooling(0)The load capacity of/Al-SBA-15 powder body, wherein nano zero valence iron is 18%.
(2) repair function material, is prepared.According to bentonite, attapulgite clay, the loaded mesoporous material (Fe of nano zero valence iron(0)/Al- SBA-15 quality) is 1 ~ 2:1~2:7 ratio weighs each component, wherein swelling soil granularity be 200 mesh, attapulgite clay granularity be 400 Mesh.Each component is prepared into repair function material granule by powder granulator, grain diameter is 0.5-2mm.
(3) repair function portion, is prepared.The 101 laying repair function material 102, Ran Hou on ground floor non-woven geotextile Its top re-lays second layer non-woven geotextile 103, and then acupuncture makes each layer fix together using the fiber of nonwoven layer.This On bright ground floor non-woven geotextile 101 and second layer non-woven geotextile 103 be preferably the spun-bonded needle punched soil of high-strength thick denier polypropylene Work cloth, its feature:Have the advantages that intensity height, acid-alkali-corrosive-resisting are strong, higher intensity can be kept in contaminated site.
(4), prepare and there is the flexible barrier repaired with vertical divider function.Repair function portion 1 is tiled first, then will Rubberized asphalt non-cured water-proof coating 2 is poured into during material is filled and heated, when coating bulk temperature reaches sprayable state(150℃), Rubberized asphalt non-cured water-proof coating is equably sprayed on non-woven fabrics with special coating machine, has been sprayed and has been spread in time in rear 30s Lid HDPE geomembranes 3, it is ensured that repair function portion is in the caking property of HDPE geomembranes.
Hereinafter, with reparation the present invention is entered with a concrete application process of the flexible barrier of vertical divider function with a kind of Row explanation, application process comprises the steps:
1)Fluting:Along the position vertical channel of contaminated site periphery(The side of groove is Polluted area 10, and opposite side is uncontaminated area Domain 20), bottom land is excavated to underground impermeable stratum, using mud off during vertical channel;
2)HDPE geomembranes 3 and repair function portion 1 are carried out into spraying bonding with rubberized asphalt non-cured water-proof coating 2, obtains simultaneous Tool repairs the flexible barrier with vertical divider function;
3)By step 2)Gained has the slurry coat method repaired with the flexible barrier of vertical divider function in the vertical channel concurrently In be inserted in the vertical channel to bottom land, wherein repair function portion is near contaminated side;Barrier vertically hinders when installing Every portion on the outside of Polluted area, inner side is repair function portion, and pollutant are contacted after being repaired with repair function portion, then by vertical Blocking part is intercepted.
4)Slip casting:Soil and bentonite are constituted by plasticity mud 4 using pumping mode inject bottom land and cover to having away from described Repair at the bottom 1-2m with the flexible barrier of vertical divider function;
5)Backfill:One of sand and clay or its mixture are backfilled in groove to remove slurry coat method.
It is of the invention compared with traditional method, the present invention nano zero valence iron is born using mesoporous material Al-SBA-15 Carry, using the nano pore restriction effect of mesoporous material the reunion of nano zero valence iron is avoided, reduce the surface energy of nano zero valence iron And surface oxidation, improve reactivity;In addition by powder body pelletize, the loss of nano zero valence iron can effectively be reduced.Adopt simultaneously Compound in HDPE geomembranes with repair function portion, structure has the flexible barrier repaired with vertical divider function concurrently, can be preferable Solve conventional vertical cut-pff wall and there is no repair function, permeable reactive wall does not possess the problem of vertical divider function.Present invention tool There is the advantages of construction is simple, and good seepage-proof property, repair function are good.
Embodiment described above is only the preferred embodiment lifted to absolutely prove the present invention, the protection model of the present invention Enclose not limited to this.Equivalent substitute or conversion that those skilled in the art are made on the basis of the present invention, in the present invention Protection domain within.Protection scope of the present invention is defined by claims.

Claims (10)

1. it is a kind of with the flexible barrier repaired with vertical divider function, it is characterised in that to include:
Repair function portion, it includes:Two-layer non-woven geotextile and the repair function material being located between the harmless geotextiles of two-layer The bed of material;
Vertical divider portion, it is made up of HDPE geomembranes, and wherein the one of the repair function portion is fixed in the vertical divider portion The outside of non-woven geotextile.
2. it is according to claim 1 with the flexible barrier repaired with vertical divider function, it is characterised in that the reparation The thickness of function material layer is 3-5cm, and it is loaded mesoporous that the repair function material layer contains bentonite, attapulgite clay and nano zero valence iron Material.
3. it is according to claim 2 with the flexible barrier repaired with vertical divider function, it is characterised in that the reparation The mass ratio of the loaded mesoporous material of bentonite, attapulgite clay and nano zero valence iron is 1 ~ 2 in function material layer:1~2:7.
4. it is according to claim 2 with the flexible barrier repaired with vertical divider function, it is characterised in that nano zero-valence The loaded mesoporous material of ferrum carries out loading the material Fe for obtaining for mesoporous material Al-SBA-15 to nano zero valence iron(0)/Al-SBA- 15, the wherein load capacity of nano zero valence iron is 10-20wt%.
5. according to claim 2 ~ 4 with repairing and the flexible barrier of vertical divider function, it is characterised in that it is described to repair The preparation method of the repair function material of multiple function material layer comprises the steps:Take bentonite, attapulgite clay and nano zero valence iron to bear Mesoporous material mixing is carried, pelletize is obtained final product.
6. it is according to claim 1 with the flexible barrier repaired with vertical divider function, it is characterised in that described vertical Adhesive layer is provided between blocking part and the repair function portion, adhesive layer is adhesively fixed vertical divider portion in the repair function The outside of a wherein non-woven geotextile in portion.
7. it is according to claim 6 with the flexible barrier repaired with vertical divider function, it is characterised in that the bonding Layer is rubberized asphalt non-cured water-proof coating layer.
8. according to claim 1 with the flexible barrier repaired with vertical divider function, the vertical divider portion is 2mm ~ 3mm thick HDPE geomembranes.
9. described in claim 6 with the preparation method repaired with the flexible barrier of vertical divider function, it is characterised in that bag Include following steps:
1)The preparation of repair function material:The loaded mesoporous material mixing of bentonite, attapulgite clay and nano zero valence iron is taken, pelletize is obtained final product;
2)The preparation in repair function portion:Repair function material is laid on ground floor non-woven geotextile and forms repair function material Layer, then re-lays above it second layer non-woven geotextile, is then made by needling process using the fiber of non-woven geotextile Obtain ground floor non-woven geotextile and second layer non-woven geotextile is fixed together, and ground floor non-woven geotextile and second layer nonwoven soil Sandwiched repair function material layer in the middle of work cloth;
3)The fixation in vertical divider portion:Repair function portion is tiled first, then forms adhesive layer in its one side spraying adhesive, Vertical divider portion is covered on adhesive layer with fixation.
10. described in any one of claim 1 ~ 9 with the application process repaired with the flexible barrier of vertical divider function, it is special Levy and be, comprise the steps:
1)Fluting:Along the position vertical channel of contaminated site periphery, bottom land is excavated to underground impermeable stratum, in the mistake of vertical channel Mud off is adopted in journey;
2)It is described by being inserted in the slurry coat method of the vertical channel with reparation and the flexible barrier of vertical divider function To bottom land in vertical channel, wherein repair function portion is near contaminated side;
3)Slip casting:Soil and bentonite are constituted by plasticity mud injection bottom land using pumping mode, cover to away from described with reparation At the bottom 1-2m of the flexible barrier of vertical divider function;
4)Backfill:One of sand and clay or its mixture are backfilled in groove to remove slurry coat method.
CN201611022133.4A 2016-11-21 2016-11-21 Flexible barrier having restoration and vertical obstruction functions and preparation and application thereof Pending CN106677226A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611022133.4A CN106677226A (en) 2016-11-21 2016-11-21 Flexible barrier having restoration and vertical obstruction functions and preparation and application thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611022133.4A CN106677226A (en) 2016-11-21 2016-11-21 Flexible barrier having restoration and vertical obstruction functions and preparation and application thereof

Publications (1)

Publication Number Publication Date
CN106677226A true CN106677226A (en) 2017-05-17

Family

ID=58867615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611022133.4A Pending CN106677226A (en) 2016-11-21 2016-11-21 Flexible barrier having restoration and vertical obstruction functions and preparation and application thereof

Country Status (1)

Country Link
CN (1) CN106677226A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107363092A (en) * 2017-08-16 2017-11-21 武汉科技大学 The repair system and its application method of a kind of combined contamination soil
CN107700509A (en) * 2017-10-11 2018-02-16 苏州大学 Compound underground anti-seepage isolation wall construction and construction method
CN108330953A (en) * 2017-12-19 2018-07-27 苏州大学 New type compound underground anti-seepage swelling cob wall and its construction method
CN109056764A (en) * 2018-09-28 2018-12-21 北京高能时代环境技术股份有限公司 Compound impervious wall and its construction method for soft clay area landfill yard environmental protection
CN109837928A (en) * 2018-09-12 2019-06-04 中国环境科学研究院 The application method of seepage proof curtain, guide seepage control system and seepage proof curtain
WO2024036966A1 (en) * 2022-08-15 2024-02-22 中国矿业大学 Control method for composite metal ions in solid waste landfill

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1580422A (en) * 2003-08-14 2005-02-16 郎荣良 Earthworking composite material and its manufacture method
KR20080101145A (en) * 2007-05-16 2008-11-21 한국지질자원연구원 Shielding layer and method of multilayer soil addition restoring using the same
CN102701297A (en) * 2012-05-29 2012-10-03 华南师范大学 Mesoporous silicon dioxide microsphere-loaded zero-valent iron nanoparticle (SiO2@ FeOOH@ Fe) and preparation method and application thereof
CN104805871A (en) * 2015-04-30 2015-07-29 北京高能时代环境技术股份有限公司 Compound type perpendicular seepage-proofing screen and application thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1580422A (en) * 2003-08-14 2005-02-16 郎荣良 Earthworking composite material and its manufacture method
KR20080101145A (en) * 2007-05-16 2008-11-21 한국지질자원연구원 Shielding layer and method of multilayer soil addition restoring using the same
CN102701297A (en) * 2012-05-29 2012-10-03 华南师范大学 Mesoporous silicon dioxide microsphere-loaded zero-valent iron nanoparticle (SiO2@ FeOOH@ Fe) and preparation method and application thereof
CN104805871A (en) * 2015-04-30 2015-07-29 北京高能时代环境技术股份有限公司 Compound type perpendicular seepage-proofing screen and application thereof

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107363092A (en) * 2017-08-16 2017-11-21 武汉科技大学 The repair system and its application method of a kind of combined contamination soil
CN107363092B (en) * 2017-08-16 2020-01-24 武汉科技大学 Remediation system for composite contaminated soil and application method thereof
CN107700509A (en) * 2017-10-11 2018-02-16 苏州大学 Compound underground anti-seepage isolation wall construction and construction method
CN108330953A (en) * 2017-12-19 2018-07-27 苏州大学 New type compound underground anti-seepage swelling cob wall and its construction method
CN108330953B (en) * 2017-12-19 2021-01-15 苏州大学 Novel composite underground seepage-proofing bentonite wall and construction method thereof
CN109837928A (en) * 2018-09-12 2019-06-04 中国环境科学研究院 The application method of seepage proof curtain, guide seepage control system and seepage proof curtain
CN109056764A (en) * 2018-09-28 2018-12-21 北京高能时代环境技术股份有限公司 Compound impervious wall and its construction method for soft clay area landfill yard environmental protection
WO2020062340A1 (en) * 2018-09-28 2020-04-02 北京高能时代环境技术股份有限公司 Complex diaphragm wall for environmental protection of landfill in soft soil area, and construction method therefor
CN109056764B (en) * 2018-09-28 2021-02-09 北京高能时代环境技术股份有限公司 Composite impervious wall for environmental protection of landfill in soft soil area and construction method thereof
WO2024036966A1 (en) * 2022-08-15 2024-02-22 中国矿业大学 Control method for composite metal ions in solid waste landfill

Similar Documents

Publication Publication Date Title
CN106677226A (en) Flexible barrier having restoration and vertical obstruction functions and preparation and application thereof
KR101342975B1 (en) Eco soil and its construction method
CN206296294U (en) A kind of underground landfill heap body of the heavy metal pollution clayed soil based on flexible structure
CN110512589A (en) A kind of shallow-layer ultra-soft foundation curing method of vacuum Yield rainfall relation co-oxidation magnesium carbonization
CN106345801A (en) Dump leaching restoration system and restoration process of chromium pollution soil
CN108330953A (en) New type compound underground anti-seepage swelling cob wall and its construction method
CN213171564U (en) Composite low-permeability vertical separation reaction wall
CN106799395A (en) The construction method of contaminated site is repaired in a kind of environmentally friendly medicament injection in situ
WO2020062340A1 (en) Complex diaphragm wall for environmental protection of landfill in soft soil area, and construction method therefor
CN206090642U (en) Protective surface layer is passed through in landfill's prevention of seepage
CN110512591B (en) Reinforcing method for vacuum preloading and carbonization ultra-soft foundation by utilizing gas injection of guide pipe pile
CN111014226A (en) Ton package and landfill of soluble waste salt
CN107675702A (en) A kind of construction method of cinder from refuse incineration stake
CN205604306U (en) Perpendicular cut -pff wall of GCL
CN105174276A (en) High-efficiency impermeable polymer bentonite nano composite material and preparation method thereof
CN206279563U (en) A kind of heavy metal pollution clayed soil underground landfill heap body based on rigid structure
CN110512592A (en) A kind of consolidation process system of vacuum preloading benefit conduit stake gas injection carbonization ultra-soft foundation
CN104790282B (en) A kind of road surface with soft subgrade whitewashing processing means
CN207143849U (en) A kind of man-made lake polycrystalline substance for improving water body self-purification ability
CN207794062U (en) Compound underground anti-seepage swelling cob wall
CN103933696B (en) A kind of poisonous and harmful solid waste solidification and stabilization firming agent
CN207228279U (en) A kind of sinking greenery patches structure
CN102477282A (en) Antiseepage leak-stopping organic grouting material used for landfill and application method
CN107630437A (en) A kind of man-made lake polycrystalline substance for improving water body self-purification ability
CN212294214U (en) Ecological anti-seepage structure utilizing construction waste and sludge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170517