CN106677197A - Railway slope structural steel stiffened plain concrete column combination supporting structure and construction method thereof - Google Patents
Railway slope structural steel stiffened plain concrete column combination supporting structure and construction method thereof Download PDFInfo
- Publication number
- CN106677197A CN106677197A CN201710113928.4A CN201710113928A CN106677197A CN 106677197 A CN106677197 A CN 106677197A CN 201710113928 A CN201710113928 A CN 201710113928A CN 106677197 A CN106677197 A CN 106677197A
- Authority
- CN
- China
- Prior art keywords
- plain concrete
- slope
- shaped steel
- concrete columns
- energy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
- E02D17/207—Securing of slopes or inclines with means incorporating sheet piles or piles
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
The invention discloses a railway slope structural steel stiffened plain concrete column combination supporting structure and a construction method thereof. The railway slope type steel stiffened plain concrete column combination supporting structure is characterized by erecting structural steel stiffened plain concrete columns in rows at intervals on the outer side of a slope along a railway trend, arranging a circuit purlin on the waist parts of the structural steel stiffened plain concrete columns erected in rows, and arranging a crown beam on the top parts of the structural steel stiffened plain concrete columns erected in rows; and adopting the structural steel stiffened plain concrete columns and the crown beam as an anchoring base, which is provided with crown beam anchor ropes toward a slope soil body, and adopting the structural steel stiffened plain concrete columns and the circuit purlin as an anchoring base, which is provided with circuit purlin anchor ropes toward the slope soil body. According to the slope supporting structure provided by the invention, the mechanical operation is realized, the guarantee of engineering quality is greatly facilitated, the work efficiency is improved, the construction safety risk is reduced, and the labor intensity of constructors is reduced.
Description
Technical field
The present invention relates to slope retaining, more specifically applies the supporting construction in railway high slope rockmass and its construction
Method.
Background technology
In prior art, for railway slope supporting often uses friction pile, existed using the manually digging hole filling pile of big cross section
Toe is in a row laid, and reaching slope retaining prevents the effect of side slope slump.To meet mechanical requirements, friction pile its pile body section
Greatly, it is difficult to arrange on steep side slope, and its pile body is artificial digging pile, manually digging hole high labor intensive, speed of application be slow,
Poor stability.High falling in work progress, object strike, cave in hole, the safety problem such as poisonous gas poisoning all the time
Workmen is formed safely and is threatened.Workmen in work progress be to carry out the passive strick precaution based on self-protection, can not
The accident for avoiding happens occasionally.
The content of the invention
The present invention is to avoid the weak point existing for above-mentioned prior art, there is provided a kind of railway slope shaped steel is put more energy into element
Concrete column combination supporting construction and its construction method, by improving supporting construction, enable slope retaining to realize that machinery is turned into
Industry, improves the efficiency of construction of slope retaining, reduces the security risk in construction.
The present invention is adopted the following technical scheme that to solve technical problem:
Railway slope shaped steel of the present invention put more energy into plain concrete columns combined support structure the characteristics of be:Along oriented railway in side slope
Outside in a row, and the vertical shaped steel of septal branch put more energy into plain concrete columns, set in the put more energy into waist of plain concrete columns of the shaped steel of Zhi Li in a row
It is equipped with and encloses purlin, the top setting Guan Liang of plain concrete columns of putting more energy in the shaped steel of Zhi Li in a row;Put more energy into plain concrete with the shaped steel
Post and Guan Liang arrange Guan Liang anchor cable towards in slope soil as anchoring base, and put more energy into plain concrete columns with the shaped steel and enclose
Purlin is arranged towards in slope soil for anchoring base and encloses purlin anchor cable.
Railway slope shaped steel of the present invention put more energy into plain concrete columns combined support structure the characteristics of lie also in:The Guan Liang anchor cable
With enclose purlin anchor cable in slope soil towards downward-sloping.
Railway slope shaped steel of the present invention put more energy into plain concrete columns combined support structure construction method the characteristics of be by as follows
Step is carried out:
Step a, draw hole on slope construction platform and shaped steel is put in hole to designed elevation, pour and safeguard concrete shape
Put more energy into plain concrete columns into shaped steel;
The elevation of bottom of step b, the plain concrete columns excavation slope soil body to Guan Liang of putting more energy into along shaped steel, bores in anchor hole position
Hole is constructed, and inserts Guan Liang anchor cable, immediately slip casting after reaching drilling depth;
Step c, the position according to Guan Liang anchor cable and angle fix aperture after-pouring Guan Liang concrete, in the coagulation of Guan Liang
When native intensity reaches 100%, stress is applied to Guan Liang anchor cable;
Step d, the plain concrete columns excavation slope soil body of putting more energy into along shaped steel are bored to the elevation of bottom for enclosing purlin in anchor hole position
Hole is constructed, and purlin anchor cable is enclosed in insertion after reaching drilling depth, slip casting immediately;
Step e, basis encloses the position of purlin anchor cable and angle fixes aperture after-pouring and encloses purlin concrete, is enclosing the coagulation of purlin
When native intensity reaches 100%, apply stress to enclosing purlin anchor cable;Continue on shaped steel and put more energy into the plain concrete columns excavation slope soil body extremely
Substrate completes construction.
Compared with the prior art, the present invention has the beneficial effect that:
1st, the present invention is enable slope retaining to realize do mechanization operation, greatly reduces construction by improving supporting construction
The labor intensity of personnel.
2nd, the present invention has no effect on normal excavation construction, as side slope defines effective supporting, is greatly beneficial to
The guarantee of construction quality, improves work efficiency.
3rd, the present invention can extensively model suitable for various slope retainings construction, especially for short time limit, features as poor geologic condition, application
Region is wide, can greatly reduce construction safety risk.
Description of the drawings
Fig. 1 is supporting construction schematic front view in the present invention;
Fig. 2 is supporting construction sectional schematic diagram in the present invention;
Label in figure:1 shaped steel is put more energy into plain concrete columns, 2 Guan Liangs, 3 Guan Liang anchor cables, and 4 enclose purlin, and 5 enclose purlin anchor cable, 6 side slopes soil
Body.
Specific embodiment
Referring to Fig. 1, in the present embodiment, railway slope shaped steel plain concrete columns combined support structure of putting more energy into is:Along oriented railway
On the outside of the side slope in a row, and the vertical shaped steel of septal branch put more energy into plain concrete columns 1, shaped steel put more energy into plain concrete columns 1 be using shaped steel as
Beaer, ensures shaped steel position with plain concrete;It is provided with and encloses purlin in the put more energy into waist of plain concrete columns 1 of the shaped steel of Zhi Li in a row
4, the top setting Guan Liang 2 of plain concrete columns 1 of putting more energy in the shaped steel of Zhi Li in a row;Put more energy into plain concrete columns 1 and Guan Liang 2 with shaped steel
Guan Liang anchor cable 3 is set towards in slope soil 6 for anchoring base, and plain concrete columns 1 is put more energy into shaped steel and purlin 4 is enclosed as anchoring base
Seat is arranged towards in slope soil 6 and encloses purlin anchor cable 3;Guan Liang anchor cable 3 and purlin anchor cable 5 is enclosed in slope soil 6 towards downward-sloping.
In the present embodiment, the put more energy into construction method of plain concrete columns combined support structure of railway slope shaped steel is by following step
Suddenly carry out:
Step 1, draw hole using machinery on slope construction platform and shaped steel is put in hole to designed elevation, pour maintenance
Concrete forms shaped steel and puts more energy into plain concrete columns 1.
The elevation of bottom of step 2, the 1 excavation slope soil body 6 of plain concrete columns to Guan Liang 2 of putting more energy into along shaped steel, in anchor hole position
Drilling construction is put, after reaching drilling depth, Guan Liang anchor cable 3, immediately slip casting is inserted.
Step 3, the position according to Guan Liang anchor cable 3 and angle fix aperture after-pouring Guan Liang concrete, in the mixed of Guan Liang 2
When solidifying soil intensity reaches 100%, stress is applied to Guan Liang anchor cable 3, the locking of Guan Liang anchor cable 3 is realized;
Step 4, the 1 excavation slope soil body 6 of plain concrete columns of putting more energy into along shaped steel to the elevation of bottom for enclosing purlin 4, in anchor hole position
Drilling construction is put, purlin anchor cable 5 is enclosed in insertion after reaching drilling depth, slip casting immediately;
Step 5, basis encloses the position of purlin anchor cable 5 and angle fixes aperture after-pouring and encloses purlin concrete, is enclosing the mixed of purlin 4
When solidifying soil intensity reaches 100%, apply stress to enclosing purlin anchor cable 5, the locking of purlin anchor cable 5 is enclosed in realization;Subsequently, you can continue on
Shaped steel put more energy into the 1 excavation slope soil body 6 to substrate of plain concrete columns complete construction.
In being embodied as, hole depth, aperture and angle are must assure that when machinery draws hole, for Guan Liang anchor cable 3 and enclose purlin anchor
The anchor hole drilling of rope 5, needs borehole cleaning after projected depth is reached;Guan Liang anchor cable 3 should add concrete with the anchored end for enclosing purlin anchor cable 5
End socket, to protect anchored end, and needs before the mounting through antirust treatment.
Claims (3)
1. a kind of railway slope shaped steel is put more energy into plain concrete columns combined support structure, it is characterized in that:Along oriented railway outside side slope
Side in a row, and the vertical shaped steel of septal branch put more energy into plain concrete columns (1), the waist of plain concrete columns (1) of putting more energy in the shaped steel of Zhi Li in a row
Portion is provided with and encloses purlin (4), top setting Guan Liang (2) of plain concrete columns (1) of putting more energy in the shaped steel of Zhi Li in a row;With the shaped steel
Plain concrete columns (1) and the Guan Liang (2) of putting more energy into arranges Guan Liang anchor cable (3) towards in slope soil (6) as anchoring base, and with institute
State shaped steel and put more energy into and plain concrete columns (1) and enclose purlin (4) and enclose purlin anchor cable (3) towards arranging in slope soil (6) for anchoring base.
2. railway slope shaped steel according to claim 1 is put more energy into plain concrete columns combined support structure, it is characterized in that:It is described
Guan Liang anchor cable (3) and purlin anchor cable (5) is enclosed in slope soil (6) towards downward-sloping.
3. the railway slope shaped steel described in a kind of claim 1 is put more energy into the construction method of plain concrete columns combined support structure, its
It is characterized in that:
Step a, draw hole on slope construction platform and shaped steel is put in hole to designed elevation, pour and safeguard concrete formation type
Steel is put more energy into plain concrete columns (1);
The elevation of bottom of step b, plain concrete columns (1) the excavation slope soil body (6) to Guan Liang (2) of putting more energy into along shaped steel, in anchor hole
Position drilling construction, inserts Guan Liang anchor cable (3), immediately slip casting after reaching drilling depth;
Step c, the position according to Guan Liang anchor cable (3) and angle fix aperture after-pouring Guan Liang concrete, in the mixed of Guan Liang (2)
When solidifying soil intensity reaches 100%, stress is applied to Guan Liang anchor cable (3);
Step d, plain concrete columns (1) the excavation slope soil body (6) of putting more energy into along shaped steel to the elevation of bottom for enclosing purlin (4), in anchor hole
Position drilling construction, insertion after reaching drilling depth enclose purlin anchor cable (5), immediately slip casting;
Step e, basis encloses the position of purlin anchor cable (5) and angle fixes aperture after-pouring and encloses purlin concrete, is enclosing the mixed of purlin (4)
When solidifying soil intensity reaches 100%, apply stress to enclosing purlin anchor cable (5);Continue on shaped steel put more energy into plain concrete columns (1) excavate side
The slope soil body (6) to substrate completes construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710113928.4A CN106677197A (en) | 2017-02-28 | 2017-02-28 | Railway slope structural steel stiffened plain concrete column combination supporting structure and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710113928.4A CN106677197A (en) | 2017-02-28 | 2017-02-28 | Railway slope structural steel stiffened plain concrete column combination supporting structure and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106677197A true CN106677197A (en) | 2017-05-17 |
Family
ID=58862161
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710113928.4A Pending CN106677197A (en) | 2017-02-28 | 2017-02-28 | Railway slope structural steel stiffened plain concrete column combination supporting structure and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106677197A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004100237A (en) * | 2002-09-09 | 2004-04-02 | Koji Kurihara | Earth retaining structure making use of steel-made screen |
CN203174614U (en) * | 2013-06-08 | 2013-09-04 | 郭红标 | Prestressed anchor cable pile slab wall |
CN105201525A (en) * | 2015-10-19 | 2015-12-30 | 河南理工大学 | Repairable bottom heave control method |
CN206503151U (en) * | 2017-02-28 | 2017-09-19 | 中铁上海工程局集团有限公司 | Railway slope shaped steel is put more energy into plain concrete columns combined support structure |
-
2017
- 2017-02-28 CN CN201710113928.4A patent/CN106677197A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004100237A (en) * | 2002-09-09 | 2004-04-02 | Koji Kurihara | Earth retaining structure making use of steel-made screen |
CN203174614U (en) * | 2013-06-08 | 2013-09-04 | 郭红标 | Prestressed anchor cable pile slab wall |
CN105201525A (en) * | 2015-10-19 | 2015-12-30 | 河南理工大学 | Repairable bottom heave control method |
CN206503151U (en) * | 2017-02-28 | 2017-09-19 | 中铁上海工程局集团有限公司 | Railway slope shaped steel is put more energy into plain concrete columns combined support structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105781571A (en) | Construction method for soft rock deformation tunnel lining support dismantling-replacing arch | |
CN105937396B (en) | A kind of method for protecting support of ridge ridge section highly stress soft rock stress constructing tunnel Deformation control | |
CN104612713B (en) | Buried section of method for tunnel construction of an ultra shallow | |
CN105134269B (en) | Control method for roadway surrounding rock achieving cooperative load bearing by enabling anchor cables to penetrate through sheds | |
CN109372556A (en) | A kind of sandwich arch and construction method suitable for high stressed soft rock tunnel supporting roadway surrounding rock | |
CN106245931A (en) | The underpinning device of load bearing wall and construction method in brick mix structure | |
CN109930609A (en) | A kind of campshed composite supporting construction and its construction method for upper-soft lower-hard ground | |
JP6523064B2 (en) | Pipe type surface collapse prevention facility and construction method of pipe type surface collapse prevention facility | |
CN206503151U (en) | Railway slope shaped steel is put more energy into plain concrete columns combined support structure | |
CN105887948A (en) | Inclination resetting, deviation correction and reinforcement method for anti-slide pile | |
CN110080775A (en) | Complex environment digs a well basic microvariations excavation method | |
CN107420115A (en) | A kind of shallow-depth-excavation tunnel fall changes arch processing unit and its processing method | |
CN107012874A (en) | A kind of upper-soft lower-hard ground subway station building enclosure | |
CN111549804B (en) | Cutting slope reinforced passive protection system and construction method thereof | |
CN104612719B (en) | The anti-collapse processing method in a kind of soft rock tunnel hole | |
CN105156111B (en) | The method for protecting support of high working face lane formula filling Striping noise | |
CN106677197A (en) | Railway slope structural steel stiffened plain concrete column combination supporting structure and construction method thereof | |
CN205576907U (en) | Anchor rope structure for side slope support retaining wall | |
CN209243910U (en) | A kind of side slope building structure | |
CN204199296U (en) | Based on the foundation pit supporting construction of old outer wall of basement structure | |
CN105970990A (en) | Excavation and dado construction process for tilting type superlarge-section single-pile foundation | |
CN113605401B (en) | Foundation pit steel structure supporting system and construction method thereof | |
CN104947694A (en) | Earth slope grouting reinforcement construction method | |
CN212358029U (en) | Tunnel type anchorage structure for cable crane | |
CN104632246B (en) | A kind of UNDERGROUND STRUCTURES |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170517 |
|
RJ01 | Rejection of invention patent application after publication |